HomeMy WebLinkAboutR_4013150SYM I REVISION
APRON R INFRASTRUCTURE
LEGEND
c
REMOVE AIR BELOW GRADE <
X X X X REMOVE AIR ABOVE GRADE
I I �
ABANDON AIR BELOW GRADE
4-20 BUILDING APRON R 4-82 BUILDING I APRON R
I UTILADOR I
(E)3" AIR I (E)3" AIR GENERAL NOTES
Iof 41of
/_kkkkk 1. REFER TO CIVIL PLANS FOR TRENCH
3 I 2 I 1 LOCATION.
I I
I I
I
REMOVAL NOTES
REMOVE 3" COMPRESSED AIR PIPING UP TO
ISOLATION VALVE. CAP AND PROTECT FOR
RECONNECTION.
COMPRESSED AIR BUILDING CONNECTION - REMOVAL COMPRESSED AIR BUILDING CONNECTION - REMOVAL 2 2�ABANDON 3" COMPRESSED AIR PIPING UP TO
SCALE: NONE M111 R M510-5R SCALE: NONE M114R M510-5R ISOLATION VALVE.
REMOVE 3" COMPRESSED AIR PIPING FROM
APRON R TO ISOLATION VALVE.
BY I APPROVED I DATE
W47003311 FSi 1 1 06.08.18
SYM
REVISION
BY I APPROVED I DATE
Q� BOE/NG
C'-
�� W - 4 �V
0 of WASy�Nc� C
A 48289
jSTERE,� ,
eSS/ONAL E�
ACCEPTABILITY W. BOONE
THIS DESIGN AND/OR CHECKED
G.
o SPECIFICATION IS APPROVED ENG NEIER
z TH
APPROVED BY DEPT. DATE A. LANGDON
REMOVAL
41 t SUBTITLE
06.08.18
06.08.18
TITLE
06.08.18
MECHANICAL MASTER
PIPING DETAILS
APRON R INFRASTRUCTURE
SITE 04-APRON R
S ITE
FSi consulting engineers
Seattle, Washington
Solutions & Service
CIVIL PERMIT
====to
CURRENT REVISION SYMBOL DATE
W4700331 06.08.18
SHEET
M510-5R M7
JOB NO. COMP NO.
W4700331
DWG N0.
RENTON, WA 04—APRON—R—M510-5R