Loading...
HomeMy WebLinkAboutT_40131375 a_ 00 N 00 N L O z E 0 c 0 0 c� U) m J FUTURE SLOPE SUMMER EL +15.18 WINTER EL +13.18-- EXIST MUDLINE FUTURE SLOPE SUMMER EL +15.18 1' CONCRETE TO BE REMOV WINTER EL +13A8-- EXIST MUDLINE TEMPORARY SHEET PILE LAB SECTION - DEMOLITION S50��9 SCALE: 1/2" = 1'-0" 2 0 2 4 1/2" = 1'-0$) scale feet Trunnnnnv rI 1rrr nil r LB� SECTION - S50�-09 SCALE: 1 /2" = 1'-0 MOVED 'RETE WALL REMOVED BULKHEAD TO BE 'ED, TYP DEMOLITION 2 0 2 4 1 /2" = 1'-0" scale feet INSALLATION OF RETAINING WALLS TO BE COMPLETED UNDER A SEPARATE BUILDING PERMIT i BergerABAM 33301 9th Avenue South, Suite 300 Federal Way, Washington 98003-2600 (206) 431-2300 Fax:(206) 431-2250 CIVIL PERMIT I r-rF-Nln DEMOLITION CONSTRUCTION NOTES REMOVE EXIST PILE FOUNDED SLAB. DRIVE EXIST PILES REMOVE EXIST CONC SLAB/BEAMS/BULKHEAD. ® REMOVE EXIST TIMBER LAGGING. T-401313 R-401410 IN COMPLIANCE WITH CITY OF RENTON STANDARDS SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE UNAWN UAI E SUBTITLE CURRENT REVISION SYMBOL DATE �L G. THIS ESIGNAND/OR CHECKED GP 06 21 1$ STAGE 2 - CENTRAL RAMP DEMOLITION SECTIONS W4700331 — 06/21/18 APRON R INFRASTRUCTURE W4700331 ABAM MGW 06/21 /18 ��' e WAsSPT 06 21 18 SHEET 'i' SPECIFICATION IS APPROVED �0 ENGINEER TITLE APRON R INFRASTRUCTURE APPROVED BY DEPT. I DATE MGW 06 21 18 S500-10CHECKED S10 l C'1, 28710 �~ w RENTON SITE D COMP N0. s �aaL e� Gw APPROVED JOB No. W4700331 AL APPROVED CIVIL MASTER SITE RENTON, WA DWG NO. 4—APRON—R—S500-10