HomeMy WebLinkAboutT_40130475
N
00
N
u;
0
z
0
0
A
ca
J
I AI/E- \AIA0L1INI(`T0N1
i BerizerABAM
CALL 48 HOURS
BEFORE YOU DIG 33301 9th Avenue South, Suite 300
Federal Way, Washington 98003-2600
1-800-424-5555 (206) 431-2300 Fax: (206) 431-2250
SYM REVISION
- APRON R INFRASTRUCTURE W4700331
\ 200' SHORELINE SETBACK
\ PER CITY OF RENTON
\ • 2
\ 3
\
\ \ 6 PC
\ N: 186007.65
\ E: 1300405.46
\
\ c
\
\
MATCH LINE, SEE SHEET C500-4E
6 / i
6 I
I
/ R-240' ` 1
C � I
I
Y
I` C500-4J
\\ po I
/ I
/ 1
I
_ 30N3J XNIINIVHO,-
J.71
E: 1300364.08 1
Imo- --------_ _
4 N: 185971.68 -
\ -E: 1300160.68
\ I
\ I
\ I
\ 4 N- 185969.17
\ E: 1300151.00
\ I
\ I
\ I
\ I
\ I
BY I APPROVED I DATE I SYM REVISION
ABAM I SPT 06/08/18
I
1 PT
N: 185977.08 1�
E: 1300360.19 1
I
N: 186015.86 4 ,d
E: 1300315.72 110
N: 186009.02 1
E: 1300308.42
_------R--200' - -
I
1 PC
N: 185944.46
E: 1300312.41 1
1 - X 4
\ 5 PT
N: 185928.93
E: 1300307.25 1
1 COI
°om oa
I \
\ 1
PC
1 N: 185932.29
E: 1300281.02
I
I. \
I \
-T -
1
I
I \
I I
I
1
I \
N: 185917.23
1 E: 1300225.01
I I
I I
I
I
PC
- - - - - I N: 185899.07 5
_ - I E: 1300203.62
I
I
I I
I
I �
I 12' 12'
I a"
I I 1= I
MATCH LINE, SEE SHEET C500-4C
BY I APPROVED I DATE
P.
of WA �f
BOE//V� OD
x
31271 w�
��ssioNaL
,61
o 0 m o m
m �HARDSTAND
0 omamom om
1 1 20 40
DRAWN DATE SUBTITLE
ACCEPTABILITY JDM 06/08/18
THIS DESIGN AND/OR CHECKED
SPECIFICATION IS APPROVED SPT 06 08 18
ENGINEER TITLE
APPROVED BY DEPT. I DATE JLC 06/08/18
CIVIL MASTER
GENERAL NOTES
1. REFER TO SHEET G2 FOR GENERAL STRIPING NOTES
2. THERE SHALL BE NO EXPOSED GALVANIZED MATERIALS, COATINGS OR
ZINC APPLIED SURFACE TREATMENTS ON ANY EXTERIOR OR
UNDERGROUND MATERIALS OR SURFACES. ALL GALVANIZED OR ZINC
APPLIED MATERIALS OR COATINGS SHALL BE PERMANENTLY PAINTED OR
COATED TO PREVENT EXPOSURE OF THE GALVANIZED/ZINC MATERIALS
PRIOR TO INSTALLATION OR COMPLETION OF CONSTRUCTION.
3. HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM, NORTH
ZONE, NORTH AMERICA DATUM 1983(91). VERTICAL DATUM: NATIONAL
GEODETIC VERTICAL DATUM 1929 (NGVD29). VERTICAL DATUM
CONVERSION: NGVD29 TO THE NORTH AMERICAN VERTICAL DATUM 1988
(NAVD88) = NGVD29 + 3.60 FEET.
4. DOUBLE YELLOW CENTERLINE STRIPING PER SHEET C500-4G DETAIL 8
5. PEDESTRIAN LANE STRIPING PER SHEET C500-4G DETAIL 4 AND 5
6. WHITE STRIPE PER SHEET C500-4G DETAIL 6
7. WHITE GORE STRIPING PER SHEET C500-4G DETAIL 11
8. RED GORE STRIPING PER SHEET C500-4G DETAIL 10
9. 15 MPH STRIPING PER SHEET C500-4G DETAIL 2 AND 3
10. TRAFFIC ARROW PER SHEET C500-4G DETAIL 12
11. SECTION VALVE MARKINGS AT VALVE. VALVE PAINT MARKINGS PER SHEET
M510-2 DETAIL 4. REFER TO SHEET M262 FOR VALVE LOCATION.
12. REFER TO ELECTRICAL PLANS FOR STATIC GROUND MARKINGS AND
ASSOCIATED DETAILS.
13. REFRESH EXISTING PAVEMENT MARKINGS DIRECTLY ADJACENT TO
PROJECT LIMITS AS DIRECTED BY BOEING REPRESENTATIVE IN FIELD.
14. SEE SHEET C500-46 FOR SIGN LOCATIONS AND DESCRIPTIONS.
CONSTRUCTION NOTES
PROVIDE DOUBLE YELLOW CENTERLINE STRIPING
PROVIDE "15 MPH" LETTERING
3�
STATIC GROUND. SEE GENERAL NOTE 12
4�
PROVIDE RED GORE STRIPING
PROVIDE 4" WIDE WHITE PAINT STRIPE
PROVIDE 6" WIDE YELLOW TOWPATH STRIPE
CIVIL PERMIT
PAVEMENT MARKING PLAN - SHEET 4
APRON R INFRASTRUCTURE
RENTON SITE
SITE
KEY PLAN
SCALE: N.T.S.
T-401304 R-401390
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
W4700331 - 06/08/18
SHEET
C5004D C74
JOB N0. COMP NO.
W4700331
RENTON, WA DWG N0. 4-APRON-R-0500-4D