Loading...
HomeMy WebLinkAbout160362E001 Alpine Nursery FR 48-52.pdfa s s o c i a t e d earth sciences i n c o r p o r a t e d 911 Fifth Avenue Kirkland, Washington 98033 Phone: 425-827-7701 Fax: 425-827-5424 www.aesgeo.com ro: Toll Brothers 9720 NE 120th Place, #100 Kirkland, WA 98034 ATrN: Paul 011estad AS REQUESTED BY: Cllent FIELD REPORT Paye 1 of 2 Date Project Name Project No. 3/1/2017 Alpine Nursery 160362-EO01 Location Municipality Weather SE 144" St and 161St Ave SE Renton Cloudy, 40s Permit No. DPD No. Report No. 48 Engineer/Architect D.R. Strong / Maher A. Joudi Client/Owner Toll Brothers General Contractor/Superintendent Toll Brothers Grading Contractor/Superintendent Team Nelson / Derrick THE FOLLOWING WAS NOTED: AESI arrived on-site at 9:30 AM to observe water main installation. Upon arrival AESI met with Derrick, the foreman from Team Nelson. 161ST Ave Water Main Installation: Team Nelson continued placing water main heading south along 161St Ave toward Road B (Figure 1). An existing gas main and an existing water main were in conflict with the planned placement of water main along 161St. Team Nelson called the civil engineer and the 22.5° bend was placed further north than planned to avoid existing utilities. This change resulted in water main placed 5-10' west of the planned location. The 8" DI pipe was placed approximately 4' deep and was bedded and covered with 5/8" minus crushed rock. Backfill consisted of approximately 3' of native soil compacted by a ho -pack, followed by approximately 4" of 1 %" minus crushed rock compacted by a ho -pack, 2" of 5/8" minus crushed rock compacted by a vibratory roller, and 2" of hot asphalt compacted by a vibratory roller. Derrick said that 161" will be resurfaced at a future date. Density testing was conducted on the native soil backfill before crushed rock was placed (Table 1). All backfill was compacted to firm and unyielding conditions before more backfill was placed. Lot Fills: When observed today, the material placed in Lots 22, 23, and 24 was still very wet and yielded under foot. AESI left the site at 1:30 PM and will return tomorrow to observe water main installation. Copies To: Distribution Date Mailed: Mr�i � � 2011 Field Rep: Josh G Principal / PM: Kurt D P.E. st Th15 document is considered a DRAFT until signed or initialed ESI Principal or Project Manager To: Date: Permit No, AESI FIELD REPORT 3/1/2017 Table 1: Water Main Backfill Density Tests Project Name Project No.: DPD No, Alpine Nursery 160362-E001 Page 2 of 2 Figure 1: Plan with Approximate Density Test Locations (LF AS REQGdJ M) CONCWWW BLOCKWO PER KCWW DETAIL N"4 ##I! STA* 51+8174 A04' W1 2F OLM FLANGE CIN E7C ME OUT Mw EK foC i£ RLt3EfUhfC CAP EX 50 AC 1WIH:8` DJ. CA P r-s� , BLOOOW 7E as _ Lr �__- Note: 22.5° bend placed north of plan e44 y w• If- 1 j - AIR YAG: ABY KC*M DETAPI. N�?a _ 1dCAIr AT Awi T CF RAW) ; 112p (r STA. 4447a 2Z68' Lm TAw 49+"44a [838 t" p STA. 5r+7G.54 &AWF L TA. 15+J&04 Ia56 L j I-8' IEE (RAful 17 F7M PRE; d PMTY 7EST I3 , Jpppp8w GA7E YoFLVLs (Fza1rJ) XXP rA & MM FLi1SHlNf3 1 >F�t or�c�+c ET TAP polt? E795TING le CI NWER -7f1`xff TAPP/N( < ABANlk7NEA AT MAWFER -5" WE VALVE (FLxNJ) I i i' WA7V? USIMCM STAWAR �� su eevsr riru�acr ec arnruncnl � i +..:L,. .. --•-- Copies To: Distribution 2 XLSiiNG WA M? SPRUCE TO f Field Rep: Josh Greer, Staff Geologist Date Mailed: Principal / PM: Kurt D. Merriman, P. E. v. 6/14 This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Dry Test Depth Proctor (ASTM Moisture Compaction Location Density Pass/Fail No. (ft) D1557) % 1 161St Ave Water Main -0.5 134.1 / 8.6% 131.6 6.8 98 Pass 2 161St Ave Water Main -0.5 134.1/8.6% 132.5 7.2 99 Pass Figure 1: Plan with Approximate Density Test Locations (LF AS REQGdJ M) CONCWWW BLOCKWO PER KCWW DETAIL N"4 ##I! STA* 51+8174 A04' W1 2F OLM FLANGE CIN E7C ME OUT Mw EK foC i£ RLt3EfUhfC CAP EX 50 AC 1WIH:8` DJ. CA P r-s� , BLOOOW 7E as _ Lr �__- Note: 22.5° bend placed north of plan e44 y w• If- 1 j - AIR YAG: ABY KC*M DETAPI. N�?a _ 1dCAIr AT Awi T CF RAW) ; 112p (r STA. 4447a 2Z68' Lm TAw 49+"44a [838 t" p STA. 5r+7G.54 &AWF L TA. 15+J&04 Ia56 L j I-8' IEE (RAful 17 F7M PRE; d PMTY 7EST I3 , Jpppp8w GA7E YoFLVLs (Fza1rJ) XXP rA & MM FLi1SHlNf3 1 >F�t or�c�+c ET TAP polt? E795TING le CI NWER -7f1`xff TAPP/N( < ABANlk7NEA AT MAWFER -5" WE VALVE (FLxNJ) I i i' WA7V? USIMCM STAWAR �� su eevsr riru�acr ec arnruncnl � i +..:L,. .. --•-- Copies To: Distribution 2 XLSiiNG WA M? SPRUCE TO f Field Rep: Josh Greer, Staff Geologist Date Mailed: Principal / PM: Kurt D. Merriman, P. E. v. 6/14 This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager a s s o c i a t e d earth sciences n C o r p o r a t e d 911 Fifth Avenue Kirkland, Washington 98033 Phone: 425-827-7701 Fax: 425- 827-5424 www.aesgeo.com To: Toll Brothers 9720 NE 120th Place, #100 Kirkland, WA 98034 ATTN: Paul 011estad AS REQUESTED BY: Client FIELD REPORT Page 1 of 2 Date Project Name Project No. 3/2/2017 Alpine Nursery 160362-EO01 Location Municipality Weather SE 144" St and 161" Ave SE Renton Cloudy, 40s Permit No. DPD No. Report No. 49 Engineer/Architect D.R. Strong/ Maher A. Joudi Client/Owner Toll Brothers General Contractor/Superintendent Toll Brothers Grading Contractor/Superintendent Team Nelson / Derrick THE FOLLOWING WAS NOTED: AESI arrived on-site at 9:30 AM to observe water main installation. Upon arrival AESI met with Derrick, the foreman from Team Nelson, 1615k Ave Water Main Installation: Today Team Nelson placed water main along 161St Ave between Road Band 145th St. (Figure 1). The 8" DI pipe was placed approximately 4' deep and was bedded and covered with 5/8" minus crushed rock. Backfill consisted of approximately 3' of native soil compacted by a ho -pack, followed by approximately 4" of 1 A" minus crushed rock compacted by a ho -pack, 2" of 5/8" minus crushed rock compacted by a vibratory roller, and 2" of hot asphalt compacted by a vibratory roller. Derrick said that 161St Ave will be resurfaced at a future date. Density testing was conducted on native soil backfill before crushed rock was placed (Table 1). All backfill was compacted to firm and unyielding conditions before more backfill was placed. AESI left the site at 130 PM and will return tomorrow to observe water main installation. Copies To: Distribution Date Mailed: v. 6/14 Field Rep: LIAR 16 2011 Principal / PM: This document is considered a DRAFT until signed or Geol Kurt Q.�JJ,�rr'i/nan, P.E. AESI Principal or Project Manager To: Date: Permit No. AESI FIELD REPORT 3/2/2017 Table 1: Water Main Backfill Density Tests Project Name Project No.: DPD No. Alpine Nursery 160362-E001 Page 2 of 2 Locations Note: 22.5° bend placed north of plan 5 & WA Copies To: Distribution Field Rep: Josh Greer, Staff Geologist Date Mailed: Principal / PM: Kurt D. Merriman, P. E. v. 6/14 This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Dry Test Depth Proctor (ASTM Moisture Compaction Location Density Pass/Fail No. (ft) D1557) % 1 161" Ave Water Main -0.5 134.1 / 8.6% 129.1 6.0 96 Pass 2 161" Ave Water Main -0.5 134.1 / 8.6% 130.2 6.6 97 Pass 3 161St Ave Water Main -0.5 134,1/8,6% 128.8 7.3 96 Pass 3 161St Ave Water Main -0.5 134.1 / 8.6% 131.4 7.4 98 Pass Locations Note: 22.5° bend placed north of plan 5 & WA Copies To: Distribution Field Rep: Josh Greer, Staff Geologist Date Mailed: Principal / PM: Kurt D. Merriman, P. E. v. 6/14 This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager TO: ATTN: a s s o c i a t e d earth sciences n c o r p o r a t e d 911 Fifth Avenue Kirkland, Washington 98033 Phone: 425-827-7701 Fax: 425-827-5424 www.aesgeo.com Toll Brothers 9720 NE 120th Place, #100 Kirkland, WA 98034 Paul 011estad AS REQUESTED BY: Cllent FIELD REPORT Page 1 of 2 Date Project Name Project No. 3/3/2017 Alpine Nursery 160362-EO01 Location Municipality Weather SE 144" St and 161't Ave SE Renton Light Rain, 40s Permit No. DPD No. Report No. 50 Engineer/Architect D.R. Strong / Maher A. Joudi Client/Owner Toll Brothers General Contractor/Superintendent Toll Brothers Grading Contractor/Superintendent Team Nelson / Derrick THE FOLLOWING WAS NOTED: AESI arrived on-site at 10:30 AM to observe water main installation. Upon arrival AESI met with Derrick, the foreman from Team Nelson. 1615tAve Water Main Installation: Today Team Nelson placed water main along 161St Ave between 145th St. and Lot 9 (Figure 1). The 8" DI pipe was placed approximately 4' deep and was bedded and covered with 5/8" minus crushed rock. Backfill consisted of approximately 3' of native soil compacted by a ho -pack, followed by approximately 6" of 1 %" minus crushed rock compacted by a ho -pack, 3" of 5/8" minus crushed rock compacted by a vibratory roller, and 2" of hot asphalt compacted by a vibratory roller. Derrick said that 161" Ave will be resurfaced at a future date. Density testing was conducted on native soil backfill before crushed rock was placed (Table 1). All backfill was compacted to firm and unyielding conditions before more backfill was placed. AESI leF4-+k site at 200 PM and will return tomorrow to observe water main installation. Copies To: Distribution Date Mailed: Field Rep: Josh Principal / PM: Kurt D P.E. st This document is considered a DRAFT until signed or initialed �n AE51 Principal or Project Manager To: Date: Permit No. AESI FIELD REPORT 3/3/2017 Table 1: Water Main Backfill Density Tests Project Name: Project No.: DPD No, Alpine Nursery 160362-E001 Page 2 of 2 Copies To: Distribution Field Rep: Josh Greer, Staff Geologist Date Mailed: v. 6/14 Principal / PM: Kurt D. Merriman, P.E. This document is considered a DRAFT until signed or initialed by an AE51 Principal or Project Manager Dry Test Depth Proctor (ASTM Moisture Compaction Location Density% Pass/Fail No. (ft) D1557) / 1 161" Ave Water Main -0.5 134,1/8,6% 128.9 7.0 96 Pass 2 161St Ave Water Main -0.5 134,1/8,6% 127.6 8.3 95 Pass 3 161" Ave Water Main -0.5 134,1/8,6% 130.8 9.5 98 Pass 4 16151 Ave Water Main -0.5 134,1/8,6% 132.6 8.4 99 Pass Copies To: Distribution Field Rep: Josh Greer, Staff Geologist Date Mailed: v. 6/14 Principal / PM: Kurt D. Merriman, P.E. This document is considered a DRAFT until signed or initialed by an AE51 Principal or Project Manager a s s o c i a t e d earth sciences n c o r p o r a t e d 911 Fifth Avenue Kirkland, Washington 98033 Phone: 425-827-7701 Fax: 425-827-5424 www.aesgeo.com To: Toll Brothers 9720 NE 120th Place, #100 Kirkland, WA 98034 ATTN: Paul011estad AS REQUESTED BY: Client FIELD REPORT Page 1 of 2 Date Project Name Project No. 3/6/2017 Alpine Nursery 160362-E001 Location Municipality Weather SE 1441h St and 16V Ave SE Renton Cloudy, 40s Permit No. DPD No. Report No. 51 Engineer/Architect D.R. Strong/ Maher A. Joudi Client/Owner Toll Brothers General Contractor/Superintendent Toll Brothers Grading Contractor/Superintendent Team Nelson / Derrick THE FOLLOWING WAS NOTED: AESI arrived on-site at 11:00 AM to observe water main installation. Upon arrival AESI met with Derrick, the foreman from Team Nelson, 1615L Ave Water Main Installation: Today Team Nelson placed water main along 161St Ave between Lot 9 and the south end of the site (Figure 1). The 8" DI pipe was placed approximately 4' deep and was bedded and covered with 5/8" minus crushed rock. Backfill consisted of approximately 3' of native soil compacted by a ho -pack, followed by approximately 6" of 1 %" minus crushed rock compacted by a ho -pack, 3" of 5/8" minus crushed rock compacted by a vibratory roller, and 2" of hot asphalt compacted by a vibratory roller. Derrick said that 161St Ave will be resurfaced at a future date. Density testing was conducted on native soil backfill before crushed rock was placed (Table 1). All backfill was compacted to firm and unyielding conditions before more backfill was placed. Dry Utility Crossings: Workers began excavating dry utility crossings in Road A and placing conduit in the 3' deep trenches. The 5 PVC conduits were bedded in sand. Backfill will be placed tomorrow. AESI left the site at 1:00 PM and will return tomorrow to observe water main installation. Copies To: Distribution Date Mailed: v. 6/14 Field Rep: Josh Gre ff Geologist PrincipalD. M ri n, P.E. This document is considered a DRAFT until signed or initioledhy. AESI Principal or Project Manager AESI FIELD REPORT To: Date: 3/6/2017 Permit No. Table 1: Water Main Backfill Density Tests Project Name: Alpine Nursery Project No.: 160362-EO01 DPD No. Page 2 of 2 Figure 1: Plan with Approximate Density Test Locations ' i I Dry Test Depth Proctor (ASTM Moisture Compaction Location Density Pass/Fail No (ft) D1557) % % 1 1611t Ave Water Main -0.5 134,1/8o6% 128,6 7,8 96 Pass 2 161St Ave Water Main -0.5 134,1/8m6% 12790 940 95 Pass 3 161St Ave Water Main -0.5 134,1/8,6% 129,1 8.5 96 Pass 4 161St Ave Water Main -0,5 134,1 / 8,6% 129.9 8.8 97 Pass AND CO&NkM c�OAWT STA, s8+4&Jaz' m �c r a y ►int cuTlr� Av7n DaS7M QS a WA M? t_g- tH SO= a&fflm As ftVUAW) c�' ,I MAIN MON: I—W DI SUMW (XIJj I -r Ilk OEM {�1/yJw.1-i�J)• AND CAP 4' AC lip b; I -e D! SPM =U"t! AS REDL M) -4 00 CAP PLUG ��� 1-8m 7RAN9'7AW COWL" (&Ka) CONCRETE 8L0(7fING CONCRETE S,OcxtlNG i f C A n c i `,s 37 LF 8' Wo M52 -'r. - '.A _WATO? �— __. &a A ARLY 4 3 t 2 3b4 Copies To: Distribution Date Mailed: v. 6/14 Field Rep: Josh Greer, Staff Geologist Principal / PM: Kurt D. Merriman, P.E. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager a s s o c i a t e d earth sciences n c o r p o r a t e d 911 Fifth Avenue Kirkland, Washington 98033 Phone: 425-827-7701 Fax: 425- 827-5424 www.aesgeo.com To: Toll Brothers 9720 NE 120th Place, #100 Kirkland, WA 98034 ATTN: Paul 011estad AS REQUESTED BY: Cllent FIELD REPORT Page 1 of 3 Date Project Name Project No. 3/7/2017 Alpine Nursery 160362-EO01 Location Municipality Weather SE 1441h St and 161st Ave SE Renton Rain, 40s Permit No. DPD No. Report No. 52 Engineer/Architect D.R. Strong / Maher A. Joudi Client/Owner Toll Brothers General Contractor/Superintendent Toll Brothers Grading Contractor/Superintendent Team Nelson / Derrick THE FOLLOWING WAS NOTED: AESI arrived on-site at 11:30 AM to observe water main installation. Upon arrival AESI met with Derrick, the foreman from Team Nelson. 161ST Ave Water Main Installation: Today Team Nelson continued placing water service and hydrant connections along 161St Ave (Figure 1). 6" DI pipe was bedded and covered with 5/8" minus crushed rock. 1" copper tubing was bedded and covered with sand. Backfill consisted of approximately 2.5' of native soil compacted by a ho -pack, followed by approximately 6" of 1 %" minus crushed rock compacted by a ho -pack, 3" of 5/8" minus crushed rock compacted by a vibratory roller, and 2" of hot asphalt compacted by a vibratory roller. Derrick said that 161St Ave will be resurfaced at a future date. Density testing was conducted on native soil backfill before crushed rock was placed (Table 1). All backfill was compacted to firm and unyielding conditions before more backfill was placed. Dry Utility Crossings: Workers continued excavating dry utility crossings in Road A (Figure 2). The 5 PVC conduits placed approximately 3' deep and were bedded in sand. Backfill consisted of 1' lifts of native soil compacted by a ho -pack. Density testing was conducted at the surface in both lanes of the road (Table 2). All backfill was compacted to firm and unyielding conditions before more backfill was placed. AESI left the site at 2:30 PM and will return tomorrow to observe water connections and utility trench backfill. Copies To: Distribution Field Rep: Josh Gr S ff Geologist Date Mailed: ''�i Principal / PM: Kurt D. e an, P.E. v. 6/14 This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager AESI FIELD REPORT To: Date: 3/7/2017 Permit No, Table 1: 161" Water Backfill Densitv Tests Project Name Project No.: DPD No. Alpine Nursery 160362-E001 Page 2 of 3 Fieure 1: Plan with Aagroximate Density Test Locations 1 .?3 i I I STA 5Bt4& �Gi' t _- cur ro Easrt>vca a M tea 7144 800 {{u vd 1-8• to 9VM I As �atttn) i rlam) t �` �, � t � � caaaeEtF eaacxmrc-•-___4 ��� 3 37 tF e 3 s2 Vb'' t .--- :x W LF WWI }00 ASSY t/J 5 8 _ 41 2 v f c Copies To: Date Mailed: .6/14 Distribution Field Rep: Josh Greer, Staff Geologist Principal / PM: Kurt D. Merriman, P.E. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Dry Test Depth Proctor (ASTM Moisture Compaction Location Density Pass/Fail No. (ft) D1557) 1 1461h Water Main Connection -0.5 134,1/8,6% 130.5 9.5 97 Pass 2 1611t Ave Water Service -0.5 134.1 / 8.6% 131.0 9.0 98 Pass 3 1611 Ave Water Service -0.5 134,1/846% 129.9 9.8 97 Pass 4 16111 Ave Water Service -0.5 134,1/8,6% 128.4 8.9 96 Pass 5 16111 Ave Water Service -0.5 134,1/8,6% 128.6 9.1 96 Pass Fieure 1: Plan with Aagroximate Density Test Locations 1 .?3 i I I STA 5Bt4& �Gi' t _- cur ro Easrt>vca a M tea 7144 800 {{u vd 1-8• to 9VM I As �atttn) i rlam) t �` �, � t � � caaaeEtF eaacxmrc-•-___4 ��� 3 37 tF e 3 s2 Vb'' t .--- :x W LF WWI }00 ASSY t/J 5 8 _ 41 2 v f c Copies To: Date Mailed: .6/14 Distribution Field Rep: Josh Greer, Staff Geologist Principal / PM: Kurt D. Merriman, P.E. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager AESI FIELD REPORT To: Date: 3/7/2017 Permit No, Table 2: Dry Utilitv Crossing Backfill Densitv Tests Project Name: Alpine Nursery Project No.: 160362-EO01 DPD No. Page 3 of 3 Test No. Location Depth (ft) Proctor (ASTM D1557) Dry (pcf) Moisture sture % Compaction ° / Pass/Fail 1 Road A Dry Utility Backfill -0 134,1/8,6% 132.1 8.7 99 Pass 2 Road A Dry Utility Backfill -0 134,1/8,6% 129.8 8.7 97 Pass 3 Road A Dry Utility Backfill -0 134,1/8,6% 133.7 8.3 99 Pass 4 Road A Dry Utility Backfill -0 13461/8s6% 130.1 9.7 97 Pass 5 Road A Dry Utility Backfill -0 134.1 / 8.6% 131.4 9.9 98 Pass 6 Road A Dry Utility Backfill -0 134.1 / 8.6% 130.0 7.6 97 Pass Figure 2: Plan with Approximate Density Testing Locations :SEI 167S7AVESE__ TT t s„� t `Irl w..� i re .,;, � PJAW � tf ro 12 I.. 15 F y 1 `1 18 I t4 19 + sf , + rwacrs T ,tea I 3 - ?5 25 2T II 78 I fw.2t '23 THAW 24f( � AI -P u�. L P� I / zz AI San 6— — -, — _ I - v_ . - 20 JW " . i.-. �` - r TRACT;III -,; p i r _ 2 E 1 8 ' i €AA — Copies To: Date Mailed: .6/14 Distribution Field Rep: Josh Greer, Staff Geologist Principal / PM: Kurt D. Merriman, P.E. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager