200-FT SHORELINE
SETBACK PER CITY
OF RENTON
I
I
I
MATCHLINE, SEE SHEET C500-2K
4), Ber erABAM INSALLATION OF RETAINING WALLS TO BE COMPLETED UNDER
CALL 48 HOURS " A SEPARATE BUILDING PERMIT
BEFORE YOU DIG 33301 9th Avenue South, Suite 300
Federal Way, Washington 98003-2600
1-800-424-5555 (206) 431-2300 Fax: (206) 431-2250
SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE
- APRON R INFRASTRUCTURE W4700331 ABAM SPT 06/08/18
A CONST.PHASING & PIPE DEPTH W4700331 ABAM SPT 10/09/18
P.
of WA �f
x
31271 w�
��ssioNaL V-�`�'�
--—— — — — — — -
I
I
I
I
I
I
I
I
1 " = 20' 20 0 20 40
scale feet
DRAWN DATE SUBTITLE
ACCEPTABILITY JDM 06/08/18
THIS DESIGN AND/OR CHECKED
SPECIFICATION IS APPROVED SPT 06/08/18
ENGINEER TITLE
APPROVED BY DEPT. I DATE BEE 06/08/18
■Sill■\I�
SUBGRADE IMPROVEMENT BENCH ELEVATION: 7.5 FT
IN —WATER FILL
+ + + + SUBGRADE IMPROVEMENT BENCH ELEVATION: 13.0 FT
*BENCH ELEVATION IS DEFINED AS THE BOTTOM OF SUBGRADE IMPROVEMENTS
AND THE TOP OF DRIVEN TIMBER PILE. SEE GENERAL NOTE 3.
GENERAL NOTES
1. HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM, NORTH
ZONE, NORTH AMERICA DATUM 1983(91). VERTICAL DATUM: NATIONAL
GEODETIC VERTICAL DATUM 1929 (NGVD29). VERTICAL DATUM CONVERSION:
NGVD29 TO THE NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) _
NGVD29 + 3.60 FEET.
2. THERE SHALL BE NO EXPOSED GALVANIZED MATERIALS, COATINGS OR ZINC
APPLIED SURFACE TREATMENTS ON ANY EXTERIOR OR UNDERGROUND
MATERIALS OR SURFACES. ALL GALVANIZED OR ZINC APPLIED MATERIALS
OR COATINGS SHALL BE PERMANENTLY PAINTED OR COATED TO PREVENT
EXPOSURE OF THE GALVANIZED/ZINC MATERIALS PRIOR TO INSTALLATION
OR COMPLETION OF CONSTRUCTION.
3. THE MUDLINE ELEVATIONS SHOWN BELOW PILE SUPPORTED STRUCTURES IN
THESE PLANS ARE ASSUMED. TOP OF PILE/BOTTOM OF SUBGRADE SHALL
BE ELEVATION 13.0 OR 2 FEET BELOW THE FIELD VERIFIED MUDLINE,
WHICHEVER IS DEEPER.
4. SUBGRADE IMPROVEMENTS SHALL BE CONSTRUCTED PER DETAIL 2 ON
SHEET C500-2S.
5. IN -WATER FILL SHALL BE CONSTRUCTED PER DETAIL 3 ON SHEET
C500-2S.
6. SEE STRUCTURAL PLANS FOR STAGED DEMOLITION OF PILE SUPPORTED
STRUCTURES, TEMPORARY SHEET PILE CONTAINMENT WALL, AND PERMANENT
CONCRETE STEM WALL DETAILS.
CONSTRUCTION NOTES
TEMPORARY SHEET PILE CONTAINMENT WALL
DRIVE EXISTING TIMBER PILE TO BENCH ELEVATION OR 2'-0" MINIMUM BELOW
EXISTING MUDLINE. SEE GENERAL NOTE 3.
SUBGRADE IMPROVEMENT BENCH ELEVATION SHALL BE A MINIMUM OF 2 FEET
BELOW PROPOSED UTILITIES AND SPAN ACROSS A MINIMUM OF 2 PILES.
CIVIL PERMIT
SUBGRADE IMPROVEMENT PLAN - SHEET 3
KEY PLAN
SCALE: N.T.S.
R-401352
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
afowler 12/20/2018
W4700331 J' ""' A ""' ` 10/09/ 18
APRON R INFRASTRUCTURE C500-2L C35
RENTON SITE JOB NO. COMP NO.
W4700331
SITE RENTON, WA DWG NO. 4—APRON—R—0500-2L
CIVIL MASTER