Major Franchise Permit: MFP19005304
IVR Number: 19005304
Permit Informaon
Permit Name:Comcast Cable Franchise Permit
Address/Locaon :09/13/2019Application Date:2023059109Parcel Number:2401 PUGET DR SE
Permit Type:10/02/2019Issue Date:Franchise
Permit Work Class:10/01/2020Expiration Date:Major Utility
Job Number:JB#80153Franchise Type:Cable
Description:Comcast proposes to bore (2) 2" conduits with 48ct fiber 1,175' then proof and pull 48ct fiber through existing conduit
365'. Install vaults. Pothole all existing utilities. Restoration per City of Renton standards.
APPROVED WITH COMMENTS OR REDLINES
Contacts
Name Address PhoneTypeBilling
Comcast Cable Communication
Management & Comcast Cable
B: (215) 665-1700Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Scott Nall
SEFNCO Communications Inc
2904 4th Ave NE
Puyallup, WA 98372
B: (877) 385-2903
C: (253) 444-9057
Contractor
Business License Number: 41108Construction Contractor: SEFNCCI850QD
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
New Construction Repair/Relocate Underground Overhead Sidewalk Street
Open Trench Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
MFP19005304
Scott Warlick 10/2/2019
POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS
Nathan Janders 10/2/2019
This permit is for Major construction work in the ROW and will be billed at an additional $60/hr for
inspections. After hours work and weekend work will be billed at $125/hr.
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
SE52XC303
SEFNCO Communications, Inc.
ASHLEY KIEHN (253)999-2271
4610 TACOMA AVE, SUMNER, WA 98390
ASKIEHN@SEFNCO.COM
2403 PUGET DR SE
9AM - 3PM Scott Warlick
10/2/2019Monday - Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
FLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEO
P
EOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLEO
P
EO
P
EO
P
EOP
EO
P
EO
P
EO
P
EO
P
EO
P
EO
P
EO
P
EOPEOPEOPEOPEOPEOPEOPEOPEOPOOOOOO
O
O OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOEOPEOPEOPEOPEOPEOPEOPEOPEO
P
EO
P
EO
P
EO
P
EO
PEOPEOPEO
P
EO
P
EO
P
EO
P
EO
P
EO
P
EO
P
EO
P
EOP
EOPEOPEOP
EOPS PUGET
D
R
S PUGET DR
S PUGET
D
R
S
P
U
G
E
T
D
R ROYAL HILLS DR SEROYAL HILLS DR SEEOPEOPEOPEOPEOPEOPEOPEOPBE
A
C
O
N
W
Y
S
BE
A
C
O
N
W
Y
S
116TH AVE SE116TH AVE SEACCESS ROADNO THRU TRAFFIC
STOPSTOP365'
2403
MATCH LINE SOW-2MATCH LINE SOW-1ROWROWROWROWROWROWROWR
OW
R
OW159'75'5'20'VEHICLE ENTRY/EXITMATCH LINE TCP-1
MATCH LINE TCP-2
ROWROWROWALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THEFEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF
THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
52''&25 30 35 45 50 55
155 200 250 360 425 495 570
.10)+67&+0#.$7(('452#%'$
.'0)6*
40
305
60 65 70
780 840 10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
.#0'9+&6*25 30 35 40 45 50 55 60 65 70
/+0+/7/6#2'4.'0)6*+0(''6.
2156'&52''&.+/+6
/2*5+6'52'%+(+%64#((+%%10641.2.#0
41;#.*+..5&45'=241215'&914-70&'4)4170&?
%10641.6;2'
5*17.&'4%.1574'2'&'564+#09+6*52166'45
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC2403 PUGET DR SERENTON, WA80153SPLICE PERMIT1 17/5/2019TCP PERMITRPK5+6'016'5
MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
SIDE WALK TO REMAIN OPEN.
2'&'54+#02#6*2418+&'&9*'4'4'37+4'& AND WILL BE
MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING WORK UNLESS OTHERWISE
NOTED.
COMCAST
NOTE:
PEDESTRIAN TRAFFIC WILL BE MONITORED BY A
SPOTTER TO ENSURE FLOW AND SAFETY DURING
CONSTRUCTION.
NOTE:
THIS IS A SLOW MOVING CONTINUOUS
OPERATION. FLAGGERS, AND SPOTTERS TO MOVE
WITH CONSTRUCTION FLOW.ROADWORKAHEADSHOULDERWORKRIGHTSHOULDERCLOSEDROAD
WORK
AHEA
DWO
R
K
V
E
H
I
C
L
E ABLIMITSPEEDR2-125WORK
Z
O
N
E
SPOTTER*
SPOTTER*WORKVEHICLESPOTTER*WO
R
K
Z
O
N
E
SPOTTER*TYP TEMP PEDESTRIAN PATHWAY (5' MIN):
SPOTTERS SHALL DETOUR PEDESTRIANS
BEHIND ANNOTATED WORK ZONE.ROADWORKAHEADSHOULDERWORKRIGHTSHOULDERCLOSEDROADWORKAHEADSHOULDERWORKRIGHTSHOULDERCLOSEDA
B
LIMITSPEEDR2-135SHOULDER WORK TYP AT ALL ANNOTATED
BORE-PIT LOCATIONS (×7) AND PROOF/PULL.WORK ZONEWORK ZONEAdditional traffic
control may be needed
per inspector in the field
SHEET INDEX:
1 - COVER SHEET
2 - LEGEND SHEET
3 - NOTES
4 -DESIGN
SE52XC303
THIS IS PROPRITORY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED SEFNCO COMMUNICATIONS
PROJECT MAP:
COVER
2403 PUGET DR SE RENTON, WA 98055
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC2403 PUGET DR SERENTON, WA80153PERMIT1 77/3/2019PERMITRPK***JT#: 80153
COMCAST
KYLE KINNEY
410 VALLEY AVE SUITE 12 BLDG C
PUYALLUP, WA 98371
(253) 235-7016
KYLE_KINNEY@COMCAST.COM
CONTACTS
SEFNCO
JOSE COSME
4610 TACOMA AVE.
SUMNER, WA 98390
(253) 321-7117
JCOSME@SEFNCO.COM
COMCAST
COMCAST
BEGIN ROW WORK
PROJECT DESCRIPTION*
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
=
=
=
=
=
=
=
·BORE (2) 2" CONDUITS W/ 48 CT FO
·PULL 48 CT FO / EXISTING CONDUIT
TOTAL:
1,175' LN
365' LN
1,540'
SE52XC303
COVER
2403 PUGET DR SE RENTON, WA 98055
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC2403 PUGET DR SERENTON, WA80153PERMIT2 77/3/2019PERMITRPK***JT#: 80153
STORM DRAIN
MANHOLE
COMMUNICATIONS
WATER
SEWER
POWER
GAS
6
ROW
R
PROPOSED VAULT
PROPOSED BORE PIT
STREET/SIGNAL/TRAFFIC LIGHT
CONSTRUCTION NOTE
CATCH BASIN
FIRE HYDRANT
EXISTING POLE W/ NEW RISER
BUILDING OUTLINE
TRAFFIC FLOW
LANDSCAPING/TREE
POTHOLE LOCATION
CHANNELIZATION
(xxx') OPEN TRENCH
SIDEWALKS / DRIVEWAYS
EXISTING PULL THRU
PROPOSED BORE
PROPOSED OPEN TRENCH
(xxx') EXISTING PULL THRU
(xxx') BORE
SIDEWALKS / DRIVEWAYSRIGHT-OF-WAY
CENTERLINE
TRAFFIC LANE
FENCE
D
CB
S C
GAURD RAIL
AERIAL STRAND
LEGEND:
V
U U U U U U
S
W
P
C
G
D
EOP EDGE OF PAVEMENT
POLE
AERIAL STRAND
OVERLASH OVERLASH
COMCAST
NOTES & LEGEND
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC2403 PUGET DR SERENTON, WA80153PERMIT3 77/3/2019PERMITRPKFIBER PLACEMENT NOTES:GENERAL NOTES:
DISCLAIMER:
1.IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAY
BEFORE CONSTRUCTION IS TO BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN
THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY.
2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE
BEEN FIELD LOCATED.
3.ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTION
AND IS COLLECTED IN THE AS-BUILT PHASE.
1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY
SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY.
2.CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP
AND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECT
COMPLETION.
3.SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER,
REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESS
ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED.
4.FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE
CASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND.
5.CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM
PRODUCTS.
6.A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED.
7.ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE
LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER.
8.ALL RISERS WILL BE CAPPED AT ALL TIMES.
9.ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, AND
BLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER.
1. ALL VAULTS / HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS.
2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION.
3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS
SPECIFIED OTHERWISE.
4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS,
AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET.
5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY
OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.
6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE
REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD
SPECIFICATIONS.
7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON
BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES
WITH BUILDING MANAGEMENT.
8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO
CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s).
9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEING
PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT
BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE
REWORK AT HIS OWN COST.
10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT
PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER.
11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN
ALLOWED (9AM-3PM) BUSINESS HOURS.
12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE
CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED.
13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE
SHOULD BE ANTICIPATED. ADJUST AS NEEDED.
14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR
ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THE
MINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVE
OR APPROVED EQUIVALENT.
15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS,
NOT FIELD VERIFIED.
16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS.
17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED.
18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION.
19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANE
CLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BE
COORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING.
20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERE
SHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BE
NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE
CLOSURES.COMCAST
FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLE
O
P
EO
PEOPEOP
EOPEOPEOPEOPEOPEOPEOPEOPE
O
P
EOPEOPEOP
EOPS PUGE
T
D
R
S PUGET
D
R
S PUGET DR
S PUGET
D
R
BE
A
C
O
N
W
Y
S
365'
2403
MATCH LINE SOW-2MATCH LINE SOW-1VEHICLE ENTRY/EXIT"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC2403 PUGET DR SERENTON, WA80153SOW-14 77/3/2019PERMITRPKCOMCAST
BEGIN ROW DESIGN
NEW VAULT-1: PLACE NEW
17"×30" LANDSCAPE VAULT
PATH OF U/G WORK
PROOF AND PULL 48 CT FIBER OPTIC CABLE
THROUGH EXISTING, OCCUPIED CONDUIT
CONDUIT. BEGIN AT NEW-VAULT 1. END
PROOF/PULL AT NEW VAULT-2.
FLFLFLEOPEOP
EOP
EOPEOPEOPEOP EOPEOPEOPEOPEOPO O O O O O O O O O O O O O O O O
OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
OO
OO
O
OOOOEOPEOPEOPEOPEOPEOPEO
P
EOP EOP
EOPEOPEOPEOPEOP
EOP
EOPEOPEOPEOPEOPEOPS PUGET DRROYAL HILL
S
D
R
S
E
RO
Y
A
L
H
I
L
L
S
D
R
S
E
R
O
Y
A
L
H
I
L
L
S
D
R
S
EEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP116TH AVE SE
116TH AVE SEACCESS ROADNO THRU TRAFFICSTOPSTOPMATCH LINE SOW-2
MATCH LINE SOW-1
MATCH LINE SOW-2MATCH LINE SOW-3ROWROWROWROWROW
ROW ROWROW159'
75'
5'
20'
R
OW
ROW ROW
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC2403 PUGET DR SERENTON, WA80153SOW-24 77/3/2019PERMITRPKCOMCASTPATH OF U/
G
W
O
RK
PAT
H
O
F
U
/
G
W
O
R
K
NEW VAULT-2 (BORE PIT-1): 2'×4' TYP
NEW VAULT-3 BORE PIT-2
PATH OF U
/
G
W
O
R
K
TRENCH AND PLACE (2) 2" SCH 40 CONDUITS
IN SOFT SURFACE SHOULDER. DO NOT BORE.
SIDEWALK TYP
P
A
T
H
O
F
U
/
G
W
O
R
K
BORE PIT-4
TRENCH AND PLACE (2) 2" SCH 40 CONDUITS
IN SOFT SURFACE SHOULDER. DO NOT BORE.
BORE AND PLACE (2)2" SCH. 40 CONDUIT,
WITH 48 CT FIBER OPTIC CABLE, 36" MIN
DEPTH, BEGINNING AT BORE PIT-3. END
BORE AT BORE PIT-4,
BORE PIT PER ±400' BORED TYP.
BORE / CONDUIT PLACEMENT SHALL NOT
OCCUPY ROADWAY. BORE MUST OCCUR UNDER
SIDEWALK ONLY.
PROOF AND PULL 48 CT FIBER OPTIC CABLE
THROUGH EXISTING, OCCUPIED CONDUIT
CONDUIT. BEGIN AT NEW-VAULT 1. END
PROOF/PULL AT NEW VAULT-2.
O
O
O OO OO OOO
O
O OO OO OOO
O
O OO OO OOO
O
O OO OO OOOO
O OO OO
O
EOP
EOP EOPEOP
EOP EOP EOP
EOP EOPEOPEOPROYAL HILLS DR SEROYAL HILLS DR SEROYAL HILLS DR SEEOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPVEHICLE ENTRY/EXITMATCH LINE SOW-2
MATCH LINE SOW-3
MATCH LINE SOW-3
MATCH LINE SOW-4
ROWROWROWROWROW410'341'ROW
ROW
ROW
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC2403 PUGET DR SERENTON, WA80153SOW-36 77/3/2019PERMITRPKCOMCASTPATH OF U/G WORKPAT
H
OF
U/
G
W
O
RK
NEW VAULT-4 (BORE PIT-5)
BORE AND PLACE (2)2" SCH. 40 CONDUIT,
WITH 48 CT FIBER OPTIC CABLE, 36" MIN
DEPTH, BEGINNING AT BORE PIT-5. END
BORE AT BORE PIT-4,
SIDEWALK TYP
BORE / CONDUIT PLACEMENT SHALL NOT
OCCUPY ROADWAY. BORING UNDER SIDEWALK
AND SHOULDER IS PERMITTED.
BORE AND PLACE (2)2" SCH. 40 CONDUIT,
WITH 48 CT FIBER OPTIC CABLE, 36" MIN
DEPTH, BEGINNING AT BORE PIT-5. END
BORE AT BORE PIT-6,
EO
P
EOP
EOPEOPEO
PEOPEOPEOP
EOPEOPEOP EOPEOP
EOP
EOP
EOPEOPEOPEOP
EOP
EOP
EO
P
EOP
EOP
ROYAL HILLS DR SEROYAL
HILLS
D
R S
E EOPFLEO
P
EOPEOPEOPEOPEOPEOPEOPEOPEOPF
L
LA
K
E
YOUNG
S
W
Y
S
E
ROYAL
HILLS
DR SE
LAKE
YOUNG
S
WY
SE
LAK
E
YOUNGS
W
Y
SESTOPS
T
O
P
MATCH LINE SOW-3
MATCH LINE SOW-4 ROWROWROWROWROWSTOPSTOPP390'190'
ROW ROWROW"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC2403 PUGET DR SERENTON, WA80153SOW-47 77/3/2019PERMITRPKCOMCAST
PATH
O
F
U/
G
W
O
R
K PATH OF
U
/G
WORK
BORE AND PLACE (2)2" SCH. 40 CONDUIT,
WITH 48 CT FIBER OPTIC CABLE, 36" MIN
DEPTH, BEGINNING AT BORE PIT-6. END
BORE AT BORE PIT-7.
BORE PIT-6
EXISTING PEDESTAL-1 (BORE PIT-7)
END ROW DESIGN
PATH OF U/G WORKBORE PIT PER ±400' BORED TYP.
BORE / CONDUIT PLACEMENT SHALL NOT
OCCUPY ROADWAY. BORE MUST OCCUR UNDER
SIDEWALK ONLY.
BORE AND PLACE (2)2" SCH. 40 CONDUIT,
WITH 48 CT FIBER OPTIC CABLE, 36" MIN
DEPTH, BEGINNING AT BORE PIT-5. END
BORE AT BORE PIT-6,
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS