HomeMy WebLinkAboutR_4013191MATCH LINE, SEE SHEET E9D
LEGEND
RAMP
MATCH LINE, SEE SHEET E913
z
N
,.
8" DI
g
° m CONC PAD
0
0
z
0
Q 4-20
m °
U
BUILDING
°
0
0
u
- - $ - - 3/4"x30' COPPER CLAD GROUND ROD
0
C
EXOTHERMIC WELD OR APPROVED
COMPRESSION FITTING
`c'
C
0
GENERAL NOTES
T
C
1. NO EXPOSED GALVANIZED STEEL TO BE INSTALLED
ABOVE GRADE ON APRON. PVC COATED OR PAINTED
RIGID STEEL IS ACCEPTABLE.
2. HORIZONTAL DATUM: WASHINGTON STATE
COORDINATE SYSTEM, NORTH ZONE, NORTH
AMERICAN DATUM 1983(91). VERTICAL DATUM:
NATIONAL GEODETIC VERTICAL DATUM 1929
(NGVD29). VERTICAL DATUM CONVERSION: NGVD29
TO THE NORTH AMERICAN VERTICAL DATUM 1988
(NAVD88) = NGVD29 + 3.60 FEET.
REFERENCE DRAWINGS
04-APRON-R-E510-6 GROUNDING DETAILS
T
y �
`'
a
C
C
C
CONSTRUCTOR NOTES
T
PROVIDE AND INSTALL GROUND ROD AND G
CONNECT TO NEWLY INSTALLED DISTRIBUTION -_
STAND. SEE GROUNDING DETAIL SHEET E510-6
FOR REFERENCE.
PROVIDE AND INSTALL STATIC GROUND WELL,
CENTERED BETWEEN ENGINE POSITIONS, AS
SHOWN.
KEY PLAN
SCALE: N.T.S.
LAKE WASHINGTON
4-&1
jj
0
CCASNE ENGINEERING, INC.
ELECTRICAL AND TECHNOLOGY CONSULTANTS
10604 NE 38th PL., SUITE 205 KIRKLAND, WA 98033
(425) 522-1000 WWW. CA SNE. COM JOB NO. 161-140
20 10 0 10 20 40
U I V I L H E RM I I
SCALE: IN FEET C)
SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE
A APRON R INFRASTRUCTURE W4700331 CASNE CEC 01.30.18 wash j �� THIS DESIGN BAND/ R CHECKED HGG 04.07.17 W4700331 A 06.08.18
�' ��' �� DAT 04.07.17 PARTIAL SITE GROUNDING PLAN SHEET
SPECIFICATION IS APPROVED
EN VIED BY DEPT. DATE DATINEEK 04.07.17
CHECKED TITLE APRON R INFRASTRUCTURE E9C E23
"d,p 35276 APPROVED RENT 0 N SITE JOB N0. COMP N0.
0 ISTER� ' I W4700331
�SSIONAL � 8II APPROVED DWG N0.
ELECTRICAL MASTER SITE RENTON, WA RTN-YD-E9C