HomeMy WebLinkAboutR-404905DEMOLITION
AND T.E.S.C.
PLAN
0
O
1
CV
U
1 " •
0 5 10 20
\A \\\\
T.E.S.C. LEGEND
EXISTING STORM DRAIN
EXISTING WATER LINE
EXISTING GAS LINE
EXISTING OVERHEAD POWER
SAWCUT LINE
CATCH BASIN PROTECTION
TEMP. CONSTRUCTION ENTRANCE
TEMP. CONSTRUCTION FENCE
CLEARING LIMITS
SILT FENCE
ASPHALT TO BE REMOVED
CONCRETE TO BE REMOVED
Know what's below.
Call before you dig.
Dial 811
w- - - -w- -
Ie
P(OH
iannUUnnn°°I
--Q ---- - - - --- -.-- a
L-----
---------------�
DEMOLITION AND T.E.S.C. SCHEDULE
( ESTABLISH CLEARING LIMITS AS SHOWN FOR PROJECT.
(INSTALL TEMP. FILTER FABRIC PERIMETER SILT FENCE TO PREVENT SILT
LADEN RUNOFF FROM DISCHARGING TO ADJACENT PROPERTY
( INSTALL TEMPORARY CONSTRUCTION ENTRANCE (IF NEEDED).
( REMOVE EXISTING CONCRETE STEPS & DISPOSE OFFSITE.
OCOORDINATE THE DISCONNECTION OF POWER SERVICE & REMOVAL OF
OVERHEAD LINES TO EXISTING ADJACENT BUILDING (TO BE REMOVED)
WITH POWER COMPANY.
(D REMOVE EXISTING VEGETATION & DISPOSE OFFSITE.
CONSTRUCTION SEQUENCE:
1. SCHEDULE AND ATTEND PRE -CONSTRUCTION MEETING WITH THE CITY OF
RENTON.
2. CALL THE HOTLINE (DIAL 81 1) FOR UNDERGROUND UTILITIES LOCATES BEFORE
YOU DIG.
3. INSTALL TESC MEASURES, FLAG OR FENCE CLEARING LIMITS TESC MEASURES
SHALL BE MAINTAINED UNTIL FINAL GRADING, PAVING, AND HYDROSEEDING.
4. MARK ALL TREES TO REMOVE AND PROTECT TREES TO REMAIN PRIOR TO
REMOVING TREES AS SHOWN. COORDINATE WITH OWNER REGARDING TIMBER
LOGGING AND OBTAIN NECESSARY PERMITS FROM CITY PRIOR TO REMOVAL.
5. DEMO EXISTING PAVEMENT AND PERFORM ROUGH GRADING AS SHOWN ON THE
PLANS. STABILIZE EXPOSED GROUND WITH SUITABLE GROUND COVER.
6. INSTALL UTILITIES, INCLUDING STORM DRAINAGE, SANITARY SEWER, WATER,
POWER, GAS, ETC.
7. PERFORM FINAL GRADING, PAVING, AND SURFACING IMPROVEMENTS.
8. HYDROSEED AND MULCH ALL EXPOSED AREAS.
9. SWEEP AND CLEAN ALL PAVED AREAS, THEN CLEAN THE STORM SYSTEM.
10. REMOVE ALL CLEARING LIMITS AND TEMPORARY EROSION AND SEDIMENTATION
CONTROL FACILITIES ONLY AFTER EXPOSED AREAS ON SITE ARE STABILIZED.
11. CALL FOR FINAL INSPECTION OF FACILITIES.
EX. TOPOGRAPHY/SURVEY INFORMATION NOTE:
PROJECT ENGINEER DOES NOT WARRANT THAT THE TOPOGRAPHY SHOWN ON THESE
DRAWINGS IS REPRESENTATIVE OF WHAT IS EXISTING AND/OR CONSTRUCTED. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO COORDINATE WITH THE OWNER TO HAVE ALL
IMPROVEMENTS FIELD VERIFIED PRIOR TO CONSTRUCTION. DISCREPANCIES SHALL BE
BROUGHT TO THE ATTENTION OF THE PROJECT ENGINEER PRIOR TO WORK. UTILITIES
AND UTILITY EASEMENTS FOR THIS SITE HAVE NOT BEEN RESEARCHED OR CONFIRMED.
UTILITY CONFLICT NOTE -
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION,
AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY
POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION
PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE Q
1-800-424-555 AND THEN POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS
OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST
LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE
UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS
SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT PROJECT ENGINEER TO RESOLVE
ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION.
ik
G
3�
C) GAS
I�STUB
i
JNE 0 i
AGS
0
i
i
NT
F.
J3NP ENGINEERING -
1735 POINTE WOODWORTH DR NE
TACOMA, WA 98422 1
(206) 730-3348
NO.
- - _"_ -TV- -W- -W- -W- -W- -W- -W- -W- -W- -W-
1 �
1
FOUND REBAR & CAP
-CAP OBLITERATED
0.07'W
FOUND REBAR & CAP
KJ OYLER LS 5524
0.14'S 0.07'W
SURVEYED:
DESIGNED:
J3NP
DRAW
J3NP
REVISED PER CITY REVIEW COMMENTS PT 4 17 19 PT CHECKED:
J3NP
REVISION BY DATE APPR -J3NP
EROSION AND SEDIMENT CONTROL (ESC) STANDARD
PLAN NOTES:
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION
MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE
CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR.
2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF
ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS REQUIRED
FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING
REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER
GENERAL PERMIT.
3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE
ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO
POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS.
4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND
AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE
PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN
ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL
(RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION
PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE
CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE
DURATION OF CONSTRUCTION.
5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL
MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE
REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK -OUT TO
ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF
SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE
END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO
PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE.
6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN DESIGNATED
CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE
GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE DUMPING OF EXCESS
CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS.
7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND
CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO
SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL
BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR
CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. ALL
ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS
BEEN STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT EXIST. THE
IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC
BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT.
8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE
RUNOFF SHALL BE DISPOSED OF PROPERLY.
9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM
REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES
AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE
THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON
THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE
OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS
THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER
AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT
PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF
STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR
STORMWATER FACILITIES.
11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER
FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL.
12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE
DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL
30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH)
SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G.,
SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF
THE RENTON SWDM.
13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER
1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY.
14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION,
SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS.
15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM
OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. INSPECTION AND
MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY.
16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER
THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS
DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS
THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP.
ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS
NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION.
17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE
CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED
PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER
INTO THE DOWNSTREAM SYSTEM.
18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN
SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE
STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN
INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE
ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE
FINAL GRADE OF THE PERMANENT FACILITY.
SCALE:
VERTICAL: NAVD 1988
1 "= 10, HORIZONTAL: NAD 1983/1991
ONE INCH DAT U M
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
G* A • T9
41 of w A s,y/ f j,
� O
�o 37819 p ��
F� � S T ERA`'
S70NA L NG
04/17/202 9
CITY OF
RENTON
Plonning/Building/Public Works Dept.
19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR
ON -SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE
CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND
COMPACTION DURING CONSTRUCTION.
20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS
SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN
PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED
WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF THOSE AREAS
TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE
SUBMITTED TO THE CITY FOR REVIEW.
21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO
PREVENT SEDIMENT -LADEN WATER FROM LEAVING THE PROJECT SITE, ALL ESC BMPS
SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON -SITE
BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED
AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY
STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND
MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL
APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED
BEFORE OCTOBER 1ST.
22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION
CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL
ROCKERIES IN CITY ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH
CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED
IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE.
DEMOLITION NOTES
1. CONTRACTOR SHALL ASSURE THAT ALL NECESSARY PERMITS HAVE BEEN OBTAINED PRIOR
TO COMMENCING WORK, INCLUDING DEMOLITION AND ANY SEWER CAPPING PERMITS. FIRE
PROTECTION DEMOLITION PERMIT IF REQUIRED, IS ISSUED BY FIRE DEPARTMENT. SEPARATE
PERMITS ARE REQUIRED FOR EACH BUILDING AS WELL AS SEPARATE SEWER CAPPING
PERMIT
2. DISMANTLE AND DEMOLISH BUILDING STRUCTURES. DEMOLITION DEBRIS AND MATERIALS TO
BE STOCKPILED AND DISPOSED OF AT AN APPROVED SITE. FOUNDATIONS BELOW SLAB
AND BELOW ADJACENT SURFACES SHALL BE REMOVED IN AREAS OF NEW CONSTRUCTION.
REMOVE ALL STEM WALLS, ANCHOR BOLTS, ETC. TO LEAVE THE AREA FREE FROM ANY
PROTRUSIONS (STRUCTURAL OR UTILITY).
3. ANY HAZARDOUS SUBSTANCES AND/OR MATERIALS ENCOUNTERED SHALL BE HANDLED AND
DISPOSED OF BY QUALIFIED PERSONNEL ACCORDING TO COUNTY, STATE AND FEDERAL
REGULATIONS.
4. ANY ENCOUNTERED UNDERGROUND TANKS, VAULTS, ETC., SHALL BE REMOVED PER
COUNTY/STATE REGULATIONS. CRAWL SPACES, TUNNELS, TANK HOLES, ETC., SHALL BE
BACKFILLED AND COMPACTED PER SOILS ENGINEERS RECOMMENDATIONS.
5. DISCONNECT ALL POWER, TELEPHONE, GAS FROM BLDG. CONTRACTOR SHALL CONTACT AND
COORDINATE WITH THE FIELD ENGINEER AND ANY APPROPRIATE UTILITY COMPANIES ON
REQUESTING DISCONNECTION'S, REMOVALS AND/OR RELOCATION OF EXISTING SERVICE.
CONTRACTOR SHALL COORDINATE WITH THE OWNERS ENGINEER, AND APPROPRIATE UTILITY
PURVEYORS TO VERIFY SERVICE LOCATIONS TO EXISTING BUILDING. CONTRACTOR IS
CAUTIONED THAT PERIMETER UTILITIES OUTSIDE OF THE BUILDING ARE TO REMAIN
OPERATIONAL. THE CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR ANY DAMAGES AS A
RESULT OF A DISRUPTION OF UTILITY SERVICE ASSOCIATED WITH AND/OR DUE TO HIS
ACTIVITIES.
6. PLUG AND CAP ALL EXISTING WATER LINES, AND STORM DRAINS AT BLDG. CAP ALL
UTILITIES TO THE BUILDING, DISCONNECT ELECTRICAL AND REMOVE ANY WATER METERS
AND CAP LINES
7. CONTRACTOR SHALL CONFIRM AND VERIFY WORK SCOPE ITEMS AND BUILDING UTILITY
SERVICES TO DEMOLISH WITH THE OWNERS AUTHORIZED REPRESENTATIVE.
EXISTING GRADE
I
TEMPORARY 2.1 CUT SLOPE IP.
PROVIDE TEMPORARY SHORING WALL
PER STRUCTURAL ENGINEER AS NECESSARY
(SEE PLAN FOR LOCATION)
4' MAX. VERTICAL CUT
PER GEOTECH. REPORT
BOTTOM OF EXCAVATION
VARIES (SEE PLAN)
TYPICAL EXCAVATION SECTION
NOT TO SCALE
R-404905
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
jchavez 04/23/2019
SAHOTA RESIDENCE - LOT 22
1133 N. 33RD PLACE
CIVIL PERMIT
TEMPORARY EROSION & SEDIMENTATION CONTROL
DEMOLITION & T.E.S.C. PLAN SHEET
DATE:
2/11/19
PAGE-
C2
SHEET: OF:
2 3