Loading...
HomeMy WebLinkAboutRE GH Phase 2 - Traffic Signal Pole SubmittalsAndrew, Attached is a formal version of the approved as noted submittal. Tim Tim Ryan Project Manager II (p) 425-441-2217 (c) 612-360-3056 From: Eric Cutshall [mailto:ECutshall@Rentonwa.gov] Sent: Tuesday, August 01, 2017 8:25 AM To: 'Andrew Hollenback'; 'Chris Bicket' Cc: Elyse Hanson; Bob Bracco; Tim Schalk; Tim Ryan; Jaedi Stevens; Justin T. Johnson Subject: RE: GH Phase 2 - Traffic Signal Pole Submittals The attached submittal is approved. Thank you, Eric Cutshall Transportation Maintenance Manager City Of Renton, WA (425)-430-7423 Ecutshall@rentonwa.gov <mailto:Ecutshall@rentonwa.gov> Renton-Home of the XLVIII Super Bowl Champion Seahawks From: Andrew Hollenback [mailto:AHollenback@primeelectric.com] Sent: Friday, July 28, 2017 3:03 PM To: Eric Cutshall <ECutshall@Rentonwa.gov>; 'Chris Bicket' <bicket@tenw.com> Cc: Elyse Hanson <hanson@tenw.com>; Bob Bracco <bbracco@primeelectric.com>; Tim Schalk <Tim.Schalk@RyanCompanies.com>; Tim Ryan <Tim.Ryan@RyanCompanies.com>; Jaedi Stevens <stevens@tenw.com> Subject: RE: GH Phase 2 - Traffic Signal Pole Submittals Please find attached SC connector submittal. Thanks Andrew Hollenback Project Manager Prime Electric | O: 425.747.5200 | C: 425.864.1753 | F: 425.747.5552 13301 SE 26th Street Bellevue, WA 98005 | primeelectric.com <http://www.primeelectric.com/> Facebook <https://www.facebook.com/Prime-Electric-112196175509504/> | Twitter <https://twitter.com/prime_electric?lang=en> | LinkedIn <https://www.linkedin.com/company/prime-electric> | Instagram <https://www.instagram.com/prime_electric/> From: Eric Cutshall [mailto:ECutshall@Rentonwa.gov] Sent: Friday, July 28, 2017 2:21 PM To: Andrew Hollenback <AHollenback@primeelectric.com>; 'Chris Bicket' <bicket@tenw.com> Cc: Elyse Hanson <hanson@tenw.com>; Bob Bracco <bbracco@primeelectric.com>; Tim Schalk <Tim.Schalk@RyanCompanies.com>; Tim Ryan <Tim.Ryan@RyanCompanies.com>; Jaedi Stevens <stevens@tenw.com> Subject: RE: GH Phase 2 - Traffic Signal Pole Submittals Correct Thank you, Eric Cutshall Transportation Maintenance Manager City Of Renton, WA (425)-430-7423 Ecutshall@rentonwa.gov <mailto:Ecutshall@rentonwa.gov> Renton-Home of the XLVIII Super Bowl Champion Seahawks From: Andrew Hollenback [mailto:AHollenback@primeelectric.com] Sent: Friday, July 28, 2017 2:18 PM To: Eric Cutshall <ECutshall@Rentonwa.gov>; 'Chris Bicket' <bicket@tenw.com> Cc: Elyse Hanson <hanson@tenw.com>; Bob Bracco <bbracco@primeelectric.com>; Tim Schalk <Tim.Schalk@RyanCompanies.com>; Tim Ryan <Tim.Ryan@RyanCompanies.com>; Jaedi Stevens <stevens@tenw.com> Subject: RE: GH Phase 2 - Traffic Signal Pole Submittals I assume you mean we will not be pulling any fiber to 43rd and Oaksdale? Andrew Hollenback Project Manager Prime Electric | O: 425.747.5200 | C: 425.864.1753 | F: 425.747.5552 13301 SE 26th Street Bellevue, WA 98005 | primeelectric.com <http://www.primeelectric.com/> Facebook <https://www.facebook.com/Prime-Electric-112196175509504/> | Twitter <https://twitter.com/prime_electric?lang=en> | LinkedIn <https://www.linkedin.com/company/prime-electric> | Instagram <https://www.instagram.com/prime_electric/> From: Eric Cutshall [mailto:ECutshall@Rentonwa.gov] Sent: Friday, July 28, 2017 2:15 PM To: Andrew Hollenback <AHollenback@primeelectric.com>; 'Chris Bicket' <bicket@tenw.com> Cc: Elyse Hanson <hanson@tenw.com>; Bob Bracco <bbracco@primeelectric.com>; Tim Schalk <Tim.Schalk@RyanCompanies.com>; Tim Ryan <Tim.Ryan@RyanCompanies.com>; Jaedi Stevens <stevens@tenw.com> Subject: RE: GH Phase 2 - Traffic Signal Pole Submittals The drawing is a little deceiving. You will not be pulling any fiber to Oakdale. The schematic is purely for splicing reference. The Oaksdale fiber already exist. Thank you, Eric Cutshall Transportation Maintenance Manager City Of Renton, WA (425)-430-7423 Ecutshall@rentonwa.gov <mailto:Ecutshall@rentonwa.gov> Renton-Home of the XLVIII Super Bowl Champion Seahawks From: Andrew Hollenback [mailto:AHollenback@primeelectric.com] Sent: Friday, July 28, 2017 1:57 PM To: Eric Cutshall <ECutshall@Rentonwa.gov>; 'Chris Bicket' <bicket@tenw.com> Cc: Elyse Hanson <hanson@tenw.com>; Bob Bracco <bbracco@primeelectric.com>; Tim Schalk <Tim.Schalk@RyanCompanies.com>; Tim Ryan <Tim.Ryan@RyanCompanies.com>; Jaedi Stevens <stevens@tenw.com> Subject: RE: GH Phase 2 - Traffic Signal Pole Submittals Eric, Per the attached email response to our RFI we posed about the fiber earlier. Prime only has included pulling a 24ct fiber from 27th and Naches through existing pathway and splicing it in the cabinet at 27th and Oaksdale. Per your direction we will splice them using SC connectors. The part that you have highlighted below, we do not have covered as there is no wire note nor construction note anywhere on the drawings instructing to pull this fiber. Thanks Andrew Hollenback Project Manager Prime Electric | O: 425.747.5200 | C: 425.864.1753 | F: 425.747.5552 13301 SE 26th Street Bellevue, WA 98005 | primeelectric.com <http://www.primeelectric.com/> Facebook <https://www.facebook.com/Prime-Electric-112196175509504/> | Twitter <https://twitter.com/prime_electric?lang=en> | LinkedIn <https://www.linkedin.com/company/prime-electric> | Instagram <https://www.instagram.com/prime_electric/> From: Eric Cutshall [mailto:ECutshall@Rentonwa.gov] Sent: Friday, July 28, 2017 1:36 PM To: 'Chris Bicket' <bicket@tenw.com>; Andrew Hollenback <AHollenback@primeelectric.com> Cc: Elyse Hanson <hanson@tenw.com>; Bob Bracco <bbracco@primeelectric.com>; Tim Schalk <Tim.Schalk@RyanCompanies.com>; Tim Ryan <Tim.Ryan@RyanCompanies.com>; Jaedi Stevens <stevens@tenw.com> Subject: RE: GH Phase 2 - Traffic Signal Pole Submittals Please splice 12 fibers (Blue buffer tube) of the 24CT cable. The orange buffer tube is for future use. Connect all fiber ends of the blue buffer tube with SC connectors. Thank you, Eric Cutshall Transportation Maintenance Manager City Of Renton, WA (425)-430-7423 Ecutshall@rentonwa.gov <mailto:Ecutshall@rentonwa.gov> Renton-Home of the XLVIII Super Bowl Champion Seahawks From: Chris Bicket [mailto:bicket@tenw.com] Sent: Friday, July 28, 2017 1:22 PM To: Andrew Hollenback <AHollenback@primeelectric.com>; Eric Cutshall <ECutshall@Rentonwa.gov> Cc: Elyse Hanson <hanson@tenw.com>; Bob Bracco <bbracco@primeelectric.com>; Tim Schalk <Tim.Schalk@RyanCompanies.com>; Tim Ryan <Tim.Ryan@RyanCompanies.com>; Jaedi Stevens <stevens@tenw.com>; Chris Bicket <bicket@tenw.com> Subject: RE: GH Phase 2 - Traffic Signal Pole Submittals Looping in Eric, feel free to coordinate with him directly. Thx Chris Bicket, P.E. | Design Manager ________________________________ TENW 11400 SE 8th Street, Suite 200, Bellevue, WA 98004 bicket@tenw.com <mailto:bicket@tenw.com> |Cell: 206-817-9400|Direct: 425-250-5002 From: Andrew Hollenback [mailto:AHollenback@primeelectric.com] Sent: Thursday, July 27, 2017 3:56 PM To: Tim Ryan <Tim.Ryan@RyanCompanies.com>; Jaedi Stevens <stevens@tenw.com> Cc: Chris Bicket <bicket@tenw.com>; Elyse Hanson <hanson@tenw.com>; Bob Bracco <bbracco@primeelectric.com>; Tim Schalk <Tim.Schalk@RyanCompanies.com> Subject: RE: GH Phase 2 - Traffic Signal Pole Submittals Tim / Jaedi I just spoke with out fiber guys and he said that an SC connector will not work with the 24 count fiber submitted. If the City of Renton only wants a 12 count fiber from 27th and Naches to 27th and Oaksdale, then an SC connector will work. Can you have Eric Cutshall verify what count of fiber he wants run between the 2 intersections? Let me know if that does not make sense or you have any questions Thanks Andrew Hollenback Project Manager Prime Electric | O: 425.747.5200 | C: 425.864.1753 | F: 425.747.5552 13301 SE 26th Street Bellevue, WA 98005 | primeelectric.com <http://www.primeelectric.com/> Facebook <https://www.facebook.com/Prime-Electric-112196175509504/> | Twitter <https://twitter.com/prime_electric?lang=en> | LinkedIn <https://www.linkedin.com/company/prime-electric> | Instagram <https://www.instagram.com/prime_electric/> From: Tim Ryan [mailto:Tim.Ryan@RyanCompanies.com] Sent: Thursday, July 27, 2017 8:45 AM To: Andrew Hollenback <AHollenback@primeelectric.com>; Jaedi Stevens <stevens@tenw.com> Cc: Chris Bicket <bicket@tenw.com>; Elyse Hanson <hanson@tenw.com>; Bob Bracco <bbracco@primeelectric.com>; Tim Schalk <Tim.Schalk@RyanCompanies.com> Subject: GH Phase 2 - Traffic Signal Pole Submittals Andrew, Sorry for the delay on this. Attached are two reviewed submittals. Regarding the fiber, the City of Renton is requesting SC fiber connecters rather than LC. They would like you to resubmit on the SC connectors. All other info was approved as noted. Thanks, Tim Tim Ryan Project Manager II (p) 425-441-2217 (c) 612-360-3056