HomeMy WebLinkAboutR_401311075
a_
00
N
00
N
L
O
z
E
0
c
0
0
c�
U)
m
J
FUTURE SLOPE
SUMMER EL +15.18
WINTER EL +13.18--
EXIST MUDLINE
FUTURE SLOPE
SUMMER EL +15.18
1' CONCRETE
TO BE REMOV
WINTER EL +13A8--
EXIST MUDLINE
TEMPORARY SHEET PILE
LAB SECTION - DEMOLITION
S50��9 SCALE: 1/2" = 1'-0" 2 0 2 4
1/2" = 1'-0$)
scale feet
Trunnnnnv rI 1rrr nil r
LB� SECTION -
S50�-09 SCALE: 1 /2" = 1'-0
MOVED
'RETE WALL
REMOVED
BULKHEAD TO BE
'ED, TYP
DEMOLITION
2 0 2 4
1 /2" = 1'-0"
scale feet
INSALLATION OF RETAINING WALLS TO BE COMPLETED UNDER
A SEPARATE BUILDING PERMIT
i BergerABAM
33301 9th Avenue South, Suite 300
Federal Way, Washington 98003-2600
(206) 431-2300 Fax:(206) 431-2250
CIVIL PERMIT
I r-rF-Nln
DEMOLITION
CONSTRUCTION NOTES
REMOVE EXIST PILE FOUNDED SLAB.
DRIVE EXIST PILES
REMOVE EXIST CONC SLAB/BEAMS/BULKHEAD.
® REMOVE EXIST TIMBER LAGGING.
T-401313 R-401410
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE UNAWN UAI E SUBTITLE CURRENT REVISION SYMBOL DATE
�L G. THIS ESIGNAND/OR CHECKED GP 06 21 1$ STAGE 2 - CENTRAL RAMP DEMOLITION SECTIONS W4700331 — 06/21/18
APRON R INFRASTRUCTURE W4700331 ABAM MGW 06/21 /18 ��' e WAsSPT 06 21 18 SHEET
'i' SPECIFICATION IS APPROVED
�0 ENGINEER TITLE APRON R INFRASTRUCTURE
APPROVED BY DEPT. I DATE MGW 06 21 18 S500-10CHECKED S10
l C'1, 28710 �~ w RENTON SITE D COMP N0.
s �aaL e� Gw APPROVED JOB No. W4700331
AL
APPROVED CIVIL MASTER SITE RENTON, WA DWG NO. 4—APRON—R—S500-10