6' EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES:
0
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD
O AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S
CONTRACTOR.
2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY)
CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL
w PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE
CONSTRUCTION STORMWATER GENERAL PERMIT.
3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT
SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL
PROJECT ESC REQUIREMENTS.
4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION
PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY
FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE
w WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION
PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE
U MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
z
w 5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND
0 MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH
SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND
TRACK -OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS
TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE
w FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE
STATE.
Q 6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN DESIGNATED CONCRETE WASHOUT
AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN
Q DITCHES. ON -SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT
= AREAS.
Q 7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR
C/) CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND
ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME
THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. ALL
ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO
M ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT EXIST, THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT,
U ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT,
8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE
DISPOSED OF PROPERLY.
9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED
SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE
APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION
CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND
RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES
AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO
PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE
DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR STORMWATER FACILITIES.
11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED
TO THE CITY FOR REVIEW AND APPROVAL.
12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO
DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON
(MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER
METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE
RENTON SWDM.
13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH,
UNLESS OTHERWISE APPROVED BY THE CITY.
14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED
WITHIN SEVEN (7) DAYS.
15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR
WITHIN 24 HOURS FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY
AS REQUIRED BY THE CITY.
16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN
216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED
OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT
POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY
TO ENSURE FULLY FUNCTIONING CONDITION.
17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL
CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL
NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM.
18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED
WITH THE NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY
IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY
SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE
OF THE PERMANENT FACILITY.
19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED
SOILS, BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC
BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION.
20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO
IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS
SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF
THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO
THE CITY FOR REVIEW.
21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT
SEDIMENT -LADEN WATER FROM LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND
STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON -SITE BMPS SHALL BE RESTORED TO THEIR FULLY
FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE
PERMANENTLY STABILIZED_ AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO
ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS
ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST.
22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES
SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS -OF -WAY
SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS -OF -WAY
SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE.
TOE IN SHEETING IN_j -
4" %4' MIN. TRENCH
IT MAX..
III - ----------
PROVIDE ENERGY DISS PATIOI f
AT TOE IF EROSION IS LIKELY
SANDBAG (TYP)
1 Lr MAX -
NOTES:
1. CONDITIONS OF 418E
1-1. PLASTIC COWERING MAY BE USED ON DISTURBED AREAS THAT REQUIRE COVER MEASURES FOR LESS THAN 90 DAYS.
12 PLASTC IS PARTICULARLY USEFUL FOR PROTECTI NG CUT AND FILL SLOPES AND STOCKPILES.
1-3. CLEAR PLASTIC SHEETING MAY BE USED OVER NEWLY -SEEDED AREAS TO CREATE A GR€ENHOUSE EFFECT AND ENCOURAGE GRASS GROWTH.
CLEAR PLAS TC SHOULD NOT BE USED FOR THIS PURPOSE DURING THE SUMMER MONTHS.
1.4. THIS MET14DO SHALL NOT BE USED UPSLOPE OF AREAS THAT MIGHT BE ADVERSELY IMPACTED BY RUN -Of F. SUCH AREAS INCLUDE STEEP ARID
UNSTABLE SLOPES
2- DESIGN AND INSTALLATION SPECIFICATIONS
2.1- PLASTIC SHEETING SHOULD HAVE A MINIMUM THICKNESS OF 0.06 MILLIMETERS.
2.P. If EROSION AT THE TOE OF A SLOPE IS LIKELY. A GRAVEL BERM, RIPRAP. OR OTHER SUITABLE PROTECTION SHALL BE INSTALLED AT THE TOE
OF THE SLOPE IN ORDER TO REDUCE THE VELOCITY OF RUNOFF.
2.5 TIRES, SANE➢ BAGS, OR EQUIVALENT MAY BE USED TO WEIGHT PLASTIC.
2.4- SEAMS BETWEEN SHEETS MUST OVERLAP A MINIMUM 01: 121NCHES AND BE WEIGHTED OR TAPED-
S. MAINTENANCE STANDARDS
3,1- TORN SHEETS MUST BE REPLACED AND OPEN SEAMS REPAIRED.
32. IF THE PLASTIC BEGINS TO DETERIORATE DUE TO ULTRAVIOLET RADIATION, IT MUST BE COMPLETELY RBMDVED AND REPLACED.
3.3- WHEN THE PLASTIC IS NO LONGER NEEDED, IT SHALL BE COMPLETELY REMOVED.
UNLESS aTNl'R1A115I NOTEO. DI;AWFNG IS Hot To SCALE (NTSI
STD. PLAN - 213.30
• DEPARTMENT PUBLIC WORKS PLASTIC COVERING P�QVMGAZ 9/28/ZO18 1
limp -
DATE
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
5' MAX.
DRAINAGE ORATE TRIM
GRATE FRAME _
OVERFLOW BYPASS
BELOW INLET GRATE DEVICE
SEDIMENT AND DEBRIS
b
FILTERED
WATER
SECTION VIEW
DRAI NAGE GRATE
(RECTANGULAR GRATE SHOWN) RETRIEVAL SYSTEM (TYP.)
OVERFLOW BYPASS (TYP-)
BELOW INLET GRATE DEVICE
ISOMETRIC VIEW
NOTES:
1. PROTECT11ON SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWN SLOPE AND WITHIN 501) FEET OF A DISTURBED OR
CONSTRUCTION AREA. UNLESS THE RUNOFF THAT ENTERS TREE CATCH BASIN WILL BE CONVEYED TO A SEDIMENT PONE) OR TRAP.
2. INLET PROTECTION SHALL BE USED TO PROTECT THE DRAINAGE SYSTEM.
3. THE CONTRIBUTING DRAINAGE AREA MUST NOT BE LARGER THAN ONE ACRE.
4. 512E THE BELOW INLET GRATE DEVICE (NGD) FOR THE STORMwATER STRUCTURE IT WILL SERVICE.
5. THE 1316b SHALL HAVE A BUILT-IN HIGH -FLOW RELIEF SYSTEM (OVERFLOW BYPASS).
S. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF THE BIGD WITHOUT SPILLING THE COLLECTED MATERIAL.
7. PERFORM MAINTENANCE IN ACCORDANCE WITH STANDARD SPECIFICATION 8-01.3(15y
B. ANY SEDIMENT IN THE CATCH BASIN INSERT SHALL BE REMOVED WHEN THE SEDIMENT HAS FILLED ONE-THIRD OF THE AVAILABLE
STORAGE. THE FILTER MEDIA FOR THE INSERT SHALL BE CLEANED OR REPLACED AT LEAST MONTHLY.
UNLESS O'nfFRWISF NCTFD, DRAWING IS NOT TO WALE (NIT$)
STD. PLAN - 216.30
PUBLIC WORKS uPPa �:rn
DEPARTMENT CATCH BASIN INSERT C7 Z 9f28/201$ I
DATE
J3NP EN GI N EERI N G
1735 POINTE WOODWORTH DR NE
TACOMA, WA 98422 1
(206) 730-3348
NO.
REVISED PER CITY REVIEW COMMENTS
REVISION
:45 AN
2"x2" 14 GAUGE WIRE, OR
EQUIVALENT, IF STANDARD
STRENGTH FABRIC USED
FILTER FABRIC
T:-I
IT MAX.
PAST $PAGING MAY BE 1I1C11EA5E❑ 474-MIN. TRENCH
J TO&' IF WIRE BACKING IS USED
BACKFILLTREHCH WITH NATIVE SOIL
OR 314" TO 1.112' WASHED GRAVEL
2'x4' WOOD POSTS, STEEL FENCE POSTS. OR EQUIVALENT (TYP.)
2'MIN.
NOTES:
1. CONDITIONSOFUSE
1..1. SILT FENCE MAYBE USED OC�WNSLOPE OF ALL DISTURBED AREAS.
1..2. SLT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS. NOR IS IT INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOW -ANY CONCENTRATED
FLOW MUST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR POND.
2. DESIGN AND INSTALLATION SPECIFICATIONS
2.1. THE GEOTEXTILE USED MUST MEET THE STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MUST BE AVAILABLE ON SITE.
AOS (ASTM D4751)
50-TOO SIEVE $LZE (0.60-0.15m FOR SILT FILM
))
5D-100 SIEVE SLZE (0.36-0.15mmFOR OTHER FABRICS
WATER PERMITTIVITY (ASTM ❑4491
032 SEC' MINIMUM
GRAB TENSLLE STRENGTH (ASTM D4632)
18D LBS. MIN. FOR EXTRA STRENGTH FABRIC
100 LBS. MIN. FOR STANDARD STRENGTH FABRIC
GRAB TENSILE ELONGATION (ASTM D4632)
30%MAX. (WOVEN)
ULTRAVIOLET RESISTANCE(ASTM 343M)
70% MIN.
2.2, STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE. WIRE BACKING OR CLOSER POST SPACING MAYBE REQUIRED
FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE.
2.3. WHERE THE FENCE IS INSTALLED, THE SLOPE SHALL NOT BE STEEPER THAN 2H:1V
2.4. IF A TYPICAL SILT FENCE IS USED, THE STANOA$10 4"X4" TRENCH MAY BE REOUCEO AS LONG AS THE BOTTOM R INCHES OF THE SILT FENCE FABRIC IS WELL BURIED AND
SECURE IN A TRENCH THAT STABILIZES THE FENCE AND DOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT FENCE.
25. FILTER FABRIC FENCES SHALL BE INSTALLED ALONG CON70URS WHENEVER POSSIBLE.
3. MAINTENANCE STANDARDS
3.1. ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY.
3.2. F CONCENTRATED FLOWS ARE EVIDENT UPHILL OF THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND.
3.3. IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND THEN CAUSING
CHANNELIZATION OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE OR REMOVE; THE TRAPPED SEDIMEP-17
3.4. SEDIMENT MUST BE REMOVED WHEN SEDIMENT IS B INCHES HIGH.
3.5. IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED.
UNLESS OTHERWISE NCITD. OILA W WC, IS NOT TO $CAL I IN TSI
Sib. PLAN - 214.00
4 PUBLIC WORKS DEPARTMENT SILT FENCE GAZ
PR 9128/201$
aum<wanc aem.��o DATE
SEEDING NOTES
:45 A[-
1. SEED MIXTURE SHALL BE EROSION CONTROL SEED MIXTURE, AND SHALL BE APPLIED AT THE RATE OF
120 POUNDS PER ACRE.
2. SEED BEDS PLANTED BETWEEN MAY 1 AND OCTOBER 31 WILL REQUIRE IRRIGATION AND OTHER
MAINTENANCE AS NECESSARY TO FOSTER AND PROTECT THE ROOT STRUCTURE.
3. FOR SEED BEDS PLANTED BETWEEN OCTOBER 31 AND APRIL 30, ARMORING OF THE SEED BED WILL
BE NECESSARY (E.G., GEOTEXTILES, JUTE MAT, CLEAR PLASTIC COVERING).
4. BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF CONTROL MEASURES SUCH AS GRADIENT TERRACES,
INTERCEPTOR DIKES, SWALES, LEVEL SPREADER, AND SEDIMENT BASINS.
5. THE SEED BED SHALL BE FIRM WITH A FAIRLY FINE SURFACE, FOLLOWING SURFACE ROUGHENING.
PERFORM ALL OPERATIONS ACROSS OR AT RIGHT ANGLES TO THE SLOPE.
6. FERTILIZERS ARE TO BE USED ACCORDING TO SUPPLIERS' RECOMMENDATIONS. AMOUNTS USED SHOULD BE
MINIMIZED, ESPECIALLY ADJACENT TO WATER BODIES AND WETLANDS.
SEED MIXTURE FOR EROSION CONTROL
NAME
PROPORTIONS BY
PERCENT PURITY
PERCENT
GERMINATION
WEIGHT
REDTOP (AGROSTIS ALBA)
10 PERCENT
92
90
ANNUAL RYE (LOLIUM MULTIFLORUM)
40 PERCENT
98
90
CHEWING FESCUE (FESTUCA RUBRA
COMMUTATA)(JAMESTOWN, BANNER,
SHODOW, OR KOKET)
40 PERCENT
97
80
WHITE DUTCH CLOVER (TRIFOLIUM
REPENS)
10 PERCENT
96
90
��15jLrLGaaao
R=25'MIN� �-
r�
INSTALL DRIVEWAY CULVERT
IF THERE 15 A ROADSIDE
DITCH PRESENT. AS PER CITY
ROAD STAN DARDS
4%8' QUARRY SPALLS
GEOTEXTILE
12" MIN. THICKNESS
100' MIN.
CONSTRUC710H ENTRANCE NOTES:
1. DRIVEWAYS SHALL BE PAVED TO
THE EDGE OF THE RIGHT-OF-WAY
PRIOR TO INSTALLATION OF THE
CONSTRUCTION ENTRANCE TO
AVOID DAMAGING OF THE
ROADWAY,
2. IT IS RECOMMENDED THAT THE
ENTRANCE BE CROWNED SO THAT
RUNOFF DRAINS OFF THE PAD
15 MIN.
PROVIDE FULL WIDTH OF
INORESSIEGRESS AREA
NOTES:
1. CONDITION OF i1SE
1.1. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION 51TE AND TRAVELING ON PAVED ROADS OR OTHER
PAVED AREAS WITHIN 1.000 FEET OF THE SITE.
1 2. FOR RESIDENTIAL CONSTRUCTION PROVIDE STABILIZED CONSTRUCTION ENTRANCES FOR EACH RESIDENCE IN ADDITION TO THE MAIN SUBDIVISION
ENTRANCE. STABILIZED SURFACES SHALL BE OF SUFFICIENT LENGTHNWDTH TO PROVIDE VEHICLE ACCESSMARKLNG. BASED ON LOT SIZEICONFIGURATICN.
2. DESIGN AND INSTALLATION SPECIFICATIONS
2.1. A SEPARATION GEOTEXTILE SHALL BE PLACED UNDER THE SPALLS TO PREVENT FINE SEDIMENT FROM PUMPING UP INTO THE ROCK PAD. THE GEOTEXTILE
SHALL MEET THE FOLLOWING STANDARDS -
GRAB TENSILE STRENGTH (ASTM D4632)
200 LBS. MIN.
GRAB TENSILE ELONGATION (ASTM D4632)
30% MAX. (WOVEN)
CBR PUNCTURE STRENGTH (ASTM D6241)
495 LBS. MIN.
ACS (ASTM 04751)
20-45 (U.S. STANDARD SIEVE SIZE)
2.2, DO NOT USE CRUSHED CONCRETE, CEMENT, OR CALCIUM CHLORIDE FOR CONSTRUCTION ENTRANCE STABILIZATION B€CAUSE THESE PRODUCTS RAISE PH
LEVELS IN 67ORMWATERAN❑ CONCRETE DISCHARGE TO SURFACE WATERS OF THE STATE IS PROHIBITED.
2.3. HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH OuARRY SPALLS IN AREAS THAT WILL NOT BE USED FOR PERMANENT ROADS.
HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR MAY AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS
IF THE HOG FUEL 15 NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS. BEING CARRIED ONTO PAVEMENT.
2,4- FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE-
2.5, WHENEVER POSSIBLE. THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM. COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY INCREASE THE
EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE.
3, MAINTENANCE STANDARDS
3.1. QUARRY SPALLS SHALL BE ADDED IF THE PAO IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS.
3.2. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT. THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF
SEDIMENT $HALL BE USED THIS MAY INCLUDE STREET $WEEPING, AN INCREASE IN THE DIMENSION$ OF THE ENTRANCE, OR THE INSTALLATION OF A WHEEL
WASH. IF WASHING IS USED. IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK, AND WASH WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND
3.3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE
REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET- EXCEPT WHEN SWEEPING IS INEFFECTIVE AND
THERE IS A THREAT TO PUBLIC SAFETY. IF IT IS NECESSARY TO WASH THE STREETS, A SMALL SUMP MUST BE CONSTRUCTED. THE SEDIMENT WOULD THEN BE
WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLED AND DISCHARGED APPROPRIATELY- WASH WATER MUST BE PUMPED BACK ONTO THE SITE AND
CANNOT DISCHARGE TO SYSTEMS TRIBUTARY TO SURFACE WATERS.
3.4. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY.
3.5. IF VEHICLES ARE ENTERING OR EXITING THE SITES AT PDINTS OTHER THAN THE CONSTRUCTION ENTRANCE($), FENCING SHALL BE INSTALLED TO CONTROL
TRAFFIC.
UNLESS OTHEIIWISE NOTED. 11RAWINC 15 NOT TO SCALE (NT$I
STD. PLAN - 215,10
Adftm � PUBLIC WORK PPROVED
3,1 DEPARTMEN STABILIZED CONSTRUCTION ENTRANCE CAZ 9/28/2018 1
Po11t Wadt aemnisvmcr DATr
RIP RAP SPECIFICATIONS
ALL RIP RAP PADS SHALL BE 7' WIDE X 8' LONG X 1' DEEP, USING THE GRADATION
SPECIFIED BELOW:
RIP RAP SHALL BE IN ACCORDANCE WITH SECTION 9-13.1 OF THE WSDOT/APWA �11C A • T,9
STANDARD SPECIFICATIONS.
C4 of WAS
1 41 `y
RIP RAP TO BE REASONABLY WELL GRADED WITH ROCK GRADATION AS FOLLOWS: Q o
PASSING 8 INCH SQUARE SIEVE 100% OR MAXIMUM STONE SIZE 8" o
:45 A' PASSING 6 INCH SQUARE SIEVE 40-60% OR MEDIUM STONE SIZE 6"
PASSING 2 INCH SQUARE SIEVE 0-10% OR MINIMUM STONE SIZE 2" ,02�,3 781 R<z�
SURVEYED:
DESIGNED:
J3NP
DRAWN:
J3NP
PT 4 17 19 PT CHECKED:
J3NP
BY DATE I APPR I J3NP
APPROWD,
T "
NA L
04/17/2019
SCALE:
VERTICAL: NAVD ,BBB • CITY O F
AS SHOWN HORIZONTAL: NAD 1983/1991
RENTON
ONE INCH DATUM
AT FULL SCALE Plonning/Building/Public Works Dept.
IF NOT ONE INCH
SCALE ACCORDINGLY
STOCK PILES
1. INSTALL BIO BERM OR SEDIMENT FENCING/BARRIERS AT TOE OF SLOPE.
2. STOCK PILES ON SITE SHALL BE COVERED WITH POLYETHYLENE PLASTIC SHEETING
6 MIL MINIMUM THICKNESS.
3. COVERING SHALL BE INSTALLED AND MAINTAINED TIGHTLY IN PLACE BY USING
SANDBAGS ON ROPES WITH A MAXIMUM 10' GRID SPACING IN ALL DIRECTIONS. ALL
SEAMS SHALL BE TAPED OR WEIGHTED DOWN FULL LENGTH AND THERE SHALL BE
AT LEAST A 12" OVERLAP OF ALL SEAMS. FOR SEAMS PARALLEL TO THE SLOPE
CONTOUR, THE UPHILL SHEET SHALL OVERLAP THE DOWNHILL SHEET. NO RUNOFF
SHALL BE ALLOWED TO RUN UNDER THE PLASTIC COVERING.
4. CONSTRUCTION MATERIALS CONTAINING TOXIC CONTAMINANTS SHALL NOT BE STORED
WITHIN 25 FEET OF ANY STORM DRAIN INLET STRUCTURE OR DESIGNATED
PROTECTED AREA.
5. DEBRIS, WASTE AND GARBAGE PILES SHALL NOT BE PLACED WITHIN 25 FEET OF
ANY STORM DRAIN INLET STRUCTURE OR DESIGNATED PROTECTED AREA.
6. LOCATION OF CONSTRUCTION MATERIAL STORAGE AREAS AND DEBRIS, WASTE AND
GARBAGE PILE AREAS SHALL BE PROVIDED BY THE CONTRACTOR AT THE TIME OF
THE INITIAL ESC CONTROL INSPECTION.
:45 AI
R-404906
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
jchavez 04/23/2019
SAHOTA RESIDENCE - LOT 22
1133 N. 33RD PLACE
CIVIL PERMIT
TEMPORARY EROSION AND SEDIMENTATION CONTROL
NOTES AND DETAILS
W
U
z
w
w
DATE:
2/11/19
Q
FIELDBOOK:
PAGE -
O
DRAWING NM
C3
Q
c/')
SHEET: OF:
3 3