Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
R_4013130
WE N N 00 N L 0 z E 0 c 0 J SYM I REVISION APRON R INFRASTRUCTURE SECTION SCALE: 1 /2" = 1'-0 COLUMN AT G1 PARTIAL PAN - COLUMN AT G1 3 SCALE: 1 /2" = 1'-0" S534 7rN BY I APPROVED I DATE I SYM W47003311 ABAM 1 101/30/181 REVISION BY I APPROVED DATE � BOE/NG° 9— #5 @ 12" OC PAVEMENT, SEE PAVEMENT SECTIONS DETECTABLE WARNING TAPE CSBC, SEE PAVEMENT SECTIONS 1 #5 @ 12" OC EPDXY GROUT TO (E) FLR SLAB (6" EMBED) p � U m 00 Q � � p p RIMLLJ (E) FLR (D CONC SLAB N z 2" 0 COMMUNICATION CONDUIT YO AIR LINE SEE NOTE 1 BELOW GEOTEXTI LE AS 00 °0° oa o ° °o ° °o 0000000 o 00 0 000000000000000000000000 REQUIRED 0°00000000000000000000 FOR OVEREXCAVATION. 60000 0 010000000000000 0 0 0 0 000000 SEE NOTES 00 00 ° °0000 - ° °0 ° °0000 ° 0 ° 0° 00 QUARRY SPALLS AS REQUIRED FOR OVEREXCAVATION. TRENCH WIDTH SEE NOTES PER PLAN NOTES: z co o 0 1. CENTER AIR LINE IN TRENCH WHEN ONLY UTILITY PRESENT. 2. ALL BACKFILL SHALL BE COMPACTED TO AT LEAST 95% OF MAX. DRY DENSITY PER ASTM D-1557. 3. FOR ADDITIONAL REQUIREMENTS SEE THE GENERAL NOTES ON SHEET G2. 4. IF TRENCH SUBGRADE IS DETERMINED TO BE UNSUITABLE BY THE GEOTECHNICAL ENGINEER DURING CONSTRUCTION, PROVIDE GEOTEXTILE FABRIC FOR SUBGRADE STABILIZATION AS DIRECTED BY THE BOEING CONSTRUCTION MANAGER PER THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS. C n i1 .7 12" MIN OVEREXCAVATION AS REQUIRED SEE NOTES, TYP COMM CONDUIT CONN TO (E) COL SCALE: 1 " = 1'-0" S534 PARTIAL PLAN - BLDG 4-20 AT GRID GI SCALE: 1 /4" = 1'-0" i BergerABAM 33301 9th Avenue South, Suite 300 Federal Way, Washington 98003-2600 (206) 431-2300 Fax:(206) 431-2250 DRAWN DATE SUBTITLE ACCEPTABILITY JKM 06 21 18 �Y1E �1 THIS DESIGN AND/OR CHECKED wOV WA3Fjf�� SPECIFICATION IS APPROVED LEH ENGINEER 06 21 18 TITLE A ;2 APPROVED BY DEPT. I DATE BEM 06/21 /18 �SIDNAL���C' D 2,-9 I I D D 2 D 4 L- ,J 11 S5 4 2'- 4 E361 (E) COL (W6x 15*) COMM CONDUIT PER ELECTRICAL W/ CLAMP TO UNISTRUT MEW m� UNISTRUT P 100 AT 6'-0" OC MAX 1. SAND OFF FINISH. 2. DEGREASE SOLVENT TO CLEAN SURFACE. 3. PATCH UNISTRUT FINISH AS REQUIRED. * FIELD VERIFY DIMENSIONS COMM CONDUIT CONN TO (E) COL SCALE: 1" = 1'-0" CIVIL PERMIT STRUCTURAL MASTER PARTIAL PLAN & DETAILS APRON R INFRASTRUCTURE BUILDING 04-020 GENERAL NOTES 1. REFER TO SHEETS C81 - C85 FOR OVERALL SITE PLAN DESIGN. 2. FOR UTILITY TRENCH SECTION 2 OUTSIDE OF BUILDING, REFER TO C50�-3L 3. IF FIELD CONDITIONS VARY FROM THOSE INDICATED ON PLANS AND DETAILS, CONTACT BOEING CM FOR DIRECTION. DATA CONDUIT, SEE ELECTRICAL 2� COMPRESSED AIR LINE, SEE MECHANICAL BUILDING WALL ® EXISTING UTILITY VAULT NEW ELECTRICAL BOX AND ELBOW © NEW BOLLARD, SEE C500-5C R-4013130 IN COMPLIANCE WITH CITY OF RENTON STANDARDS W4700331 - 06/21 /18 SHEET S534 S30- JOB NO. COMP NO. W4700331 RENTON, WA DWG NO. 04-020-S534