HomeMy WebLinkAboutMFP19005324.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP19005324
IVR Number: 19005324
Permit Informaon
Permit Name:Olympic Pipe Line Company
Address/Locaon :10/02/2019Application Date:1623059015Parcel Number:201 UNION AVE SE
Permit Type:10/03/2019Issue Date:Franchise
Permit Work Class:10/02/2020Expiration Date:Minor Utility
Job Number:20AR 2018-015Franchise Type:Natural Gas
Description:Olympic Pipeline is required to inspect the pipeline at an anomaly location identified during their recent internal
inspection tool run. Work includes excavation in 2 areas to locate a nearby weld and anomaly. Coordinate with the
leisure village mobile home park for this work on private property. Call in for locates. It appears that there may be a
sewer main nearby this work. Restoration per City of Renton standards.
APPROVED WITH COMMENTS OR REDLINES
Contacts
Name Address PhoneTypeBilling
Olympic Pipe Line Company 1006 CENTRAL Rd
EVERSON, WA 98247
B: (425) 235-7736Applicant
CARYL CHIAVERINI
PERCHERON LLC
B: (503) 539-0487Contact
Brent Huwa
Hanging H Companies LLC
4626 Weld County Road 65
Keenesburg, CO 80643
B: (360) 726-2334Contractor
Business License Number: 50270
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Jeremy Millard
Park Preservations L L C
21145 212th Ave SE
Maple Valley, WA 98038
C: (206) 941-1001Owner
Dustin Lambert
Olympic Pipeline - Billing
2319 Lind Ave SW
Renton, WA 98057-3347
B: (425) 235-7711
C: (770) 317-5174
Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
& 1623059127MFP19005324Please be sure to coordinate with the leisure village mobile home park for this work on private property.please call in for locates. it appears that there may be a sewer main nearby this work.Scott Warlick10/3/2019RESTORATION PER CITY OF RENTON STANDARDS201 Union Ave SEHolly Powers10/3/2019
The locations of all features shown are approximate.
This drawing is for information purposes. It is intended to assist in
showing features discussed in an attached document. GeoEngineers,
Inc. cannot guarantee the accuracy and content of electronic files. The
master file is stored by GeoEngineers, Inc. and will serve as the official
record of this communication.
1.
2.
Notes:Olympic 20 AR 2018-015
Vicinity Map
Renton,Washington
Figure 1
Approximate location
of work area
Olympic 20” Pipeline
SP: 0089412636\Working\20AR 2018-015.pptx CRW: 09/30/2019MFP19005324
1.The locations of all features shown are approximate.
2.This drawing is for information purposes. It is intended to assist in
showing features discussed in an attached document.
GeoEngineers, Inc. cannot guarantee the accuracy and content of
electronic files. The master file is stored by GeoEngineers, Inc. and
will serve as the official record of this communication.
Notes:
Olympic 20 AR 2018-015
Site Plan
Renton,Washington
Figure 2
Olympic 20” Pipeline
Work Area
Approximate Weld Excavation Location
4 ft to 8 ft square x 4 ft (d)
Two excavations will be completed along the existing Olympic pipeline. Site
conditions will be restored to pre-construction conditions and contours.
The Weld and Anomaly locations are approximately 58 feet apart.
Approximate Anomaly
Excavation Location
8 ft x 10 ft x 6 ft (d) SP: 0089412636\Working\20AR 2018-015.pptx CRW: 09/30/2019MFP19005324
1.The locations of all features shown are approximate.
2.This drawing is for information purposes. It is intended to assist in
showing features discussed in an attached document.
GeoEngineers, Inc. cannot guarantee the accuracy and content of
electronic files. The master file is stored by GeoEngineers, Inc. and
will serve as the official record of this communication.
Notes:Olympic 20 AR 2018-015
Typical Cross Section
Renton,Washington
Figure 3
This drawing is not to scale.
Weld excavation above the Olympic pipeline will be
about 4 to 8 feet square at surface and 4 feet deep.
Anomaly Excavation will be about 8 ft wide, 10 ft long
and 6 ft deep
Olympic 20” Pipeline
Shoring
The ground surface at each location will be restored to pre-
excavation conditions after work is completed.
Shoring
The ground surface at each location will be restored to
pre-excavation conditions after work is completed.
4 ft to 6 ft deep
4 ft to 6 ft deep
4 to 8 ft wide
4 ft to 10 ft long Olympic 20” Pipeline
SP: 0089412636\Working\20AR 2018-015.pptx CRW: 09/30/2019MFP19005324