Loading...
HomeMy WebLinkAboutERC_Determination_Agency_Ltr_191018 Enclosure cc: King County Wastewater Treatment Division Ramin Pazooki, WSDOT, NW Region Boyd Powers, Department of Natural Resources Larry Fisher, WDFW Karen Walter, Fisheries, Muckleshoot Indian Tribe Duwamish Tribal Office Melissa Calvert, Muckleshoot Cultural Resources Program US Army Corp. of Engineers Stephanie Jolivette, Office of Archaeology & Historic Preservation Washington State Department of Ecology October 18, 2019 Washington State Department of Ecology Environmental Review Section PO Box 47703 Olympia, WA 98504-7703 Subject: ENVIRONMENTAL (SEPA) THRESHOLD DETERMINATION Transmitted herewith is a copy of the Environmental Determination for the following project reviewed by the Environmental Review Committee (ERC) on October 14, 2019: SEPA DETERMINATION: Determination of Non-Significance - Mitigated (DNS-M) PROJECT NAME: Family First Community Center PROJECT NUMBER: LUA19-000212, SA-A, CU-H, ECF, V-A, MOD Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on November 1, 2019, together with the required fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057. Appeals to the Examiner are governed by RMC 4-8-110 and information regarding the appeal process may be obtained from the City Clerk’s Office, (425) 430-6510. Please refer to the enclosed Notice of Environmental Determination for complete details. If you have questions, please call me at (425) 430-7289. For the Environmental Review Committee, Clark H. Close Senior Planner DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF ENVIRONMENTAL DETERMINATION ISSUANCE OF A DETERMINATION OF NON-SIGNIFICANCE - MITIGATED (DNS-M) POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION DNSM: THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC) HAS DETERMINED THAT THE PROPOSED ACTION HAS PROBABLE SIGNIFICANT IMPACTS THAT CAN BE MITIGATED THROUGH MITIGATION MEASURES. DATE OF NOTICE OF ENVIRONMENTAL DETERMINATION: October 18, 2019 PROJECT NAME/NUMBER: PR18-000336 Family First Community Center / LUA19-000212, SA-A, CU-H, ECF, V-A, MOD PROJECT LOCATION: 16022 116th Ave SE, Renton, WA 98058 APPLICANT/PROJECT CONTACT PERSON: Meredith Everist, Baylis Architects / 10801 Main Street, #110, Bellevue, WA 98004 / everistm@baylisarchitects.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2kzfAao PROJECT DESCRIPTION: The applicant is requesting Administrative Site Plan Review, Hearing Examiner Conditional Use Permit review, Height Variance, Driveway Design Modification, Street Modification and Waiver, and Environmental (SEPA) Review to construct a community center at 16022 116th Ave SE (APN 2823059034). The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School and associated improvements. The proposed 21,110 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, and childcare for facility users. Access to the new facility would be provided via an existing driveway at the south end of the property. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school. No critical areas were identified on the site. Construction is expected to begin in May 2020 and end in July 2021. Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on November 1, 2019, together with the required fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057. Appeals to the Examiner are governed by City of RMC 4-8-110 and information regarding the appeal process may be obtained from the Renton City Clerk’s Office, (425) 430-6510. PUBLIC HEARING: A public hearing is tentatively scheduled for November 19, 2019 at 11:00 AM before the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of Renton City Hall, located at 1055 South Grady Way. If the Environmental Determination is appealed, the appeal will be heard as part of this public hearing. NOTICE DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT SIGNATURES: Gregg Zimmerman, Administrator Public Works Department Date Rick M. Marshall, Administrator Renton Regional Fire Authority Date Kelly Beymer, Administrator Community Services Department Date C.E. Vincent, Administrator Date Department Of Community & Economic Development ENVIRONMENTAL (SEPA) DETERMINATION OF NON-SIGNIFICANCE - MITIGATED (DNS-M) PROJECT NUMBER: LUA19-000212, SA-A, CU-H, ECF, V-A, MOD APPLICANT: Russ Woodruff, City of Renton, 1055 S Grady Way, Renton, WA 98057 PROJECT NAME: Family First Community Center PROJECT DESCRIPTION: The applicant is requesting Administrative Site Plan Review, Hearing Examiner Conditional Use Permit review, Height Variance, Driveway Design Modification, Street Modification and Waiver, and Environmental (SEPA) Review to construct a community center at 16022 116th Ave SE (APN 2823059034). The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School and associated improvements. The proposed 21,110 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, and childcare for facility users. Access to the new facility would be provided via an existing driveway at the south end of the property. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school. No critical areas were identified on the site. Construction is expected to begin in May 2020 and end in July 2021. PROJECT LOCATION: 16022 116th Ave SE, Renton, WA 98056 LEAD AGENCY: City of Renton Environmental Review Committee Department of Community & Economic Development The City of Renton Environmental Review Committee has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). Conditions were imposed as mitigation measures by the Environmental Review Committee under their authority of Section 4-9-070D Renton Municipal Code. These conditions are necessary to mitigate environmental impacts identified during the environmental review process. Because other agencies of jurisdiction may be involved, the lead agency will not act on this proposal for fourteen (14) days. Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on November 1, 2019. Appeals must be filed in writing together with the required fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057. Appeals to the Examiner are governed by RMC 4-8-110 and more information may be obtained from the Renton City Clerk’s Office, (425) 430-6510. PUBLICATION DATE: October 18, 2019 DATE OF DECISION: October 14, 2019 DocuSign Envelope ID: 28C409A9-F5AA-448B-8873-F3931CE67FA8 10/15/2019 | 12:21 PM PDT 10/15/2019 | 12:10 PM PDT 10/15/2019 | 10:33 AM PDT 10/15/2019 | 9:51 AM PDT DETERMINATION OF NON-SIGNIFICANCE – MITIGATED (DNS-M) MITIGATION MEASURES AND ADVISORY NOTES PROJECT NUMBER: PR18-000336/LUA19-000212 APPLICANT: Meredith Everist, Baylis Architects, 10801 Main St, #110, Bellevue, WA 98004, everistm@baylisarchitects.com PROJECT NAME: Family First Community Center PROJECT DESCRIPTION: The applicant is requesting Administrative Site Plan Review, Hearing Examiner Conditional Use Permit review, Height Variance, Driveway Design Mod ification, Street Modification and Waiver, and Environmental (SEPA) Review to construct a community center at 16022 116th Ave SE (APN 2823059034). The existing site is zoned Residential -6 (R-6) and is currently occupied by Cascade Elementary School and associated improvements. The proposed 21,110 square foot one-story community center would be open to the general public and would offer services such as after school programs and activities, health care offices with labs, counseling services, and childcare fo r facility users. Access to the new facility would be provided via an existing driveway at the south end of the property. Site improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school. No critical areas were identified on the site. Construction is expected to begin in May 2020 and end in July 2021. PROJECT LOCATION: 16022 116th Ave SE, Renton, WA 98056 LEAD AGENCY: The City of Renton Department of Community & Economic Development Planning Division MITIGATION MEASURES: 1. The project construction shall comply with the recommendations found in the submitted Geotechnical Engineering Report, prepared by The Riley Group, Inc. (RGI), dated Jue 8, 2018, and future addenda. ADIVISORY NOTES: The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal process for the land use actions. DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: October 10, 2019 TO: Clark Close, Senior Planner FROM: Brianne Bannwarth, Development Engineering Manager SUBJECT: Utility and Transportation Comments for Family First Community Center 16022 116th Avenue SE LUA19-000212 I have reviewed the application for the Family First Community Center at 16022 116th Avenue SE (APN 2823059034). The project proposes to construct a 27,000 square foot recreational center with 120 surface parking stalls. The following are the civil review comments for the proposed project: EXISTING CONDITIONS The site is approximately 14.9 acres in size and is rectangular in shape. Cascade Elementary School with associated parking lot resides on the west portion of existing property and the remaining portion is open fields with lawn. Water Water service is provided by Soos Creek Water and Sewer District. Sewer Wastewater service is provided by the Soos Creek Water and Sewer District. Storm There is an existing storm drainage system in 116th Avenue SE. Stormwater runoff from the existing site consists of surface, shallow, and piped flow to the existing biofiltration swale located on the south side of the site, which then discharges to the existing stormwater system at the southeast corner of the site as defined by the project Technical Information Report dated August 22, 2019 prepared by Coughlin Porter Lundeen. Streets 116th Avenue SE is a Minor Arterial Street with an existing right of way (ROW) width of 60 feet as measured using the King County Assessor’s Map. The pavement width is 35 feet (two 11-foot lanes with 7 foot shoulder on the west side of the roadway) with a 0.5-foot curb, 6-foot planter strip, and 5-foot sidewalk on the west side of the roadway. Family First Community Center – LUA19-000212 Page 2 of 6 October 10, 2019 CODE REQUIREMENTS WATER 1. Please obtain a water availability certificate from Soos Creek Water and Sewer District and provide it with the construction permit submittal. 2. Review of the water plans will be conducted by Soos Creek Water and Sewer District and the Renton Regional Fire Authority. 3. Plans approved by Soos Creek Water and Sewer District shall be routed to the City for final review prior to permit issuance. SEWER 1. Please obtain a sewage availability certificate from Soos Creek Water and Sewer District and provide it with the construction permit submittal. 2. Review of the sewage plans will be conducted by Soos Creek Water and Sewer District. 3. Plans approved by Soos Creek Water and Sewer District shall be routed to the City for final review prior to permit issuance. SURFACE WATER 1. A geotechnical report, dated June 8, 2018, completed by Riley Group, Inc. for the site has been provided. Erosion control measures will need to be in place prior to starting grading activities on the site. The report discusses the soil and groundwater characteristics of the site including a very brief discussion regarding the infiltration potential and provide recommendations for project design and construction. The report notes that the site is underlain by up to 11 feet of fill material. Geotechnical recommendations presented need to be address within the project plans. 2. A Preliminary Drainage Plan and Technical Information Report (TIR), dated August 22, 2019, was submitted by Coughlin Porter Lundeen with the Land Use Application. Based on the City of Renton’s flow control map, the site falls within the Flow Control Duration Standard area matching Forested Site Conditions and is within the Lower Cedar River Drainage Basin. The development is subject to Full Drainage Review in accordance with the 2017 Renton Surface Water Design Manual (RSWDM). All nine core requirements and five out of the six special requirements discussed in the Technical Information Report. a. Discharge at the Natural Location, RSWDM Core Requirement #1: The existing project site’s surface water discharges to an existing conveyance system located at the southeast portion of the site. The surface water is then directed to the storm drainage system within the adjacent residential neighborhood. b. Off-site Analysis, RSWDM Core Requirement #2: The project off-site analysis evaluated the upstream and downstream area. The analysis identified that there were no downstream concerns. c. Flow Control, RSWDM Core Requirement #3: The proposed detention system shall be designed in accordance with the RSWDM that is current at the time of civil construction permit application. Separate structural plans will be required to be submitted for review and approval under a separate building permit for the detention system ensuring that system can withstand fire truck loading. Special inspection from the building department is required. The project proposes two Family First Community Center – LUA19-000212 Page 3 of 6 October 10, 2019 proprietary detention Stormtech Chamber system (SC-310 and MC-3500) to address the flow control requirements. The following are items that will need to be addressed as part of the Civil Construction Permit Application: i. In accordance with the Flow Control Duration Standard Matching Forested Site Conditions, the developed mitigated 2-year and 10-year peak flow rates shall match the pre-developed (forested) 2-year and 10- year peak flow rates. Additionally, the developed mitigated flow duration extending from 50% of the 2-year to the full 50-year flow must match the pre-developed (forested) condition. ii. Targeted area not able to be routed to the detention vault shall be modeled as bypass area (i.e. unmitigated flow directed to the projects downstream point of compliance). This includes the slope area that is surrounding the parking lot on the east side of the development. iii. Lid and access panels for the detention vault shall be located outside of the ADA paths and stalls. iv. Applicant shall provide flow control model calculations to verify that the storage volume proposed can adequately mitigate created flows. d. Conveyance, RSWDM Core Requirement #4: All new conveyance systems constructed as part of the project must be sized to RSWDM standards for the total tributary area (onsite and offsite) that the storm systems serve. i. Pipe connects into the proposed structures shall be evaluated for constructability as part of the Civil Construction Permit Applications. Details of structure connections shall be provided. e. Core Requirements #5 through #7: Core Requirements shall be fully addressed as part of the Civil Construction Permit Application. f. Water Quality, RSWDM Core Requirement #8: Based on the commercial use of the project, Enhanced Basic Water Quality Treatment is required. The project proposes to use two proprietary system to meet the water quality assessment. One of the system will replace the existing bioretention swale providing water quality for the existing site impervious area. The second will be downstream of the proposed detention system for the proposed improvements. i. Applicant shall provide model calculations showing the required volume to be treated by the water quality facilities, per Core Requirement 8. . g. Onsite BMPs, RSWDM Core Requirement #9: Appropriate on-site BMPs will be required to help mitigate the new runoff created by this development. A preliminary drainage plan, including the application of on-site BMPs, has been included with the land use application. Infiltration has been determined to be infeasible based on the fill material on site, therefore, the project proposes to implement non-infiltrative bioretention, soil quality preservation, and vegetated roof to meet this requirement. The final drainage plan and drainage report must be submitted with the civil construction permit application. i. Final evaluation of the application of on-site BMPs to the maximum extent feasible will be completed during civil construction permit review. The applicant may be required to apply additional on-site BMPs in order to meet the minimum requirements outlined in Core Requirement #9. ii. Non-infiltrative bioretention (bioretention with underdrain) does not meet the requirements of Core Requirement #9, unless approved via an Family First Community Center – LUA19-000212 Page 4 of 6 October 10, 2019 adjustment per Section 1.4 of the RSWDM that, at minimum, addresses comparable hydraulic performance, water quality concerns, and maintainability. iii. Permeable pavement is deemed infeasible in the TIR, yet the design plans call out pervious concrete parking stalls. h. Aquifer Protection Area, RSWDM Special Requirement #6: The existing site is outside of the City’s Aquifer Protection Area, however, the Technical Information Report shall be revised as part of the Civil Construction Permit Application to address this requirement. 3. The current City of Renton Surface Water Standard Plans that shall be used in all drainage submittals are available online at the City of Renton website. 4. A Construction Stormwater General Permit from Department of Ecology will be required since grading and clearing of the site exceeds one acre. A Stormwater Pollution Prevention Plan (SWPPP) is required for this site. 5. Surface water system development fee is $0.720 per square foot of new impervious surface, but not less than $1,800.00. This is assessed based on the final approved civil construction plans and payable prior to issuance of the construction permit. TRANSPORTATION 1. The transportation impact fee that is current at the time of building permit application will be levied, payable at issuance of building permit. 2. The proposed development fronts along 116th Avenue SE, a Minor Arterial street. Existing right-of-way (ROW) width is approximately 60 feet. The City’s Transportation Division has established a corridor plan for this section of 116th Ave SE. The corridor determined by the City’s Transportation Division which supports recommendations in the Benson Hill Community Plan, requires a right-of-way width of 71-ft. The paved roadway section is 44- ft, consisting of two 11-ft travel lanes, one 12-ft center turn lane, and two 5-ft bike lanes. A 0.5-ft vertical curb, 8-ft planter and 5-ft sidewalk are required along each side of the roadway. Dedication of 5.5-ft of right-of-way would be required. a. The applicant submitted a waiver request as part of the land use application to maintain the existing roadway improvements fronting the subject property. Community and Economic Development Staff in conjunction with Pubic Works Transportation staff have reviewed the street waiver request. Staff recommends approval of the waiver given that the existing street section meets the transportation needs for connectivity, pedestrian access, and separation between vehicular and pedestrian movements. Staff does recommend a condition of approval to dedicate the required 5.5-feet right of way required to complete the proposed corridor plan and upgrading all of the existing driveway curb ramps along the west property line to meet current ADA requirements. 3. Transportation Engineering NorthWest (TENW) provided a transportation memorandum dated February 13, 2019. The site generated traffic volumes were calculated using data from the Institute of Transportation Engineers (ITE) Trip Generation Manual, 10th Edition, (2017). The TIA evaluated traffic operations at seven intersections around the site. The intersections evaluated during the PM Peak Hour were: a. 116th Avenue SE / S Puget Drive / Royal Hills Drive SE b. 116th Avenue SE / SE 22nd Street c. 116th Avenue SE / SE 164th Street Family First Community Center – LUA19-000212 Page 5 of 6 October 10, 2019 d. 116th Avenue SE / SE Petrovitsky Road e. 116th Avenue SE / Project North Driveway (AM Peak Hour as well) f. 116th Avenue SE / Project Center Shared Site Driveway (AM Peak Hour as well) g. 116th Avenue SE / Project South Shared Site Driveway (AM Peak Hour as well) The intersections were evaluated using Level of Service (LOS) methodology under existing conditions, existing plus project conditions, and project opening year conditions. LOS evaluation was done in accordance with the industry standard 2010 Highway Capacity Manual (HCM). Study intersections were visited by Idax Data Solutions in May 2018 during the AM and PM Peak periods. Traffic counts were done between 7:00 AM and 9:00 AM and between 4:00 PM and 6:00 during the weekday. From this data, existing LOS was determined for each intersection. The report concludes that in the existing condition, each intersection operates at LOS D or better. It was noted that the circulation of pedestrians and vehicles during the peak arrival and dismissal periods are not operating efficiently. Project trip generation was completed using the 10th Edition of the Institute of Transportation Engineers (ITE) trip generation manual. The 10th Edition of the ITE manual is the industry and City standard for determining trip generation. The Recreational Community Center use (Code 495) and Clinic use (Code 630) were used for the proposed trip generation. The Family First Community Center is projected to generate approximately 46 AM net new AM peak hour trips, 54 PM peak hour trips, and 669 net new daily trips. New trip distribution was projected for the AM and PM peak hours. Trips were assigned to the existing City streets at the study intersections based on field observations by TENW and the proposed configuration of the parking lot and site circulation. City staff has reviewed the trip generation and trip assignment and found that the tables in the report do not match the tables referenced in the Attachments. Please reconcile values and provide updated impact fee calculations based on the actual trip values. Using the trip assignments, the LOS for the existing plus project conditions was determined for each intersection. The report concludes that in the existing plus project condition, the signalized, unsignalized intersection, and the minor street driveway approaches are projected to operate at acceptable LOS. The report identifies several recommendations related to the arrival and dismissal periods to help with circulation including:  Restricting parent’s drop-off/pick-up operations on-site within the existing southern parking lots,  Reconfiguring the parking lot to provide more perpendicular parking and “by- pass” lane to accommodate peak dismissal periods, and  Consolidate the central drive providing a more elongated on-site queuing area. City staff is in support of the recommendations identified in the Transportation Impact Analysis. Family First Community Center – LUA19-000212 Page 6 of 6 October 10, 2019 Driveway sight distance was evaluated at the two existing site driveways (center and south driveways) are anticipated to meet minimum AASHTO entering and stopping sight distance requirements. 4. ADA access ramps shall be installed at all street crossings. Ramps shall be shown at each intersection. Ramps shall be oriented to provide direct pedestrian crossings. 5. The project exceeds 5,000 square feet of new additional building, therefore, street lighting will be required along 116th Avenue SE as per RMC 4-6-060. 6. If frontage improvements are required, undergrounding of utilities along 116th Avenue SE will be required as per the requirements of RMC 4-6-090. 7. Paving and trench restoration within the City of Renton right of way shall comply with the City’s Restoration and Overlay requirements. The document is available at https://edocs.rentonwa.gov/Documents/0/edoc/1074326/Trench%20Restoration%20a nd%20Street%20Overlay%20Requirements.pdf. 8. Parking lot construction shall be in accordance with City code 4-4-80G.Street lighting and street trees are required to meet current city standards. Lighting plans are required to be submitted with the land use application and will be reviewed during the construction utility permit review. 9. Transportation Concurrency under separate cover. GENERAL COMMENTS 1. All existing and proposed utility lines (i.e. electrical, phone, and cable services, etc.) along property frontage or within the site must be underground. The construction of these franchise utilities must be inspected and approved by a City of Renton inspector. 2. Maximum exposed retaining wall height is 6-ft and shall be setback a minimum of 3-ft from the right-of-way as outlined in RMC 4-4-040 – Fences, Hedges and Retaining Walls. 3. Adequate separation between utilities as well as other features shall be provided in accordance with code requirements. a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other utilities is required with the exception of water lines which require 10-ft horizontal and 1.5-ft vertical. b. The stormwater line should be minimum 5 feet away from any other structure or wall or building. c. Trench of any utility should not be in the zone of influence of the retaining wall or of the building. 4. A civil construction permit for the site, utility and street improvements will require a separate plan submittal. Civil construction plans shall conform to the City Renton Drafting Standards. A licensed Civil Engineer shall prepare the civil plans. Please visit the City’s website for submittal requirements: https://rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=9687014 5. A landscaping plan shall be included with the civil plan submittal. Each plan shall be on separate sheets. 6. Fees quoted in this document reflect the fees applicable in the year 2019 only and will be assessed based on the fee that is current at the time of the permit application or issuance, as applicable to the permit type. Please visit www.rentonwa.gov for the current development fee schedule. 7. * An additional 5% technology fee will be added to each fee marked with an asterisk (*). DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 2 LUA19-000212 ADVISORY NOTES TO APPLICANT The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal process for the land use action. Planning: (Contact: Clark H. Close, 425-430-7289, cclose@rentonwa.gov) 1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise approved by the Development Services Division. 2. Commercial and other nonresidential construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. 3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an appropriate ground cover over any portion of the site that is graded or cleared of vegetation and where no further construction work will occur within ninety (90) days. Alternative measures such as mulch, sodding, or plastic covering as specified in the current King County Surfac e Water Management Design Manual as adopted by the City of Renton may be proposed between the dates of November 1st and March 31st of each year. The Development Services Division’s approval of this work is required prior to final inspection and approval of the permit. 4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is being cleared. 5. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or fluids, operate any equipment, install impervious surfaces, or compact the earth in any way within the area defined by the drip line of any tree to be retained. 6. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected Trees” or on each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or groups of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the applicant shall provide supervision whenever equipment or trucks are moving near trees. 7. This permit is shall comply with the Bald and Golden Eagle Protection Act. The permitted is responsible for adhering to the U.S. Fish and Wildlife Service National Bald Eagle Management Guidelines (2007) and /or your U.S. Fish and Wildlife Service permit. Development Engineering: (Contact: Justin Johnson, 425-430-7291, jtjohnson@rentonwa.gov) 1. See Attached Development Engineering Memo dated October 10, 2019. Fire Authority: (Contact: Corey Thomas, 425-430-7024, cthomas@rentonwa.gov) Environmental Impact Comments: 1. Fire impact fees are applicable at the rate of $2.36 per square foot. This fee is paid at time of building permit issuance. ADVISORY NOTES TO APPLICANT Page 2 of 2 LUA19-000212 Fire Code Related Comments: 1. The preliminary fire flow is 2,750 gpm. A minimum of three fire hydrants are required. One within 150- feet and two others within 300-feet of the building. One hydrant is required within 50-feet of the fire department connection for the sprinkler system. A certificate from Soos Creek Water is required. A looped water main is required around the building as fire flow exceeds 2,500 gpm. 2. Approved fire sprinkler and fire alarm systems are required throughout the building. Direct outside access is required to the fire sprinkler riser room. Fire alarm system is required to be fully addressable and full detection is required. Separate plans and permits required by the fire department. 3. Fire department apparatus access roadways are required within 150 -feet of all points on the buildings. Fire access roads are required to be a minimum of 20-feet unobstructed width with turning radius of 25-feet inside and 45-feet outside minimum. Fire lane signage required for the onsite roadways. Roadways shall support a minimum of a 30-ton vehicle and 75-psi point loading. Technical Services: (Contact: Amanda Askren, 425-430-7369, aaskren@rentonwa.gov) 1. No comments at this time. Community Services: (Contact: Leslie Betlach, 425-430-6619, lbetlach@rentonwa.gov) 1. Parks Impact fee per Ordinance 5670 applies. Police: (Contact: Cyndie Parks, 425-430-7521, cparks@rentonwa.gov) 1. No comments at this time. Building: (Contact: Craig Burnell, 425-430-7290, cburnell@rentonwa.gov) 1. Recommendations of the geotechnical report must be followed as a condition of building permits.