Loading...
HomeMy WebLinkAboutR_4013190MATCH LINE, SEE SHEET E9C SYM I REVISION A I APRON R INFRASTRUCTURE BY APPROVED DATE SYM W47003311 CASNE I CEC 1 06.08.18 1 E510-13 E9 �o HARDSTAND R10 GROUND F #4/0 GND 1 E510-14 LE9 HARDSTAND R11 0 GROUND ROD #4/0 7�ND- 0 1 E510-15 LE9 HARDSTAND R12 0 GROUND iOD 0 #4/0 GN�- 1 E510-16 E9 z 0 HARDSTAND R13 Z^ l CSklwlu 0 TEMP STRUCT 1 #4/0 GND I I I I G fil SHED I --#4/0 GND I ,I I I • I • I I 4;+#4/0 GND '-- #4/0 G tl -I —10 estimated, nose poi ,lon 737-900 ; —10 estimated, nose poF�lon cw CW CW C --------- --- ----W -- #4/0 GND —���7r-- MATCH LINE, SEE SHEET E9A i i i i' i i i 200' SHORELINE SETBACK PER ..Itt OF RENTON-- i i <w�cw 0 GND cw �cw I .• 4-20 BUILDING LEGEND — — $ — — 3/4"x30' COPPER CLAD GROUND ROD 0 EXOTHERMIC WELD OR APPROVED c COMPRESSION FITTING c c GENERAL NOTES ° T 1. NO EXPOSED GALVANIZED STEEL TO BE INSTALLED C ABOVE GRADE ON APRON. PVC COATED OR PAINTED RIGID STEEL IS ACCEPTABLE. 2. HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM, NORTH ZONE, NORTH AMERICAN DATUM 1983(91). VERTICAL DATUM: NATIONAL GEODETIC VERTICAL DATUM 1929 (NGVD29). VERTICAL DATUM CONVERSION: NGVD29 TO THE NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) = NGVD29 + 3.60 FEET. REFERENCE DRAWINGS 04—APRON—R—E510-6 GROUNDING DETAILS T y � `' a c c c CONSTRUCTOR NOTES T PROVIDE AND INSTALL BARE 4/0 GROUND G CONDUCTOR ALONG CONDUIT PATHWAY INSIDE —_ TRENCHING. SEE DETAIL E510-4 FOR ORIENTATION. PROVIDE AND INSTALL GROUND ROD AND CONNECT TO NEWLY INSTALLED DISTRIBUTION STAND. SEE GROUNDING DETAIL SHEET E510-6 FOR REFERENCE. PROVIDE AND INSTALL GROUND ROD IN NEWLY INSTALLED MANHOLE. REFERENCE DETAIL DRAWINGS E510-8 AND E510-6 FOR CONNECTION INFORMATION. ® PROVIDE AND INSTALL STATIC GROUND WELL, CENTERED BETWEEN ENGINE POSITIONS, AS SHOWN. KEY PLAN o SCALE: N.T.S. 4/0 GND LAKE WASHINGTON M83 HOTEL AT SOUTHPORT HH—P1 3 1 _q_— J CW 131 6, 82 \ ° -44 4--46 0 �4 / I _ A� �1F e 8TH SIREE Y cxm I � w bMX�XININMINIIl111NINWIMV [AMMFJ m 1 PAGE dIIHIWINHIIHWMYMMINID ANMIN� n� OXw�,HWr dX�1XINML �NIN AWXWhLII�IM1111® dNMR �NINXXY6' ItlMMtlH�q gIII611111111�III�IINXINµtl � 10.20 N. 6TH STREET - � 5-407 P4�x�riml.,aa�„a j. z i z i i 10-t6 O a LOT 8 20 10 0 10 20 40 SCALE: IN FEET C) DRAWN DATE BY APPROVED DATE `i L 4 of was tr ACCEPTABILITY HGG 04.07.17 SUBTITLE THIS DESIGN AND/OR CHECKED - "d� 35276 0�' 1 STERN �SSJ 0NAL � SPECIFICATION IS APPROVED DAT ENGI ;,ROVED BY DEPT. DATE DAT 04.07.17 TITLE 04.07.17 PARTIAL SITE GROUNDING PLAN APRON R INFRASTRUCTURE RENTON SITE ELECTRICAL MASTER SITE CCASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 NE 38th PL., SUITE 205 KIRKLAND, WA 98033 (425) 522-1000 WWW. CA SNE. COM JOB NO. 161-140 CIVIL PERMIT CURRENT REVISION SYMBOL DATE W4700331 A 06.08.18 SHEET E9B E22 JOB NO. COMP NO. W4700331 RENTON, IRA DWG NO. RTN—YD—E9B