HomeMy WebLinkAboutD 9111140880 •r
FILED FOR, RECORD AT REQUEST OF
Office of the City Clerk
Renton Municipal Bldg. DEED OF RIGHT TO USE LAND FOR
200 Mill Ave. So.
Renton, WA 98055 PUBLIC RECREATION PURPOSES
The Grantor, City of Renton for and in
consideration of monies coming in whole or in part from the Outdoor Recreation
Account of the General Fund of the State of Washington and in fulfillment of terms of
the Project Contract identified below, conveys and grants to the State of Washington
individually and as the representative of all the people of the State, the right to use the
real property described below forever for the outdoor recreation purposes described
in the Project Contract entered into between the Grantor and the State of Washington
through the Interagency Committee for Outdoor Recreation entitled Cedar River Trail
I-405 Conversion Project Number 79-01RA signed by the Grantor on the ?7„d day of
March, 1979and by the Interagency Committee on the 27th day aarch,1977nd the
application and supporting materials which are on file with the Grantor and the state
in connection with the Project Contract.
The Grantor will not make or permit to be made any use of the real property
described in this deed, or any part of it, which is inconsistent with the right to use for
public outdoor recreation herein granted unless the state, through the Interagency
CC Committee for Outdoor Recreation or its successors, consents to the inconsistent use,
OG which consent shall be granted only upon conditions which will ensure that other
gort• outdoor recreation land of at least equal fair market value at the time of change of use
and of as nearly as feasible equivalent usefulness and location for the public recreation
purposes for which state assistance was originally granted will be substituted in the
manner provided in RCW 43.99.100 for marine recreation land, whether or not the
real property covered by this deed is marine recreation land. RCW 43.99.100 reads as
follows:
"Marine recreation land with respect to which money has been
expended under RCW 43.99.080 shall not, without the approval of the
committee, be convertid to uses other than those for which such
expenditure was originally approved. The committee shall only
approve any such conversion upon conditions which will assure the
substitution of other marine recreation land of at least equal fair market
value at the time of conversion and of as nearly as feasible equivalent
usefulness and location."
The real property covered by this deed is described as follows:
ui
The land referred to in this Deed of Right to use land for Public Recreation Purposes is
sem.
situated in the county of King, State of Washington, and described as follows:
That part of Government Lot 2 and that part of Government Lot 4,
Section 16, Township 23 North, Range 5 East, W.M., in King County,
Washington, described as:
Beginning in said Government Lot 4 at the intersection of the
southwesterly right-of-way line of SR 169 as it existed prior to February
18, 1971 and a line described as:
Beginning at a point opposite Highway Engineer's Station (hereinafter
referred to as HES) 1494 + 21.74 on the SR 169 Line Survey of SR 169,
Renton; Maplewood to Jct. SR 405, and 57.85 feet southwesterly
therefrom;
•
thence northwesterly to a point opposite HES 1499 + 54.94 P.C. on said
SR 169 Line Survey and 60 feet southwesterly therefrom;
thence northwesterly, westerly and southwesterly parallel with said SR
169 Line Survey to a point opposite HES 1504 +00 thereon;
thence southwesterly to a point opposite HES 1505 + 50 on said SR 169
Line Survey and 85 feet southeasterly therefrom and the end of this line
description;
thence northwesterly, westerly and southwesterly along the above-
described line to the intersection in said Government Lot 2 with said
southwesterly right-of-way line;
thence southeasterly along said southwesterly right-of-way line to the
point of beginning.
This deed shall in no way modify or extinguish the functions of the Grantor under the
Project Contract, including the Grantor's functions to operate and maintain the land as
set out in paragraph 14 of the Project Contract.
Dated this 0.71 day of , 19Lt
By: ' •
Title ay0/
A'l-I'EST:
))/") •
�_.
STATE OF WASHINGTON )
: SS
COUNTY OF )
4h
CX: 27 9
THIS IS TO CERTIFY that on this • day of tin CY, 191 before me the
CD undersigned Notary Public in acid for the State of W in on, duly commissioned and
*d- sworn, personally appeared • - C ►, • -4-I, Wo me personally known
to be the a Cr i KC.4- C , of th Gi or' �v►ti that
executed the foregofdg deed and .cknowledged to me that they signed and sealed the
7 same as the free and voluntary act and deed of said i hdiU
Qiolitto.t5 and on oath stated
that they were authorized to execute said instrument and that the seal affixed is the
seal of said C;5 r)-P' leen` - -v .
WITNESS my hand and official seal the day and year in this certificate first above
written
Aa L , :LA
otary ' ��► c in and for the State of
Washin:'Y, residing at Ki 1: C_CrUnt
f/forms/pm/recdeed/May91/bh
•
ATTACHMENT A
That part of Government Lot 2 and that part of Government Lot 4, Section 16,
Township 23 North, Range 5 East, W.M. in King County, Washington, described
as:
Beginning in said Government Lot 4 at the intersection of the southwesterly right-
of-way line of SR 169 as it existed prior to February 18, 1971 and a line described
as:
Beginning at a point opposite highway Engineer's Station (hereinafter referred to
as HES) 1494 + 21.74 on the SR 169 Line Survey of SR 169, Renton: Maplewood
to Jct. SR 405, and 57.85 feet southwesterly therefrom;
thence northwesterly to a point opposite HES 1499 + 54.94 P.C. on said SR 169
Line Survey and 60 feet southwesterly therefrom;
thence northwesterly, westerly and southwesterly parallel with said SR 169 Line
Survey to a point opposite HES 1504 + 00 thereon;
thence southwesterly to a point opposite HES 1505 + 50 on said SR 169 Line
Survey and 85 feet southeasterly therefrom and the end of this line description;
thence northwesterly, westerly and southwesterly along the above-described line
to the intersection in said Government Lot 2 with said southwesterly right-of-way
line;
thence southeasterly along said southwesterly right-of-way line to the point of
beginning.
OC
OC
qct- a)
CAG-138-91
DEPARTMENT OF NATURAL RESOURCES
AQUATIC LANDS ENHANCEMENT ACCOUNT
PROGRAM GRANT AGREEMENT
Project Title - Cedar River Trail Development and Interpretive
Project No. AL-91-04
Section Index Page
1 . Nature of Grant Agreement 2
2. Scope of Work
3. Administrative Guidelines and Requirements
4. Project Period
5. Funding of Project
6. Disbursement of Funds 3
7. Reporting Requirements
8. Amendments
9. Project Termination
10. Recovery of Payments to Grantee 4
11. Restriction on Conversion of Project to Other Uses
12. Use and Maintenance of Assisted Project
13. No Waiver by DNR 5
14. Identifying Markers
15. Provisions Applying to Projects Involving Acquisition
16. Assignment 6
17. Maintenance of Records
18. Audit Discrepancies 7
19. Miscellaneous
19.1 Headings
19.2 Entire Agreement
19.3 Invalidity
19.4 Authority of the Grantee
19.5 Hold Harmless
19.6 Hazardous Substances
19.7 Wetland Protection 8
19.8 Other Requirements
19.9 Governing Law
19.10 No Other Duties Assumed by DNR
19.11 Reappropriation Notice
19.12 Inspections 9
20. Disputes
21 . Exhibits 10
I . Project Application/Scope of Work
II . Project Reimbursement Procedure Manual
III . Deed of Right to Use for Public Access
IV. Special Conditions
1
•
1. Nature of Grant Agreement. This grant agreement, (Agreement) sets out
the terms and conditions, not otherwise appearing in statutes or
regulations, of a grant of money by the state of Washington through the
Department of Natural Resources (DNR) from the Aquatic Lands Enhancement
Account (ALEA) of the General Fund of the state of Washington to City of
Renton (Grantee) in aid of Cedar River Trail project.
The ALEA was established by the 1984 state legislature to provide
funding for state and local projects specifically designed to enhance
publicly owned aquatic lands by providing public access, recreation and
environmental protection.
2. Scope of Work. The project "scope of work" is set out in the Grantee's
application for Aquatic Land Enhancement Account assistance, dated
July 30, 1990, and which is attached as Exhibit I and incorporated by
reference. The Special Conditions, if any, that further clarify or limit
the scope of eligible activities is attached as Exhibit IV and
incorporated by reference.
3. Administrative Guidelines and Requirements. ALEA program guidelines,
contained in the DNR ALEA Approved Project and Reimbursement Procedures
Manual (hereafter referred to as "ALEA Grant Manual ") as now existing or
hereafter amended, and are made part of this Agreement as Exhibit II.
The Grantee shall abide by these requirements and guidelines. On
matters not addressed in DNR's ALEA Grant Manual , DNR shall at their
discretion, refer to Interagency Committee for Outdoor Recreation (IAC)
Grant Manuals on a case by case basis.
4. Project Period. The "effective date" of this agreement shall be the
date this document is signed by the manager of the Division of Aquatic
Lands. The Grantee shall execute and complete the approved project
scope of work no later than April 1, 1993. A project will be considered
"complete" when (1) all approved or required activities including
(construction and/or acquisition) are complete, (2) on-site signs are in
place, (3) records management and fiscal transactions have been
completed, and (4) a project close-out report is submitted to DNR with
the Grantee's final request for reimbursement. The project may extend
beyond the specified date with the written consent of DNR.
5. Funding of Project. DNR agrees to reimburse the Grantee for the above-
described project activities from funds available from the Aquatic Land
Enhancement Account of the State General Fund. The total reimbursement
from all eligible project activities and related costs described in
Section 2 shall not exceed the granted amount of $41,866. The
obligation of DNR to make payments is contingent upon the availability
of funds within the ALEA through legislative appropriation and state
allotment. Ten (10) percent of the total granted amount will be
retained by DNR and disbursed contingent upon project completion in
accordance with the terms of this Agreement.
2
6. Disbursement of Funds. The duty of DNR to approve disbursement of funds
pursuant to this Agreement is contingent upon strict compliance by the
Grantee with the terms of this Agreement, with particular concern for
identifying marker requirements noted in Section 14 of this Agreement.
Disbursement of funds shall be made after the Grantee has furnished DNR
such information as DNR deems necessary to show compliance with
applicable statutes and rules and the terms of the Agreement. Payments
shall be reimbursement for costs actually incurred. Grantees shall not
wait longer than 120 days between reimbursement requests. The Grantee
has up to six months after the date of DNR approval of the final project
close out report to submit any and all requests for reimbursement.
Reimbursement requests made after that time will not be honored.
Requests for payment will be submitted by the Grantee on state voucher
request forms provided by DNR. Each voucher request form and supportive
documents must itemize all allowable costs by major elements as
described in the project application financial information pages. Each
payment request must be reviewed and certified as satisfactory by the
DNR project manager (or authorized designee) prior to payment.
Instructions for completing the state voucher request form are provided
in the ALEA Grant Manual in Sections 22, 20 (acquisition) , 19.03
(construction) and 19.01.
7. Reporting Requirements.
Until the project is completed, the Grantee shall submit quarterly
written progress reports on forms provided by DNR. Quarterly reports
shall be submitted within 10 working days of the last day of each
quarterly period identified. First tr. Jan. 1 - Mar. 31
Second QQtr. Apr. 1 - June 30
Third Qtr. July 1 - Sept. 30
Fourth Qtr. Oct. 1 - Dec. 31
In addition, the Grantee shall promptly submit reports as DNR may
request.
Upon completion of the project described in Section 4 of this Agreement,
Grantee shall submit the final project close-out report on the form(s)
provided by DNR.
8. Amendments. Any amendments or modifications of this Agreement shall be
made in writing executed by the parties hereto, and neither DNR nor the
Grantee shall be bound by verbal or implied agreements.
9. Project Termination. All obligations of DNR under this Agreement may be
suspended or canceled, at the option of DNR, if any one of the following
events occurs:
(a) The Grantee has failed to commence work within 6 months after the
effective date of the Agreement;
(b) The Grantee has failed to make progress, satisfactory to DNR,
necessary to complete the project on time;
3
(c) The Grantee will otherwise be unable to complete the project, or
any part of it, on time;
(d) The Grantee has failed to comply with any or all of its
obligations under this Agreement; OR
(e) The ALEA contains insufficient funds and/or the legislature fails
to appropriate or reappropriate funds to adequately capitalize the
account.
10. Recovery of Payments to Grantee and Interest Rate.
The right of the Grantee to retain monies paid as reimbursement payments
is contingent upon satisfactory performance of this Agreement including
the satisfactory completion of the project described in the project
Scope of Work. In the event the Grantee fails, for any reason, to
perform obligations required of it by this Agreement, the Grantee may,
at DNR's sole discretion, be required to repay to DNR all grant funds
disbursed .to the Grantee for those parts of the project that are
rendered ineffectual , in the opinion of the DNR, by such failure to
perform.
Interest shall accrue at the rate of twelve percent (12%) per annum from
the time the DNR demands repayment of funds. In lieu of repayment any
property acquired under this Agreement, at the option of the DNR, may
become the DNR's property and the Grantee's liability, if any, to repay
monies shall be reduced by an amount reflecting the fair value of such
property.
If payments have been discontinued by the DNR due to insufficient funds
as described in Section 9(e) above, and Grantee has otherwise complied
with all the terms of this Agreement the Grantee shall not be obligated
to repay monies paid to the Grantee prior to such termination.
11 . Restriction on Conversion of Project to Other Uses. The Grantee shall
not at any time convert any property or facility acquired or developed
pursuant to this Agreement to uses other than those currently proposed
within the Grantee's application without the prior approval of DNR. DNR
will only approve conversion upon conditions that will assure the
substitution of such a similar property and/or facilities of at least
equal fair market value at the time of conversion. The substitute
property and/or facilities must have equivalent functional value,
quality and location.
12. Use and Maintenance of Assisted Project. The Grantee shall operate and
maintain, or cause to be operated and maintained, the property or
facilities which are the subject matter of this Agreement as follows:
(a) Any property or facilities open to the public shall be open for
the use by all segments of the public without restriction because
4
of the race, color, creed, religion, sex, age, national origin or
residence of the user.
(b) The Grantee shall operate and maintain the property and any
facilities in accordance with all applicable federal , state and
local laws, orders, regulations and permits.
(c) The Grantee shall actively manage and protect the acquired and/or
improved site to maintain it's functional qualities and resource
values. Improvements shall be maintained for their full design
life or 25 years (except that interpretive facilities will be
maintained for 15 years) , which ever is greater. All other
property shall be maintained in perpetuity unless the obligation
to maintain is terminated by the terms of this Agreement.
13. No Waiver by DNR. Any waiver by DNR of any condition shall only be
effective if such waiver is made in writing by DNR. Failure by DNR to
insist upon the strict performance of any provision of this Agreement
shall not affect DNR's right to require strict performance of the same
provision in the future or any other provision. Failure by DNR to
exercise any right based upon a breach, or acceptance by DNR of
performance during such breach, shall not constitute a waiver of any of
its rights with respect to such breach.
14. Identifying Markers. The Grantee shall construct and display, during
the project period and thereafter, signs or markers that shall describe
the project and the role of DNR in funding and the Grantee' s role in
funding and managing the site. Signs and locations shall be developed
incooperation with DNR, and approved in writing by DNR prior to sign
installation.
15. Provisions Applying to Projects Involving Acquisition. In projects
funded for the acquisition of land the following provisions shall apply:
(a) Evidence of Land Value. Prior to disbursement of the funds
provided for in this Agreement, the Grantee shall supply evidence
establishing to the satisfaction of DNR that the land acquisition
cost represents a fair and reasonable price (as described in IAC
Manual #3, Guidelines for Land Acquisition, Section 03.29) for the
land in question and that the value of any state-owned aquatic
lands (tidelands, shorelands, bedlands, and harbor areas) are not
included in the value of the property acquired.
(b) Evidence of Title. The Grantee shall be responsible for providing
satisfactory evidence of title for each parcel prior to
disbursement of funds provided by this Agreement. Satisfactory
evidence will consist of those documents identified in Section 20
of the ALEA Grant Manual including the Deed of Right to Use for
Public Access (Exhibit III) . In addition, the Grantee shall
demonstrate that any tidelands, bedlands, or shorelands purchased
under this Agreement were previously sold by the state and that
5
` 3 +
such lands are not subject to any conditions which would have
automatically reverted ownership to the state.
(c) Less than fee Purchase. Any purchase of less than fee simple
title shall be approved in advance in writing by DNR.
(d) Eligible/Ineligible Expenses. Only actual costs directly related
to acquisition shall be eligible for reimbursement, unless prior
written approval is obtained from DNR. The following costs will
be eligible: 1) cost of land and improvements; 2) cost of
relocation of eligible occupants; 3) cost of appraisal ; 4) cost of
appraisal review; 5) cost of title insurance; 6) closing costs; 7)
pro rata real estate taxes; and 8) recording fees. The cost of
land and improvements will be based upon the fair market value as
established by the appraisal process outlined in IAC Manual #3,
Section 03.22 or by court award. In all cases, DNR grants will
not be used to reimburse other indirect costs involved with land
acquisition including but not limited to fees for feasibility
studies, court costs, and attorney fees.
(e) Encumbrances. Property rights obtained with DNR funding must be
free of all reservations or encumbrances that, in the judgement of
the DNR, would limit the recreational use of the site
disproportionate to the public benefit.
15.1 Provisions for Projects Involving Development.
In projects funded for the development of property the following
provisions shall apply:
(a) Eligible/Ineligible project costs: Costs arising from Project
planning, design and engineering incurred prior to the effective
date of this Agreement will not be reimbursed but can be used as
part of the local match, if approved by DNR and these costs were
incurred within the 24 months preceding the effective date of this
Agreement. Project planning, design and engineering costs
(including construction management/inspection) incurred after the
effective date of this Agreement may be reimbursed, if eligible
and reasonable, up to a maximum of 20 percent of the approved
grant amount, unless otherwise approved by DNR.
(b) Subcontractors: The Grantee is responsible for ensuring that any
and all subcontractors comply with the terms of this Agreement.
16. Assignment. This Agreement shall not be assignable in whole or in part
by the Grantee except with the express written consent of DNR.
17. Maintenance of Records. The Grantee shall maintain complete program and
financial records relating to this Agreement and the project including
all books, records, documents, receipts, invoices and all other
electronic or written recordations necessary to sufficiently and
properly reflect the Grantee's Agreement, grant administration, and
payments. These records will include all direct and indirect costs of
6
the project expended by the Grantee or their subcontractors, if any, in
the development and implementation of the project. All records will be
maintained in a manner adequate to provide an audit trail for all
expenditures. All engineering documentation and field inspection
reports of all construction work accomplished under this Agreement will
also be maintained. All records described in this section shall be
subject at all reasonable times to inspection, review, or audit by the
State's personnel and other personnel directly authorized by DNR or the
Office of the State Auditor. The Grantee will retain all records
described in this section related to this Agreement and project for five
(5) years after the date of final payment by DNR under this Agreement.
18. Audit Discrepancies. If any audit identifies discrepancies in the
financial records, the Grantee shall provide clarification and/or make
adjustments accordingly. Amounts that have been paid to the Grantee in
violation ofthe terms of this Agreement shall be promptly refunded to
DNR.
19. Miscellaneous. The following shall apply:
19. 1 Headings. The paragraph headings used in this Agreement are for
convenience only. They shall not be construed to limit or to extend the
meaning of any part of this Agreement.
19.2 Entire Agreement. Except as otherwise provided in the terms of this
Agreement, this document contains the entire agreement the
parties.
No other agreement, statement or promise made by any party, or to any
employee, officer or agent of any party, shall be binding or valid.
19.3 Invalidity. If any term or provision of this Agreement or the
application of any term or provision to any person or circumstance shall
to any extent be invalid or unenforceable, the remainder of the term or
provision, or the application of such term or provision to persons or
circumstances other than those as to which it is invalid or
unenforceable and the remainder of this Agreement shall not be affected
thereby, and each term and provision of this Agreement shall be valid
and be enforced as written to the fullest extent permitted by law.
19.4 Authority of The Grantee. The Grantee by the signature of its
authorized representative below represents and warrants that this
Agreement is a legal , valid and binding obligation on behalf of the
Grantee and is enforceable in accordance with its terms.
19.5 Hold Harmless. To the extent that the constitution and the laws of the
state of Washington permit, the Grantee shall indemnify, defend and hold
harmless the state of Washington, the Department of Natural Resources
and any employee, officer or director thereof from any and all liability
damages (including, but not limited to, damages to land, aquatic life
and natural resources) expenses, causes of action, claims, costs, fees
(including but not limited to costs and attorneys fees) , penalties
(criminal or civil ) suffered or arising out of the use, occupation or
control of the facility or the facility's design or construction.
7
•
•
19.6 Hazardous Substances. The Grantee shall not keep, use, dispose,
transport or generate on or about the property any hazardous substances
or components thereof in violation of any federal , state or local law,
regulation, statute or ordinance. "Hazardous substances" shall be
defined as those substances or components thereof now or hereafter
designated as hazardous, toxic, dangerous, or harmful by federal , state,
or local law, regulation, statute or ordinance (including but not
limited to Resource Conservation and Recovery Act, Comprehensive
Environmental Response, Compensation and Liability Act, Superfund
Amendment and Reauthorization Act, and the Washington Model Toxic
Control Act) . Grantee shall indemnify the state or Department of
Natural Resources for liability costs incurred or assessed against the
state or DNR for the existence and cleanup of these hazardous
substances.
Grantee shall indemnify, defend and save harmless DNR and its agents,
employees, officers and directors for any and all liability, damages
• (including, but not limited to, natural resources damages) , expenses,
causes of action, settlements, costs (including testing, auditing,
surveying and investigation costs) , fees (including attorneys fees,
court costs and litigation costs) , penalties (civil and criminal ) and
response, clean-up, or remediation imposed as a result of use, storage,
disposal transportation or generation of hazardous substances on or
about the property.
19.7 Wetland Protection. Grantee will comply with the DNR policy on wetlands
which requires no net loss of function or area of significant wetland
habitat (see Wetland Policy detail included in the ALEA Grant Manual ) .
Grantee will provide information upon request to DNR adequate for DNR to
determine compliance.
19.8 Other Requirements. The Grantee shall comply fully with all applicable
federal , state and local laws, orders, regulations and permits.
19.9 Governing Law. This Agreement is governed by the laws of Washington.
19. 10 No Other Duties Assumed by DNR. The DNR shall not be responsible for
payment of salaries, consultants, or other costs related to the project
described herein, except as specifically provided in the grant
application specified in Section 3 of this Agreement.
Review and reimbursement of funds by DNR is for the purpose of
determining eligibility for funding under the ALEA Grant' Program and DNR
does not assume any other duty or obligation to Grantee or any other
party. DNR does not assume any obligation or duty to determine if
Grantee is complying with all applicable statutes, rules, codes,
ordinances or permits.
19. 11 Reappropriation Notice. Projects which span two or more fiscal years
(beginning July 1) may require reappropriation pursuant to
RCW 43.88.140. Prior to the end of each biennium the Grantee shall
notify DNR no later than January 1 of reimbursements the Grantee will
request following the end of the current biennium. The Grantee
8
acknowledges that appropriation decisions are made by the Washington
State Legislature and that failure to appropriate sufficient funds may
terminate DNR's obligation to reimburse the Grantee.
19. 12 Inspections. Property and facilities acquired pursuant to this
Agreement shall be available for inspection by DNR or their designated
representative at any time.
20. Disputes. Except as otherwise provided in this grant, any dispute
concerning a question of fact arising under this grant which is not
disposed of by agreement shall be decided by the ALEA Grant Program
Manager or other designated official who shall communicate his/her
decision in writing and furnish a signed copy to the Grantee. The
decision of the Program Manager shall be final and conclusive unless,
within thirty (30) days from the receipt of such copy, the Grantee mails
or otherwise furnishes to the Program Manager a written appeal addressed
to the DNR Aquatic Lands Division Manager. The decision of the DNR
Aquatic Lands Division Manager, or duly authorized representative, for
the determination of such appeals shall be final and conclusive.
IN WITNESS WHEREOF, this Agreement is executed on the day last written below.
GRANTEE STATE OF WASHINGTON
Department of Natural Resources
11 1
Sign. •re of ranteei '=Tr- entative ANN J. MORGAN, Manager
Title Mayor
Date9 9 Date
ATTEST:
Deputy ity C1 k
9
EXHIBITS
I . Project Application/Scope of Work
II. Project Reimbursement Procedures Manual
III . Deed of Right to Use for Public Access (Acquisition Projects only)
IV. Special Conditions (If any)
10
Exhibit I ALEA #: AL-91-04
Applicant: City of Renton
Project: Cedar River Trail Development
and Interpretive
Scope of Work
(a) Project (general description)
Total Project Cost ALEA Portion
Development $209,621 $19,713
Interpretive $ 29,538 $22, 153
Two applications, AL-91-04 (Development) and AL-91-115 (Interpretive
signage) , will be combined under one contract, AL-91-04. Since the ALEA
development project dollars were not shown as purchasing a specific
portion of the project this contract will cover the entire project as
described in the attached application.
Interpretive display - three stations with 1-3 panels per station.
(b) The project is hereby modified from the project description as given in
the attached application in the following respects:
None.
•
.LEA
TATE OR LOCAL AGENCY APPLICATION
RANSMITTAL FORM
D: Department of Natural Resources RE: b-9 I -0
ALEA Program ALEA project#
Division of Aquatic Lands MS: QW-21
Olympia, WA 98509
ROM: (Agency Name) Renton Parks & Recreation
(Address) 200 Mill Ave. S.
Renton, WA 98055
•
You are hereby requested to consider this application for financial assistance for the project described
irein and to grant funding from the Aquatic Land Enhancement Account. This application has been prepared
ith full knowledge of, and in compliance with,the instructions contained in the "Grant Application Manual for
quatic Land Enhancement Account Funds." Further,we agree to cooperate with the Department of Natural
?sources by furnishing such additional information as may be necessary to qualify for state aid; to execute an
LEA project grant agreement and to adhere to all appropriate state statutes governing the grant funds used in
.e project grant agreement.
We are aware that the grant-in-aid, if approved,will be paid on a reimbursement basis.
Inquiries regarding this application are to be directed to:
Jame, Title,Address,Phone)
Leslie A. Betlach William Hutsinpiller
Open Space Coordinator Superintendent, Recreation
200 Mill Ave. S. 200 Mill Ave. S.
Renton, WA 98055 Renton, WA 98055
Phone (206) 277-5549 Phone (206) 277-5522
. We certify that, to the best of our knowledge, the data in this application are true and correct.
(Signature of Authorized Repres-•tative)
William Hutsinpiller, Superintendent,
(Name and Title) Recreation
July 30, 1990
(Date)
yellow)
QUATIC LAND
vHANCEMENT ACCOUNT
EVELOPMENT PROJECT RESUME
- AGENCY I EVAL.SCORE RANK ALEA PROJ.#
City of Renton, Parks iNa--- 01 -`-
PROJECT
Cedar River Trail Vistas
@�m'' COUNTY LEGIS.DIST. 7 ISECTION16. TOWNSHIP 23N lRANGE 5W
King
udi Irereorow NEAREST STATE HWY.
._.._ PROJECT ADDRESS/DESCRIPTION
NO. 169 AWAY 200 ft.
•ROJECT TYPE: _ACQUISITION _DEVELOPMENT _COMBINATION
ACQUISITION PROJECT ONLY
XISTING PROPERTY INFORMATION 0 NEW Sri±, APPRAISED VALUE:
TONING P-1 NO.OF PARCELS 1 0 ADD TO EXIST. LAND $
;HORELiNE ENV.
ACRES THIS APPL. 1 1 4 0 FEE SIMPLE IMPROVE $
Open SpaceTOT.ACRES 114
JSE 0 LEASE COST:
OWNER City of Renton WA.WATER BODY 0 OTHER PER ACRE $
Cedar River OPTION PER FRONT$
GIDE/SHORELAND OWNER FT.
FRONT FEET 300 feet _ 0 YES 0 NO
PROJECT DESCRIPTION
This project involves improvements to a parcel of land on the Cedar River adjacent to
the future Cedar River Trail. Planned improvements include concreteLrail , picnic
facilities, new restrooms (on future Cedar River Trail) , improved river access (for
canoes and fishing) , improved parking and safety improvements to the existing bridge.
Project goals include handicap accessibility to points of interest, an interpretive
system highlighting major site features including the Chinook and Sockeye salmon runs,
enhancement of small wetland areas on the site, and providing boating and canoeing
access to Cedar River.
FACILITY(IES)PROPOSED FOR ACQUISITION/DEVELOPMENT&ESTIMATED COST
Development of riverfront access for boating and canoeing. In addition, development
of parking areas for users who utilize vehicles to transport canoes, boats, kayaks,
etc.
REQUIRED PERMITS/COORD. RELOCATION FUND SOURCE % $
❑ DNR LEASE EX SHORELINE MGT.❑ CORP OF ENGRS. ❑ YES 1n NO ALEA REQUEST (9.4 ) 19,71 3_ "i
2 PARKS CX FISH/WILDLIFE H.P.A. OTHER
1. Local
O HEALTH 0 OTHER:Specify EST.COSTS Cash 0. 6 )189,908. 1
COMMENTS
PREVIOUS ALEA GRANTS In-Kind ( ) NA i
NO.APPVD 2. Non Local ( ) NA
(provide detail in the comment section as appropnate)
TOT.VAL.$
NO.COMPL. TOTAL PROJECT FUNDS$209,F?1 50
NO.INCOM.
yellow
•
%LEA DEVELOP/ALN.r
?ROJECT DETAILS
.. Source of sponsor's share
$ N/A
appropriations
189,908. 11
3onds
N/A
Iolunteer labor, equipment and material donations
N/A
orce account (in-land)
N/A
land donations
TOTAL SPONSOR'S SHARE $ 189,908. 11
2. Have any applications for other funds been made for this project?
( ) No ( X) Yes - Explain ALFA - Interpretive Grant Application NO. AL-91-115
3. Is the proposed project consistent with applicable zoning, Shoreline Management Act
and other regulations?
Yes, this project is consistent with the City of Renton Comprehensive Plan and is
a projgct that will enhance the shoreline while affording people the opportunity
to gain access to the Cedar River and enjoy it.
4. Has the site plan been officially adopted by the local agency?
( ) No (X )Yes Date Adopted 6/89
5. Design and engineering work to be done by:
( )c) Consultants
( ) Staff
( ) Combination
( ) Other (please specify)
6. Construction will be accomplished by:
( X) Contract
( ) Force Account
( ) Volunteers
7. Estimated annual maintenance cost $ 5,000.00 per year.
The project sponsor acknowledges that the amount indicated above is the most current estimate of funds
necessary to cover operation and maintenance of the facility proposed for development and that adequate
operation and maintenance funds will be budgeted annually subsequent to the completion of the develop-
ment.
8. Explain how facility maintenance will be carried out.
Maintenance of the proposed facility will be provided by the City of
Renton Parks and REcreation Department. However, maintenance will
be minimal.
(yellow)
_ALEA DEVELOP/will' PROJECT COST Ea TIP - NTE
Name of Project Jordan LaRue (Cedar River Trail Vistas)
Date 10-19-90
This outline should serve as a guide in the preparation of cost estimates. Depending on the individual proj-
ects, some items will not be applicable while at other times the categories and items will need to be expanded.
1. Site Preparation
1. Clearing
1.0 Acre $ 5,700.00
2. Cut --- Cubic Yards (C.Y.) $ ---
3. Fill --- (C.Y.) $ ---
4. Grading
61,000 Square Feet (S.F.) $ 4,760.00
SUB-TOTAL $ 10,460.00
2.Utilities
1. Gas --- Lineal Feet (L.F.) $ ---
2. Underground power --- L.F. $ 4, 120.00
3. Water --- L.F. $ 1,000.00
4. Sewer
L.F. $ 3, 190.00
5. Storm
--- L.F. $ 2,850.00
6. Septic system $
(Number) SUB-TOTAL $ 11, 160.00
3. Landscaping
1. Trees $
2. Shrubs $
3. Ground cover $
4. GIass(specify sod or seed) 2,500 S.F. $
375.00
5. Other
SUB-TOTAL $ 375.00
4. Irrigation System S.F. $
(indicate manual or automatic)
SUB-TOTAL $ ---
(yellow)
.AI.EA DEVELOPMENTPROJECT COST ESTI :TTE continued
5. Roads, Paths and Parking
Roads(indicate width and surface)
--- L.F. $ ---
Parking(indicate surface)
20 Spaces $ 10,905.00
550 L.F. $ 21,312.50
Paths(indicate width) 1 1,425.00
Gate SUB-TOTAL $ 33,642.50
6. Support Building
Restrooms ( )No. 600 S.F. 74, 100.00 $
$ 35,000 .00
Shelter( ) No. 35,000 S.F.
_ Administrative S.F. $ - - -
Maintenance S.F $ - -
$ 300.00
Trash Containers ( ) No.
$ 12,905.00
— Other * ( ) No. S.F.
•Explain
SUB-TOTAL$ 122,305.00
7. Water Access Facilities
Pier(s)
_ Shore works(bulkheads,rip rap,etc.)
$ — — —
Boat access
Non-motorized
150' path $ 5,812.50
_ Motorized $
_ Moorage
Other
SUB-TOTAL $ 5,812.50
8. Picnic Facilities
_ Tables ( 4 ) No. 740.00 each $
2,960.00
_ Stoves ( ) No. $ 1„
SUB-TOTAL $ 2,960.00
(yellow)
ALEA DEVELOP V ' PROJECT COST Eof, ,SATE continued
9. Swimming - Wading-Spray Pools
Swimming area(size) --- $ ---
Wading area(size) --- $ ---
Support Structures(explain). --- $ ---
SUB-TOTAL$ ---
10. Lighting
Recreation(explain) --- $ ---
General security (parking) $ 5,700.00
SUB-TOTAL$ 5,700.00
11. Signs
Temporary construction sign(s) $ ---
Permanent entrance sign(s) $ 1,500.00
SUB-TOTAL$ 1,500.00
ESTIMATED CONSTRUCTION cows $ 193,914.50
(Note:Exclude costs for planning,engineer-
ing and construction management. These
costs,if properly documented,can be ap-
plied toward meeting the sponsor's match-
ing requirements.)
STATE AND LOCAL SALES TAX(8.91) $ 15,707.00
TOTAL ESTIMATED CONSTRUCTION COST $ 209,621.50
Complete if Applicable :
Other Nonlocal Sources [Subtract] $
Force Account(In-Kind) $
Donations of Services and Materials $
TOTAL ALEA GRANT REQUEST $ $19,713-3 9
(yellow)
ALEA •
STATE OR LOCAL AGENCY APPLICATION
TRANSMITTAL FORM •
TO: Department of Natural Resources RE: 2- ) 6
ALEA Program ALEA project#
Division of Aquatic Lands MS: QW-21
Olympia, WA 98509
FROM: (Agency Name) Renton Parks & Recreation
(Address) 200 Mill Ave. S.
Renton. WA, 98055
You are hereby requested to consider this application for financial assistance for the project described
herein and to grant funding from the Aquatic Land Enhancement Account. This application has been prepared
with full knowledge of, and in compliance with,the instructions contained in the "Grant Application Manual for
Aquatic Land Enhancement Account Funds." Further,we agree to cooperate with the Department of Natural
Resources by furnishing such additional information as may be necessary to qualify for state aid; to execute an
ALEA project grant agreement and to adhere to all appropriate state statutes governing the grant funds used in
the project grant agreement.
We are aware that the grant-in-aid, if approved,will be paid on a reimbursement basis.
Inquiries regarding this application are to be directed to:
(Name, Title,Address,Phone)
Leslie Betlach William Hutsinpiller
Open Space Coordinator Superintendent, Recreation
200 Mill Ave. S. 200 Mill Ave. S.
Renton, WA. 9$055 Renton, WA. 98055
Phone: (206) 277-5549 Phone: (206) 277-5522
We certify that, to the best of our knowledge,the data in this
application are true and correct.
(Signature of Authorized Repr- entative)
William Hutsinpiller, Superintendent
Recreation
July 30, 1990
(Name and Title)
(Date)
(green)
AQUATIC LAND
ENHANCEMENT ACL9OUNT
INTERPRETIVE PROJECT RESUME
-111 AGENCY EVAL.SCORE RANK ALEA PROJ.#
City of Renton Parks 4L- . /- i L5
O PROJECT �
Cedar River Trail Vista
COUNTY King LEGIS.DIST./ I SECTION 16 TOWNP RANGE 5W
1
xai11I 1..oaro..
--"=----- PROJECT ADDRESS/DESCRIPTION NEAREST STATE HWY.
SR 169 DIST. 200 ft
NO. AWAY
PROJECT TYPE: _ACQUISITION _t EVELOPMENT _COMBINATION ACQUISITION PROJECT ONLY
EXISTING PROPERTY INFORMATION 0 NEW SITE APPRAISED VALUE:
ZONING
P-1 NO.OF PARCELS 1 0 ADD TO EXIST.Sri is LAND $
SHORELINE ENV. ACRES THIS APPL. 11 1/4 0 FEE SIMPLE IMPROVE $
USE Open space TOT.ACRES 11 1/4 0 LEASE COST:
City of Renton
OWNS WA.WATER BODY 0 OTHER PER ACRE $
TIDE/SHORELANDOWNER Cedar River OPTION PER FRONT$
300 feet FT.
FRONT FEET 0 YES 0 NO
PROJECT DESCRIPTION
This project involves limited improvements to a parcel of land on the Cedar River
adjacent to the future Cedar River Trail. Planned improvements include asphalt trails,
picnic facilities, new restrooms (on future Cedar River Trail ) improved river
access (for canoes and fishing). Improved parking and safety improvements to the
development of rforraccess
utilizeboating
vehiclesand
tocanoeing.
transport canoes, boats, kayaccksnetc.
of parking area for users who
FACILITY(IES)PROPOSED FOR ACQUISITION/DEVELOPMENT&ESTIMATED COST
The design development construction and installation of interpretive signage. Signage
will focus on such topics as fish and native vegetation and wildlife in relation to
the Cedar River.
REQUIRED PERMITS/COORD. RELOCATION FUND SOURCE % $
2?,153. 0
❑ DNR LEASE R] SHORELINE MGT.0 CORP OF ENGRS. 0 YES Cf NO ALEA REQUEST ( 7.5
❑ PARKS 6 FISH/WILDLIFE H.P.A. OTHER 384.56
EST.COST $ 1. Local
• HEALTH 0 OTHER;Specify Cash ( '25 )
COMMENTS PREVIOUS ALEA GRANTS In-Kind ( )
NO.APPVD 2. Non Local ( )
TOT.VAL.$ (provide detail in the comment section as appropriate)
NO.COMPL. TOTAL PROJECT FUNDS S —
LW . NO.INCOM. 29,538. J0
.FLEA INTERPRETIVE _. ROJECT DETAIL
1. Source of sponsor's share
Appropriations $ N/A
Bonds
7,384. 50
Volunteer labor, equipment and material donations N/A
Force account (in-kind) N/A
Land donations N/A
TOTAL SPONSOR'S SHARE $ 7,384.50
2. Have any applications for other funds been made for this project?
( ) No ( )Yes -Explain I.A.C. - Interagency Committee for Outdoor Recreation.
3. Is the proposed project consistent with applicable zoning, Shoreline Management Act
and other regulations?
Yes, this project is consistent with the City of Renton Comprehensive Plan
and is a project that will enhance the shoreline. The proposed interpretive
signage is educational and will provide the opportunity to learn about aquatic
habitat.
4. Has the site plan been officially adopted by the local agency?
( ) No ( ) Yes Date Adopted 6/8 9
5. Design and engineering work to be done by:
( X) Consultants
( ) Staff
( ) Combination
( ) Other (please specify)
6. Construction will be accomplished by:
(
x) Contract
( ) Force Account
( ) Volunteers
7. Estimated annual maintenance cost $ 5,000.00 per year.
The project sponsor aclmowledges that the amount indicated above is the most current estimate of funds
necessary to cover operation and maintenance of the facility proposed for development and that adequate
operation and maintenance funds will be budgeted annually subsequent to the completion of the develop-
ment.
8. Explain how facility maintenance will be carried out.
(green)
•
FLEA INTERPRETIVE )ROJECT COST ESTIMATE
Name of Project Jordan LaRue (Interpretive ) (Cedar River Trail Vistas
Date 7-30-90
This outline should serve as a guide in the preparation of cost estimates. Depending on the individual proj-
ects, some items will not be applicable while at other times the categories and items will need to be expanded.
1.Site Preparation
1. Clearing ----
Acre $ 570.00
2. Cut --- Cubic Yards (C.Y.) $ ----
3. Fill ---- (C.Y.) $ ----
4. Grading ---
- Square Feet(S.F.) $ 1,500.00
SUB-TOTAL $ 7,070 00
2.Utilities
1. Gas Lineal Feet(L.F.) $ ----
2. Underground L.F. $ ----
3. Water L.F. $
4. Sewer L.F. $
5. Storm L.F. $ ----
6. Septic system $
(Number) SUB-TOTAL $
3. Landscaping
1. Trees $
2. Shrubs $ ----
3. Ground cover $
4. Grass(specify sod or seed) S.F. $ 700.00
5. Other $
SUB-TOTAL $ 700.00
4. Irrigation System S.F. $
(indicate manual or automanc)
SUB-TOTAL $
(green)
ALFA DEVELOPMEN'`- PROJECT COST ES i LT ATE continued
5. Roads, Paths and Parking
Roads(indicate width and surface) L.F. $ ---
Parking(indicate surface) Spaces $ ---
Paths(indicate width) 150 L.F. $ 5,810.0 0
10' Wide SUB-TOTAL $ 5,810.00
6. Support Building •
Restrooms ( ) No. S.F. ___
Shelter( ) No. S.F. $ ---
Administrative S.F. $
Maintenance S.F $
Trash Containers ( ) No. $ ---
Other* ( ) No. 100 SU'• L.F. $ 5,865.00
*Explain Modification of existing
bridge deck plus addition of handrail w/interpretive
panel bases. SUB-TOTAL$ 5,865.00
7. Water Access Facilities
_ Pier(s) $
Shore works(bulkheads,np rap,etc.) ---
Boat access
Non-motorized $
Motorized $
Moorage $
Other $
SUB-TOTAL $ '--
8. Picnic Facilities
Tables ( 2) No. 740.00 $ 1480.00
Stoves ( ) No. $
SUB-TOTAL $ 1480.00
(green)
•
ALEA INTERPRETI4 PROJECT COST ESTII ATE continued.
9. Swimming-Wading - Spray Pools
Swimming area(size) $ ---
Wading area(size) $
Support Structures(explain). $ ---
SUB-TOTAL$ ---
10. Lighting
Recreation(explain) $
General security $ ---
SUB-TOTAL$ ---
11. Signs
Temporary construction sign(s) $ ---
Permanent entrance sign(s) $ ---
Interpretive sign(s) $ 11,400.00
SUB-TOTAL$ 11,400.00
ESTIMATED CONSTRUCTION COSTS $ 27,325.00
(Note:Exclude costs for planning,engineer-
ing and construction management. These
costs,if properly documented,can be ap-
plied toward meeting the sponsor's match-
ing requirements.)
STATE AND LOCAL SALES TAX( %) $ 2,213.00
TOTAL ESTIMATED CONSTRUCTION COST $ 29.538.00
Complete if Applicable :
Other Nonlocal Sources [Subtract] $
Force Account (In-Kind) $
Donations of Services and Materials $
TOTAL ALEA GRANT REQUEST* $ 22,153.50
*Note: Costs in support of interpretive facility development (site preparation, access improvements, restrooms,
etc.) are not to exceed 25% of the total ALEA grant request or$5,000, whichever is smallest.
(green)
Exhibit II
AQUATIC LAND ENHANCEMENT ACCOUNTS FT
PROJECT REIMBURSEMENT PROCEDURE MANUAL rIRA
Revised January 29, 1990
TABLE OF CONTENTS
SECTION PAGE
NUMBER NUMBER
1 . Project Approval and Authorization to Proceed 1
2. Identifying Markers
3. Progress on Development Projects 1 1
4. Progress on Acquisition Projects 22
5. Reporting 2
6. Cost Increases 3
7. Project Contract Amendments 3
8. Construction Plans and Specifications 4
9. Construction and Consultant Contracts . 4
10. Construction Contract Change Orders 4
11 . Site Inspection 4
12. Post-completion Compliance Inspections 4
13. Operation and Maintenance 5
14. Issuance of Rules and Instructions 5
15. Nonrecreational Income 6
16. Reimbursement Procedures Scope 6
17. Information Sources 6
18. Accounting Systems 6
19. Invoice Voucher
20. Required Documentation - Development Projects 6
20.01 Progress Reports 76
20.02 As Built Plan
• 20.03 Construction By Contract 7
20.04 Construction By Force Account 7
20.05 Construction By Donation 7
21 . Required Documentation - Acquisition Projects 8
22. Record Retainage and Audit 89
23. Filling Out the Invoice Voucher
ATTACHMENTS:
Sample Invoice Voucher A A
Interim Progress Report CB
Final Project Report D
Billing Checklist for Acquisition Projects E
Determining Value for In-Kind Contributions F
Blank Invoice Voucher
AQUATIC LAND ENHANCEMENT ACCOUNT
PROJECT REIMBURSEMENT PROCEDURE MANUAL
1 . Project Approval and Authorization to Proceed
The grantee must not proceed with a Department of Natural Resource
approved project prior to executing a legally enforceable Project
Contract with the DNR; to do so may render the project ineligible.
A Project Contract will be prepared in accord with the components
contained in the grantee's application and as approved by the
Department of Natural Resources, and forwarded for execution. The
terms and conditions of this contract should be reviewed
carefully.
2. Identifying Markers
The grantee is required to construct and display signs or
identifying markers which describe the project, the grantee' s role
in funding and management of the site, and the role of the DNR in
funding, with specific reference to the Aquatic Lands Enhancement
Account. The design and placement of these signs must be
developed in cooperation with DNR, and approved in writing prior
to sign installation. Examples may be obtained by contacting the
ALEA Program staff at (206) 753-0251 .
3. Progress on Development Projects
A development project contract will provide at least twenty-four
(24) months from the date of DNR approval to complete the project.
The following schedule is considered reasonable progress on
development projects:
a. 0-6 months, any and all plans and specifications for the
project have been completed and reviewed by the DNR; in
their absence, major specific activity identified in the
project scope of work has started and measurable progress
toward its completion has been made.
b. 6-12 months, the bidding process has been completed, bids
awarded, construction has been initiated, and any cost
problems resulting from the bidding have been resolved.
c. 8-24 months, construction is taking place at a normal pace,
taking into consideration such things as adverse weather
conditions, delays in receipt of merchandise, etc.
1
•
Depending on circumstances, failure to complete the project within
the 24 month period specified on the project contract may result
in withdrawal of the Aquatic Lands Enhancement Account grant for
the project regardless of percent of completion attained. The
project grantee is responsible for requesting and justifying an
extension of the Project Contract 60 days prior to end date, if
more time is required for completion.
4. Progress on Acquisition Projects
An acquisition project contract will provide twelve months
following the date of DNR approval to complete the project.
Depending on circumstances, failure to complete the project within
the 12 month period specified on the Project Contract may result
in withdrawal of the Aquatic Lands Enhancement Account grant for
the project regardless of percent of completion attained. The
project grantee is responsible for requesting and justifying an
extension of the Project Contract 60 days prior to the end date,
if more time is required for completion.
5. Reporting
The grantee is required to submit a written status report
quarterly summarizing the progress to date on all incomplete
projects. These reports shall be submitted within 10 working days
of the last day of each quarterly period identified.
First Qtr. Jan. 1 - Mar. 31
Second Qtr. Apr. 1 - June 30
Third Qtr. July 1 - Sept. 30
Fourth Qtr. Oct. 1 - Dec. 31
Quarterly reports will be submitted on the Interim Progress Report
for (see Attachment B) .
In addition, grantees of completed projects are required to report
on specific matters whenever requested to do so by DNR. A final
close out report will be required for all final reimbursement
requests (see Attachment C) .
6. Cost Increases
Cost overruns are the responsibility of the grantee and in most
cases must be borne by the grantee. In order for the DNR to
consider development project cost increase requests the following
conditions must be met:
1 . The increase or any portion thereof is to be used only for
2
•
costs incurred on elements specified in the Project
Contract.
2. All alternatives to fulfilling the intent of the project as
approved have been fully explored.
3. The cost increase is not a result of design changes
occurring after DNR approval of the project, unless prior
approval from the DNR has been obtained.
4. The grantee has done everything to initiate implementation
of the project in a timely manner and has had little control
over the conditions causing the cost overrun.
5. DNR must be notified prior to the cost overrun occurring.
Acquisition project cost increases must meet the following
conditions:
I . The increased real market value is supported by acceptable
appraisal technique.
2. The grantee has diligently pursued the acquisition to the
best of its ability.
3. If increased relocation costs have caused a cost overrun an
explanation will be required.
Acquisition cost increases based on condemnation awards, if
granted, will be based on compensation for the property and direct
relocation costs; no court or legal costs are eligible for
reimbursement.
Cost increase requests on development projects are based on the
total approved cost. Cost increase requests on acquisition
projects are based on a parcel by parcel determination.
7. Project Contract Amendments
The project contract may be amended by execution of a project
contract amendment. All amendment requests shall be made in
writing to DNR and must include detailed justification.
8. Construction Plans and Specifications
It is required that one copy of all construction plans and
specifications be submitted to the DNR as follows:
I . Contract construction - submit at least one month prior to
advertising for bids.
3
•
•
•
2. Force account (in-kind) and donation construction - submit
at least two weeks prior to initiating work.
The DNR will review the plans and specifications and determine
conformance with the DNR Project Contract, and federal
regulations.
On contract construction, the bid advertisement, bid tabulation
sheet, and all addendums must also be submitted.
•
9. Construction and Consultant Contracts
One copy of all executed construction and consultant service
contracts must be submitted two weeks prior to the contract being
executed.
10. Construction Contract Change Orders
1. Change orders may be implemented at the discretion of the
project grantee without prior DNR approval .
2. A copy of all change order documents must be submitted to
the DNR.
3. Justification for the change orders may be requested by DNR.
This justification may include, but not be limited to, an
explanation of the situation necessitating the change, the
effects of the change, and the alternatives considered.
4. Reimbursement of costs incurred by the grantee through
implementing a change order is subject to the approval of
the DNR, based on item #3 above.
11 . Site Inspection
The DNR reserves the right to conduct site inspections of all
approved projects. Interim inspections on development projects
are normally coordinated with the grantee and are made during the
project period to help resolve any apparent or anticipated
problems.
A final inspection on development projects will be made prior to
final reimbursement to insure that the project has been completed
in accordance with the project contract.
4
12. Post-completion Compliance Inspection
In order to determine whether properties acquired or developed
with Aquatic Lands Enhancement Account assistance are being
retained and used for aquatic land access purposes in accordance
with the project contract and other applicable program
requirements, inspections will be made by the Department of
Natural Resources at least once every five years.
13. Operation and Maintenance
Grantees will be required to operate and maintain, or cause to be
operated and maintained, the property or facilities acquired or
improved with Aquatic Land Enhancement Account grant assistance as
follows:
a. The property or facilities shall be maintained so as to
appear attractive and inviting to the public and be signed
in accord with Aquatic Land Enhancement Account signing
requirements. This is to include undeveloped sites acquired
with Aquatic Land Enhancement Account assistance.
b. Sanitation and sanitary facilities shall be maintained in
accordance with applicable state and local public health
standards.
c. The property or facilities shall be kept reasonably safe for
public use.
d. Buildings, roads, trails, and other structures and
improvements shall be kept in reasonable repair throughout
their estimated lifetime, or 25 years, whichever is greater,
so as to prevent undue deterioration that would discourage
public use.
e. The facility shall be kept open for public use at reasonable
hours and times of the year, according to the type of area
or facility.
f. The property or facility shall be open for the use of all
segments of the public without restriction because of the
race, creed, color, sex, religion, national origin or
residence of the user.
14. Issuance of Rules and Instructions
The DNR may issue additional or modified rules, instructions,
interpretations and guides from time to time as it believes
necessary for the effective conduct of the grant-in-aid program.
Such changes will apply to all projects for which agreements are
5
•
signed after the effective date of the changes. Whenever
possible, sufficient lead time will be given between the
announcement and the effective date to avoid application to
projects already in process at the time of announcement.
15. Nonrecreational Income Derived During the Project Contract Period
The nonrecreational income that accrues to an Aquatic Lands
Enhancement Account assisted area during the project period per
the executed Project Contract from sources other than the intended
public access use will be used to reduce the total cost of the
project.
Any such use of an area, especially as regards the removal of
timber or structures or the alteration of the land, must be
consistent with the intended public access use of the area.
16. Reimbursement Procedures Scope
The purpose of this portion of the manual is to provide
instructions for the preparation of vouchers to enable local
government agencies to obtain reimbursement for funds expended on
either acquisition or development projects, and to itemize the
supportive documentation that must be retained to meet state
and/or federal audit requirements.
17. Information Sources
Copies of all forms referenced in this manual , together with
information as to how they are to be completed can be obtained
through contacting the ALEA Program staff at (206) 753-0251.
All requests for reimbursement must be mailed to:
Department of Natural Resources
Division of Aquatic Lands
Aquatic Lands Enhancement Program
Mail Stop QW-21
Olympia, WA 98504
Grantees may expect to receive a state warrant within three weeks
after receipt of the billing by the DNR.
18. Accounting Systems
Grantees should incorporate all Aquatic Lands Enhancement Account
Grant contracts into existing accounting systems as no specific
system is required by the DNR. However, each Aquatic Lands
6
Enhancement Account grant must be identified by a specific account
code in the grantee' s system. This will provide a cost collection
system for the grantee as well as an audit trail for the state
and/or federal auditor.
19. Invoice Voucher
Grantees are required to submit one original copy of the DNR
invoice voucher when requesting reimbursement on Aquatic Lands
Enhancement Account Grants (Attachment D) .
20. Required Documentation - Development Projects
20.01 Progress Reports
Grantees must submit an Interim Progress Report (Attachment B)
with each invoice voucher. Progress reports should contain a
brief description of work accomplished to date, the percentage of
completion on the project, identify any problems that may cause
delay in completing the project, and when necessary explain how
these problems are being dealt with. The information provided
should be directly related to the costs being claimed on the
invoice voucher.
A Final Project Report (Attachment C) must be submitted along with
the DNR invoice voucher presenting the final reimbursement
request. The Final Project Report should briefly describe the
finished project and its elements. If not already provided,
projects involving acquisition will be required to show transfer
of title. For construction projects, copies of final construction
inspection reports must be submitted with the final close out
report. Ten percent of the total granted amount will be retained
by DNR and dispersed contingent upon project completion in
accordance with the terms on the Grant Agreement.
20.02 As Built Plan
Along with the final billing, submit two copies of a plan showing
location of the elements, as they exist after construction under
terms of the Project Contract.
20.03 Construction by Contract
Submit one copy of the following when claiming reimbursement on
development projects being performed by contract along with a copy
of the DNR invoice voucher and a copy of the progress or final
project report.
1 . Construction contractor's invoice.
2. Construction contract, if not already sent.
7
•
3. Contract Change Orders, if any.
20.04 Construction by Force Account (In-Kind)
Grantees are not required to submit any additional documentation
to the DNR other than rates to be used in force account for
salaries and wages, employee benefit costs, and agency-owned
equipment rental . This should be done with the first
reimbursement request (see Attachment F) . All documents relating
to force account are to be kept on file until audit is performed.
20.05 Construction by Donation
Grantees should use the following criteria in establishing values
of donated goods and services:
a. Material and Supplies - Use the current market value of the
material or supplies. Local vendors can provide these
values which must be documented in grantee' s files.
b. Labor Costs - Apply the rate the volunteer usually earns for
his/her trade if he/she is skilled in construction work.
Apply the rate for general labor used in area if the
volunteer is not skilled in construction work. Contact the
nearest Employment Security Office for rates which must be
documented in grantee's files.
c. Equipment Rates - Must be based on the current cost to rent
the particular equipment within the local area. This must
be documented in grantee's files.
21 . Required Documentation - Acquisition Projects
When claiming reimbursement on acquisition projects grantees are
required to submit, for each parcel , one copy of the following
documents along with a copy of the DNR invoice voucher and an
acquisition project billing checklist (Attachment D) :
1 . Recorded Deed.
2. Title Insurance Policy.
3. Ten year History of Conveyance.
4. Proof of payment (Copy of cancelled warrants, both sides, or
copy of invoice voucher showing warrant number, or copy of
escrow settlement statement. )
5. Recorded "Deed of Right to Use Land for Public Aquatic Lands
Access Purposes. " (See IAC Participation Manual #3)
6. Copy of offer to property owner to accompany appraiser.
7., Copy of Statement of Just Compensation as signed by the
owner. (See IAC Participation Manual #3)
8. Statement that all incidental costs accruing to the owner
were paid.
9. If relocation was required, submit a copy of the following:
8
a. Relocation Plan.
b. Written notice of benefits to relocate.
c. Statement of right to appeal .
d. Copy of appropriate claim form - Series D1-380 or
equivalent, along with copies of cancelled warrants
(both sides) , or copy of invoice voucher showing
warrant number.
e. Certification that replacement housing is decent,
safe, and sanitary.
10. If eminent domain was used, disregard above 1 through 8 and
submit the following:
a. Court Award Document.
b. Proof of payment - copy of cancelled warrant - both
sides, or copy of invoice voucher showing warrant
number, or receipt from Court Clerk.
c. Recorded "Deed of Right to Use Land for Public Aquatic
Land Access Purposes. "
d. If relocation was required, submit copies of
documentation per nine above.
11. If tidelands, bedlands, or shorelands are involved, the
Grantee shall be responsible• for demonstrating that any
tidelands, bedlands, or shorelands purchased under this
Agreement were previously sold by the state and that such
lands are not subject to any conditions which would have
automatically reverted ownership to the state.
22. Record Retainage and Audit
All records relevant to an Aquatic Lands Enhancement Account funded
project must be on file with the grantee and are subject to audit by
both state and federal agencies and inspection by the Department of
Natural Resources. The cost of the audit will be borne by the
grantee.
Audits will be conducted by the State Auditor's Office, Division of
Municipal Corporations, as part of their regular audit program for
local agencies of government.
If the auditor' s inspection of the records discloses any charges
incorrectly claimed and reimbursed, the grantee must make cash
restitution of such incorrect amounts to the DNR for deposit to the
Aquatic Land Enhancement Account.
23. Filling Out the Invoice Voucher
(See Attachment A)
Item
1. Name and address where the warrant is to be sent.
2. Signature and title of authorized official responsible for
maintaining the official financial records.
9
3. Billing Period.
4. Project Name.
5. ALEA Project Number.
6. Current Expenditures eligible for ALEA reimbursement.
Please list these according to the identified cost categories .
Attach appropriate documentation. See Section 15.1 (a) of the
Grant Agreement for restrictions on preliminary expenses.
7. List grantee contributions as they relate to the identified
cost categories. Attach appropriate documentation.
8. Total expenses eligible for ALEA this billing.
9. Total expense reflecting grantee' s share.
10. Current ALEA disbursement request - this should be the same as
line 8.
11. Eligible ALEA expenditures to date in each category.
12. Expenditures to date paid by grantee in each category.
13. Total of column 11 .
14. Total of column 12.
Procecur
10
ATTACHMENT A
FORM STATE OF WASHINGTON ..la
AGENCY USE ONLY
a19-a 0INVOICE VOUCHER - N .p,w', * fro.
,Re• 5 55) • F8Ei1CM�1W. LOC�'�1D11 CODE.
AGENCY NAME 490 52 RCW 39 34
Department of Natural Resources Encumbrance No.
INSTRUCTIONS TO VENDOR OR CLAIMANT Submit this form in
MailStoplSSofQW-2 1 Aauatic Lc372Cj5 triplicate to claim payment for materials. merchandise or services.
Mail Show complete detail for each item
Olympia, WA 98504
(Warrant is to be payable to
VENDOR OR CLAIMANT ) Vendor's Certificate. I hereby certify under penalty of perjury that the
nems and totals listed herein are proper charges for materials.
1 merchandise or services furnished to the State of Washington.and that all
goods furnished ands or services rendered have been provided without
discrimination on the grounds of race.creed.color.national origin,sex.or
age.
BY
(SIGN IN INK)
(TITLE) ----'--- (DATE)
-- C 1 'rojec: Name
Perioi 1
3 4 5
Expenditures Since Total Expenditures
i Last Billing To Date
:atecories: ALEA Share Grantee Share ALEA Share Grantee Share
7 11 12
�CG:J ,s'tion
Land and Structures
Otner
;eye ooment
Preliminary Expenses.. .
Architectural and Engineering
Construction and Project 1 3 1 4
improvements 8 9
Total.
10
CERTIFICATION FOR PAYMENT
Currnt ALEA ReiMbursanent Request
FOR ALEA USE ONLY BELOW THIS LINE Division Manager . Date
l
Approved Disbursement Amount
• "ot-mu is
'- � Oats
Project Manager
Amount. .
LE.t,e Amount. . . . l
ALE:. Reimbursement i
i , NO PIECES RECEIVED BY DATE RECEIVED
_et?i'iaOe: „ Amount PREPAID
SKIPPING DOCUMENT Ni..) COLLECT
xRREn
"CC :.ATE .UR DOC NO
REF DOC NO VENDOR NUMBER VENDOR MESSAGE
_ woes SUB SUB
UB AMOUNT INVOICE NUMBER RJ (-OE C f0 t,PPN PROD r T P y RIAS INDEX ! Ca TOM tl.RSSI 081 081 081 C
.JF 000E n fl>K1 Oil t1 MU f _-
--- 02R 9BH . . I --- — - - --
•
•
i i
1I
I
•
1 I, l 1 I • _, I i 1 1 1
i I - i I I I I I WARRANT TOTAL WARRANT NUMBER
:OPROVEC FOR PAYMENT BY DATE
-A til-A--t-
Attachment B
INTERIM PROGRESS REPORT
NOTE: AN INTERIM PROGRESS REPORT MUST ACCOMPANY EACH BILLING.
Agency Project
WORK REPORT: Briefly describe work accomplishments to which this particular
voucher pertains.
SIGNATURE
TITLE
DATE
attach.b
•
Attachment C
FINAL PROJECT REPORT
NOTE: This report must accompany final billings .
Agency Project Number
Project Period Project Title
Work Report: Describe work accomplished, major deviations from proposal , etc.
Post-Construction Certification:
If this report applies to a development project, I hereby certify that
construction of Project Number has been completed in accordance
with the original and revised plans and specifications on file. The plans and
specifications are consistent with scope of the project approved by the
Department of Natural Resources.
Signature
Title
Date
attach.c
BILLING CHECKLIST FOR ACQUISITION P°OJECTS ATTACHMENT D
AGENCY NUMBER
PROJECT
VOUCHER NO. PARCELS
APPRAISAL REVIEW ( ) Complete NOTES:
Date
W
—• a
,
W W
- U
W
W
(l1
W
CC U
a_ —
a
ct a_
W
U W i
C
Q Q
CL z fil
DOCUMENT
•
BILLING VOUCHER
RECORDED DEED
TITLE INSURANCE
TEN YEAR CONVEYANCE
PROOF OF PAYMENT
DEED OF RIGHT
OFFER OF APPRAISER ACCOMPANIMENT
OFFER OF JUST COMPENSATION (WITH
RELOCATION ELIGIBILITY INFORMATION)
INCIDENTAL COST STATEMENT
IFRELOCATION REQUIRED:
A. RELOCATION PLAN
B. NOTICE OF BENEFITS
C. STATEMENT OF APPEAL
D. CLAIM FORMS AND PROOF OF
PAYMENT
E. REPLACEMENT HOUSING CERTIFICATION
(IS LEGAL DESCRIPTION
DESCRIPTION DEED .11■■■■■■■■■■
IDENTICAL APPRAISAL 11.■■■.■■.■■■
ON EACH Ti TLE INSURANCE 1111.■■■■■■■■.
OF THESE?) AGREEMENT 111.11■■■■■■■■.
DEED OF RIGHT TO USE 11111.1111111111.■■■■■
Attachment E
Determining Value for In-Kind Contributions
Volunteer Services
The work performed must be an integral and necessary part of project.
The time of a person donating services should be valued at the rate paid to
a general laborer unless the person is professionally skilled in the work
which they are performing (for example, a plumber working on the pipes or a
mason doing the brick work) . In the case of such specialized skills, rates
should be consistent with those paid for similar work in other activities.
If the work is being done by an employee from other than the project
sponsor, the services will be valued at that employee' s regular rate of pay
(excluding fringe benefits and overhead) providing these services are in
the same skill for which the employee is normally paid.
Equipment Usage
Equipment use changes incurred specifically for and in direct benefit
to the project must be adequately supported. Valuation should be
determined by the cost of operating the equipment, not what renting a
similar piece of equipment would be. The services of an operator would be
valued separately as discussed in "Volunteer Services", above.
Materials
Values assigned to donated materials should be reasonable and should
reflect the lower of the donor's cost or current market value at the time
of receipt by the project.
Real Property
The value should be established by an independent appraiser.
Valuations for DNR matching share must be reviewed by appraisers with the
Department of Transportation.
Sponsor-furnished Employees
When employees are working on directly related tasks their time may
be used by the project sponsor. The value assigned would be that shown on
the sponsor's records. The amount of time used may not be used as part of
another project simultaneously.
Sponsor-furnished Equipment
The value assigned to sponsor-owned equipment may not exceed that
which is determined from the sponsor' s records as actual costs of the use
of that equipment.
•
•
• Attachment F
NORM STATE OF WASHINGTON
419-A INVOICE VOUCHERz
•
IR.. 5 55) �'• ...
AGENCY NO. LOCATION CAGENCY USE ONLY ODE P.L Oat MET* IeO.
AGENCY'NAME • 490 52 RCI 39 34
Department of Natural Resources Encumbrance No.
Division ofAquaticAquatic Lands INSTRUCTIONS TO VENDOR OR CLAIMANT. Submit this form it
Mail StopQW triplicate to claim payment for materials, merchandise or services
4 Snow complete detail for each item
Olympia, WA 98504
VENDOR OR CLAIMANT (Warrant u to be payable to)
Vendor's Certificate. I hereov certify under penalty of penury trial the
items and totals listed herein are proper charges for materials
merchandise or services furnished to the State of Washington.and that al
goods furnished and:or services rendered have been provided withoir
discrimination on the grounds of race.creed.color,national origin.sex.of
age.
BY
(SIGN IN INK)
(TITLE) (DATE)
i)n0 Period Project Name Project No. 1
•
Expenditures Since Total Expenditures
Last Billing To Date
Cast Cateaories:
ALEA Share Grantee Share ALEA Share Grantee Share
Acouislt ion
Land and Structures
Other
Development
Preliminary Expenses
Arcnitectural and Engineering
Construction and Project
improvements
Total
CERTIFICATION FOR PAYMENT
Current ALEA Reimbursement Request
FOR ALEA USE ONLY BELOW THIS LINE Division Manager Date
�cinc rcRTu is Approved Disbursement Amount
grantee: Amount Project Manager Date
ALEA Amount
Ketainaoe- 7 Amount Reimbursement N
CARRIER SHIPPING DOCUMENT NO COLLECT PREPAID NO PIECES RECEIVED BY DATE RECEIVED
DOC DATE CUR DOC NO REF DOC NO VENDOR NUMBER VENDOR MESSAGE
REF TRANS rD APPN FROG ' $1!• PIED ORG an/ 'won SUB
SUB
sur CODE p F17O DTE ercEA NOEI P1/11-47 PIOf MUINDEX Ca TDMI I OBI • OBI 051B kt Nt INVOICF trlIEIER U
02R 913111 t ; t
1 •
I
• 1 1 1 i I
i
•
I � i
I' ;y }
i I 1 1 I 1 1 ' 1_ 1 I
I
• I I c 1 1 t 1 1
• lel.---—. ._ I I 1I I 1
APPROVED FOR PAYMENT B` DATEWARRANT TOTAL WARRANT NUMBER
•A 19-A—S.E
•
I In-Kind Con t r I but ion. s
P ro j ect 12C1A-k 1,4e. tale_
•
Cost Centers
Ref Donor Con t r bu i on
I rridTv.i dual or Type of equipment ,
14o. . TOTAL
organ i zat ion) material or labor)
SCALvliet5 (.41 e• _ _
-P.7.0 LLp,e 2-7.c)c) 34.L95
_6_701_
_ ke I) 3 2--04' 7__Lo _ 4 V_AD •
L S-e)."-"' 2 L57 or,
r,L1 t- 323.03
- -
•
_ --
- - -
_ .
- .
--• - _ .
— —
- -
1 • __
In-Kind Contribution*
i
' Project
Ref Donor Contribution Cost Centers
No. Individual or (Type of equipment , TOTAL
organization) material or labor)
f
. Szmple Accounting Forms
Time Sheet_ •
Name (Cock, prc4'e2 Ref . Number 12-4P(
Occupation t'✓tasov Project ' ,r —=.'e LAKE
S.S . Number 1z--5-41= f,799
)ates WorkeC;iours '.iorxect Rare I Value boecific Work Performed
4- 18-7/ I 67- 12-- I 7.---55-- i 7.o.f' melee„ 4Qe� o;� dei7 aLs
Personal 4-1 e-r/ t I 4 • eo -� 2-.470 5et si'oi/e_ aeiert-- .7' coo II
Services
1
t I
Signature of Donor Signature of Supervisor
Equipment Utilization
Donor 12ockeQ C ' -' t Ref. Number E--o(
Type CA-7- Project Pik QT 44,, L-14_42_
Model -(e
fates Worked'ours Worked Rate Value pecific Work Performed
Equipment 4--it-g/ I 15,-4:2- l 1 6, .540 -7,2--PC' CleaRed Resfn-.•..r S,T;
Useage c4.-Ls'-7/ I - 3 1.(,. oo 3 z,'cc C-leR
B7/ /7b4 i" l-Q uR?T Stl&
I
- (?„,. „tzPA ,_9_ _.1...., _
Signature of Operator Signature of Supervisor
Materials Receipt
Ref. Number /1 Project (�w.ix of
Date Rc'd { .`�aterials 14 Units I Value
t ..
q_/?-1(____I -7-)44 4c 8 4/...t 4,,e4le I so I //�=
2-12 4. 4 peic I �o /some
"aterials
�� � Comparable Tendons Value
Donor
Delivered By lam t-- u- "t
• Received By_ J. / � ' i IA 7 0 -t
• I l.h.��--( ( �"? 9 so I
Sample Accounting Forms
•
Time Sheet
•
Name Ref. Number
Occupation Project
S.S. Number
Dates Worked'iours Worked Rate Value Specific WorK Performed
Personal
Services
Signature of Donor Sianature of Supervisor
Equipment Utilization
Donor_ Ref. Number
Type Project
Model
Dates Workediours Worked Rate Value Specific Work Performed
Equipment
Useage
Signature of Operator Signature of Supervisor
Materials Receipt
Ref. Number Project
Date Rc'd Materials # Units Value
Materials
Donor Comparable Vendors Value
Delivered By
Received By
EXHIBIT IV
Special Conditions
ALEA #: AL-91-04
Applicant: City of Renton
Project: Cedar River Trail Development and Interpretive
ALEA review of the interpretive signing at a point where final
sketches are available but changes can still be made.
Grantee shall provide:
(a) ALEA approved credit sign.
(b) Safe public parking and access to the site.