Loading...
HomeMy WebLinkAboutCedar River Trail Trestle Bridge_ Permitting Documents_WSP_Memo_5.31.2019From:Roberts, Grace To:Alan Wyatt Cc:Roscoe, Dan; Nelson, Garth; Leslie A Betlach; Angelea Weihs; Vanessa Dolbee Subject:Cedar River Trail Trestle Bridge: Permitting Documents Date:Friday, May 31, 2019 11:52:03 AM Attachments:image003.pngCedar River Bridge Repairs_BE_DRAFT_05_31_2019.docxBE_SHEETS_01 to 07.pdfHPA 18174_Agent_Authorization_Letter_15May19.pdfFinal Renton Cedar River Bridge_JARPA_05_31_19.pdfJARPA drawings_03May19.pdfFinal HPA App_31May19.pdf Hi Alan, Attached to this email are the following permitting documents: · Final JARPA o On the JARPA, please initial, sign, and return Section 11a on the last page · Final HPA online application o Please sign and return the attached HPA Agent Authorization Letter which is the authorization form for the HPA. · Draft Biological Evaluation (BE) o Please make edits in track changes and return to us. o The BE has its own set of sheets. Sheets 1-6 are the same as the JARPA. Sheet 7 (action area) is new. After we make your edits to the BE, we will submit the entire application package to the agencies (this includes the signed JARPA, stream study, and the BE). We will submit the online application for the HPA separately through WDFW’s online portal APPS. Feel free to contact me if you have any questions. Thanks, Grace Roberts Environmental Scientist/Diver BergerABAM is now WSP. Come imagine with us! Please note the new email address. Email: grace.roberts@wsp.com Phone: 206-431-2295 WSP USA 33301 Ninth Avenue South, Suite 300 Federal Way, WA 98003-2600 wsp.com