HomeMy WebLinkAboutMFP19004967.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP19004967
IVR Number: 19004967
Permit Informaon
Permit Name:Comcast Cable Franchise Permit
Address/Locaon :09/10/2019Application Date:1623059087Parcel Number:351 UNION AVE NE
Permit Type:10/07/2019Issue Date:Franchise
Permit Work Class:10/06/2020Expiration Date:Minor Utility
Job Number:JB0000151686Franchise Type:Cable
Description:Aerial splice at 2 locations. Tie into existing splice case in vault. Overlash (1) 12CT fiber on existing aerial strand.
Proof and pull (1) 12CT fiber down existing riser. Proof and pull (1) 12CT fiber through existing conduit.
CONDITIONS OF OVERHEAD APPROVAL:
1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15’ 6”. 2. Any abandoned or unused lines
within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must
be separately submitted to the City, and no construction may take place until the City has approved a traffic control
plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at
Comcast’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case Comcast
shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit
is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be
undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development
Administrator or designee, from the first event triggering the requirement to underground the aerial lines.
Contacts
Name Address PhoneTypeBilling
Comcast Cable Communication
Management & Comcast Cable
B: (215) 665-1700Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Michael Cannon
Cannon Construction Inc
406 Porter Way
Milton, WA 98354-9638
B: (253) 922-2787
C: (253) 588-4034
Contractor
Business License Number: 20838Construction Contractor: CANNOCI055CS
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP19004967
(Date)(Signature)
Page 2 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
MFP19004967Scott Warlick9/12/2019Nathan Janders9/18/2019
MFP19004967Monday - Friday8:00AM - 3:00PMScott Warlick9/12/2019
MFP19004967
MFP19004967
MFP19004967
MFP19004967
1 - COVER SHEET
2 -GENERAL NOTES
3 -LEGEND
4 -OVERVIEW
5 -DESIGN
6-8 -SITE PHOTOS
9 -NODE MAPS
THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED CANNON COMPANIES
12 CT FIBER: 1000 FT + 20% STORAGE = 1200 FT
36 CT FIBER: 158 FT + 20% STORAGE = 190 FT
CONTACTS:
PROJECT MAP:
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
N
SCOPE OF WORK:
SHEET INDEX:
BILL OF MATERIALS*:
NEW AERIAL =
OVERLASH =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
RISER (2)=
TOTAL FOOTAGE =
0 FT.
426 FT.
0 FT.
373 FT.
50 FT.
849 FT.
PROJECT DESCRIPTION - ROW*
NEW BUILDING PATH WAY =
EXISTING BUILDING PATH WAY =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
TOTAL FOOTAGE =
30 FT.
0 FT.
78 FT.
0 FT.
108 FT.
PROJECT DESCRIPTION -SITE*
TOTAL PROJECT FOOTAGE =957 FT.
- TIE INTO EXISTING SPLICE CASE SP.WAKV.0114_(KV07RS1.7A.3A)
- PROOF AND PULL (1) 36CT FIBER THROUGH EXISTING CONDUIT
- OVERLASH (1) 12CT FIBER ON EXISTING AERIAL STRAND
- INSTALL NEW STRAP OUT CASE ON EXISTING AERIAL STRAND
- PROOF AND PULL (1) 12CT FIBER DOWN EXISTING RISER
- PROOF AND PULL (1) 12CT FIBER THROUGH EXISTING CONDUIT
- HOG SHOT NEW 2" CONDUIT AND PULL (1) 12CT FIBER
- INSTALL LB AND 2 1
2" CORE DRILL INTO BUILDING
- PLACE NEW 1 1
4" PLENUM DUCT AND PULL (1) 12CT FIBER
351 UNION AVE NE
RENTON, WA 98059
TPJ INC.
JB 0000151686
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
COMCAST
CANNON COMPANIES
Ron Hoover - (360)-286-1154 - rhoover@cannonconstructioninc.com
COMCAST COMMUNICATION
Kyle Kinney - (253)-235-7016 - Kyle_Kinney@cable.comcast.com
Business/Job Contact
POC:
Review _________________________
WORK AREA
Randy Palmer - (425)-228-3204 - randy@plumbingjoint.com
METRO E
MFP19004967
GENERAL NOTES
STANDARD
1. THE LOCATIONS OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TO
CONSTRUCTION. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEAD OF THE WORK, AS
NECESSARY, TO DETERMINE THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES. IT IS UNDERSTOOD THAT
THERE WILL BE INTERFERING UTILITIES AND OTHER UNDERGROUND PIPES, DRAINS OR STRUCTURES ENCOUNTERED THAT ARE
NOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE PLANS OR THAT HAVE NOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD.
THE CONTRACTOR AGREES THIS IS A NORMAL AND USUAL OCCURRENCE IN THE CONSTRUCTION OF UNDERGROUND
IMPROVEMENTS. FURTHERMORE, CONTRACTORS UNDERSTAND AND AGREE THAT WORK IN SOME CASES PROPOSED PATH MAYBE
IN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES, DRAINS AND STRUCTURES NOT SHOWN ON THE PLANS WHICH
MAY REQUIRE A CHANGE IN OPERATIONS AND MAY CAUSE SLOUGHING OF THE TRENCH, ADDITIONAL TRAFFIC CONTROL,
ADDITIONAL PAVEMENT AND BACKFILL COSTS AND TIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF THESE
OCCURRENCES IS USUAL AND ORDINARY, AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE CONTRACTORS AGREES
TO PROVIDE FOR THESE CONFLICTS AND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGES
AND/OR UTILITY RELOCATIONS DUE TO SAID CONFLICTS.
2. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 811
3. INSPECTIONS - THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES.
4. EXCESS WATER - SHOULD WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
DEWATER, AS PER LOCAL JURISDICTIONS STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES.
5. NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROL SYSTEM.
6. THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS/HER WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCES TO
PREVENT ANY HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE.
7. ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS.
8. AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
9. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE, INCLUDING SAFETY
OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY
AND NOT BE LIMITED TO NORMAL WORKING HOURS.
10. PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHERE PRIOR
WRITTEN APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED.
11. BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ON ADJACENT
PROPERTIES WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACH DAY AND AS
OTHERWISE REQUIRED.
12. PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL
MOVEMENT, UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION.
TRAFFIC CONTROL
1. THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILL APPROVE
ONLY THOSE LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH A
SPECIFIC TASK. NO LANE OR ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS.
2. THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURING
NON-WORKING HOURS. EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'S EMPLOYEES
AND AGENTS SHALL NOT PARK PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN.
SITE PREPARATION
1. SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SOD SHALL BE
EITHER REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE.
2. SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENT WITH LIKE
MATERIAL (I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE).
3. EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR.
TRENCH EXCAVATION AND BACKFILL
1. TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALL
BACKFILL WITH BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS. STONEWAY MIX
351 IS ACCEPTABLE IN ALL LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON-TRAFFIC AREAS. MIX 1121 IS TO BE USED IN
TRAFFIC-BEARING LOCATIONS.
2. COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS.
UTILITY DUCT
1. BURIED DUCT SHALL BE (1) 4" SCHEDULE 40 PVC, UNLESS NOTED OTHERWISE. MINIMUM CONDUIT COVER SHALL BE 36" WITH A
MINIMUM SLOPE OF 1/2 % TO VAULT.
2. THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE IS COMPLETED,
PLUG ENDS OF CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULAR CARE TO KEEP
CONDUITS CLEAR OF CONCRETE, DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OF CONSTRUCTION.
3. AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH. INSTALL PULL
ROPE AND PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBER CABLE WILL REQUIRE
SIMPLEX COMPRESSION PLUGS SEALING THE CONDUITS AROUND THE CABLE.
4. OUTSIDE INNERDUCT SHALL BE 1-1/4" OPTIC-GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITH PULL
ROPES AND PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM-RATED.
CEMENT CONCRETE PAVEMENT
1. ALL CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THE STANDARD
SPECIFICATIONS OF EACH JURISDICTION.
ASPHALT CONCRETE PAVEMENT
1. ALL ASPHALT CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED WITH CLASS B ASPHALT
CONCRETE ACCORDING TO THE REQUIREMENTS OF EACH JURISDICTION.
GRAVEL AREAS
1. ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOP COURSE IN
ACCORDANCE WITH THE REQUIREMENTS OF EACH JURISDICTION.
SITE RESTORATION
1. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED
PRIOR TO PLACEMENT OF THE CONDUIT AND STRUCTURES.
2. VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN-KIND PLANT MATERIAL AND SHALL BE PROPERLY PLANTED
AND WATERED IN TO ENSURE ITS SURVIVAL.
3. SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEY EXISTED
PRIOR TO CONSTRUCTION.
WATER QUALITY
1. CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THE STATE OF
WASHINGTON'S WATER QUALITY STANDARDS
2. THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE.
DIRECTIONAL BORING
1. WHEN BORING ROADWAYS, INSTALL (1) 4" SCHEDULE 40 PVC CONDUIT WITH PULL ROPES AND PLUGS.
2. PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATE EXISTING
UTILITIES.
FIRE PROTECTION
1. ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT.
2. ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE-RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALL BE
REPAIRED OR REPLACED UPON DUCT OR CABLE PLACEMENT.
AERIAL INSTALLATION
1. ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS.
2. ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION.
3. 6.35 MM STRAND TO BE USED WITH STANDARD 1/4" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRAND TO
POWER MAIN WHERE APPLICABLE.
4. ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCAL AND
REGIONAL GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THE CONSTRUCTION PERMITS
IS TO BE VALIDATED WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION.
OF
DATE REVISION BY QC
CANNON COMPANIES
0000151686TPJ INC.351 UNION AVE NE
RENTON, WA 98059
GENERAL NOTES 2 9
08/23/2019 JS RH
COMCAST
MFP19004967
EOP
FL
P
C
S
D
G
W
TS
T
ST
UT
ROW
DD DD DD DD
EDGE OF PAVEMENT
FOGLINE
POWER
COMMUNICATION
SEWER
DRAIN
DRAINAGE DITCH
GAS
WATER
TRAFFIC SIGNAL
TELCOM
STEAM
UNKNOWN UTILITY
RIGHT OF WAY
TRAFFIC CONES
PROPOSED NEW CONDUIT
STRAW WATTLES
P
V
LT
CW
R
UTILITY POLE
VAULT - SMALL
PEDESTAL
STREET LIGHT
CROSSWALK LIGHT
UTILITY RISER
V VAULT - SMALL
444LA MANHOLE
VAULT - 25TA
CB
CB
CATCH BASIN
CATCH BASIN WITH SOCK
GLULAM UTILITY POLECENTER LINE
LANE LINE
FENCE
HIGH VISIBILITY FENCE
S SEWER MANHOLE
D DRAIN MANHOLE
W WATER MANHOLE
V UTILITY VALVE
SHRUBBERY
BORE PIT
VAULT - LARGE
VAULT - 25TA
C COMMUNICATION MANHOLE
FIRE HYDRANT
DISTANCE STATIONSTA 0+00
NOTE CALLOUT#
X.X DISTANCE DIMENSION
ASPHALT SURFACE
CONCRETE SIDEWALK PANEL
CONCRETE ROADWAY PANEL
HF H-FRAME
VAULT - LARGE
CAB CABINET
LEGEND
LANE DIRECTION INDICATOR
PROPOSED MARK-UP NOTATIONS RESTORATION TYPESEXISTING FEATURESLINE TYPES
OF
DATE REVISION BY QC
CANNON COMPANIES
0000151686TPJ INC.351 UNION AVE NE
RENTON, WA 98059
GENERAL NOTES 3 9
08/23/2019 JS RH
COMCAST
MFP19004967
354
4020
3901
351
4114
3929
4112
402040004004400840124016
359
355
367
363
3804 3808 3812 3902 3906 3910 3914 3944 3948 3952
4105
4004
4260
3933
4102
345
VASHON CT NE
NE 4TH ST
UNION AVE NE36ct
NE 4TH ST
V
R25'
R25'
373'
53'176'70'127'TIE INTO EXISTING SPLICE
CASE SP.WAKV.0114
(KV07RS1.7A.3A)
PROOF AND PULL (1) 36CT FIBER
THROUGH EXISTING CONDUIT
OVERLASH (1) 36CT FIBER ON
EXISTING AERIAL STRAND
HOG SHOT NEW 2" CONDUIT
AND PULL (1) 12CT FIBER
INSTALL NEW 2" CONDUIT
AND PLACE NEW LB
PLACE NEW 1 1
4" PLENUM DUCT
AND PULL (1) 12CT FIBER
CUSTOMER TO PLACE
SERVER RACK
LEAVE 50' COIL
LEAVE 200'
STORAGE
78'
30'
36ct
36ct36ct
36ct
36ct
12ct
V
CHANGE OUT FLOWER POT
WITH NEW 14X19 VAULT
INSTALL NEW STRAP OUT CASE AND
TRANSITION FROM 36CT TO 12CT
FIBER ON EXISTING AERIAL STRAND
EXISTING RISER PLACE STANDOFFS
AND 2" SPLIT DUCT OVER EXISTING
DROPNEW METAL 2 12"
CORE DRILL
OF
DATE REVISION BY QC
CANNON COMPANIES
0000151686TPJ INC.351 UNION AVE NE
RENTON, WA 98059
GENERAL NOTES 4 9
08/23/2019 JS RH
COMCAST
N
MFP19004967
354
4020
3901
351
4114
3929
4112
402040004004400840124016
359
355
367
363
3804 3808 3812 3902 3906 3910 3914 3944 3948 3952
4105
4004
4260
3933
4102
345 ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROW
ROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROW ROW ROW ROW ROW
ROWROWROWROWROWROWROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW
ROWROWROWROWROWROWROWROWROWROWROW
ROW
ROWROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROW
ROWROWROWROWROWROW
ROWROWROWROWROWROWROW
ROWROWROWROWROWROW
ROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROW ROWROWROWROW
ROWROWROWROWROWROWROWROW
ROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW
ROW ROW ROWROW ROW ROW ROW ROW ROW ROW ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW
ROWROWROWROWROWROWROWROWROW
ROW
ROW
ROW
ROWROWROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW ROW
ROWROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROWROW
ROW ROW ROW
ROW
ROW
ROWROWROW ROW
ROWROWROW
ROWROWROW
ROW
ROW
ROWROWROWROWROWROW ROW ROW ROW ROW
ROW
ROW
ROW
RO
W
ROWROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW
ROWROWROWROWROW
ROW
ROW ROW ROW
VASHON CT NE
NE 4TH ST
UNION AVE NEEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP
EO
P
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP
EOP EOP EOP EOP EOP EOP EOP EOP
EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP
EOP
EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
NE 4TH ST
FL FL FL FL FL FL FL FL FL FL FL FL FL FL
EOP EOP
FL FL FL FL FL FL FL FL FL FL FL FL
V
R25'
R25'
373'
53'176'70'127'TIE INTO EXISTING SPLICE
CASE SP.WAKV.0114
(KV07RS1.7A.3A)
PROOF AND PULL (1) 36CT FIBER
THROUGH EXISTING CONDUIT
OVERLASH (1) 36CT FIBER ON
EXISTING AERIAL STRAND
HOG SHOT NEW 2" CONDUIT
AND PULL (1) 12CT FIBER
INSTALL NEW 2" CONDUIT
AND PLACE NEW LB
PLACE NEW 1 1
4" PLENUM DUCT
AND PULL (1) 12CT FIBER
CUSTOMER TO PLACE
SERVER RACK
LEAVE 50' COIL
LEAVE 200'
STORAGE
78'
30'
CLASS/HT:
POLE TYPE:
- MAKE READY -
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT VIOLATION
2 PUGET SOUND ENERGY
318128 - 167129
SECONDARY 29 8 N/A
STREET LIGHT 25 2 N/A
COMCAST 24 6 N/A
CTL #1 23 6 N/A
CTL #2 22 2 N/A
D
CLASS/HT:
POLE TYPE:
- MAKE READY -
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT VIOLATION
3 PUGET SOUND ENERGY
318111 - 167128
WOODEN ARM (ALL 3 ATTACHED)24 9 N/A
T
CLASS/HT:
POLE TYPE:
- MAKE READY -
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT VIOLATION
4 PUGET SOUND ENERGY
318100 - 167128
SECONDARY 23 5 YES
COMCAST 22 1 N/A
CTV #1 20 7 N/A
CTL #2 19 4 N/A
D
CLASS/HT:
POLE TYPE:
- MAKE READY -
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT VIOLATION
5 PUGET SOUND ENERGY
318089 - 167128
SECONDARY 27 6 N/A
STREET LIGHT 25 9 N/A
COMCAST 21 5 N/A
CTL #1 19 9 N/A
CTL #2 18 2 N/A
D
V
CHANGE OUT FLOWER POT
WITH NEW 14X19 VAULT
CLASS/HT:
POLE TYPE:
- MAKE READY -
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT VIOLATION
1 PUGET SOUND ENERGY
318126 - 167134
SECONDARY 29 8 YES
COMCAST 26 9 N/A
D
RAISE SECONDARY RISER
INSTALL NEW STRAP OUT CASE AND
TRANSITION FROM 36CT TO 12CT
FIBER ON EXISTING AERIAL STRAND
RAISE SECONDARY DRIP LOOPS
EXISTING RISER PLACE STANDOFFS
AND 2" SPLIT DUCT OVER EXISTING
DROPNEW METAL 2 12"
CORE DRILL
OF
DATE REVISION BY QC
CANNON COMPANIES
0000151686TPJ INC.351 UNION AVE NE
RENTON, WA 98059
GENERAL NOTES 5 9
08/23/2019 JS RH
COMCAST
N
MFP19004967
TIE IN CASE: KV07RS1.7A.3A (SP.WAKV.0113)1 3 SPLICES CASES IN EXISTING VAULT2 FIBER PATH FROM VAULT TO POLE RISER3
NEW EXTERIOR CONDUIT FIBER PATH7EXISTING EXTERIOR CONDUIT FIBER PATH6
OVERLASH FIBER PATH4 STRAPOUT CASE LOCATION5
TIE INTO SPLICE
CASE KV07RS1.7A.3A
SP.WAKV.0114 IN
EXISTING VAULT
EXISTING VAULT FULL
OF 3 SPLICE CASES
TIE INTO SPLICE
CASE KV07RS1.7A.3A
SP.WAKV.0114 IN
EXISTING VAULT
PROOF AND PULL (1) 36CT
FIBER THROUGH EXISTING
CONDUIT FROM EXISTING
VAULT TO POLE RISER
PULL (1) 36CT FIBER
THROUGH EXISTING
RISER UP POLE
OVERLASH (1) 36CT
FIBER ON EXISTING
AERIAL STRAND
OVERLASH (1)
36CT FIBER ON
EXISTING
AERIAL STRAND
PLACE 2" SPLIT
DUCT AND STAND
OFFS FOR RISER
PULL (1) 12CT
FIBER TO NEW
VAULT
PLACE 2" SPLIT DUCT
FOR RISER PULL (1) 12CT
FIBER TO NEW VAULT
PROOF AND PULL (1)
12CT FIBER THROUGH
EXISTING 2" CONDUIT
REPLACE FLOWER POT W/
NEW 14X19 VAULT
REPLACE FLOWER POT
W/ NEW 14X19 VAULT
2X5 ASPHALT CUT
AND RESTORATION
HOG SHOT NEW 2" CONDUIT
AND PULL (1) 12CT FIBER
INSTALL NEW
STRAP OUT CASE
ON EXISTING
AERIAL STRAND
EXISTING 2"
RISER WITH DROP
OF
DATE REVISION BY QC
CANNON COMPANIES
0000151686TPJ INC.351 UNION AVE NE
RENTON, WA 98059
PHOTOS 6 9
08/23/2019 JS RH
COMCAST
MFP19004967
NEW EXTERIOR CONDUIT FIBER PATH8 NEW EXTERIOR CONDUIT FIBER PATH9
FIRE PENETRATION LOCATION11 NEW INTERIOR FIBER PATH12 CUSTOMER SERVER RACK LOCATION13
FIBER ENTRY POINT10
HOG SHOT NEW 2" CONDUIT
AND PULL (1) 12CT FIBER
2X5 ASPHALT CUT
AND RESTORATION
HOG SHOT NEW 2" CONDUIT
AND PULL (1) 12CT FIBER
2X5 ASPHALT CUT
AND RESTORATION
HOG SHOT NEW 2" CONDUIT
AND PULL (1) 12CT FIBER
INSTALL NEW 2"
CONDUIT AND
PLACE NEW LB
METAL CORE
DRILL NEW 2 12"
PENETRATION
INSTALL NEW 2 12"
METAL CORE DRILL
PLACE NEW 1 14" PLENUM DUCT
AND PULL (1) 12CT FIBER PLACE NEW 1 1
4" PLENUM DUCT
AND PULL (1) 12CT FIBER
CUSTOMER TO PLACE
SERVER RACKLEAVE 50' COIL
PLACE NEW 1 14" PLENUM DUCT
AND PULL (1) 12CT FIBER
OF
DATE REVISION BY QC
CANNON COMPANIES
0000151686TPJ INC.351 UNION AVE NE
RENTON, WA 98059
PHOTOS 7 9
08/23/2019 JS RH
COMCAST
MFP19004967
INSTALL NEW 2 1
2"
METAL CORE DRILL
AT FIBER ENTRY
CUSTOMER TO PLACE
SERVER RACK FOR TERM
PANEL AND SWITCH
PLACE NEW 1 1
4" PLENUM DUCT
AND PULL (1) 12CT FIBER
OF
DATE REVISION BY QC
CANNON COMPANIES
0000151686TPJ INC.351 UNION AVE NE
RENTON, WA 98059
PHOTOS 8 9
08/23/2019 JS RH
COMCAST
N
MFP19004967
MFP19004967
CANNON CONSTRUCTION,
406 PORTER WAY
MILTON WA, 98354
09/10/2019
City of Renton
1055 South Grady Way
Renton, WA 98057
RE: Aerial Variance Request for JB0000151686
To whom it may concern,
Cannon Construction has been contracted to design and engineer this project on behalf of Comcast
Cablevision. Comcast is applying for a variance request in order to upgrade their existing facilities.
Comcast proposed to over lash approximately 426’ of aerial fiber along the right of way of NE 4th st and
Union Ave NE. Please see maps and drawings for more details.
Comcast is requesting that the City of Renton approve this variance request based on the fact that the
requirements for undergrounding this proposed over lash will not cause substantial adverse impacts to
other persons or entities in the immediate area and will cause undue hardship.
1. Installation of undergrounding facilities will increase the total cost of construction roughly
15-25 times the amount of an aerial over lash on the existing Comcast strand.
2. Potential damage to underground facilities will be increased.
3. Over lash will not cause substantial adverse impact to other persons or entities in the
immediate area. Over lashing the cable will be accomplished in a few days, and the
residents will not notice any impact. Comcast will clean up the over lashed spans as
necessary and identify and remove and existing dead cables along this route.
4. The variance is necessary to prevent any undue hardship due to the increased construction
costs if forced to install the proposed extension underground.
5. The granting of the variance will not be materially detrimental to the public welfare because
Comcast does agree to underground the cable system, but they are waiving the obligation
into the future when all other utilities are underground to prevent an undue hardship
against Comcast currently.
Upon the granting of the Variance, Comcast will coordinate construction and traffic control as per your
requirements. Comcast and their contractors want to cooperate at the highest level and agree to adhere
to all provisions and requirements set forth by the City of Renton to insure safe installation and
maintenance of the proposed facilities.
If you have any further questions regarding this project, please contact Cody Shackett at (253) 864-4246
Thank you for your consideration in this matter.
Cody Shackett
Construction Coordinator
MFP19004967
Attachments:
1. Application for ROW permit
2. 11” x 17” Site plan
3. 11” x 17” Design plan
4. Traffic Control Plan
October 7, 2019
Cody Shackett
Comcast Cable Communications, LLC
410 Valley Ave NW
Puyallup, WA 98371
Via Email: owen_shackett@comcast.com
SUBJECT: Request for Undergrounding Exemption (JB0000151686, MFP19004967, 351 Union Ave NE)
Dear Mr. Shackett:
The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal
Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required
to be installed underground, pursuant to the standards of the section of RMC.
Comcast proposes to have Cannon Construction overlash approximately 426 lineal feet of new 36 count
fiber to existing Puget Sound Energy (PSE) poles beginning at the pole in the sidewalk to the west of 4102
NE 4th ST and crosses to the west side of Union Avenue NE before continuing south on Union Avenue NE
for 373 lineal feet, crossing NE 4th Street, where it will then be placed underground and continue to the
customer at 351 Union Ave NE.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(h) ii. Ordinance
5720 grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over,
below, through and across the streets, avenues and alleys of City of Renton within the right-of-way of
Renton. Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline
service providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility
service provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area
are underground, Grantee shall place its Cable System’s distribution cables underground within that area;
provided that such underground locations are actually capable of accommodating Grantee’s cable and
other equipment without technical degradation of the Cable Systems’ signal quality.
The proposal would utilize existing poles with other attached franchisee communication facilities and
overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need
to be provided for, any existing obsolete cable will need to be removed; staff recommends these as
conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast
franchise agreement which allows new overhead facilities to be placed overhead provided there are other
similar providers overhead as well.
Comcast Job JB0000151686
Page 2 of 2
October 7, 2019
DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with the Comcast Franchise Agreement.
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical
clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground
facilities in the future, at Comcast’s cost, when any one of the following events occurs: (1) any
other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed
by a franchisee within the Project Reach, in which case Comcast shall participate in the joint
use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is
made available within the Project Reach that will accommodate the aerial lines. The new
aerial lines must be undergrounded within one year, or approved otherwise by the City of
Renton Community and Economic Development Administrator or designee, from the first
event triggering the requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, October 21, 2019.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Gregg Zimmerman, PW Administrator
Jennifer Henning, Planning Director
Justin Johnson, Civil Engineer III
Scott Warlick, Engineering Specialist II
Holly Powers, Permit Technician
Franchise Permits
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP19004967
Engineering
1 Engineering General Conditions
The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at
Comcast’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case
Comcast shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or
(3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and
Economic Development Administrator or designee, from the first event triggering the requirement to underground
the aerial lines.
2 Engineering General Conditions
Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
3 Engineering General Conditions
A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
4 Engineering General Conditions
Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15’-6”.
Page 1 of 1