Loading...
HomeMy WebLinkAboutR_4013195SYM A I APRON R INFRASTRUCTURE I:a MInil BY APPROVED W47003311 CASNE CEC DATE I SYM 1. 1: CSwvulu MATCH LINE, SEE SHEET E111 PARTIAL SCALE: 1 "=20'-0 BY I APPROVED I DATE POWER PLAN Q� BOE/NG C'- ��� of WAS L�T� LEGEND GENERAL NOTES 0 480V, 3� MOTOR/VALVE 1 NO EXPOSED GALVANIZED STEEL TO BE INSTALLED (SIZE AS NOTED) ABOVE GRADE ON APRON. PVC COATED OR PAINTED RIGID STEEL IS ACCEPTABLE. 0 2. COLOR CODING OF CONDUCTORS SHALL BE OBSERVED c ON ALL CIRCUITS 600 VOLTS OR LESS AS FOLLOWS: 0 C 277 480V C 3. "A" PHASE (LEFT BUS IN PANEL) BROWN 0 n rr T 20 10 0 10 20 40 SCALE: IN FEET ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED — UNAWN HGG UAIL 05.05.17 SUBTITLE CHECKED DAT 05.05.17 ENGINEERTITLE DAT 05.05.17 ; ,PROVED BY DEPT. I DATE PARTIAL POWER PLAN APRON R INFRASTRUCTURE B PHASE (CENTER BUS IN PANEL) ORANGE "C" PHASE (RIGHT BUS IN PANEL) YELLOW NEUTRAL GRAY EQUIPMENT GROUND GREEN 4. FOR CURVES LESS THAN FIVE FOOT IN RADIUS, ELECTRICAL ELLS, BENDS, AND SWEEPS SHALL BE PVC COATED GALVANIZED RIGID STEEL. STRAIGHT SECTIONS AND CURVES WITH LARGER THAN FIVE FOOT RADIUS MAY BE SCHEDULE 40 PVC. 5. UNLESS OTHERWISE SHOWN, PITCH CONDUIT AT 1 MINIMUM SLOPE TOWARDS MANHOLES. 6. A RED PLASTIC WARNING TAPE, POLYETHYLENE, 24 INCHES WIDE, WITH 4.0 MIL THICKNESS, AND CONTINUEING THE ENTIRE LENGTH OF THE UNDERGROUND CONDUITS, SHALL BE INSTALLED AT LEAST SIX INCHES ABOVE BURIED CONDUIT AND NOT SHALLOWER THAN ONE FOOT DEEP. TAPE SHALL BE CONTINUESLY IMPRINTED "CAUTION: BURIED ELECTRICAL LINE BELOW" 7. HORIZONTAL DATUM: WASHINGTON STATE COORDINATE SYSTEM, NORTH ZONE, NORTH AMERICAN DATUM 1983(91). VERTICAL DATUM: NATIONAL GEODETIC VERTICAL DATUM 1929 (NGVD29). VERTICAL DATUM CONVERSION: NGVD29 TO THE NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) = NGVD29 + 3.60 FEET. CONSTRUCTION NOTES PROVIDE AND INSTALL EQUIPMENT HARDSTAND AS SHOWN ON DETAIL DRAWINGS E510-10 THROUGH E510-17. PROVIDE AND INSTALL BURIED CONDUIT, CONDUCTORS AND ALL ANCILLIARY HARDWARE. PROVIDE PULL BOX ON EXTERIOR OF 04-41 BUILDING. MOUNT BOTTOM OF PULL BOX AT 36" ABOVE GRADE. REFERENCE STRUCTURAL DRAWINGS FOR ATTACHMENT DETAILS. ® PROVIDE AND INSTALL CONDUIT, CONDUCTORS AND ALL ANCILLIARY HARDWARE FROM EXISTING V45 PULL BOX TO NEW PULLBOX ALONG SOUTH WALL OF THE 04-41 BUILDING. REFERENCE STRUCTURAL DRAWINGS FOR ATTACHMENT DETAILS. C T CONNECT TO EXISTING SUBSTATION BREAKERS V45A/5 C AND V45B/4 VIA SPARE CONDUITS IN EXISTING V45 C PULL BOX. C IN © PROVIDE SPARE CONDUITS WITH NYLON PULL STRING. T CAP AND PLUG SPARE CONDUITS AT GRADE LEVEL. a to KEY PLAN SCALE: N.T.S. LAKE WASHINGTON O CCASNE ENGINEERING, INC. ELECTRICAL AND TECHNOLOGY CONSULTANTS 10604 NE 38th PL., SUITE 205 KIRKLAND, WA 98033 (425) 522-1000 WWW. CA SNE. COM JOB NO. 161-140 CIVIL PERMIT W4700331 J I tVIUVL n ""' L 06.08.18 E110 E27 JOB NO. COMP NO. W4700331 J r 35276 ��'1 STER�� �SSIONAL� ELECTRICAL MASTER RENTON SITE SITE RENTON, WA I III No. RTN-YD-El10