Loading...
HomeMy WebLinkAboutMFP19005234DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP19005234 IVR Number: 19005234 Permit Informaon Permit Name:Comcast Cable Franchise Permit Address/Locaon :09/25/2019Application Date:1432401075Parcel Number:11873 SE 170TH PL Permit Type:10/14/2019Issue Date:Franchise Permit Work Class:10/13/2020Expiration Date:Major Utility Job Number:JB#75648Franchise Type:Cable Description:Comcast proposes to place 4 fiber splice cases in 4 separate locations: 11873 SE 170th PL, 116th Ave SE and SE 168th ST, 108th Ave SE and 172nd ST, and 17418 108th Ave SE. Restoration per City of Renton standards. APPROVED AS SUBMITTED Contacts Name Address PhoneTypeBilling Comcast Cable Communication Management & Comcast Cable B: (215) 665-1700Applicant Tom Donnelly Comcast Business Communications 1701 Jfk Blvd, 32nd Floor Philadelphia, PA 19103 B: (215) 286-7347 C: (215) 286-7557 Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction X Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Comcast is proposing to place 4 fiber splice case in 4 separate locations as follows: 11873 SE 170th Pl, 116th Ave SE & SE 168th St, 108th Ave SE & 172nd St and 17598 108th Ave SE. SEFNCO Communications, Inc. SEFNCC1850QD BLO29666 7-29-2019 Comcast Cable Communications Management, LLC JB#75648 - FIBER SPLICING Cody Shackett 253 235-7406 owen_shackett@comcast.com 11873 SE 170TH PLACE FIBER SPLICING - 4 LOCATIONS 17418 108th Ave SE MFP19005234 Scott Warlick 9/30/2019 Nathan Janders 10/14/2019 MFP19005234 MFP19005234 MFP19005234 MFP19005234 POLESP.WAKV.0041 POLESP.WAKV.0054 POLESP.WAKV.0477 POLESP.WAKV.0060 SHEET INDEX: 1 - COVER SHEET 2 - LEGEND SHEET 3 - NOTES 4-7 -DESIGN SPLICE PERMIT THIS IS PROPRITORY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED SEFNCO COMMUNICATIONS PROJECT MAP: COVER 17418 108TH AVE SE KENT, WA "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OF17418 108TH AVE SERENTON, WAJB# 75648SPLICE PERMIT1 7 JB# 75648 COMCAST KYLE KINNEY 410 VALLEY AVE PUYALLUP, WA 98371 253-235-7016 KYLE_ KINNEY@COMCAST.COM CONTACTS SEFNCO JEREMY BURNSIDE 4610 TACOMA AVE. SUMNER, WA 98390 253-299-8566 JEBURNSIDE@sefnco.com COMCAST COMCAST PROJECT DESCRIPTION* *ALL FOOTAGES AND MATERIALS ARE ESTIMATED = = = = = = = ·SPLICE CASE LOCATION FOR PERMIT. ·SPLICE CASE LOCATION FOR PERMIT. ·SPLICE CASE LOCATION FOR PERMIT. ·SPLICE CASE LOCATION FOR PERMIT. TOTAL: revisions: date:drawn by: date: checked by: * drawn by: MDB designed by: * 09/23/2019 LN FT LN FT WORK AREASWORK AREASWORK AREASWORK AREAS MFP19005234 LEGEND "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OF17418 108TH AVE SERENTON, WAJB# 75648SPLICE PERMIT2 7 STORM DRAIN MANHOLE COMMUNICATIONS WATER SEWER POWER GAS ROW R PROPOSED VAULT PROPOSED BORE PIT STREET/SIGNAL/TRAFFIC LIGHT CATCH BASIN FIRE HYDRANT EXISTING POLE W/ NEW RISER TRAFFIC FLOW CHANNELIZATION (xxx') OPEN TRENCH .25 SIDEWALKS / DRIVEWAYS 1.0 EXISTING PULL THRU 1.0 PROPOSED BORE .50 PROPOSED OPEN TRENCH (xxx') EXISTING PULL THRU (xxx') BORE SIDEWALKS / DRIVEWAYS.50 RIGHT-OF-WAY .50 CENTERLINE .50 TRAFFIC LANE .25 FENCE D CB S C .25 GAURD RAIL .50 AERIAL STRAND LEGEND V U U U U U U U U U S W P C G D EOP .25 EDGE OF PAVEMENT POLE AERIAL STRAND OVERLASH 1.0 OVERLASH COMCAST RE-CLAIMED WATERWF CONSTRUCTION NOTE EXISTING VAULT V BUILDING OUTLINE POTHOLE LOCATION PROPOSED PEDESTALP P EXISTING PEDESTAL revisions: date:drawn by: date: checked by: * drawn by: MDB designed by: * 09/23/2019 MH MFP19005234 NOTES & LEGEND "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OF17418 108TH AVE SERENTON, WAJB# 75648SPLICE PERMIT3 7 FIBER PLACEMENT NOTES:GENERAL NOTES: DISCLAIMER: 1.IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY. 2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE BEEN FIELD LOCATED. 3.ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTION AND IS COLLECTED IN THE AS-BUILT PHASE. 1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY. 2.CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP AND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECT COMPLETION. 3.SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER, REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESS ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED. 4.FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE CASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND. 5.CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM PRODUCTS. 6.A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED. 7.ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER. 8.ALL RISERS WILL BE CAPPED AT ALL TIMES. 9.ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, AND BLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER. 1. ALL VAULTS / HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS. 2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION. 3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS SPECIFIED OTHERWISE. 4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS, AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET. 5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION. 6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD SPECIFICATIONS. 7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES WITH BUILDING MANAGEMENT. 8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s). 9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEING PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE REWORK AT HIS OWN COST. 10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER. 11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN ALLOWED (9AM-3PM) BUSINESS HOURS. 12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED. 13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE SHOULD BE ANTICIPATED. ADJUST AS NEEDED. 14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THE MINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVE OR APPROVED EQUIVALENT. 15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS, NOT FIELD VERIFIED. 16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS. 17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED. 18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION. 19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANE CLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BE COORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING. 20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERE SHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BE NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE CLOSURES.COMCAST revisions: date:drawn by: date: checked by: * drawn by: MDB designed by: * 09/23/2019 MFP19005234 POLE SP.WAKV.0041EOPEOPEOPEOPEOPE O P E O P E O PEOP EOPEOPXXXXXXXXXX X X X X X X 116TH AVE SEDRIVEWAY SIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALKXXXXXXXXX X XXXXXX16840 116TH AVE SE1 1 9 T H S T S E "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OF16840 116TH AVE SERENTON, WAJB# 75648SPLICE PERMIT4 7 COMCAST revisions: date:drawn by: date: checked by: * drawn by: MDB designed by: * 09/23/2019 SPLICE CASE LOCATION SP.WAKV.0041. MFP19005234 EOP EOP EOPEOPFLFLFLFLFLFLFLFLFLFLSIDEWALK SE 172ND ST EOPFLFLEOP EOP FLEOPEOPEOP EOP EOPPOLESP.WAKV.0477SE 172ND ST 108TH AVE SE108TH AVE SESIDEWALK SIDEWALK SIDEWALKDRIVEWAY SE 172ND ST "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OF108TH AVE & SE 172ND STRENTON, WAJB# 75648SPLICE PERMIT5 7 COMCAST revisions: date:drawn by: date: checked by: * drawn by: MDB designed by: * 09/23/2019 SPLICE CASE LOCATION SP.WAKV.0477. MFP19005234 POLE SP.WAKV.0054EOP EOPDRIVEWAY EOP EOPSIDEWALK EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP108TH AVE SEBENSON RD S 17418 "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OF17418 108TH AVE SERENTON, WAJB# 75648SPLICE PERMIT6 7 COMCAST revisions: date:drawn by: date: checked by: * drawn by: MDB designed by: * 09/23/2019 SPLICE CASE LOCATION SP.WAKV.0544. MFP19005234 F L F L F L F L F L F L F L F L F L F L F L F L F L F L EO P E O P EO P E O P E O P E O P E O P EO P EO P E O P F L F L F L F L F L F L F L F L F L F L F L F L F L F L 11873 POLE SP .W A K V . 0 0 6 0 EOP EOP 119TH AVE SES E 1 7 0 T H P LDRIVEWAY DRIVEWAY "DELIVERING EXCELLENCE" SEFNCO COMMUNICATIONS OF11873 170TH PLRENTON, WAJB# 75648SPLICE PERMIT7 7 COMCAST revisions: date:drawn by: date: checked by: * drawn by: MDB designed by: * 09/23/2019 SPLICE CASE SP.WAKV.0060 MFP19005234