Loading...
HomeMy WebLinkAboutMFP19005147.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP19005147 IVR Number: 19005147 Permit Informaon Permit Name:Comcast Cable Franchise Permit Address/Locaon :09/24/2019Application Date:3340406260Parcel Number:900 SW 16TH ST, 100 Permit Type:10/02/2019Issue Date:Franchise Permit Work Class:10/01/2020Expiration Date:Minor Utility Job Number:JB#0000085372Franchise Type:Cable Description:Access ROW to splice in two locations. APPROVED WITH COMMENTS OR REDLINES Contacts Name Address PhoneTypeBilling Comcast Cable Communication Management & Comcast Cable B: (215) 665-1700Applicant Tom Donnelly Comcast Business Communications 1701 Jfk Blvd, 32nd Floor Philadelphia, PA 19103 B: (215) 286-7347 C: (215) 286-7557 Contact Michael Cannon Cannon Construction Inc 406 Porter Way Milton, WA 98354-9638 B: (253) 922-2787 C: (253) 588-4034 Contractor Business License Number: 20838Construction Contractor: CANNOCI055CS CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES MFP19005147Nathan Janders9/24/2019Scott Warlick9/30/2019 MFP19005147Monday - Friday8:00AM - 3:00PMScott Warlick9/30/2019 SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). MFP19005147 MFP19005147 MFP19005147TAPPER THIS LANEOFF WITH CONES 1 - COVER SHEET 2 -LEGEND 3 -GENERAL NOTES 4 -DETAIL 5 -OVERVIEW 6 -DESIGN 7 -NODE MAP 8 -SITE PHOTOS THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED CANNON COMPANIES 12 CT FIBER: 70 FT + 20% STORAGE = 84 FT CONTACTS: PROJECT MAP: *ALL FOOTAGES AND MATERIALS ARE ESTIMATED N SCOPE OF WORK: SHEET INDEX: BILL OF MATERIALS*: NEW AERIAL = OVERLASH = NEW UNDERGROUND = EXISTING UNDERGROUND = RISER (0)= TOTAL FOOTAGE = 0 FT. 0 FT. 0 FT. 0 FT. 0 FT. 0 FT. PROJECT DESCRIPTION - ROW* NEW BUILDING PATH WAY = EXISTING BUILDING PATH WAY = NEW UNDERGROUND = EXISTING UNDERGROUND = TOTAL FOOTAGE = 70 FT. 0 FT. 0 FT. 0 FT. 70 FT. PROJECT DESCRIPTION -SITE* TOTAL PROJECT FOOTAGE =70 FT. -TIE INTO IM SPLICE CASE -PLACE NEW 1-1/4" PLENUM DUCT AND PULL (1) 12CT FIBER -PERFORM 2" PENETRATION AND PLACE NEW 2" SLEEVE -PLACE 30' FIBER STORAGE COIL ON EXISTING CUSTOMER SERVER RACK -INSTALL TERM PANEL IN CUSTOMER SERVER RACK CANNON COMPANIES SAFETY | QUALITY | INTEGRITY | TEAMWORK Connecting The Future Since 1985 COMCAST Business/Job Contact POC:Jim Kisset 206-336-5334 EMAIL:jikisset@andoverco.com Review _________________________ CANNON COMPANIES Mark Lee - (360)-250-7072 - mlee@cannonconstructioninc.com COMCAST COMMUNICATION Kyle Kinney - (253)-235-7016 - Kyle_Kinney@cable.comcast.com 900 SW 16TH ST STE 100 RENTON, WA, 98057 ANDOVER CO. PC#500000 JB#0000085372 METRO-EMFP19005147 N EOP FL P C S D G W TS T ST UT ROW DD DD DD DD EDGE OF PAVEMENT FOGLINE POWER COMMUNICATION SEWER DRAIN DRAINAGE DITCH GAS WATER TRAFFIC SIGNAL TELCOM STEAM UNKNOWN UTILITY RIGHT OF WAY TRAFFIC CONES PROPOSED NEW CONDUIT STRAW WATTLES P V LT CW R UTILITY POLE VAULT - SMALL PEDESTAL STREET LIGHT CROSSWALK LIGHT UTILITY RISER V VAULT - SMALL 444LA MANHOLE VAULT - 25TA CB CB CATCH BASIN CATCH BASIN WITH SOCK GLULAM UTILITY POLECENTER LINE LANE LINE FENCE HIGH VISIBILITY FENCE S SEWER MANHOLE D DRAIN MANHOLE W WATER MANHOLE V UTILITY VALVE SHRUBBERY BORE PIT VAULT - LARGE VAULT - 25TA C COMMUNICATION MANHOLE FIRE HYDRANT DISTANCE STATIONSTA 0+00 NOTE CALLOUT# X.X DISTANCE DIMENSION ASPHALT SURFACE CONCRETE SIDEWALK PANEL CONCRETE ROADWAY PANEL HF H-FRAME VAULT - LARGE CAB CABINET LEGEND LANE DIRECTION INDICATOR PROPOSED MARK-UP NOTATIONS RESTORATION TYPESEXISTING FEATURESLINE TYPES OF DATE REVISION BY QC CANNON COMPANIES 0000085372ANDOVER CO. 900 SW 16TH ST STE 100 RENTON, WA, 98057 LEGEND 2 7 06/18/2019 AH ML COMCAST SPLICE CASE MFP19005147 COMCAST OF DATE REVISION BY QC CANNON COMPANIES 0000085372ANDOVER CO. 900 SW 16TH ST STE 100 RENTON, WA, 98057 GENERAL NOTES 3 7 06/18/2019 AH ML MFP19005147 MFP19005147 900 0 SW 16TH STROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP 40'30' TIE IN TO IM SPLICE CASE PLACE 1-1/4" PLENUM DUCT. PULL (1) 12CT FIBER PERFORM 2" PENETRATION AND PLACE NEW 2" SLEEVE. LEAVE 30' COIL AND INSTALL TERM PANEL IN CUSTOMER RACK GARAGE LEVEL ELECTRICAL ROOM 1ST FLOOR ELECTRICAL ROOM CUSTOMER SERVER ROOM N COMCAST OF DATE REVISION BY QC CANNON COMPANIES 0000085372ANDOVER CO. 900 SW 16TH ST STE 100 RENTON, WA, 98057 DESIGN 5 7 06/18/2019 AH ML MFP19005147 MFP19005147 1 GARAGE ELECTRICAL ROOM 2 1ST FLOOR ELECTRICAL ROOM 3 1ST FLOOR ELECTRICAL ROOM 2" PENETRATION. INSTALL TERM PANEL4CUSTOMER SERVER ROOM PLACE 1-1/4" PLENUM DUCT. PULL (1) 12CT FIBER 2" PENETRATION. PLACE NEW 2" SLEEVE LEAVE 30' FIBER COIL FOR RACK MOUNTED TERM PANEL PLACE DUCT. PULL (1) 12CT FIBERPLACE DUCT. PULL (1) 12CT FIBER TIE IN TIE IN TO IM SPLICE CASE PLACE 1-1/4" PLENUM DUCT. PULL (1) 12CT FIBER PLACE 1-1/4" PLENUM DUCT. PULL (1) 12CT FIBER NOTE: CUSTOMER AND IT POC SAID TO PLACE NEW EQUIPMENT AT THIS LOCATION. CURRENT EQUIPMENT WILL NEED TO BE REMOVED COMCAST OF DATE REVISION BY QC CANNON COMPANIES 0000085372ANDOVER CO. 900 SW 16TH ST STE 100 RENTON, WA, 98057 PHOTOS 7 7 06/18/2019 AH ML MFP19005147