Loading...
HomeMy WebLinkAboutR_4013150SYM I REVISION APRON R INFRASTRUCTURE LEGEND c REMOVE AIR BELOW GRADE < X X X X REMOVE AIR ABOVE GRADE I I � ABANDON AIR BELOW GRADE 4-20 BUILDING APRON R 4-82 BUILDING I APRON R I UTILADOR I (E)3" AIR I (E)3" AIR GENERAL NOTES Iof 41of /_kkkkk 1. REFER TO CIVIL PLANS FOR TRENCH 3 I 2 I 1 LOCATION. I I I I I REMOVAL NOTES REMOVE 3" COMPRESSED AIR PIPING UP TO ISOLATION VALVE. CAP AND PROTECT FOR RECONNECTION. COMPRESSED AIR BUILDING CONNECTION - REMOVAL COMPRESSED AIR BUILDING CONNECTION - REMOVAL 2 2�ABANDON 3" COMPRESSED AIR PIPING UP TO SCALE: NONE M111 R M510-5R SCALE: NONE M114R M510-5R ISOLATION VALVE. REMOVE 3" COMPRESSED AIR PIPING FROM APRON R TO ISOLATION VALVE. BY I APPROVED I DATE W47003311 FSi 1 1 06.08.18 SYM REVISION BY I APPROVED I DATE Q� BOE/NG C'- �� W - 4 �V 0 of WASy�Nc� C A 48289 jSTERE,� , eSS/ONAL E� ACCEPTABILITY W. BOONE THIS DESIGN AND/OR CHECKED G. o SPECIFICATION IS APPROVED ENG NEIER z TH APPROVED BY DEPT. DATE A. LANGDON REMOVAL 41 t SUBTITLE 06.08.18 06.08.18 TITLE 06.08.18 MECHANICAL MASTER PIPING DETAILS APRON R INFRASTRUCTURE SITE 04-APRON R S ITE FSi consulting engineers Seattle, Washington Solutions & Service CIVIL PERMIT ====to CURRENT REVISION SYMBOL DATE W4700331 06.08.18 SHEET M510-5R M7 JOB NO. COMP NO. W4700331 DWG N0. RENTON, WA 04—APRON—R—M510-5R