Loading...
HomeMy WebLinkAboutR_4013825 LF 8" HDPE ® 0.2%--\ SDCO N-185885.27 I O LU 75 N 00 N L 0 z E 0 c 0 ca J SITE SPECIFIC DATA PROJECT NUMBER 4851 PROJECT NAME SOUTH SHORE OF LAKE WA - APRON R PROJECT LOCATION RENTON, WA STRUCTURE ID RTU-014 TREATMENT REQUIRED VOLUME BASED (CF) FLOW BASED (CFS) *0.256 TREATMENT HGL AVAILABLE (FT) N/A PEAK BYPASS REQUIRED (CFS) - IF APPLICABLE 0.904 PIPE DATA I.E. MATERIAL DIAMETER INLET PIPE 16. JO HDPE 8" OUTLET PIPE 15.20 HDPE 8" PRETREATMENT BIOFIL IRA TION DISCHARGE RIM ELEVATION 18.70 18.70 18.70 SURFACE LOAD 120 KIPS 120 KIPS 120 KIPS FRAME & COVER J6" x J6n J6" x 74" 2 " J6 J6 374 6 , 30 " X 30 " INDUSTRIAL MEDIA VOLUME (CY) 4.15 INDUSTRIAL MEDIA DELIVERY METHOD PER CONTRACT ORIFICE SIZE (DIA. INCHES) 02.4J" 17: TWO MWS UNITS WILL PROVIDE THE REQUIRED TREATMENT NEENAH FOUNDRY NEENAH FOUNDRY PATENTED R-J498-R2S SPRING R-J498-RJS SPRING PERIMETER ASSIST HATCHES f INDUSTRIAL MEDIA ASSIST HATCH VOID AREA CIL I BED NEENAH FOUNDRY R-3498-RJS SPRING ASSIST HATCH .-:.-.-..- :..-:..-------------- --- T - --- - - - - - - -- ----c VERTICALI -�� , - - i �i-�.' e+�c ;r a� •=�+ : • Cf:.'"?�:y' .. �✓ -� sib I UNDERDR41N I %' tcy ' � i v,•I MANIFOLD ' 's r, � ;# � f INLET PIPE i I ❑ ❑ ❑ ' ❑ ❑ 1 SEE NOTES ' El El ❑❑ ❑❑ °❑❑ 0❑1 L r f A TPRE -FILTER CARTRIDGE 1&70 INSTALLATION NOTES 16.JO 1. CONTRACTOR TO PROVIDE ALL LABOR, EQUIPMENT, MATERIALS AND P 0 INCIDENTALS REQUIRED TO OFFLOAD AND INSTALL THE SYSTEM AND NEENAH FOUNDRY R-J498-RJS SPRING ASSIST HATCH `- DRAIN DOWN LINE � R� LEFT E N D VIEW PLAN VIEW NEENAH FOUNDRY OUTLET PIPE R-J498-R2 SPRING SEE NOTES ASSIST HATCH I - i - ^ APPURTENANCES IN ACCORDANCE WITH THIS DRAWING AND THE MANUFACTURERS SPECIFICATIONS, UNLESS OTHERWISE STATED IN WALE I MANUFACTURERS CONTRACT. 6" 20'-0" 6" 2. UNIT MUST BE INSTALLED ON LEVEL BASE. MANUFACTURER 15.20 RECOMMENDS A MINIMUM 6" LEVEL ROCK BASE UNLESS SPECIFIED BY 21 '--O ` THE PROJECT ENGINEER. CONTRACTOR IS RESPONSIBLE TO VERIFY PROJECT ENGINEERS RECOMMENDED BASE SPECIFICATIONS J. ALL PIPES MUST BE FLUSH WITH INSIDE SURFACE OF CONCRETE. (PIPES CANNOT INTRUDE BEYOND FLUSH). INVERT OF OUTFLOW PIPE MUST BE FLUSH WITH DISCHARGE CHAMBER FLOOR. ALL GAPS AROUND PIPES SHALL BE SEALED WATER TIGHT WITH A NON -SHRINK GROUT PER MANUFACTURERS STANDARD CONNECTION DETAIL AND SHALL MEET OR EXCEED REGIONAL PIPE CONNECTION STANDARDS. 4. CONTRACTOR TO SUPPLY AND INSTALL ALL EXTERNAL CONNECTING PIPES. 5. CONTRACTOR RESPONSIBLE FOR INSTALLATION OF ALL RISERS, MANHOLES, AND HATCHES CONTRACTOR TO GROUT ALL MANHOLES AND HATCHES TO MATCH FINISHED SURFACE UNLESS SPECIFIED OTHERWISE. 6. DRIP OR SPRAY IRRIGATION REQUIRED ON ALL UNITS WITH VEGETATION. GENERAL NOTES 1. MANUFACTURER TO PROVIDE ALL MATERIALS UNLESS OTHERWISE NOTED. 2. ALL DIMENSIONS, ELEVATIONS, SPECIFICATIONS AND CAPACITIES ARE SUBJECT TO CHANGE. FOR PROJECT SPECIFIC DRAWINGS DETAILING EXACT DIMENSIONS, WEIGHTS AND ACCESSORIES PLEASE CONTACT MANUFACTURER. SYM REVISION BY APPROVED DATE SYM APRON R INFRASTRUCTURE W4700331 ABAM SPT 06/08/18 A CITY OF RENTON COMMENTS W4700331 ABAM SPT 10/01/18 ELEVATION VIEW INTERNAL BYPASS DISCLOSURE: THE DESIGN AND CAPACITY OF THE PEAK CONVEYANCE METHOD TO BE REVIEWED AND APPROVED BY THE ENGINEER OF RECORD. HGL(S) AT PEAK FLOW SHALL BE ASSESSED TO ENSURE NO UPSTREAM FLOODING. PEAK HGL AND BYPASS CAPACITY SHOWN ON DRAWING ARE USED FOR GUIDANCE ONLY. LOW INFLOW PIPE DISCLOSURE: IT IS RECOMMENDED THAT A SUFFICIENT VARIATION IN ELEVATION BETWEEN THE INLET AND OUTLET BE PROVIDED TO ALLOW FOR ACCUMULATION OF SEDIMENT IN THE PRE-TREATMENT CHAMBER. FAILURE TO DO SO MAY RESULT IN BLOCKAGE AT INFLOW POINT(S) WHICH MAY CAUSE UPSTREAM FLOODING. /11 o NEENAH FOUNDRY NEENAH FOUNDRY i R-3498-P2S R-3498-R3S SPRING SPRING ASSIST ASSIST HATCH HATCH CIL J7 Ll R R R RIGHT END VIEW NEAR MODULAR WETLAND SYSTEM RTU-014 C500-3C SCALE: NTS REVISION BY I APPROVED I DATE P. of WAsh� �f x 31271 w� ��ssioNaL rw�rosrr ,_vuwir RTU-013 0 1 -3U 9 LF 8" HDPE @ 0.6% SDCO N-185855.72 E-1299949.86 RIM = 15.92 IE = 15.17 9 LF 8" HDPE @ 0.2% RTU-014 PLAN N SCALE: NTS AIRCRAFT RATED HATCHES 72" X 36" DOUBLE NEENAH R-3498-R3S 62" X 36" DOUBLE EAST JORDAN 8196-DOUBLE 36" X 36" SINGLE NEENAH R-3498-R2S 24" DIA ROUND NEENAH R-3492 NOTES: 1. ALL VAULT STRUCTURES AND ASSOCIATED ACCESS LIDS AND HATCHES SHALL MEET THE DESIGN LOADING REQUIREMENTS SHOWN ON SHEET G3. 2. THE LIFTING FORCE REQUIRED TO OPEN ACCESS LIDS AND HATCHES SHALL BE A MAXIMUM OF 35-POUNDS. HINGED LIDS AND ACCESS HATCHES SHALL BE EQUIPPED WITH A HYDRAULIC LIFT ASSIST SYSTEM AS REQUIRED TO MEET THE MAXIMUM LIFTING FORCE REQUIREMENTS. 3. MODULAR WETLAND FRAMES, HATCHES, AND LIDS SHALL BE AS SHOWN IN THE TABLE ABOVE OR ENGINEER APPROVED EQUAL. 4. PERMANENT WATER QUALITY TREATMENT FACILITIES SHALL NOT BE USED TO CONVEY OR CONTAIN CONSTRUCTION STORM WATER. NEW FACILITIES SHALL BE KEPT OFFLINE UNTIL PROJECT IS COMPLETE. THE CONTRACTOR SHALL CLEAN AND FLUSH ALL PARTS OF THE SYSTEM PRIOR TO INSPECTION. SEE GENERAL NOTES ON SHEET G2. 5. SEE STRUCTURAL PLANS FOR STRUCTURAL SUPPORT DETAILS. BergerABAM 33301 9th Avenue South, Suite 300 Federal Way, Washington 98003-2600 (206) 431-2300 Fax:(206) 431-2250 ACCEPTABILITY DRAWN JDM DATE 06/08/18 SUBTITLE THIS DESIGN AND/OR SPECIFICATION IS APPROVED CHECKED SPT 06/08/18 ENGINEER BEE 06/08/18 TITLE APPROVED BY DEPT. I DATE CIVIL PERMIT STORM DRAINAGE DETAILS -SHEET 1 APRON R INFRASTRUCTURE RENTON SITE CIVIL MASTER SITE HIGH FLOW BYPASS R-401382 IN COMPLIANCE WITH CITY OF RENTON STANDARDSURE DEVELOPMENT ENGINEERING SFACWATER UTILITY afowler 12/20/201801 rstraka 12/20/2018Ul 0 wI` \LIV W4700331 �­`­­ n 10/01 / 18 /� SHEET C500-3V C65 JOB NO. COMP NO. W4700331 RENTON, WA DWG NO. 4-APRON-R-0500-3V