HomeMy WebLinkAboutMFP19005536.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP19005536
IVR Number: 19005536
Permit Informaon
Permit Name:Comcast Cable Franchise Permit
Address/Locaon :10/14/2019Application Date:3664500300Parcel Number:6627 NE 4TH ST
Permit Type:10/16/2019Issue Date:Franchise
Permit Work Class:10/15/2020Expiration Date:Minor Utility
Job Number:JB#80320 - SEFranchise Type:Cable
Description:Tie into existing stored fiber on pole, install riser to existing conduit stubbed to base of pole, pull fiber through riser
and existing underground conduit to existing h frame on private property.
Contacts
Name Address PhoneTypeBilling
Comcast Cable Communication
Management & Comcast Cable
B: (215) 665-1700Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Scott Nall
SEFNCO Communications Inc
2904 4th Ave NE
Puyallup, WA 98372
B: (877) 385-2903
C: (253) 444-9057
Contractor
Business License Number: 41108Construction Contractor: SEFNCCI850QD
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Comcast Cable Communications Management, LLC
JB#80320 - SE52XC035
Cody Shackett
253 235-7406
owen_shackett@comcast.com
15800 SE 128TH ST SE52XC035
Comcast is proposing to tie in at existing stored fiber on pole, install riser to existing
conduit stubbed to base of pole; pull fiber through riser and ~9' underground conduit to cell site h-frame.
SEFNCO Communications, Inc.
SEFNCC1850QD BLO29666
10/10/2019
MFP19005536
Nathan Janders 10/15/2019
Scott Warlick 10/16/2019
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
SE52XC035 - JB#80320
SEFNCO Communications, Inc.
Ashley Kiehn, Permit Area Manager 253 999-2271
4610 Tacoma Ave, Sumner, WA 98390
askiehn@sefnco.com
15800 SE 128TH ST
9:00 am to 3:00 pm
TBD
Reset FormPrint Form
STEFANIA SPENCER, PERMIT COORDINATOR 10-10-2019
MFP19005536
Monday - Friday 10/16/2019
Scott Warlick
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
EOP EOP EOP EOP EOP EOP EOP
EOP EOP EOP EOP EOP
EOP
EOP
FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FL FL FL FL FL FL FL FL FL FL FL FL FL FL
POLE 1
SE 128ST
34'
DRIVEWAY
DRIVEWAY
DRIVEWAY ROWROWROWROWROWROWROWROWROWROWROWROW
ROW
ROW
ROWROWROWROW
ROW
ROWROW
158TH AVE SEALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
52''&25 30 35 45 50 55
155 200 250 360 425 495 570
.10)+67&+0#.$7(('452#%'$
.'0)6*
40
305
60 65 70
780 840 10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
.#0'
9+&6*25 30 35 40 45 50 55 60 65 70
/+0+/7/6#2'4.'0)6*+0(''6.
2156'&52''&.+/+6
/2*5+6'52'%+(+%64#((+%%10641.2.#0
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OF15800 SE 128TH STRENTON, WAJB-80320TCP-11 4
5+6'016'5
MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
SIDE WALK TO REMAIN OPEN.
2'&'54+#02#6*2418+&'&9*'4'4'37+4'& AND WILL BE
MONITORED BY A SPOTTER TO INSURE FLOW AND SAFETY DURING WORK UNLESS OTHERWISE
NOTED.
COMCAST
5'6*56=241215'&914-70&'4)4170&?
%10641.6;2'
':#/2.'Ä.#0'%.1574'2'&'564+#09+6*52166'45
revisions:
date:drawn by:
date:
checked by: *
drawn by: MDD
designed by: *
10/9/2019
LIMIT
SPEED R2-1
45WORK
VEHICLE
SPOTTER*FASWORK AREA
NOTE:
PEDESTRIAN TRAFFIC WILL BE MONITORED BY A
SPOTTER TO INSURE FLOW AND SAFETY DURING
CONSTRUCTION.
NOTE:
PEDESTRIAN TRAFFIC WILL BE MONITORED BY A
SPOTTER TO INSURE FLOW AND SAFETY DURING
CONSTRUCTION.ROADWORKAHEADRIGHTLANECLOSEDAHEADCBA
SPOTTER*ROADWORKAHEADROADWORKAHEAD
MFP19005536
POLE 1
THIS IS PROPRITORY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED SEFNCO COMMUNICATIONS
PROJECT MAP:
COVER
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OF15800 SE 128TH STRENTON, WAJB-80320COVER SHEET1 4
COMCAST
COMCAST
revisions:
date:drawn by:
date:
checked by: *
drawn by: MDD
designed by: *
10/9/2019
SHEET INDEX:
1 - COVER SHEET
2 - LEGEND SHEET
3 - NOTES
4 -DESIGN
1 - TCP
PROJECT MAP:
WORK AREA
CONTACTS
SEFNCO
4610 TACOMA AVE.
SUMNER, WA 98390
253-475-0628
PROJECT DESCRIPTION*
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
=
=
=
=
=
=
=
·PLACE NEW RISER
·PROOF/PULL 24CT FIBER.
TOTAL:
34 LN FT
34 LN FT
SE52XC035
15800 SE 128TH ST
JB# 80320
COMCAST
410 VALLEY AVE
PUYALLUP, WA 98371
KYLE_KINNEY @COMCAST.COM
253-235-7018
KYLE KINNEY JEREMIAH COUSINS
J COUSINS@SEFNCO.COM
LEGEND
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OF15800 SE 128TH STRENTON, WAJB-80320LEGEND 2 4
STORM DRAIN
MANHOLE
COMMUNICATIONS
WATER
SEWER
POWER
GAS
ROW
R
PROPOSED VAULT
PROPOSED BORE PIT
STREET/SIGNAL/TRAFFIC LIGHT
CATCH BASIN
FIRE HYDRANT
EXISTING POLE W/ NEW RISER
TRAFFIC FLOW
CHANNELIZATION
(xxx') OPEN TRENCH
.25 SIDEWALKS / DRIVEWAYS
1.0 EXISTING PULL THRU
1.0 PROPOSED BORE
.50 PROPOSED OPEN TRENCH
(xxx') EXISTING PULL THRU
(xxx') BORE
SIDEWALKS / DRIVEWAYS.50 RIGHT-OF-WAY
.50 CENTERLINE
.50 TRAFFIC LANE
.25 FENCE
D
CB
S C
.25 GAURD RAIL
.50 AERIAL STRAND
LEGEND
V
U U U U U U U U U
S
W
P
C
G
D
EOP .25 EDGE OF PAVEMENT
POLE
AERIAL STRAND
OVERLASH 1.0 OVERLASH
COMCAST
RE-CLAIMED WATERWF
CONSTRUCTION NOTE
EXISTING VAULT V
BUILDING OUTLINE
POTHOLE LOCATION
PROPOSED PEDESTALP
P EXISTING PEDESTAL
revisions:
date:drawn by:
date:
checked by: *
drawn by: MDD
designed by: *
10/9/2019
MH
NOTES & LEGEND
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OF15800 SE 128TH STRENTON, WAJB-80320NOTES3 4
FIBER PLACEMENT NOTES:GENERAL NOTES:
DISCLAIMER:
1.IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAY
BEFORE CONSTRUCTION IS TO BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN
THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY.
2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE
BEEN FIELD LOCATED.
3.ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTION
AND IS COLLECTED IN THE AS-BUILT PHASE.
1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY
SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY.
2.CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP
AND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECT
COMPLETION.
3.SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER,
REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESS
ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED.
4.FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE
CASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND.
5.CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM
PRODUCTS.
6.A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED.
7.ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE
LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER.
8.ALL RISERS WILL BE CAPPED AT ALL TIMES.
9.ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, AND
BLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER.
1. ALL VAULTS / HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS.
2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION.
3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS
SPECIFIED OTHERWISE.
4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS,
AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET.
5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY
OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.
6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE
REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD
SPECIFICATIONS.
7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON
BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES
WITH BUILDING MANAGEMENT.
8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO
CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s).
9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEING
PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT
BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE
REWORK AT HIS OWN COST.
10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT
PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER.
11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN
ALLOWED (9AM-3PM) BUSINESS HOURS.
12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE
CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED.
13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE
SHOULD BE ANTICIPATED. ADJUST AS NEEDED.
14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR
ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THE
MINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVE
OR APPROVED EQUIVALENT.
15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS,
NOT FIELD VERIFIED.
16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS.
17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED.
18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION.
19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANE
CLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BE
COORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING.
20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERE
SHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BE
NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE
CLOSURES.COMCAST
revisions:
date:drawn by:
date:
checked by: *
drawn by: MDB
designed by: *
10/9/2019
EOP EOP EOP EOP EOP EOP EOP EOP
EOP EOP EOP EOP EOP
EOP
EOP
FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FL FL FL FL FL FL FL FL FL FL FL FL FL
POLE 1
SE 128ST
34'
DRIVEWAY
DRIVEWAY
DRIVEWAYROW ROWROWROWROWROWROWROWROWROWROWROWROW
ROW
ROW
ROWROW
ROW
ROW
ROW
158TH AVE SE"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OF15800 SE 128TH STRENTON, WAJB-80320DESIGN4 4
COMCAST
revisions:
date:drawn by:
date:
checked by: *
drawn by: MDD
designed by: *
10/9/2019
TIE IN TO EXISTING VAULT.
CONTINUE TO PRIVATE.
PROOF/PULL THRU NEW DOWN RISER
24CT FIBER.
END OF ROW DESIGN.
MFP19005536