Loading...
HomeMy WebLinkAboutR-404902DEMOLITION AND T.E.S.C. PLAN 1 " =10' 0 5 10 20 \A \\\\ ■EXISTING STORMDRAIN EXISTING WATER LINE W U EXISTING GAS LINE - Z EXISTING OVERHEAD POWER w 0 SAWCUT LINE w CATCH BASIN PROTECTION = TEMP. CONSTRUCTION ENTRANCE C.� z TEMP. CONSTRUCTION FENCE C/7 CLEARING LIMITS SILT FENCE ASPHALT TO BE REMOVED N U CONCRETE TO BE REMOVED Know what's below. Call before you dig. Dial 811 P(OH ----------------------- C3 o- n\- �n 1 0 U,-On n- �O F-.---------------- a--1 L-- a-----------------J DEMOLITION AND T.E.S.C. SCHEDULE 0 ESTABLISH CLEARING LIMITS AS SHOWN FOR PROJECT. (DINSTALL TEMP. FILTER FABRIC PERIMETER SILT FENCE TO PREVENT SILT LADEN RUNOFF FROM DISCHARGING TO ADJACENT PROPERTY TEMPORARY CONSTRUCTION ENTRANCE (IF NEEDED) UTILIZE (DINSTALL EXISTING PAVEMENT PRIOR TO REMOVAL. 0 REMOVE EXISTING BUILDING STRUCTURE & DISPOSED OFFSITE. O5 REMOVE EXISTING CONCRETE DRIVEWAY & DISPOSE OFFSITE. OREMOVE EXISTING CONCRETE STEPS & DISPOSE OFFSITE. O7 REMOVE EXISTING CONCRETE WALKWAY & DISPOSE OFFSITE. OREMOVE EXISTING DECK AND DISPOSE OFFSITE. OREMOVE EXISTING ROCKERY/RETAINING WALL AND DISPOSE OFFSITE. CONSTRUCTION SEOUENCE: 1. SCHEDULE AND ATTEND PRE -CONSTRUCTION MEETING WITH THE CITY OF RENTON. 2. CALL THE HOTLINE (DIAL 81 1) FOR UNDERGROUND UTILITIES LOCATES BEFORE YOU DIG. 3. INSTALL TESC MEASURES, FLAG OR FENCE CLEARING LIMITS TESC MEASURES SHALL BE MAINTAINED UNTIL FINAL GRADING, PAVING, AND HYDROSEEDING. 4. MARK ALL TREES TO REMOVE AND PROTECT TREES TO REMAIN PRIOR TO REMOVING TREES AS SHOWN. COORDINATE WITH OWNER REGARDING TIMBER LOGGING AND OBTAIN NECESSARY PERMITS FROM CITY PRIOR TO REMOVAL. 5. DEMO EXISTING PAVEMENT AND PERFORM ROUGH GRADING AS SHOWN ON THE PLANS. STABILIZE EXPOSED GROUND WITH SUITABLE GROUND COVER. 6. INSTALL UTILITIES, INCLUDING STORM DRAINAGE, SANITARY SEWER, WATER, POWER, GAS, ETC. 7. PERFORM FINAL GRADING, PAVING, AND SURFACING IMPROVEMENTS. 8. HYDROSEED AND MULCH ALL EXPOSED AREAS. 9. SWEEP AND CLEAN ALL PAVED AREAS, THEN CLEAN THE STORM SYSTEM. 10. REMOVE ALL CLEARING LIMITS AND TEMPORARY EROSION AND SEDIMENTATION CONTROL FACILITIES ONLY AFTER EXPOSED AREAS ON SITE ARE STABILIZED. 11. CALL FOR FINAL INSPECTION OF FACILITIES. EX. TOPOGRAPHY/SURVEY INFORMATION NOTE: PROJECT ENGINEER DOES NOT WARRANT THAT THE TOPOGRAPHY SHOWN ON THESE DRAWINGS IS REPRESENTATIVE OF WHAT IS EXISTING AND/OR CONSTRUCTED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE WITH THE OWNER TO HAVE ALL IMPROVEMENTS FIELD VERIFIED PRIOR TO CONSTRUCTION. DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE PROJECT ENGINEER PRIOR TO WORK. UTILITIES AND UTILITY EASEMENTS FOR THIS SITE HAVE NOT BEEN RESEARCHED OR CONFIRMED. _SS N 9°0 UTILITY CONFLICT NOTE - THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE Q J3NP E N G I N E E R I N G 1-800-424-555 AND THEN POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. 1735 POINTE WOODWORTH DR NE LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE TACOMA, WA 98422 UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS 1 REVISED PER CITY REVIEW COMMENTS Z SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT PROJECT ENGINEER TO RESOLVE (206) 730-3348 W ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. N0. REVISION n - -n- -W- -W- -W- -W- -W- EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES: 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR. 2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF SS SS S -- SS ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT. ► -► -----------------------------1--------- 3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE JG C _ ► ►>;-- G - ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO ► ► POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS. ► i ► 4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND GAS I ► ► ► AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE STUB ► ► ► PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ► ► ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL ► N 89; 04'35" 60.02 (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION ► ► PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE ► I �� ► CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE ► �� `�""""`^^"" ^^^%ww�f DURATION OF CONSTRUCTION. i �� ► 5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF ► �� Q CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL ► _ _ _�� ► MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE ► - - - - - �► / REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK -OUT TO ► ====�i �` �� ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF �/ - - - - - - - - SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE I� END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE. 6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN DESIGNATED i CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE c) I Q GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE DUMPING OF EXCESS + CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS. �- 6- ; J / 48.3' 7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL Q BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT EXIST. THE Q IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC 173.7' BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT. i. 8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE of 4 RUNOFF SHALL BE DISPOSED OF PROPERLY. c I 9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES 22 AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON w THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE i OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS 1 THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER Ln I AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT (N I PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. ;r) I i I 10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF o STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR i STORMWATER FACILITIES. I 11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. 59.2' 12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE I DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF ~~�~�~�~" --- THE RENTON SWDM. 13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER I ►►li - - - - - - - - - - - - - 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY. 14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, It; SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. tl� 15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM j i OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. INSPECTION AND I� MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY. 16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER --___- --- �� THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS 89 04 5" W►50.02' DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION. 17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE O ;^ ,�� CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED IR PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE I STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. SURVEYED: DESIGNED: J3NP DRAWN: J3NP PT 4 17 19 PT CHECKED: J3NP BY DATE APPR A-mJ3NP SCALE: 1 "=10, ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATUM A. T9 4� of w A s,y1 f j, �o 378 F� � S T ER19 S70NA L NG 04117/2019 CITY OF RENTON Plonning/Building/Public Works Dept. 19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION. 20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW. 21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON -SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST. 22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. DEMOLITION NOTES 1. CONTRACTOR SHALL ASSURE THAT ALL NECESSARY PERMITS HAVE BEEN OBTAINED PRIOR TO COMMENCING WORK, INCLUDING DEMOLITION AND ANY SEWER CAPPING PERMITS. FIRE PROTECTION DEMOLITION PERMIT IF REQUIRED, IS ISSUED BY FIRE DEPARTMENT. SEPARATE PERMITS ARE REQUIRED FOR EACH BUILDING AS WELL AS SEPARATE SEWER CAPPING PERMIT 2. DISMANTLE AND DEMOLISH BUILDING STRUCTURES. DEMOLITION DEBRIS AND MATERIALS TO BE STOCKPILED AND DISPOSED OF AT AN APPROVED SITE. FOUNDATIONS BELOW SLAB AND BELOW ADJACENT SURFACES SHALL BE REMOVED IN AREAS OF NEW CONSTRUCTION. REMOVE ALL STEM WALLS, ANCHOR BOLTS, ETC. TO LEAVE THE AREA FREE FROM ANY PROTRUSIONS (STRUCTURAL OR UTILITY). 3. ANY HAZARDOUS SUBSTANCES AND/OR MATERIALS ENCOUNTERED SHALL BE HANDLED AND DISPOSED OF BY QUALIFIED PERSONNEL ACCORDING TO COUNTY, STATE AND FEDERAL REGULATIONS. 4. ANY ENCOUNTERED UNDERGROUND TANKS, VAULTS, ETC., SHALL BE REMOVED PER COUNTY/STATE REGULATIONS. CRAWL SPACES, TUNNELS, TANK HOLES, ETC., SHALL BE BACKFILLED AND COMPACTED PER SOILS ENGINEERS RECOMMENDATIONS. 5. DISCONNECT ALL POWER, TELEPHONE, GAS FROM BLDG. CONTRACTOR SHALL CONTACT AND COORDINATE WITH THE FIELD ENGINEER AND ANY APPROPRIATE UTILITY COMPANIES ON REQUESTING DISCONNECTION'S, REMOVALS AND/OR RELOCATION OF EXISTING SERVICE. CONTRACTOR SHALL COORDINATE WITH THE OWNERS ENGINEER, AND APPROPRIATE UTILITY PURVEYORS TO VERIFY SERVICE LOCATIONS TO EXISTING BUILDING. CONTRACTOR IS CAUTIONED THAT PERIMETER UTILITIES OUTSIDE OF THE BUILDING ARE TO REMAIN OPERATIONAL. THE CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR ANY DAMAGES AS A RESULT OF A DISRUPTION OF UTILITY SERVICE ASSOCIATED WITH AND/OR DUE TO HIS ACTIVITIES. 6. PLUG AND CAP ALL EXISTING WATER LINES, AND STORM DRAINS AT BLDG. CAP ALL UTILITIES TO THE BUILDING, DISCONNECT ELECTRICAL AND REMOVE ANY WATER METERS AND CAP LINES 7. CONTRACTOR SHALL CONFIRM AND VERIFY WORK SCOPE ITEMS AND BUILDING UTILITY SERVICES TO DEMOLISH WITH THE OWNERS AUTHORIZED REPRESENTATIVE. EXISTING GRADE TEMPORARY 2:1 CUT SLOPE TYP. PROVIDE TEMPORARY SHORING WALL PER STRUCTURAL ENGINEER AS NECESSARY (SEE PLAN FOR LOCATION) 4' MAX. VERTICAL CUT PER GEOTECH. REPORT BOTTOM OF EXCAVATION VARIES (SEE PLAN) TYPICAL EXCAVATION SECTION NOT TO SCALE R-404902 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING jchavez 04/23/2019 U LLI DATE: SINGH RESIDENCE -LOT 21 2/11/19 w 1 1 2 9 N. 3 3 R D PLACE FIELDBOOK: PEE CIVIL PERMIT _ DRAWING N0: TEMPORARY EROSION & SEDIMENTATION CONTROL C2 DEMOLITION &T.E.S.C. PLAN SHEET SHEET: 2 OF: Z