Loading...
HomeMy WebLinkAboutMFP19004967.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP19004967 IVR Number: 19004967 Permit Informaon Permit Name:Comcast Cable Franchise Permit Address/Locaon :09/10/2019Application Date:1623059087Parcel Number:351 UNION AVE NE Permit Type:10/07/2019Issue Date:Franchise Permit Work Class:10/06/2020Expiration Date:Minor Utility Job Number:JB0000151686Franchise Type:Cable Description:Aerial splice at 2 locations. Tie into existing splice case in vault. Overlash (1) 12CT fiber on existing aerial strand. Proof and pull (1) 12CT fiber down existing riser. Proof and pull (1) 12CT fiber through existing conduit. CONDITIONS OF OVERHEAD APPROVAL: 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’ 6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at Comcast’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case Comcast shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or designee, from the first event triggering the requirement to underground the aerial lines. Contacts Name Address PhoneTypeBilling Comcast Cable Communication Management & Comcast Cable B: (215) 665-1700Applicant Tom Donnelly Comcast Business Communications 1701 Jfk Blvd, 32nd Floor Philadelphia, PA 19103 B: (215) 286-7347 C: (215) 286-7557 Contact Michael Cannon Cannon Construction Inc 406 Porter Way Milton, WA 98354-9638 B: (253) 922-2787 C: (253) 588-4034 Contractor Business License Number: 20838Construction Contractor: CANNOCI055CS CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP19004967 (Date)(Signature) Page 2 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES MFP19004967Scott Warlick9/12/2019Nathan Janders9/18/2019 MFP19004967Monday - Friday8:00AM - 3:00PMScott Warlick9/12/2019 MFP19004967 MFP19004967 MFP19004967 MFP19004967 1 - COVER SHEET 2 -GENERAL NOTES 3 -LEGEND 4 -OVERVIEW 5 -DESIGN 6-8 -SITE PHOTOS 9 -NODE MAPS THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED CANNON COMPANIES 12 CT FIBER: 1000 FT + 20% STORAGE = 1200 FT 36 CT FIBER: 158 FT + 20% STORAGE = 190 FT CONTACTS: PROJECT MAP: *ALL FOOTAGES AND MATERIALS ARE ESTIMATED N SCOPE OF WORK: SHEET INDEX: BILL OF MATERIALS*: NEW AERIAL = OVERLASH = NEW UNDERGROUND = EXISTING UNDERGROUND = RISER (2)= TOTAL FOOTAGE = 0 FT. 426 FT. 0 FT. 373 FT. 50 FT. 849 FT. PROJECT DESCRIPTION - ROW* NEW BUILDING PATH WAY = EXISTING BUILDING PATH WAY = NEW UNDERGROUND = EXISTING UNDERGROUND = TOTAL FOOTAGE = 30 FT. 0 FT. 78 FT. 0 FT. 108 FT. PROJECT DESCRIPTION -SITE* TOTAL PROJECT FOOTAGE =957 FT. - TIE INTO EXISTING SPLICE CASE SP.WAKV.0114_(KV07RS1.7A.3A) - PROOF AND PULL (1) 36CT FIBER THROUGH EXISTING CONDUIT - OVERLASH (1) 12CT FIBER ON EXISTING AERIAL STRAND - INSTALL NEW STRAP OUT CASE ON EXISTING AERIAL STRAND - PROOF AND PULL (1) 12CT FIBER DOWN EXISTING RISER - PROOF AND PULL (1) 12CT FIBER THROUGH EXISTING CONDUIT - HOG SHOT NEW 2" CONDUIT AND PULL (1) 12CT FIBER - INSTALL LB AND 2 1 2" CORE DRILL INTO BUILDING - PLACE NEW 1 1 4" PLENUM DUCT AND PULL (1) 12CT FIBER 351 UNION AVE NE RENTON, WA 98059 TPJ INC. JB 0000151686 CANNON COMPANIES SAFETY | QUALITY | INTEGRITY | TEAMWORK Connecting The Future Since 1985 COMCAST CANNON COMPANIES Ron Hoover - (360)-286-1154 - rhoover@cannonconstructioninc.com COMCAST COMMUNICATION Kyle Kinney - (253)-235-7016 - Kyle_Kinney@cable.comcast.com Business/Job Contact POC: Review _________________________ WORK AREA Randy Palmer - (425)-228-3204 - randy@plumbingjoint.com METRO E MFP19004967 GENERAL NOTES STANDARD 1. THE LOCATIONS OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TO CONSTRUCTION. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEAD OF THE WORK, AS NECESSARY, TO DETERMINE THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES. IT IS UNDERSTOOD THAT THERE WILL BE INTERFERING UTILITIES AND OTHER UNDERGROUND PIPES, DRAINS OR STRUCTURES ENCOUNTERED THAT ARE NOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE PLANS OR THAT HAVE NOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD. THE CONTRACTOR AGREES THIS IS A NORMAL AND USUAL OCCURRENCE IN THE CONSTRUCTION OF UNDERGROUND IMPROVEMENTS. FURTHERMORE, CONTRACTORS UNDERSTAND AND AGREE THAT WORK IN SOME CASES PROPOSED PATH MAYBE IN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES, DRAINS AND STRUCTURES NOT SHOWN ON THE PLANS WHICH MAY REQUIRE A CHANGE IN OPERATIONS AND MAY CAUSE SLOUGHING OF THE TRENCH, ADDITIONAL TRAFFIC CONTROL, ADDITIONAL PAVEMENT AND BACKFILL COSTS AND TIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF THESE OCCURRENCES IS USUAL AND ORDINARY, AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE CONTRACTORS AGREES TO PROVIDE FOR THESE CONFLICTS AND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGES AND/OR UTILITY RELOCATIONS DUE TO SAID CONFLICTS. 2. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 811 3. INSPECTIONS - THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES. 4. EXCESS WATER - SHOULD WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DEWATER, AS PER LOCAL JURISDICTIONS STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES. 5. NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROL SYSTEM. 6. THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS/HER WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCES TO PREVENT ANY HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE. 7. ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS. 8. AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 9. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. 10. PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHERE PRIOR WRITTEN APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED. 11. BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ON ADJACENT PROPERTIES WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACH DAY AND AS OTHERWISE REQUIRED. 12. PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MOVEMENT, UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION. TRAFFIC CONTROL 1. THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILL APPROVE ONLY THOSE LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH A SPECIFIC TASK. NO LANE OR ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS. 2. THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURING NON-WORKING HOURS. EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'S EMPLOYEES AND AGENTS SHALL NOT PARK PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN. SITE PREPARATION 1. SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SOD SHALL BE EITHER REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE. 2. SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENT WITH LIKE MATERIAL (I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE). 3. EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR. TRENCH EXCAVATION AND BACKFILL 1. TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALL BACKFILL WITH BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS. STONEWAY MIX 351 IS ACCEPTABLE IN ALL LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON-TRAFFIC AREAS. MIX 1121 IS TO BE USED IN TRAFFIC-BEARING LOCATIONS. 2. COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS. UTILITY DUCT 1. BURIED DUCT SHALL BE (1) 4" SCHEDULE 40 PVC, UNLESS NOTED OTHERWISE. MINIMUM CONDUIT COVER SHALL BE 36" WITH A MINIMUM SLOPE OF 1/2 % TO VAULT. 2. THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE IS COMPLETED, PLUG ENDS OF CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULAR CARE TO KEEP CONDUITS CLEAR OF CONCRETE, DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OF CONSTRUCTION. 3. AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH. INSTALL PULL ROPE AND PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBER CABLE WILL REQUIRE SIMPLEX COMPRESSION PLUGS SEALING THE CONDUITS AROUND THE CABLE. 4. OUTSIDE INNERDUCT SHALL BE 1-1/4" OPTIC-GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITH PULL ROPES AND PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM-RATED. CEMENT CONCRETE PAVEMENT 1. ALL CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THE STANDARD SPECIFICATIONS OF EACH JURISDICTION. ASPHALT CONCRETE PAVEMENT 1. ALL ASPHALT CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED WITH CLASS B ASPHALT CONCRETE ACCORDING TO THE REQUIREMENTS OF EACH JURISDICTION. GRAVEL AREAS 1. ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOP COURSE IN ACCORDANCE WITH THE REQUIREMENTS OF EACH JURISDICTION. SITE RESTORATION 1. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED PRIOR TO PLACEMENT OF THE CONDUIT AND STRUCTURES. 2. VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN-KIND PLANT MATERIAL AND SHALL BE PROPERLY PLANTED AND WATERED IN TO ENSURE ITS SURVIVAL. 3. SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEY EXISTED PRIOR TO CONSTRUCTION. WATER QUALITY 1. CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THE STATE OF WASHINGTON'S WATER QUALITY STANDARDS 2. THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE. DIRECTIONAL BORING 1. WHEN BORING ROADWAYS, INSTALL (1) 4" SCHEDULE 40 PVC CONDUIT WITH PULL ROPES AND PLUGS. 2. PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATE EXISTING UTILITIES. FIRE PROTECTION 1. ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT. 2. ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE-RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALL BE REPAIRED OR REPLACED UPON DUCT OR CABLE PLACEMENT. AERIAL INSTALLATION 1. ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS. 2. ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION. 3. 6.35 MM STRAND TO BE USED WITH STANDARD 1/4" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRAND TO POWER MAIN WHERE APPLICABLE. 4. ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE. 5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCAL AND REGIONAL GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THE CONSTRUCTION PERMITS IS TO BE VALIDATED WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION. OF DATE REVISION BY QC CANNON COMPANIES 0000151686TPJ INC.351 UNION AVE NE RENTON, WA 98059 GENERAL NOTES 2 9 08/23/2019 JS RH COMCAST MFP19004967 EOP FL P C S D G W TS T ST UT ROW DD DD DD DD EDGE OF PAVEMENT FOGLINE POWER COMMUNICATION SEWER DRAIN DRAINAGE DITCH GAS WATER TRAFFIC SIGNAL TELCOM STEAM UNKNOWN UTILITY RIGHT OF WAY TRAFFIC CONES PROPOSED NEW CONDUIT STRAW WATTLES P V LT CW R UTILITY POLE VAULT - SMALL PEDESTAL STREET LIGHT CROSSWALK LIGHT UTILITY RISER V VAULT - SMALL 444LA MANHOLE VAULT - 25TA CB CB CATCH BASIN CATCH BASIN WITH SOCK GLULAM UTILITY POLECENTER LINE LANE LINE FENCE HIGH VISIBILITY FENCE S SEWER MANHOLE D DRAIN MANHOLE W WATER MANHOLE V UTILITY VALVE SHRUBBERY BORE PIT VAULT - LARGE VAULT - 25TA C COMMUNICATION MANHOLE FIRE HYDRANT DISTANCE STATIONSTA 0+00 NOTE CALLOUT# X.X DISTANCE DIMENSION ASPHALT SURFACE CONCRETE SIDEWALK PANEL CONCRETE ROADWAY PANEL HF H-FRAME VAULT - LARGE CAB CABINET LEGEND LANE DIRECTION INDICATOR PROPOSED MARK-UP NOTATIONS RESTORATION TYPESEXISTING FEATURESLINE TYPES OF DATE REVISION BY QC CANNON COMPANIES 0000151686TPJ INC.351 UNION AVE NE RENTON, WA 98059 GENERAL NOTES 3 9 08/23/2019 JS RH COMCAST MFP19004967 354 4020 3901 351 4114 3929 4112 402040004004400840124016 359 355 367 363 3804 3808 3812 3902 3906 3910 3914 3944 3948 3952 4105 4004 4260 3933 4102 345 VASHON CT NE NE 4TH ST UNION AVE NE36ct NE 4TH ST V R25' R25' 373' 53'176'70'127'TIE INTO EXISTING SPLICE CASE SP.WAKV.0114 (KV07RS1.7A.3A) PROOF AND PULL (1) 36CT FIBER THROUGH EXISTING CONDUIT OVERLASH (1) 36CT FIBER ON EXISTING AERIAL STRAND HOG SHOT NEW 2" CONDUIT AND PULL (1) 12CT FIBER INSTALL NEW 2" CONDUIT AND PLACE NEW LB PLACE NEW 1 1 4" PLENUM DUCT AND PULL (1) 12CT FIBER CUSTOMER TO PLACE SERVER RACK LEAVE 50' COIL LEAVE 200' STORAGE 78' 30' 36ct 36ct36ct 36ct 36ct 12ct V CHANGE OUT FLOWER POT WITH NEW 14X19 VAULT INSTALL NEW STRAP OUT CASE AND TRANSITION FROM 36CT TO 12CT FIBER ON EXISTING AERIAL STRAND EXISTING RISER PLACE STANDOFFS AND 2" SPLIT DUCT OVER EXISTING DROPNEW METAL 2 12" CORE DRILL OF DATE REVISION BY QC CANNON COMPANIES 0000151686TPJ INC.351 UNION AVE NE RENTON, WA 98059 GENERAL NOTES 4 9 08/23/2019 JS RH COMCAST N MFP19004967 354 4020 3901 351 4114 3929 4112 402040004004400840124016 359 355 367 363 3804 3808 3812 3902 3906 3910 3914 3944 3948 3952 4105 4004 4260 3933 4102 345 ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROW ROW ROW ROW ROW ROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROW ROW ROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROW ROWROWROWROWROWROW ROWROWROWROWROWROWROW ROWROWROWROWROWROW ROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROW ROWROWROWROW ROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROWROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROWROWROWROWROWROWROWROWROW ROW ROW ROW ROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROW ROW ROW ROW ROW ROW ROWROWROW ROW ROWROWROW ROWROWROW ROW ROW ROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW RO W ROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROWROWROWROWROW ROW ROW ROW ROW VASHON CT NE NE 4TH ST UNION AVE NEEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EO P EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP NE 4TH ST FL FL FL FL FL FL FL FL FL FL FL FL FL FL EOP EOP FL FL FL FL FL FL FL FL FL FL FL FL V R25' R25' 373' 53'176'70'127'TIE INTO EXISTING SPLICE CASE SP.WAKV.0114 (KV07RS1.7A.3A) PROOF AND PULL (1) 36CT FIBER THROUGH EXISTING CONDUIT OVERLASH (1) 36CT FIBER ON EXISTING AERIAL STRAND HOG SHOT NEW 2" CONDUIT AND PULL (1) 12CT FIBER INSTALL NEW 2" CONDUIT AND PLACE NEW LB PLACE NEW 1 1 4" PLENUM DUCT AND PULL (1) 12CT FIBER CUSTOMER TO PLACE SERVER RACK LEAVE 50' COIL LEAVE 200' STORAGE 78' 30' CLASS/HT: POLE TYPE: - MAKE READY - OWNER: POLE#: - ATTACHMENTS - HEIGHT VIOLATION 2 PUGET SOUND ENERGY 318128 - 167129 SECONDARY 29 8 N/A STREET LIGHT 25 2 N/A COMCAST 24 6 N/A CTL #1 23 6 N/A CTL #2 22 2 N/A D CLASS/HT: POLE TYPE: - MAKE READY - OWNER: POLE#: - ATTACHMENTS - HEIGHT VIOLATION 3 PUGET SOUND ENERGY 318111 - 167128 WOODEN ARM (ALL 3 ATTACHED)24 9 N/A T CLASS/HT: POLE TYPE: - MAKE READY - OWNER: POLE#: - ATTACHMENTS - HEIGHT VIOLATION 4 PUGET SOUND ENERGY 318100 - 167128 SECONDARY 23 5 YES COMCAST 22 1 N/A CTV #1 20 7 N/A CTL #2 19 4 N/A D CLASS/HT: POLE TYPE: - MAKE READY - OWNER: POLE#: - ATTACHMENTS - HEIGHT VIOLATION 5 PUGET SOUND ENERGY 318089 - 167128 SECONDARY 27 6 N/A STREET LIGHT 25 9 N/A COMCAST 21 5 N/A CTL #1 19 9 N/A CTL #2 18 2 N/A D V CHANGE OUT FLOWER POT WITH NEW 14X19 VAULT CLASS/HT: POLE TYPE: - MAKE READY - OWNER: POLE#: - ATTACHMENTS - HEIGHT VIOLATION 1 PUGET SOUND ENERGY 318126 - 167134 SECONDARY 29 8 YES COMCAST 26 9 N/A D RAISE SECONDARY RISER INSTALL NEW STRAP OUT CASE AND TRANSITION FROM 36CT TO 12CT FIBER ON EXISTING AERIAL STRAND RAISE SECONDARY DRIP LOOPS EXISTING RISER PLACE STANDOFFS AND 2" SPLIT DUCT OVER EXISTING DROPNEW METAL 2 12" CORE DRILL OF DATE REVISION BY QC CANNON COMPANIES 0000151686TPJ INC.351 UNION AVE NE RENTON, WA 98059 GENERAL NOTES 5 9 08/23/2019 JS RH COMCAST N MFP19004967 TIE IN CASE: KV07RS1.7A.3A (SP.WAKV.0113)1 3 SPLICES CASES IN EXISTING VAULT2 FIBER PATH FROM VAULT TO POLE RISER3 NEW EXTERIOR CONDUIT FIBER PATH7EXISTING EXTERIOR CONDUIT FIBER PATH6 OVERLASH FIBER PATH4 STRAPOUT CASE LOCATION5 TIE INTO SPLICE CASE KV07RS1.7A.3A SP.WAKV.0114 IN EXISTING VAULT EXISTING VAULT FULL OF 3 SPLICE CASES TIE INTO SPLICE CASE KV07RS1.7A.3A SP.WAKV.0114 IN EXISTING VAULT PROOF AND PULL (1) 36CT FIBER THROUGH EXISTING CONDUIT FROM EXISTING VAULT TO POLE RISER PULL (1) 36CT FIBER THROUGH EXISTING RISER UP POLE OVERLASH (1) 36CT FIBER ON EXISTING AERIAL STRAND OVERLASH (1) 36CT FIBER ON EXISTING AERIAL STRAND PLACE 2" SPLIT DUCT AND STAND OFFS FOR RISER PULL (1) 12CT FIBER TO NEW VAULT PLACE 2" SPLIT DUCT FOR RISER PULL (1) 12CT FIBER TO NEW VAULT PROOF AND PULL (1) 12CT FIBER THROUGH EXISTING 2" CONDUIT REPLACE FLOWER POT W/ NEW 14X19 VAULT REPLACE FLOWER POT W/ NEW 14X19 VAULT 2X5 ASPHALT CUT AND RESTORATION HOG SHOT NEW 2" CONDUIT AND PULL (1) 12CT FIBER INSTALL NEW STRAP OUT CASE ON EXISTING AERIAL STRAND EXISTING 2" RISER WITH DROP OF DATE REVISION BY QC CANNON COMPANIES 0000151686TPJ INC.351 UNION AVE NE RENTON, WA 98059 PHOTOS 6 9 08/23/2019 JS RH COMCAST MFP19004967 NEW EXTERIOR CONDUIT FIBER PATH8 NEW EXTERIOR CONDUIT FIBER PATH9 FIRE PENETRATION LOCATION11 NEW INTERIOR FIBER PATH12 CUSTOMER SERVER RACK LOCATION13 FIBER ENTRY POINT10 HOG SHOT NEW 2" CONDUIT AND PULL (1) 12CT FIBER 2X5 ASPHALT CUT AND RESTORATION HOG SHOT NEW 2" CONDUIT AND PULL (1) 12CT FIBER 2X5 ASPHALT CUT AND RESTORATION HOG SHOT NEW 2" CONDUIT AND PULL (1) 12CT FIBER INSTALL NEW 2" CONDUIT AND PLACE NEW LB METAL CORE DRILL NEW 2 12" PENETRATION INSTALL NEW 2 12" METAL CORE DRILL PLACE NEW 1 14" PLENUM DUCT AND PULL (1) 12CT FIBER PLACE NEW 1 1 4" PLENUM DUCT AND PULL (1) 12CT FIBER CUSTOMER TO PLACE SERVER RACKLEAVE 50' COIL PLACE NEW 1 14" PLENUM DUCT AND PULL (1) 12CT FIBER OF DATE REVISION BY QC CANNON COMPANIES 0000151686TPJ INC.351 UNION AVE NE RENTON, WA 98059 PHOTOS 7 9 08/23/2019 JS RH COMCAST MFP19004967 INSTALL NEW 2 1 2" METAL CORE DRILL AT FIBER ENTRY CUSTOMER TO PLACE SERVER RACK FOR TERM PANEL AND SWITCH PLACE NEW 1 1 4" PLENUM DUCT AND PULL (1) 12CT FIBER OF DATE REVISION BY QC CANNON COMPANIES 0000151686TPJ INC.351 UNION AVE NE RENTON, WA 98059 PHOTOS 8 9 08/23/2019 JS RH COMCAST N MFP19004967 MFP19004967 CANNON CONSTRUCTION, 406 PORTER WAY MILTON WA, 98354 09/10/2019 City of Renton 1055 South Grady Way Renton, WA 98057 RE: Aerial Variance Request for JB0000151686 To whom it may concern, Cannon Construction has been contracted to design and engineer this project on behalf of Comcast Cablevision. Comcast is applying for a variance request in order to upgrade their existing facilities. Comcast proposed to over lash approximately 426’ of aerial fiber along the right of way of NE 4th st and Union Ave NE. Please see maps and drawings for more details. Comcast is requesting that the City of Renton approve this variance request based on the fact that the requirements for undergrounding this proposed over lash will not cause substantial adverse impacts to other persons or entities in the immediate area and will cause undue hardship. 1. Installation of undergrounding facilities will increase the total cost of construction roughly 15-25 times the amount of an aerial over lash on the existing Comcast strand. 2. Potential damage to underground facilities will be increased. 3. Over lash will not cause substantial adverse impact to other persons or entities in the immediate area. Over lashing the cable will be accomplished in a few days, and the residents will not notice any impact. Comcast will clean up the over lashed spans as necessary and identify and remove and existing dead cables along this route. 4. The variance is necessary to prevent any undue hardship due to the increased construction costs if forced to install the proposed extension underground. 5. The granting of the variance will not be materially detrimental to the public welfare because Comcast does agree to underground the cable system, but they are waiving the obligation into the future when all other utilities are underground to prevent an undue hardship against Comcast currently. Upon the granting of the Variance, Comcast will coordinate construction and traffic control as per your requirements. Comcast and their contractors want to cooperate at the highest level and agree to adhere to all provisions and requirements set forth by the City of Renton to insure safe installation and maintenance of the proposed facilities. If you have any further questions regarding this project, please contact Cody Shackett at (253) 864-4246 Thank you for your consideration in this matter. Cody Shackett Construction Coordinator MFP19004967 Attachments: 1. Application for ROW permit 2. 11” x 17” Site plan 3. 11” x 17” Design plan 4. Traffic Control Plan October 7, 2019 Cody Shackett Comcast Cable Communications, LLC 410 Valley Ave NW Puyallup, WA 98371 Via Email: owen_shackett@comcast.com SUBJECT: Request for Undergrounding Exemption (JB0000151686, MFP19004967, 351 Union Ave NE) Dear Mr. Shackett: The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed underground, pursuant to the standards of the section of RMC. Comcast proposes to have Cannon Construction overlash approximately 426 lineal feet of new 36 count fiber to existing Puget Sound Energy (PSE) poles beginning at the pole in the sidewalk to the west of 4102 NE 4th ST and crosses to the west side of Union Avenue NE before continuing south on Union Avenue NE for 373 lineal feet, crossing NE 4th Street, where it will then be placed underground and continue to the customer at 351 Union Ave NE. ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(h) ii. Ordinance 5720 grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below, through and across the streets, avenues and alleys of City of Renton within the right-of-way of Renton. Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline service providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility service provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area are underground, Grantee shall place its Cable System’s distribution cables underground within that area; provided that such underground locations are actually capable of accommodating Grantee’s cable and other equipment without technical degradation of the Cable Systems’ signal quality. The proposal would utilize existing poles with other attached franchisee communication facilities and overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need to be provided for, any existing obsolete cable will need to be removed; staff recommends these as conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast franchise agreement which allows new overhead facilities to be placed overhead provided there are other similar providers overhead as well. Comcast Job JB0000151686 Page 2 of 2 October 7, 2019 DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C) as requested by the applicant is approved with conditions subject to the conditions below as the request complies with the Comcast Franchise Agreement. Conditions of Approval: 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at Comcast’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case Comcast shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or designee, from the first event triggering the requirement to underground the aerial lines. This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk, along with the required appeal fee, by 5:00 pm, October 21, 2019. Sincerely, Brianne Bannwarth, PE Development Engineering Manager cc: C.E. “Chip” Vincent, CED Administrator Gregg Zimmerman, PW Administrator Jennifer Henning, Planning Director Justin Johnson, Civil Engineer III Scott Warlick, Engineering Specialist II Holly Powers, Permit Technician Franchise Permits DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit MFP19004967 Engineering 1 Engineering General Conditions The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at Comcast’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case Comcast shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or designee, from the first event triggering the requirement to underground the aerial lines. 2 Engineering General Conditions Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3 Engineering General Conditions A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4 Engineering General Conditions Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. Page 1 of 1