AS REQUESTED BY: Cllent
FIELD REPORT
Paye 1 of 2
Date
Project Name
Project No.
3/1/2017
Alpine Nursery
160362-EO01
Location
Municipality
Weather
SE 144" St and 161St Ave SE
Renton
Cloudy, 40s
Permit No.
DPD No.
Report No.
48
Engineer/Architect
D.R. Strong / Maher A. Joudi
Client/Owner
Toll Brothers
General Contractor/Superintendent
Toll Brothers
Grading Contractor/Superintendent
Team Nelson / Derrick
THE FOLLOWING WAS NOTED:
AESI arrived on-site at 9:30 AM to observe water main installation. Upon arrival AESI met with Derrick, the foreman from Team
Nelson.
161ST Ave Water Main Installation:
Team Nelson continued placing water main heading south along 161St Ave toward Road B (Figure 1). An existing gas main and an
existing water main were in conflict with the planned placement of water main along 161St. Team Nelson called the civil engineer
and the 22.5° bend was placed further north than planned to avoid existing utilities. This change resulted in water main placed 5-10'
west of the planned location.
The 8" DI pipe was placed approximately 4' deep and was bedded and covered with 5/8" minus crushed rock. Backfill consisted of
approximately 3' of native soil compacted by a ho -pack, followed by approximately 4" of 1 %" minus crushed rock compacted by a
ho -pack, 2" of 5/8" minus crushed rock compacted by a vibratory roller, and 2" of hot asphalt compacted by a vibratory roller.
Derrick said that 161" will be resurfaced at a future date. Density testing was conducted on the native soil backfill before crushed
rock was placed (Table 1). All backfill was compacted to firm and unyielding conditions before more backfill was placed.
Lot Fills:
When observed today, the material placed in Lots 22, 23, and 24 was still very wet and yielded under foot.
AESI left the site at 1:30 PM and will return tomorrow to observe water main installation.
Copies To: Distribution
Date Mailed:
Mr�i � � 2011
Field Rep: Josh G
Principal / PM: Kurt D
P.E.
st
Th15 document is considered a DRAFT until signed or initialed ESI Principal or Project Manager
To:
Date:
Permit No,
AESI FIELD REPORT
3/1/2017
Table 1: Water Main Backfill Density Tests
Project Name
Project No.:
DPD No,
Alpine Nursery
160362-E001
Page 2 of 2
Figure 1: Plan with Approximate Density Test Locations
(LF AS REQGdJ M)
CONCWWW BLOCKWO
PER KCWW DETAIL N"4
##I!
STA* 51+8174 A04'
W1 2F
OLM FLANGE CIN E7C ME OUT Mw EK foC i£ RLt3EfUhfC
CAP EX 50 AC 1WIH:8` DJ. CA P
r-s� ,
BLOOOW
7E
as _ Lr �__-
Note: 22.5° bend placed north of plan
e44 y w• If- 1
j - AIR YAG: ABY
KC*M DETAPI. N�?a
_ 1dCAIr AT Awi
T CF RAW) ; 112p
(r STA. 4447a 2Z68' Lm
TAw 49+"44a [838 t" p STA. 5r+7G.54 &AWF L
TA. 15+J&04 Ia56 L j I-8' IEE (RAful 17
F7M PRE; d PMTY 7EST I3 , Jpppp8w GA7E YoFLVLs (Fza1rJ)
XXP
rA & MM FLi1SHlNf3 1 >F�t or�c�+c
ET TAP polt? E795TING le CI
NWER -7f1`xff TAPP/N( < ABANlk7NEA AT MAWFER
-5" WE VALVE (FLxNJ) I i i' WA7V? USIMCM STAWAR
�� su eevsr riru�acr ec arnruncnl � i +..:L,. .. --•--
Copies To: Distribution
2
XLSiiNG WA M? SPRUCE TO f
Field Rep: Josh Greer, Staff Geologist
Date Mailed: Principal / PM: Kurt D. Merriman, P.
E.
v. 6/14 This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager
Dry
Test
Depth
Proctor (ASTM
Moisture
Compaction
Location
Density
Pass/Fail
No.
(ft)
D1557)
%
1
161St Ave Water Main
-0.5
134.1 / 8.6%
131.6
6.8
98
Pass
2
161St Ave Water Main
-0.5
134.1/8.6%
132.5
7.2
99
Pass
Figure 1: Plan with Approximate Density Test Locations
(LF AS REQGdJ M)
CONCWWW BLOCKWO
PER KCWW DETAIL N"4
##I!
STA* 51+8174 A04'
W1 2F
OLM FLANGE CIN E7C ME OUT Mw EK foC i£ RLt3EfUhfC
CAP EX 50 AC 1WIH:8` DJ. CA P
r-s� ,
BLOOOW
7E
as _ Lr �__-
Note: 22.5° bend placed north of plan
e44 y w• If- 1
j - AIR YAG: ABY
KC*M DETAPI. N�?a
_ 1dCAIr AT Awi
T CF RAW) ; 112p
(r STA. 4447a 2Z68' Lm
TAw 49+"44a [838 t" p STA. 5r+7G.54 &AWF L
TA. 15+J&04 Ia56 L j I-8' IEE (RAful 17
F7M PRE; d PMTY 7EST I3 , Jpppp8w GA7E YoFLVLs (Fza1rJ)
XXP
rA & MM FLi1SHlNf3 1 >F�t or�c�+c
ET TAP polt? E795TING le CI
NWER -7f1`xff TAPP/N( < ABANlk7NEA AT MAWFER
-5" WE VALVE (FLxNJ) I i i' WA7V? USIMCM STAWAR
�� su eevsr riru�acr ec arnruncnl � i +..:L,. .. --•--
Copies To: Distribution
2
XLSiiNG WA M? SPRUCE TO f
Field Rep: Josh Greer, Staff Geologist
Date Mailed: Principal / PM: Kurt D. Merriman, P.
E.
v. 6/14 This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager
a s s o c i a t e d
earth sciences
n C o r p o r a t e d
911 Fifth Avenue
Kirkland, Washington 98033
Phone: 425-827-7701
Fax: 425- 827-5424
www.aesgeo.com
To: Toll Brothers
9720 NE 120th Place, #100
Kirkland, WA 98034
ATTN: Paul 011estad
AS REQUESTED BY: Client
FIELD REPORT
Page 1 of 2
Date
Project Name
Project
No.
3/2/2017
Alpine Nursery
160362-EO01
Location
Municipality
Weather
SE 144" St and 161" Ave SE
Renton
Cloudy,
40s
Permit No.
DPD No.
Report
No.
49
Engineer/Architect
D.R. Strong/ Maher A. Joudi
Client/Owner
Toll Brothers
General Contractor/Superintendent
Toll Brothers
Grading Contractor/Superintendent
Team Nelson / Derrick
THE FOLLOWING WAS NOTED:
AESI arrived on-site at 9:30 AM to observe water main installation. Upon arrival AESI met with Derrick, the foreman from Team
Nelson,
1615k Ave Water Main Installation:
Today Team Nelson placed water main along 161St Ave between Road Band 145th St. (Figure 1). The 8" DI pipe was placed
approximately 4' deep and was bedded and covered with 5/8" minus crushed rock. Backfill consisted of approximately 3' of native
soil compacted by a ho -pack, followed by approximately 4" of 1 A" minus crushed rock compacted by a ho -pack, 2" of 5/8" minus
crushed rock compacted by a vibratory roller, and 2" of hot asphalt compacted by a vibratory roller. Derrick said that 161St Ave will
be resurfaced at a future date. Density testing was conducted on native soil backfill before crushed rock was placed (Table 1). All
backfill was compacted to firm and unyielding conditions before more backfill was placed.
AESI left the site at 130 PM and will return tomorrow to observe water main installation.
Copies To: Distribution
Date Mailed:
v. 6/14
Field Rep:
LIAR 16 2011 Principal / PM:
This document is considered a DRAFT until signed or
Geol
Kurt Q.�JJ,�rr'i/nan, P.E.
AESI Principal or Project Manager
To:
Date:
Permit No.
AESI FIELD REPORT
3/2/2017
Table 1: Water Main Backfill Density Tests
Project Name
Project No.:
DPD No.
Alpine Nursery
160362-E001
Page 2 of 2
Locations
Note: 22.5° bend
placed north of plan
5 & WA
Copies To: Distribution Field Rep: Josh Greer, Staff Geologist
Date Mailed: Principal / PM: Kurt D. Merriman, P.
E.
v. 6/14 This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager
Dry
Test
Depth
Proctor (ASTM
Moisture
Compaction
Location
Density
Pass/Fail
No.
(ft)
D1557)
%
1
161" Ave Water Main
-0.5
134.1 / 8.6%
129.1
6.0
96
Pass
2
161" Ave Water Main
-0.5
134.1 / 8.6%
130.2
6.6
97
Pass
3
161St Ave Water Main
-0.5
134,1/8,6%
128.8
7.3
96
Pass
3
161St Ave Water Main
-0.5
134.1 / 8.6%
131.4
7.4
98
Pass
Locations
Note: 22.5° bend
placed north of plan
5 & WA
Copies To: Distribution Field Rep: Josh Greer, Staff Geologist
Date Mailed: Principal / PM: Kurt D. Merriman, P.
E.
v. 6/14 This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager
TO:
ATTN:
a s s o c i a t e d
earth sciences
n c o r p o r a t e d
911 Fifth Avenue
Kirkland, Washington 98033
Phone: 425-827-7701
Fax: 425-827-5424
www.aesgeo.com
Toll Brothers
9720 NE 120th Place, #100
Kirkland, WA 98034
Paul 011estad
AS REQUESTED BY: Cllent
FIELD REPORT
Page 1 of 2
Date
Project Name
Project No.
3/3/2017
Alpine Nursery
160362-EO01
Location
Municipality
Weather
SE 144" St and 161't Ave SE
Renton
Light Rain, 40s
Permit No.
DPD No.
Report No.
50
Engineer/Architect
D.R. Strong / Maher A. Joudi
Client/Owner
Toll Brothers
General Contractor/Superintendent
Toll Brothers
Grading Contractor/Superintendent
Team Nelson / Derrick
THE FOLLOWING WAS NOTED:
AESI arrived on-site at 10:30 AM to observe water main installation. Upon arrival AESI met with Derrick, the foreman from Team
Nelson.
1615tAve Water Main Installation:
Today Team Nelson placed water main along 161St Ave between 145th St. and Lot 9 (Figure 1). The 8" DI pipe was placed
approximately 4' deep and was bedded and covered with 5/8" minus crushed rock. Backfill consisted of approximately 3' of native
soil compacted by a ho -pack, followed by approximately 6" of 1 %" minus crushed rock compacted by a ho -pack, 3" of 5/8" minus
crushed rock compacted by a vibratory roller, and 2" of hot asphalt compacted by a vibratory roller. Derrick said that 161" Ave will
be resurfaced at a future date. Density testing was conducted on native soil backfill before crushed rock was placed (Table 1). All
backfill was compacted to firm and unyielding conditions before more backfill was placed.
AESI leF4-+k
site at 200 PM and will return tomorrow to observe water main installation.
Copies To: Distribution
Date Mailed:
Field Rep: Josh
Principal / PM: Kurt D
P.E.
st
This document is considered a DRAFT until signed or initialed �n AE51 Principal or Project Manager
To:
Date:
Permit No.
AESI FIELD REPORT
3/3/2017
Table 1: Water Main Backfill Density Tests
Project Name:
Project No.:
DPD No,
Alpine Nursery
160362-E001
Page 2 of 2
Copies To: Distribution Field Rep: Josh Greer, Staff Geologist
Date Mailed:
v. 6/14
Principal / PM: Kurt D. Merriman, P.E.
This document is considered a DRAFT until signed or initialed by an AE51 Principal or Project Manager
Dry
Test
Depth
Proctor (ASTM
Moisture
Compaction
Location
Density%
Pass/Fail
No.
(ft)
D1557)
/
1
161" Ave Water Main
-0.5
134,1/8,6%
128.9
7.0
96
Pass
2
161St Ave Water Main
-0.5
134,1/8,6%
127.6
8.3
95
Pass
3
161" Ave Water Main
-0.5
134,1/8,6%
130.8
9.5
98
Pass
4
16151 Ave Water Main
-0.5
134,1/8,6%
132.6
8.4
99
Pass
Copies To: Distribution Field Rep: Josh Greer, Staff Geologist
Date Mailed:
v. 6/14
Principal / PM: Kurt D. Merriman, P.E.
This document is considered a DRAFT until signed or initialed by an AE51 Principal or Project Manager
a s s o c i a t e d
earth sciences
n c o r p o r a t e d
911 Fifth Avenue
Kirkland, Washington 98033
Phone: 425-827-7701
Fax: 425-827-5424
www.aesgeo.com
To: Toll Brothers
9720 NE 120th Place, #100
Kirkland, WA 98034
ATTN: Paul011estad
AS REQUESTED BY: Client
FIELD REPORT
Page 1 of 2
Date
Project Name
Project No.
3/6/2017
Alpine Nursery
160362-E001
Location
Municipality
Weather
SE 1441h St and 16V Ave SE
Renton
Cloudy, 40s
Permit No.
DPD No.
Report No.
51
Engineer/Architect
D.R. Strong/ Maher A. Joudi
Client/Owner
Toll Brothers
General Contractor/Superintendent
Toll Brothers
Grading Contractor/Superintendent
Team Nelson / Derrick
THE FOLLOWING WAS NOTED:
AESI arrived on-site at 11:00 AM to observe water main installation. Upon arrival AESI met with Derrick, the foreman from Team
Nelson,
1615L Ave Water Main Installation:
Today Team Nelson placed water main along 161St Ave between Lot 9 and the south end of the site (Figure 1). The 8" DI pipe was
placed approximately 4' deep and was bedded and covered with 5/8" minus crushed rock. Backfill consisted of approximately 3' of
native soil compacted by a ho -pack, followed by approximately 6" of 1 %" minus crushed rock compacted by a ho -pack, 3" of 5/8"
minus crushed rock compacted by a vibratory roller, and 2" of hot asphalt compacted by a vibratory roller. Derrick said that 161St
Ave will be resurfaced at a future date. Density testing was conducted on native soil backfill before crushed rock was placed (Table
1). All backfill was compacted to firm and unyielding conditions before more backfill was placed.
Dry Utility Crossings:
Workers began excavating dry utility crossings in Road A and placing conduit in the 3' deep trenches. The 5 PVC conduits were
bedded in sand. Backfill will be placed tomorrow.
AESI left the site at 1:00 PM and will return tomorrow to observe water main installation.
Copies To: Distribution
Date Mailed:
v. 6/14
Field Rep: Josh Gre ff Geologist
PrincipalD. M ri n, P.E.
This document is considered a DRAFT until signed or initioledhy. AESI Principal or Project Manager
AESI FIELD REPORT
To:
Date: 3/6/2017
Permit No.
Table 1: Water Main Backfill Density Tests
Project Name: Alpine Nursery
Project No.: 160362-EO01
DPD No.
Page 2 of 2
Figure 1: Plan with Approximate Density Test Locations '
i I
Dry
Test
Depth
Proctor (ASTM
Moisture
Compaction
Location
Density
Pass/Fail
No
(ft)
D1557)
%
%
1
1611t Ave Water Main
-0.5
134,1/8o6%
128,6
7,8
96
Pass
2
161St Ave Water Main
-0.5
134,1/8m6%
12790
940
95
Pass
3
161St Ave Water Main
-0.5
134,1/8,6%
129,1
8.5
96
Pass
4
161St Ave Water Main
-0,5
134,1 / 8,6%
129.9
8.8
97
Pass
AND CO&NkM c�OAWT
STA, s8+4&Jaz' m �c r a y ►int
cuTlr� Av7n DaS7M QS a WA M? t_g- tH SO= a&fflm As ftVUAW) c�'
,I MAIN MON: I—W DI SUMW (XIJj
I -r Ilk OEM {�1/yJw.1-i�J)• AND CAP 4' AC lip
b; I -e D! SPM =U"t! AS REDL M) -4 00 CAP PLUG ���
1-8m 7RAN9'7AW COWL" (&Ka) CONCRETE 8L0(7fING
CONCRETE S,OcxtlNG i f C A n c i
`,s 37 LF 8' Wo M52 -'r. - '.A _WATO?
�—
__.
&a A ARLY
4
3
t 2 3b4
Copies To: Distribution
Date Mailed:
v. 6/14
Field Rep: Josh Greer, Staff Geologist
Principal / PM: Kurt D. Merriman, P.E.
This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager
a s s o c i a t e d
earth sciences
n c o r p o r a t e d
911 Fifth Avenue
Kirkland, Washington 98033
Phone: 425-827-7701
Fax: 425- 827-5424
www.aesgeo.com
To: Toll Brothers
9720 NE 120th Place, #100
Kirkland, WA 98034
ATTN:
Paul 011estad
AS REQUESTED BY: Cllent
FIELD REPORT
Page 1 of 3
Date
Project Name
Project No.
3/7/2017
Alpine Nursery
160362-EO01
Location
Municipality
Weather
SE 1441h St and 161st Ave SE
Renton
Rain, 40s
Permit No.
DPD No.
Report No.
52
Engineer/Architect
D.R. Strong / Maher A. Joudi
Client/Owner
Toll Brothers
General Contractor/Superintendent
Toll Brothers
Grading Contractor/Superintendent
Team Nelson / Derrick
THE FOLLOWING WAS NOTED:
AESI arrived on-site at 11:30 AM to observe water main installation. Upon arrival AESI met with Derrick, the foreman from Team
Nelson.
161ST Ave Water Main Installation:
Today Team Nelson continued placing water service and hydrant connections along 161St Ave (Figure 1). 6" DI pipe was bedded and
covered with 5/8" minus crushed rock. 1" copper tubing was bedded and covered with sand. Backfill consisted of approximately 2.5'
of native soil compacted by a ho -pack, followed by approximately 6" of 1 %" minus crushed rock compacted by a ho -pack, 3" of 5/8"
minus crushed rock compacted by a vibratory roller, and 2" of hot asphalt compacted by a vibratory roller. Derrick said that 161St
Ave will be resurfaced at a future date. Density testing was conducted on native soil backfill before crushed rock was placed (Table
1). All backfill was compacted to firm and unyielding conditions before more backfill was placed.
Dry Utility Crossings:
Workers continued excavating dry utility crossings in Road A (Figure 2). The 5 PVC conduits placed approximately 3' deep and were
bedded in sand. Backfill consisted of 1' lifts of native soil compacted by a ho -pack. Density testing was conducted at the surface in
both lanes of the road (Table 2). All backfill was compacted to firm and unyielding conditions before more backfill was placed.
AESI left the site at 2:30 PM and will return tomorrow to observe water connections and utility trench backfill.
Copies To: Distribution Field Rep: Josh Gr S ff Geologist
Date Mailed: ''�i Principal / PM: Kurt D. e an, P.E.
v. 6/14 This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager
AESI FIELD REPORT
To:
Date: 3/7/2017
Permit No,
Table 1: 161" Water Backfill Densitv Tests
Project Name
Project No.:
DPD No.
Alpine Nursery
160362-E001
Page 2 of 3
Fieure 1: Plan with Aagroximate Density Test Locations
1 .?3 i I I
STA 5Bt4& �Gi' t _-
cur ro Easrt>vca a M
tea 7144 800 {{u vd
1-8• to 9VM I As �atttn)
i rlam)
t
�` �, � t � � caaaeEtF eaacxmrc-•-___4 ���
3 37 tF e 3 s2 Vb'' t .--- :x
W LF
WWI
}00 ASSY
t/J
5
8 _ 41
2
v
f
c
Copies To:
Date Mailed:
.6/14
Distribution
Field Rep: Josh Greer, Staff Geologist
Principal / PM: Kurt D. Merriman, P.E.
This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager
Dry
Test
Depth
Proctor (ASTM
Moisture
Compaction
Location
Density
Pass/Fail
No.
(ft)
D1557)
1
1461h Water Main Connection
-0.5
134,1/8,6%
130.5
9.5
97
Pass
2
1611t Ave Water Service
-0.5
134.1 / 8.6%
131.0
9.0
98
Pass
3
1611 Ave Water Service
-0.5
134,1/846%
129.9
9.8
97
Pass
4
16111 Ave Water Service
-0.5
134,1/8,6%
128.4
8.9
96
Pass
5
16111 Ave Water Service
-0.5
134,1/8,6%
128.6
9.1
96
Pass
Fieure 1: Plan with Aagroximate Density Test Locations
1 .?3 i I I
STA 5Bt4& �Gi' t _-
cur ro Easrt>vca a M
tea 7144 800 {{u vd
1-8• to 9VM I As �atttn)
i rlam)
t
�` �, � t � � caaaeEtF eaacxmrc-•-___4 ���
3 37 tF e 3 s2 Vb'' t .--- :x
W LF
WWI
}00 ASSY
t/J
5
8 _ 41
2
v
f
c
Copies To:
Date Mailed:
.6/14
Distribution
Field Rep: Josh Greer, Staff Geologist
Principal / PM: Kurt D. Merriman, P.E.
This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager
AESI FIELD REPORT
To:
Date: 3/7/2017
Permit No,
Table 2: Dry Utilitv Crossing Backfill Densitv Tests
Project Name: Alpine Nursery
Project No.: 160362-EO01
DPD No.
Page 3 of 3
Test
No.
Location
Depth
(ft)
Proctor (ASTM
D1557)
Dry
(pcf)
Moisture sture
%
Compaction
°
/
Pass/Fail
1
Road A Dry Utility Backfill
-0
134,1/8,6%
132.1
8.7
99
Pass
2
Road A Dry Utility Backfill
-0
134,1/8,6%
129.8
8.7
97
Pass
3
Road A Dry Utility Backfill
-0
134,1/8,6%
133.7
8.3
99
Pass
4
Road A Dry Utility Backfill
-0
13461/8s6%
130.1
9.7
97
Pass
5
Road A Dry Utility Backfill
-0
134.1 / 8.6%
131.4
9.9
98
Pass
6
Road A Dry Utility Backfill
-0
134.1 / 8.6%
130.0
7.6
97
Pass
Figure 2: Plan with Approximate Density Testing Locations
:SEI 167S7AVESE__
TT
t s„� t `Irl
w..� i
re .,;, � PJAW
� tf ro
12
I.. 15 F y 1
`1
18 I t4 19 +
sf , + rwacrs
T ,tea
I
3
- ?5 25 2T II
78 I fw.2t '23 THAW
24f( � AI
-P u�.
L P� I /
zz
AI
San 6— — -, — _ I -
v_ . -
20 JW
" . i.-. �` - r TRACT;III
-,;
p
i
r
_
2 E 1
8
'
i €AA
—
Copies To:
Date Mailed:
.6/14
Distribution
Field Rep: Josh Greer, Staff Geologist
Principal / PM: Kurt D. Merriman, P.E.
This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager