HomeMy WebLinkAboutERC_Determination_Applicant_Ltr_191018
October 18, 2019
Meredith Everist
Baylis Architects
10801 Main Street, #110
Bellevue, WA 98004
SUBJECT: ENVIRONMENTAL THRESHOLD (SEPA) DETERMINATION
Family First Community Center, LUA19-000212, SA-A, CU-H, ECF, V-A, MOD
Dear Ms. Everist:
This letter is written on behalf of the Environmental Review Committee (ERC) to advise you that they
have completed their review of the subject project and have issued a threshold Determination of Non-
Significance-Mitigated with Mitigation Measures. Please refer to the enclosed ERC Report, for a list of
the Mitigation Measures.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on
November 1, 2019, together with the required fee with: Hearing Examiner, City of Renton, 1055 South
Grady Way, Renton, WA 98057. Appeals to the Examiner are governed by RMC 4 -8-110 and more
information regarding the appeal process may be obtained from the Renton City Cler k’s Office, (425)
430-6510.
Also, a public hearing has been scheduled by the Hearing Examiner in the Council Chambers on the
seventh floor of City Hall on November 19, 2019 at 11:00 am to consider the Conditional Use Permit.
The applicant or representative(s) of the applicant is required to be present at the public hearing. A
copy of the staff recommendation will be available online prior to the hearing. Hard copies of the
report are also available for purchase upon request at a copying charge of $0.15, 8½ x 11 per page. The
estimated cost for the Hearing Examiner Report is $9.00, plus a handling and postage cost of $2.00. If
the Environmental Determination is appealed, the appeal will be heard as part of this public hearing.
If you have any questions or desire clarification of the above, please call me at (425) 430-7289.
Family First Community Center, LUA19-000212
October 18, 2019
Page 2 of 2
For the Environmental Review Committee,
Clark H. Close
Senior Planner
Enclosure
cc: Renton School District / Owner
Russ Woodruff / Applicant
Binkley, Brokx, Carbajal, Cornwall, Cummings, Duncan, Edgar, Engelhardt, Gustaves, Helmick, Iverson, Le, Lee, Maxwell, Meyer,
Noonan, O’Halloran, Osborne, Palosaari, Parker, Phillips, Schaewe, J. Seil, C. Seil, B. Spangler, P. Spangler, Thomas, Thomps on,
Vu, Woods / Parties of Record
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF ENVIRONMENTAL DETERMINATION
ISSUANCE OF A DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION
DNSM: THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC) HAS DETERMINED THAT THE PROPOSED
ACTION HAS PROBABLE SIGNIFICANT IMPACTS THAT CAN BE MITIGATED THROUGH MITIGATION MEASURES.
DATE OF NOTICE OF ENVIRONMENTAL
DETERMINATION:
October 18, 2019
PROJECT NAME/NUMBER: PR18-000336 Family First Community Center /
LUA19-000212, SA-A, CU-H, ECF, V-A, MOD
PROJECT LOCATION: 16022 116th Ave SE, Renton, WA 98058
APPLICANT/PROJECT CONTACT PERSON: Meredith Everist, Baylis Architects / 10801 Main Street, #110, Bellevue, WA
98004 / everistm@baylisarchitects.com
LOCATION WHERE APPLICATION MAY BE
REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also http://bit.ly/2kzfAao
PROJECT DESCRIPTION: The applicant is requesting Administrative Site Plan Review, Hearing Examiner
Conditional Use Permit review, Height Variance, Driveway Design Modification, Street Modification and Waiver, and
Environmental (SEPA) Review to construct a community center at 16022 116th Ave SE (APN 2823059034). The existing
site is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary School and associated improvements.
The proposed 21,110 square foot one-story community center would be open to the general public and would offer
services such as after school programs and activities, health care offices with labs, counseling services, and childcare for
facility users. Access to the new facility would be provided via an existing driveway at the south end of the property. Site
improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the school. No critical
areas were identified on the site. Construction is expected to begin in May 2020 and end in July 2021.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on November 1, 2019,
together with the required fee with: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057.
Appeals to the Examiner are governed by City of RMC 4-8-110 and information regarding the appeal process may be
obtained from the Renton City Clerk’s Office, (425) 430-6510.
PUBLIC HEARING: A public hearing is tentatively scheduled for November 19, 2019 at 11:00 AM
before the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of Renton City Hall, located at 1055
South Grady Way. If the Environmental Determination is appealed, the appeal will be heard as part of this public hearing.
NOTICE
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Project Location Map
SR_ERC_FFCC_LUA19-000212_v1
ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC Meeting Date: October 14, 2019
Project File Number: PR18-000336
Project Name: Family First Community Center
Land Use File Number: LUA19-000212, SA-A, CU-H, ECF, V-A, MOD
Project Manager: Clark H. Close, Senior Planner
Owner: Renton School District, 300 SW 7th St, Renton, WA 98057
Applicant: Russ Woodruff, City of Renton, 1055 S Grady Way, Renton, WA 98057
Contact: Meredith Everist, Baylis Architects, 10801 Main St, #110, Bellevue, WA 98004
Project Location: 16022 116th Ave SE, Renton, WA 98056
Project Summary: The applicant is requesting Administrative Site Plan Review, Hearing Examiner
Conditional Use Permit review, Height Variance, Driveway Design Modification,
Street Modification and Waiver, and Environmental (SEPA) Review to construct
a community center at 16022 116th Ave SE (APN 2823059034). The existing site
is zoned Residential-6 (R-6) and is currently occupied by Cascade Elementary
School and associated improvements. The proposed 21,110 square foot one-
story community center would be open to the general public and would offer
services such as after school programs and activities, health care offices with
labs, counseling services, and childcare for facility users. Access to the new
facility would be provided via an existing driveway at the south end of the
property. Site improvements would also include 90 new onsite parking spaces
and 29 shared parking spaces with the school. No critical areas were identified
on the site. Construction is expected to begin in May 2020 and end in July 2021.
Exist. Bldg. Area SF: 45,701 SF Proposed New Bldg. Area 21,100 SF
Site Area: 648,141 SF (14.9 acres) Total Building Area GSF: 66,801 SF
STAFF
RECOMMENDATION:
Staff Recommends that the Environmental Review Committee issue a
Determination of Non-Significance - Mitigated (DNS-M).
SE 160th St
SE 162nd St
SE 160th St 120th Ave SE 119th Ave SE SE 163rd St 121st Ave SE SE 162th St 116th Ave SE 114th Ave SE SE 161st St 122nd Ave SE DocuSign Envelope ID: 28C409A9-F5AA-448B-8873-F3931CE67FA8
City of Renton Department of Community & Economic Development
Family First Community Center
Staff Report to the Environmental Review Committee
LUA19-000212, SA-A, CU-H, ECF, V-A, MOD
Report of October 14, 2019 Page 2 of 8
SR_ERC_FFCC_LUA19-000212_v1
PART ONE: PROJECT DESCRIPTION / BACKGROUND
The applicant, City of Renton, is requesting Administrative Site Plan Review, Environmental (SEPA) Review, Hearing
Examiner Conditional Use Permit review, Height Variance, Street Modification and Waiver, and Driveway Design
Modification to construct a community center (Family First Community Center) at 16022 116th Ave SE (Exhibits 2-4).
The rectangular shaped property is owned by Renton School District (RSD) and is bound by an easement for two
interstate high pressure natural gas transmission pipelines operated by Williams – Northwest Pipeline to the north
(Exhibit 19), 116th Ave SE to the west and single-family residences to the east and south (Exhibit 18).
The project site was first developed as Cascade Elementary School (CES) in 1964 and was later replaced in 1995 with
the current structure (Exhibit 14). The parcel also includes supplemental portable classrooms, related play areas,
parking, and mechanical equipment. The other government facility is proposed on the south portion of the lot. RSD
will also be requesting to subdivide the 14.88-acre school property to create a separate 2.72-acre parcel for the
community center. The parcel is located in the Benson Community Planning Area and has a comprehensive plan
designation of Residential Medium Density (MD) and is zoned Residential-6 (R-6). The existing elementary school
would remain and the biofiltration swale and associated storm piping would be removed to accommodate a new
Modular Wetland System. The proposed 21,110 square foot one-story community center would be open to the
general public and would offer services such as after school programs and activities, health care offices with labs,
counseling services, childcare for facility users, community garden and demonstration kitchen, lunch room, locker
rooms, gym, and fitness programs.
The large parcel has an overall elevation drop of 13 feet from the northwest corner to the southeast corner of the
site. Access to the new facility would be provided via an existing driveway at the south end of the property off 116th
Ave SE and ingress and egress improvements would be completed on the next adjacent driveway to the north for
two-way traffic plus a proposed Bus Only lane. Site improvements would also include 90 new onsite parking spaces
and 29 shared parking spaces with the school in front of the proposed community center. A minimum 10-foot wide
fully sight-obscuring landscape visual barrier would be provided along the south property line within the
construction limits. No critical areas were identified on the site. The applicant is proposing to remove eight (8)
significant trees on the existing parcel.
The applicant is also requesting a variance to the maximum building height in the R-6 zone to 31’-3” to primarily
accommodate the gymnasium use with sport courts. In addition, the applicant is requesting a street modification
and waiver to retain the existing frontage improvements and a driveway design modification to allow modifications
to the maximum driveway width to minimize existing traffic impacts. The proposed driveway re-configuration would
consist of a 24-foot wide driveway for two-way load/unload traffic, a 14-foot wide driveway for Bus Only access
lane, and an approximately 11-foot wide island that separates these two access points. Construction of the Family
First Community Center is expected to begin in May 2020 and end in July 2021. The applicant submitted a
Geotechnical Engineering Report, a Phase One Environmental Site Assessment, a Technical Information Report, a
Tree Inventory & Retention Plan, and a Traffic Impact Study.
PART TWO: ENVIRONMENTAL REVIEW
In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those project
impacts that are not adequately addressed under existing development standards and environmental regulations.
A. Environmental Threshold Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials:
Issue a DNS-M with a 14-day Appeal Period.
DocuSign Envelope ID: 28C409A9-F5AA-448B-8873-F3931CE67FA8
City of Renton Department of Community & Economic Development
Family First Community Center
Staff Report to the Environmental Review Committee
LUA19-000212, SA-A, CU-H, ECF, V-A, MOD
Report of October 14, 2019 Page 3 of 8
SR_ERC_FFCC_LUA19-000212_v1
B. Mitigation Measures
1. The project construction shall comply with the recommendations found in the submitted Geotechnical
Engineering Report, prepared by The Riley Group, Inc. (RGI), dated June 8, 2018, and future addenda.
C. Exhibits
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: Site Plan
Exhibit 3: Overall Site Plan
Exhibit 4: Neighborhood Detail Map
Exhibit 5: Topographic & Boundary Survey
Exhibit 6: Landscape Plans
Exhibit 7: Arborist Report, prepared by Ian Gray, City of Renton Urban Forestry & Natural
Resources Manager, dated August 26, 2019
Exhibit 8: Tree Retention Plan
Exhibit 9: Irrigation Plans
Exhibit 10: Lighting Plan
Exhibit 11: Technical Information Report, prepared by Coughlin Porter Lundeen, dated August 22,
2019
Exhibit 12: Civil Drawings, prepared by Coughlin Porter Lundeen, dated September 6, 2019
Exhibit 13: Geotechnical Report, prepared by The Riley Group, Inc., dated June 8, 2018
Exhibit 14: Phase One Environmental Site Assessment, prepared by V Environmental LLC, dated
September 14, 2018
Exhibit 15: Architectural Plans (Floor Plan and Exterior Building Elevations)
Exhibit 16: Color Elevations
Exhibit 17: Proposed Material Board
Exhibit 18: Site Photos
Exhibit 19: Comment email from Williams
Exhibit 20: Staff Response to Public Comment
Exhibit 21: Traffic Impact Study, prepared by TENW, dated February 13, 2019
Exhibit 22: Traffic Concurrency Test Memorandum, prepared by City of Renton Development
Engineering Manager, dated October 10, 2019
Exhibit 23: Environmental (SEPA) Checklist, dated September 9, 2019
Exhibit 24: Construction Mitigation Description
Exhibit 25: Advisory Notes
D. Environmental Impacts
The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether the
applicant has adequately identified and addressed environmental impacts anticipated to occur in conjunction
with the proposed development. Staff reviewers have identified that the proposal is likely to have the following
probable impacts:
DocuSign Envelope ID: 28C409A9-F5AA-448B-8873-F3931CE67FA8
City of Renton Department of Community & Economic Development
Family First Community Center
Staff Report to the Environmental Review Committee
LUA19-000212, SA-A, CU-H, ECF, V-A, MOD
Report of October 14, 2019 Page 4 of 8
SR_ERC_FFCC_LUA19-000212_v1
1. Earth
Impacts: According to the applicant’s Geotechnical Engineering Report, prepared by The Riley Group,
Inc. (RGI), dated June 8, 2018 (Exhibit 13) the site is suitable for the proposed construction from a
geotechnical standpoint. According to RGI, the site is underlain by up to 11 feet of fill comprised of loose
to medium dense silty sand with varying amounts of gravel over medium dense to very dense silty sand
with varying amounts of gravel, and localized silty sand, sandy gravel, and sand with some silt and
gravel. The Geologic Map of King County, Washington indicates that the site soil is mapped as till (Qvt).
Since the site is underlain by till, the site would be considered not liquefiable and infiltration is
infeasible. RGI expects that site grading would consist of cut in the high area of the site and fill in the
existing storm water pond (approximately 10 feet deep) to achieve building and pavement grades and
excavation for utilities (Exhibit 5). On May 23, 2018, RGI performed subsurface exploration using a
tracked drill rig. A total of seven (7) test borings were advance in the proposed development area to an
average depth of approximately 16 feet. RGI encountered groundwater seepage at 15 feet in two (2) of
the subsurface explorations and fluctuations of the groundwater table are expected to occur and should
be considered when developing due to seasonal variations in the amount of rainfall, runoff, and other
factors. The project is not mapped as a coalmine hazard area.
RGI recommends that the proposed building be supported on spread footings bearing on medium dense
native soil or structural fill. The slab-on-grade can be similarly supported on medium dense native soil or
structural fill. After stripping, grubbing, and prior to placement of structural fill, RGI recommends
proofrolling building and pavement subgrades and areas to receive structural fill. Placement and
compaction of structural fill should be observed by the geotechnical engineer and in-place density tests
should be performed as the fill is being placed to confirm that the recommended level of compaction is
achieved. RGI further recommends that preparation for site grading and construction include
procedures intended to drain ponded water, control surface water runoff, and to collect shallow
subsurface seepage zones in excavations where encountered. RGI concludes that it would not be
possible to successfully compact the subgrade or utilize on-site soils as structural fill if accumulated
water is not drained prior to grading or if drainage is not controlled during construction. Attempting to
grade the site without adequate drainage control measures would reduce the amount of on-site soil
effectively available for use, increase the amount of select import fill materials required, and ultimately
increase the cost of the earthwork phases of the project. RGI anticipates that the use of berms and
shallow drainage ditches, with sumps and pumps in utility trenches, would be required for surface water
control during wet weather and/or wet site conditions.
According to the SEPA Environmental Checklist, the applicant is proposing approximately 4,200 cubic
yards of export material in order to prepare the site for the community center improvements (Exhibit
23). The project would result in roughly 1.7-acres of new or replaced impervious area and 1.02-acres of
new or replaced pervious area within the parcel. The total project area is approximately 2.72 acres.
Grading, erosion and sediment control standards of RMC 4-4-060 would mitigate dust, slope, and runoff
impacts. The geotechnical report provided discussion and recommendations for site preparation and
earthwork, foundations, retaining walls, slab-on-grade construction, drainage, utilities, and pavements.
Due to the geotechnical recommendations included in the provided report and supplemental letter and
to mitigate for potential impacts the project proposal could have on the site resulting from project
construction, staff recommends as a mitigation measure that the project construction comply with the
recommendations found in the submitted Geotechnical Engineering Report, prepared by The Riley
Group, Inc. (RGI), dated June 8, 2018, and future addenda.
Mitigation Measures: The project construction shall comply with the recommendations found in the
submitted Geotechnical Engineering Report, prepared by The Riley Group, Inc. (RGI), dated June 8, 2018,
and future addenda.
DocuSign Envelope ID: 28C409A9-F5AA-448B-8873-F3931CE67FA8
City of Renton Department of Community & Economic Development
Family First Community Center
Staff Report to the Environmental Review Committee
LUA19-000212, SA-A, CU-H, ECF, V-A, MOD
Report of October 14, 2019 Page 5 of 8
SR_ERC_FFCC_LUA19-000212_v1
Nexus: State Environmental Policy Act (SEPA) Environmental Review; RMC 4-4-060 Grading, Excavation
and Mining Regulations.
2. Air
Impacts: It is anticipated that some short-term air quality impacts could be associated with site work
and building construction required to develop this site. Project development impacts during
construction may include dust as a result of grading and exhaust from construction vehicles and
equipment. Dust control would be mitigated through the use of temporary erosion control measures,
watering or other measures to remediate impacts as needed (Exhibit 24). Long-term impacts would
result from the net increase of vehicular traffic.
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
3. Water
a. Storm Water
Impacts: The applicant submitted a Technical Information Report, prepared by Coughlin Porter
Lundeen, dated August 22, 2019 (Exhibit 11) with the project application. Based on the City of
Renton’s flow control map, the site falls within the Flow Control Duration Standard area matching
Forested Site Conditions and is within the Lower Cedar River Drainage Basin. The development
would be subject to Full Drainage Review in accordance with the 2017 Renton Surface Water Design
Manual (RSWDM). The TIR provides technical information and design analysis required for
developing the Stormwater Drainage and Temporary Erosion and Sedimentation Control (TESC)
Plans for the project and the stormwater design for the project was based on the requirements set
forth by the 2017 RSWDM. The 2.72-acres designated project development area consists of a 0.6-
acre parking lot, a grass field and an existing biofiltration swale on the southern side of the existing
CES site.
The topography generally slopes from west to east with the project site outfall located on the
southeast corner of the site (Exhibit 5). The project has two high points located in the center portion
of the site and at the western property line, at elevations of 464 and 465 respectively. The existing
low point is located at the southeast corner of the site at an elevation of 452 feet. The overall drop
across the site from the northwest corner down to the southeast corner is 13 feet. Stormwater
runoff flows from north to south.
The TIR Report analyzed existing conditions and proposed surface water collection and distribution.
The geotechnical analysis of site soils found that the conditions onsite are not compatible with
stormwater infiltration and recommended that the project not utilize infiltration, therefore, the
project proposes to implement non-infiltrative bioretention, soil quality preservation, and vegetated
roof to meet this requirement. Stormwater runoff from the existing site consists of surface, shallow,
and piped flow to the existing biofiltration swale located on the south side of the site, which then
discharges to the existing stormwater system at the southeast corner of the site. The project would
be considered a “commercial” project and drains to the City of Renton Stormwater system,
therefore, Enhanced Basic water quality is required for this project.
The Family First Community Center project would remove the biofiltration swale that is currently
being used as a water quality treatment facility for the Cascade Elementary School site. A Modular
Wetland System (MWS) is proposed to be installed in order to treat the pollution generating runoff
from the existing Cascade Elementary School site in replacement of the biofiltration swale. A second
MWS would be used to treat the pollution generating runoff from the proposed pollution generating
surfaces that would be constructed as a part of the Family First Community Center project before
discharging to the existing City of Renton stormwater system. The two proprietary systems
DocuSign Envelope ID: 28C409A9-F5AA-448B-8873-F3931CE67FA8
City of Renton Department of Community & Economic Development
Family First Community Center
Staff Report to the Environmental Review Committee
LUA19-000212, SA-A, CU-H, ECF, V-A, MOD
Report of October 14, 2019 Page 6 of 8
SR_ERC_FFCC_LUA19-000212_v1
proposed to treat runoff from all target surfaces and meet the water quality assessment are the SC-
310 and a MC-3500 Stormtech Chamber System. The SC-310 would provide a chamber volume of
18,415 cubic feet (CF) and the MC-3500 would provide a chamber volume of 30,087 CF. The MWSs
would be sized according to flow rates or sized to treat the full 2-year release rate post detention. In
the developed condition, both Stormtech Chamber systems would discharge to the existing storm
system located in the southeast corner of the site. By dividing the project into two different size
Stormtech Chamber detention systems, the project can utilize the existing topography to minimize
earthwork. In addition, the project would include a bioretention cell for water quality treatment that
would mitigate pollution generating areas and a green roof to mitigate target impervious surfaces to
the maximum extent feasible (Exhibit 12). Once the project is fully developed, the project is
expected to increase the amount of impervious area to 1.70 acres. Appropriate on-site BMPs would
also be required to help mitigate the new runoff created by this development. The final drainage
plan and drainage report would be submitted with the civil construction permit application.
It is anticipated that the City’s currently adopted 2017 RSWDM would mitigate for any other
potential surface water impacts that could be generated by the project proposal, therefore no
further mitigation is recommended at this time.
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
4. Vegetation
Impacts: The project area includes approximately 2.19 acres of grass fields and native vegetation. The
development would decrease the amount of pervious area and landscape to approximately 1.02 acres.
The applicant’s Arborist Report, prepared by Ian Gray, City of Renton Urban Forestry & Natural
Resources Manager (dated August 26, 2019; Exhibit 7), inventoried 21 trees in the vicinity of the project
site. The applicant is propping to remove eight (8) significant trees (Linden and Paper Birch). Five (5) of
the eight (8) trees to be removed were found to be dead. In addition, one of the poor damaged trees is
located within the footprint of the proposed building. Pursuant to RMC 4-4-130.H, tree retention
standards in a residential zone (specifically Residential-6 zone) require at least thirty percent (30%)
significant tree retention during and post development. The applicant is proposing to retain 12 of the
project area’s significant trees (Exhibit 8). The applicant is proposing to enhance the existing landscaping
onsite by planting 83 new trees, including deciduous trees (14-October glory maple, 17-sour gum),
evergreen trees (6-Austrian black pine, 12 Douglas fir, 9-hogan cedar), and accent trees (14-vine maple,
4-Persian parrotia, and 7-Japanese stewartia). The proposed new trees would planted and irrigated
throughout the project site (Exhibits 6 and 9).
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
5. Environmental Health
a. Noise
Impacts: Short-term construction activity-related noise impacts would primarily result from the
preparation of the building site and construction of the new structure. Construction activity hours
are restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday
through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m.
and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. Haul hours shall be restricted
to the hours between eight-thirty (8:30) a.m. and three-thirty (3:30) p.m., Monday through Friday
unless otherwise approved in advance by the Development Services Division.
All noise levels would be required to comply with City of Renton code (Chapter 7 Noise Level
Regulations) and Washington State code (WAC 173-60-040). The anticipated temporary noise
DocuSign Envelope ID: 28C409A9-F5AA-448B-8873-F3931CE67FA8
City of Renton Department of Community & Economic Development
Family First Community Center
Staff Report to the Environmental Review Committee
LUA19-000212, SA-A, CU-H, ECF, V-A, MOD
Report of October 14, 2019 Page 7 of 8
SR_ERC_FFCC_LUA19-000212_v1
impacts would be those commonly associated with a community center and elementary school.
Therefore, typical noise levels from Family First Community Center are anticipated to result in a less-
than-significant noise impact.
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
6. Aesthetics
Impacts: The applicant is proposing a single story 21,100 square foot community center. The
development would include parking, landscaping and utility improvements. The applicant is requesting a
building height variance to the maximum 24-foot wall plate height in the R-6 zone to 31’-3”. The
additional height is necessary to accommodate the gymnasium use. The building construction type
proposed is V-B and the building would be a sustainable design with the goal of Leed Silver. The
proposed building would feature heavy timber wood framing and natural light and building materials
would include wood frame construction, glulam beams and columns, metal siding for exterior walls,
fiberglass windows and PVC roof membrane (Exhibits 15-17).
The proposed building would be compatible to the adjacent CES. Bulk and scale reduction methods
include perimeter and interior landscaping around the building and parking area. The building would
also include increased building setback from the existing property line with over a 160-foot setback from
116th Ave SE, over a 65-foot setback from the south property line, and over a 230-foot setback from the
east property line. The community center would also provide over a 60-foot separation distance from
the southeast corner of the existing elementary school.
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
7. Transportation
Impacts: A Traffic Impact Study, prepared by TENW, dated May 29, 2019 (Exhibit 21), was submitted
with the project application. The submitted report indicated that at full build-out the proposed
development would generate 669 average daily trips (ADT) with 46 AM peak-hour vehicular trips (32
entering and 14 exiting) and 54 PM peak-hour vehicular trips (23 entering and 31 exiting). Access to the
new facility would be provided via an existing driveway at the south end of the property off 116th Ave
SE and ingress and egress improvements would be completed on the next adjacent driveway to the
north for two-way traffic plus a proposed Bus Only lane for improved access and circulation. Onsite
improvements would also include 90 new onsite parking spaces and 29 shared parking spaces with the
elementary school. The shared parking spaces and contained parent drop-off/pick-up area would be
maintained at its current location but contained to avoid conflict with the primary access for the
proposed community center. During non-peak school periods, the driveway restrictions from the
southern parking lot can be removed/opened by the School District and the Family First Community
Center or school can utilize the parking lot as needed. These recommendations are overviewed in Figure
9 of the Traffic Impact Study.
The applicant is requesting a modification and a waiver from street frontage improvements along 116th
Ave SE. The City of Renton’s 2018-2023 Capital Improvement Program identifies planned transportation
improvements for 116th Ave SE roadway (Puget Drive SE to Southern City Limits) – widen roadway from
two (2) lanes to three (3) lanes with bicycle lanes along 116th Ave SE and Edmonds Way SE, including
new pavement, curb, gutter, sidewalk, street lights, traffic signals, storm drainage, channelization and
landscaping. Phase 1 improvements from SE Petrovitsky Rd to SE 168th St (south of the project site) are
programmed for 2019 to 2023. Future phases would be developed for scoping, cost and schedule by City
of Renton staff. Future improvements would enhance vehicular, bicycle and pedestrian safety along this
north-south transportation corridor.
DocuSign Envelope ID: 28C409A9-F5AA-448B-8873-F3931CE67FA8
City of Renton Department of Community & Economic Development
Family First Community Center
Staff Report to the Environmental Review Committee
LUA19-000212, SA-A, CU-H, ECF, V-A, MOD
Report of October 14, 2019 Page 8 of 8
SR_ERC_FFCC_LUA19-000212_v1
The proposal has passed the City’s Traffic Concurrency Test per RMC 4-6-070.D (Exhibit 22), which is
based upon a test of the citywide Transportation Plan, consideration of growth levels included in the
LOS-tested Transportation Plan, and payment of applicable Transportation Impact Fees.
The proposed project would be responsible for the payment of a Transportation Impact Fee at the time
of Building Permit issuance (unless the fee is waived or reduced by Renton City Council). The applicant’s
parking study, included in the Traffic Impact Study, indicated that the 90 new onsite parking spaces,
combined with the 29 shared parking spaces with the school in front of the proposed community center
would comply with the peak development parking demand and no parking spillover is anticipated. As a
result, it is anticipated that through the payment of applicable Transportation Impact Fees, the addition
of the 90 new onsite parking spaces, the improvement to the shared parking, and the reconfiguration of
the of parent drop-off/pick-up operations would adequately mitigate additional traffic generated by the
project; therefore, no further mitigation is recommended.
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
E. Comments of Reviewing Departments
The proposal has been circulated to City Department and Division Reviewers. Where applicable, their comments
have been incorporated into the text of this report and/or “Advisory Notes to Applicant (Exhibit 25).”
Copies of all Review Comments are contained in the Official File and may be attached to this report.
The Environmental Determination decision will become final if the decision is not appealed within the 14-day
appeal period (RCW 43.21.C.075(3); WAC 197-11-680).
Environmental Determination Appeal Process: Appeals of the environmental determination must be filed in
writing together with the required fee to: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA
98057, on or before 5:00 p.m. on November 1, 2019. RMC 4-8-110 governs appeals to the Hearing Examiner and
additional information regarding the appeal process may be obtained from the City Clerk’s Office, Renton City Hall –
7th Floor, (425) 430-6510.
DocuSign Envelope ID: 28C409A9-F5AA-448B-8873-F3931CE67FA8
CITY OF RENTON
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE
EXHIBITS
Project Name:
Family First Community Center
Land Use File Number:
LUA19-000212, SA-A, CU-H, ECF, V-A, MOD
Date of Meeting
October 14, 2019
Staff Contact
Clark H. Close
Senior Planner
Project Contact/Applicant
Meredith Everist
Baylis Architects
10801 Main St, #110,
Bellevue, WA 98004
Project Location
16022 116th Ave SE, Renton, WA
98056
The following exhibits are included with the ERC Report:
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: Site Plan
Exhibit 3: Overall Site Plan
Exhibit 4: Neighborhood Detail Map
Exhibit 5: Topographic & Boundary Survey
Exhibit 6: Landscape Plans
Exhibit 7: Arborist Report, prepared by Ian Gray, City of Renton Urban Forestry & Natural
Resources Manager, dated August 26, 2019
Exhibit 8: Tree Retention Plan
Exhibit 9: Irrigation Plans
Exhibit 10: Lighting Plan
Exhibit 11: Technical Information Report, prepared by Coughlin Porter Lundeen, dated August 22,
2019
Exhibit 12: Civil Drawings, prepared by Coughlin Porter Lundeen, dated September 6, 2019
Exhibit 13: Geotechnical Report, prepared by The Riley Group, Inc., dated June 8, 2018
Exhibit 14: Phase One Environmental Site Assessment, prepared by V Environmental LLC, dated
September 14, 2018
Exhibit 15: Architectural Plans (Floor Plan and Exterior Building Elevations)
Exhibit 16: Color Elevations
Exhibit 17: Proposed Material Board
Exhibit 18: Site Photos
Exhibit 19: Comment email from Williams
Exhibit 20: Staff Response to Public Comment
Exhibit 21: Traffic Impact Study, prepared by TENW, dated February 13, 2019
Exhibit 22: Traffic Concurrency Test Memorandum, prepared by City of Renton Development
Engineering Manager, dated October 10, 2019
Exhibit 23: Environmental (SEPA) Checklist, dated September 9, 2019
Exhibit 24: Construction Mitigation Description
Exhibit 25: Advisory Notes
DocuSign Envelope ID: 28C409A9-F5AA-448B-8873-F3931CE67FA8
460.08
465.79465.53465.28465.03465.02465.13467.84465.33465.70465.69465.34465.34465.33465.67465.64465.32465.33466.87449.24
449.23
CE8 T
C R0.5CCCCC APP Z-LOOPLOOPLOOPLOOPLOOP OLOOP1LOOP1LOOP1LOOP1LOOP1 OGP Z-SM
BM /NORTH RIM SM
640
2001200220032004200520062013201420152016201720182019202020212022202320242036
2037
466.97 BOLBOLACTIVITY POSTEAVEEAVEEAVE LUM LUMGPPP #317005N 01°46'57" E 799.95'N 89°10'36" W 810.34'COCOCOCO(2)14" CED18" FIR24" FIR13" SPR8" EVG8" EVGROOF EL=482.2'ROOF EL=482.1'ROOF EL=482.1'COLFF EL=459.7'FF EL=459.7'FF EL=459.7'FF EL=459.7'FF EL=459.7'4654654654654654604604604554504504504504
6
8467467 467467466466 4664664664 6 6
466466466464463463462462461459
459 4594594584584574544534524524524
5
1
451451451 449449FAMILY FIRST
COMMUNITY CENTER
WATER EASEMENT
10' - 0"
N E W EXISTING SCHOOL
DROP OFF ZONE
ENTRYEXIT
EXISTING
PARKING
21 STALLS
PROPOSED
PROPERTY LINE
PROPOSED PROPERTY LINE
EXISTING PROPERTY LINEPROPOSED
PROPERTY LINE
EXISTING PROPERTY LINE PROPOSED PROPERTY LINEN89°10'39"W 495.78'N00°49'21"E 237.08'N89°10'39"W 29.93'N00°49'21"E 153.85'116TH AVEREFUSE & RECYCLEEXISTING
BALL FIELD
TYP20'-0"DRIVEWAYVAN
MIN.
24' - 0"
2 2 6 ' - 0 " SETBACK, TYP.10' - 0" SIDEYARDC C C C C C C C C C CC C C C C C C C C C CR 25'
- 0"
BUS LANE R 45' - 0"R 45' - 0"R 50' - 0"R 45' - 0"R 50' - 0"R 25' - 0"20'-0"CCCCCCCCCCTRANSFORMER PAD
PERVIOUS
CONC. (ALT)
PERVIOUS
CONC. (ALT)
PERVIOUS
CONC. (ALT)MIN.24' - 0"9' - 0"REARYARD SETBACK
25' - 0"SIDEYARD SETBACK10' - 0"SIDEYARD SETBACK
10' - 0"
FRONTYARD SETBACK
25' - 0"5' - 0"SIDEYARD SETBACK2' - 0"PARKING OVERHANGR= 50.00'
= 37°45'38"
L = 32.95'
∆
R= 50.50'
= 56°43'43"
L = 50.00'
∆
N71°51'17"
E 37.46'
TYP
9' - 0"TYP18' - 0"TYP
20' - 0"TYP9' - 0"TYP8' - 6"TYP
16' - 0"TYP9' - 0"TYP
20' - 0"
TYP
9' - 0"TYP9' - 0"TYP
20' - 0"TYP8' - 6"TYP
16' - 0"
MIN.
24' - 0"9' - 0"
TYP
9' - 0"TYP20' - 0"8' - 0"
TYP
5' - 0"
PROJECT NUMBER:
DRAWN BY:
PROJECT MANAGER:
COPYRIGHT 2019
BAYLIS ARCHITECTS INCORPORATED
ALL RIGHTS RESERVED
C
THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED
HEREIN, IS THE PROPERTY OF BAYLIS ARCHITECTS INC., AND MAY
NOT BE REUSED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN
CONSENT OF BAYLIS ARCHITECTS INCORPORATED.
REVISIONS:9/10/2019 7:43:49 PMA100.b
SITE PLAN
16-0996
CL
CheckerFAMILY FIRST COMMUNITYCENTERRENTON, WALAND USE PERMITDRAWINGS09/05/191" = 20'-0"1 SITE PLAN
105
0
4020
1"=20'-0"
NO. DESCRIPTION DATE
FAMILY FIRST
COMMUNITY CENTER
WATER EASEMENT
10' - 0"EXISTING SCHOOL
EXISTING PARKING
EXISTING PROPERTY LINEBALL FIELD
PROJECT NUMBER:
DRAWN BY:
PROJECT MANAGER:
COPYRIGHT 2019
BAYLIS ARCHITECTS INCORPORATED
ALL RIGHTS RESERVED
C
THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED
HEREIN, IS THE PROPERTY OF BAYLIS ARCHITECTS INC., AND MAY
NOT BE REUSED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN
CONSENT OF BAYLIS ARCHITECTS INCORPORATED.
REVISIONS:9/10/2019 7:43:45 PMA100.a
OVERALL SITE PLAN
16-0996
Author
CheckerFAMILY FIRST COMMUNITYCENTERRENTON, WALAND USE PERMITDRAWINGS09/05/19164
0
6432
1/32"=1'-0"
8
1/32" = 1'-0"1 SITE PLAN - SCHOOL
NO. DESCRIPTION DATE
FAMILY FIRST
COMMUNITY CENTER
116TH AVE SESE 163RD ST.
SE 164TH ST.119TH AVE SE120TH AVE SE121ST AVE SESE 162ND ST.
SE 164TH ST.
SE 162RD ST.
SE 22ND ST.114TH AVE SESE 161ST ST.
9/5/2019FAMILY FIRST COMMUNITY
CENTER
P1.01
NEIGHBORHOOD DETAIL MAP
RENTON, WA
1" = 200'-0"1 Neighborhood Detail Map
10050
0
400200
1"=200'-0"
TOPOGRAPHIC & BOUNDARY SURVEY TOPOGRAPHIC & BOUNDARY SURVEYBASIS OF BEARINGSLEGAL DESCRIPTIONVERTICAL DATUMSURVEYOR'S NOTESVICINITY MAPN.T.S.REFERENCESFAMILY FIRST COMMUNITY CENTERN.T.S.CONTROL MAPSCHEDULE B ITEMS
08/26/2019Re.160221;6thAveFamilyfirstCommunityCenterLandUsePermit—TreeInventory&RetentionPlanHiRuss,Pleasefindattachedthetreeinventory&retentionworksheetfortheFamilyFirstCommunityCenterlandusepermitapplication.Fiveoftheeighttreestoberemovedaredead.IfReplacementtreeplantingisrequiredforthethreelivetreestoberemovedthereisspacefor2mediumstaturetreesneartree#7and1largestaturetreebetweentrees#1and#2.Treeprotectionnotesareincludedwiththetreeinventorytable.Iwouldbehappytoconsultoncetheprojectgetsunderwayandtreeprotectionzonesneedtobedelineated.Feelfreetocontactmewithanyotherquestionsinthemeantime.Kindregards,IanGrayUrbanForestry&NaturalResourcesManagerPhone:425-430-6601Email:IGrayRentonWA.gov
FAMILY FIRSTCOMMUNITY CENTERNEWEXISTING SCHOOLDROP OFF ZONEENTRY
EXITEXISTINGPARKING21 STALLSPROPOSEDPROPERTY LINEPROPOSED PROPERTY LINEEXISTING PROPERTY LINE
PROPOSEDPROPERTY LINEEXISTING PROPERTY LINEPROPOSED PROPERTY LINE N89°10'39"W 495.78'N00 °49'21"E 237.08'N89°10'39"W 29.93'N00 °49'21"E 153.85'
116TH AVE
REFUSE &
RECYCLE
EXISTINGBALL FIELDDRIVEWAYVANC C C C C C C C C C C
C C C C C C C C C C C BUS LANECCCCCCCCCCSIDEYARDSETBACKR= 50.00' = 37°45'38"L = 32.95'ΔR= 50.50' = 56°43'43"L = 50.00'ΔN71°51'17"E 37.46'1234457689910101010101010101010N
O
T
F
O
R
C
ON
S
T
RU
C
T
I
O
N192 Nickerson, Suite #300Seattle, Washington 98109Phone: 206.285.2966 PROJECT NUMBER:DRAWN BY:PROJECTMANAGER:COPYRIGHT 2017BAYLIS ARCHITECTSINCORPORATEDALL RIGHTS RESERVEDCTHIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATEDHEREIN, IS THE PROPERTY OF BAYLIS ARCHITECTS INC., AND MAYNOT BE REUSED, IN WHOLE OR IN PART, WITHOUT THE WRITTENCONSENT OF BAYLIS ARCHITECTS INCORPORATED.REVISIONS:18083NBCheckerFAMILY FIRST COMMUNITY
CENTER
RENTON, WANO.DESCRIPTIONDATERA, CHLAND USE PERMIT
DRAWINGS
09/05/19E100SITE PLAN -NEW UTILITY POWER ANDTELECOMM PLANX1.EXISTING UTILITY POLE WITH OVERHEAD 3-PHASE POWER ANDTELE/COMM INFRASTRUCTURE. CONTRACTOR TO PROVIDE NEWCONDUIT SERVICE DROPS FOR EACH UTILITY PROVIDE FORUNDERGROUND UTILITY SERVICES TO COMMUNITY CENTERBUILDING. CONTRACTOR TO COORDINATE WITH EACHPROVIDER AND WILL PROVIDE PATHWAY AND INFRASTRUCTUREAS REQUIRED FOR EACH SERVICE CONNECTION.2.NEW UNDERGROUND UTILITY STREET CROSSING PER CITY OFRENTON REQUIREMENTS.3.NEW RECESSED IN-GRADE UTILITY JUNCTION BOXES. PROVIDE 1BOX FOR POWER, TELEPHONE AND CABLE TV ACCORDING TOUTILITY PROVIDERS REQUIREMENTS.4.NEW UNDERGROUND SHARED UTILITY TRENCH WITH POWER,TELEP[HONE AND CABLE TV SERVICES.5.NEW PAD MOUNTED TRANSFORMER PROVIDED BY PSE.CONTRACTOR TO PROVIDE BELOW-GRADE VAULT, VAULT LID,AND CONDUIT TERMINATIONS PER PSE REQUIREMENTS.BELOW-GRADE VAULT TO BE LOCATED A MINIMUM OF 10 FEETCLEAR OF ANY COMBUSTIBLE CONSTRUCTION.6.NEW UNDERGROUND SECONDARY SERVICE POWER FEEDERS,BY CONTRACTOR, FROM TRANSFORMER VAULT TO ELECTRICALROOM SERVICE ENTRANCE. SEE ONE-LINE ON SHEET E0.3 FORCONDUIT AND CABLE SIZES.7.NEW RECESSED IN-GRADE UTILITY JUNCTION BOXES FORTELE/COMM SERVICES.8.NEW UNDERGROUND TELEPHONE AND CABLE TV SERVICES.CONTRACTOR TO PROVIDE CONDUIT AND CABLING FROMJUNCTION BOX TO ELECTRICAL ROOM SERVICE ENTRANCE.9.EXISTING PARKING LOT LIGHTS TO BE RELOCATED, AS NEEDED,TO SUIT NEW LAYOUT.10.NEW POLE MOUNTED PARKING LOT LIGHTS.
ENGINEERING REPORT
TECHNICAL INFORMATION REPORT
FAMILY FIRST COMMUNITY CENTER
RENTON, WA
August 22, 2019
PREPARED FOR:
City of Renton
1055 South Grady Way
Renton, WA 98057
PREPARED THROUGH:
City of Renton
1055 South Grady Way
Renton, WA 98057
PREPARED BY:
COUGHLIN PORTER LUNDEEN
801 Second Avenue, Suite 900
Seattle, WA 98104
P 206.343.0460
CONTACT / Keith Kruger, P.E.
Construction Sequence:1.BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, A PRECONSTRUCTION MEETINGMUST BE HELD BETWEEN THE CITY OF RENTON, THE APPLICANT AND THE APPLICANTSCONSTRUCTION REPRESENTATIVE.2.VERIFY VERTICAL AND HORIZONTAL LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES.CONTACT ALL UTILITY COMPANIES THAT MAY BE EFFECTED BY THE PROPOSEDCONSTRUCTION. THE ONE CALL NUMBER IS 1-800-424-5555.3.MAINTAIN ALL EXISTING UTILITY SERVICES DURING CONSTRUCTION.4.VERIFY GRADES PRIOR TO CONSTRUCTION. FLAG CLEARING LIMITS.5.INSTALL FILTER FABRIC FENCING AND OTHER SEDIMENT CONTROL DEVICES PERDEMOLITION AND T.E.S.C PLAN, SHEET C-101.6.CLEAR AND GRUB AREA TO BE DISTURBED BY CONSTRUCTION.7.BACKFILL ROAD GRADE AND SURROUNDING AREAS.8.INSTALL ROADWAY UTILITIES AND ALL SURFACE IMPROVEMENTS.9.VEGETATE AND STABILIZE SITE.10.CLEAN SITE AND WORK AREA INCLUDING ALL STORM DRAINAGE SYSTEMS.11.REMOVE TESC MEASURES WHEN SITE IS STABILIZED AS AUTHORIZED BY CITY ENGINEER.SurveyorCivil EngineerCOUGHLIN PORTER LUNDEEN801 SECOND AVENUE, SUITE 900SEATTLE, WA 98104(206) 343-0460 CONTACT: BART BALKO, PETERRANE SURVEYING10801 MAIN STREET, SUITE 102BELLEVUE, WA 98004(425) 458-4488 CONTACT: EDWIN GREEN JR, PSSheet IndexC000COVER SHEETC100DEMOLITION & TESC PLANC110DEMOLITION & TESC DETAILC200GRADING & DRAINAGE PLANC210GRADING & DRAINAGE DETAILC300PAVING PLANC310PAVING DETAILSC400UTILITY PLANC410UTILITY DETAILSFamily First Community CenterRenton, Wa 98056Land Use PermitSeptember 6, 2019Vertical DatumHorizontal DatumNAD 83/91NAVD 88Basis of BearingsA BEARING OF N 01°46'57" E PER R1BenchmarkCITY OF RENTON BENCHMARK NO. 1640(LOCATION)ELEV ON DISC= 466.085'Site InformationSITE INFORMATIONTOTAL SITE AREA: 118,483 SF (2.72 AC)EXISTING CONDITIONSIMPERVIOUS AREAPERVIOUS AREA (LANDSCAPE) TOTALDEVELOPED CONDITIONSIMPERVIOUS AREA74,052 SF (1.70 AC)PERVIOUS AREA (LANDSCAPE)44,431 SF (1.02 AC)TOTAL118,483 SF (2.72 AC)Vicinity MapNTSLegal Description(LEGAL DESCRIPTION PER R1)THE SOUTH 800 FEET OF THE NORTH 830 FEET OF THE WEST816.75 FEET OF THE NORTHWEST QUARTER OF SECTION 28,TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M., IN KING COUNTY,WASHINGTON; EXCEPT THE WEST 30 FEET THEREOFCONVEYED TO KING COUNTY FOR 116TH AVE SE BY DEEDRECORDED UNDER RECORDING NO. 5091695; TOGETHERWITH THAT PORTION OF THE SOUTH 800 FEET OF THENORTH 830 FEET OF THE NORTHWEST QUARTER OFSECTION 28, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M., INKING COUNTY, WASHINGTON, LYING WESTERLY OF THE PLATOF CASCADE HILLS NO. 2, ACCORDING TO THE PLATTHEREOF RECORDED IN VOLUME 61 OF PLATS, PAGES 13AND 14, IN KING COUNTY WASHINGTON; EXCEPT THE WEST816.75 FEET THEREOF.Civil AbreviationsCBCATCH BASINCONCCONCRETECORCITY OF RENTONDEMODEMOLITIONELEC'LELECTRICALEXEXISTINGHHORIZAONTALIEINVERT ELEVATIONLLENGTHMAXMAXIMUMMIDMIDPOINTMINMINIMUMNTSNOT TO SCALEPCPOINT OF CURVEPIPOINT OF INTERSECTIONPSEPUGET SOUND ENERGYPTPOINT OF TRANSITIONRRADIUSSTASTATIONSTDSTANDARDTYPTYPICALVVERTICALVCVERTICAL CURVEWSDOTWASHINGTON STATE DEPARTMENTOF TRANSPORTATIONProject Notes1.THE CONTRACTOR SHALL TAKE REASONABLE PRECAUTIONS AND EXERCISE SOUND ENGINEERING ANDCONSTRUCTION PRACTICES IN CONDUCTING THE WORK. THE CONTRACTOR SHALL PROTECT EXISTINGPUBLIC AND PRIVATE UTILITIES FROM DAMAGE DURING CONSTRUCTION. IF EXISTING UTILITIES AREDAMAGED, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND THE ENGINEER. THECONTRACTOR SHALL RESTORE THE UTILITY TO ITS EXISTING CONDITION. (WSDOT SEC. 1-07.17 APWASUPPLEMENT). THE CONTRACTOR IS RESPONSIBLE FOR THE MEANS AND THE METHODS OFCONSTRUCTION FOR DESIGNS SHOWN ON THESE PLANS.2.WHERE THE PLANS CALL FOR UTILITIES TO BE RELOCATED BY OTHERS, THE CONTRACTOR SHALL NOTIFYTHE UTILITY COMPANY AND COORDINATE HIS WORK SO AS TO AVOID CONFLICTS.3.ALL EXCAVATION, TRENCHING, SUBGRADE PREPARATION, FILL PLACEMENT, AND ALL SOIL WORK INGENERAL SHALL BE CONDUCTED IN COMPLIANCE WITH THE RECOMMENDATIONS OF THE PROJECT SOILENGINEER AND THE CURRENT GEOTECHNICAL ENGINEERING REPORT AS WELL AS SPECIFICATION DIVISION31 AND THE PROJECT PLANS.4.CONTRACTOR SHALL BE RESPONSIBLE FOR HIRING A PROFESSIONAL LAND SURVEYOR TO REFERENCEEXISTING MONUMENTS ON OR ADJOINING ESTABLISHED SAID POINTS AT PROJECT COMPLETION. THISREESTABLISHMENT SHALL BE DOCUMENTED BY RECORD OF SURVEY OR SITE PREVIOUS TO DEMOLITIONOR CONSTRUCTION AND TO RECORNER RECORD AS DESCRIBED IN W.A.C. 332-120.5.CONTRACTOR SHALL MAINTAIN A 3 FOOT MINIMUM HORIZONTAL CLEARANCE FROM THE WATER MAIN ANDOTHER UTILITIES (i.e. GAS, CABLE, POWER, ETC.). IF SAID CLEARANCE CANNOT BE MAINTAINED EXACTMEASUREMENTS TO THE UTILITY LINES MUST BE IDENTIFIED ON THE AS-BUILT DRAWINGS.6.SCHEDULE WITH CITY (72 HOURS MINIMUM NOTICE) FOR WATERMAIN SHUTDOWN.7.UNDERGROUND UTILITIES ARE SHOWN IN THE APPROXIMATE LOCATION. THERE IS NOT A GUARANTEE THATALL UTILITY LINES ARE SHOWN OR THAT THE LOCATION, SIZE, AND MATERIAL IS ACCURATE. THECONTRACTOR SHALL UNCOVER ALL INDICATED PIPING WHERE CROSSINGS, INTERFERENCE'S ORCONNECTIONS OCCUR PRIOR TO TRENCHING OR EXCAVATION FOR ANY PIPE OR STRUCTURES, TODETERMINE ACTUAL LOCATIONS, SIZE AND MATERIAL. THE CONTRACTOR SHALL MAKE THE APPROPRIATEPROVISION FOR PROTECTION OF SAID FACILITIES. THE CONTRACTOR SHALL NOTIFY ONE CALL AT1-800-424-5555 AND ARRANGE FOR FIELD LOCATION OF EXISTING FACILITIES BEFORE CONSTRUCTION.16022 116th Avenue SESurface Water Standard Plan NotesTHE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET. ALL THE NOTESON THE LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAYSTRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOREDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THESURFACE WATER STANDARD PLAN NOTES.1.BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE-CONSTRUCTION MEETING SHALL BE HELD AMONG THECITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR.2.THE APPLICANT SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CITY, STATE, AND FEDERAL PERMITS PRIOR TOCONSTRUCTION.3.ALL STORM DRAINAGE IMPROVEMENTS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE LATEST EDITION OFTHE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM), RENTON MUNICIPAL CODE (RMC), AND THE STANDARDSPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKSASSOCIATION (APWA). IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT TO CORRECT ANY ERROR, OMISSION ORVARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THE PLANS. ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST TOTHE CITY.4.APPROVAL OF THE ROAD, GRADING, PARKING, BUILDING, AND DRAINAGE PLAN DOES NOT CONSTITUTE AS APPROVAL OF ANYOTHER CONSTRUCTION (E.G. WATER, SEWER, GAS, ELECTRICAL. ETC.). PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS,AND RETAINING WALLS REQUIRE A SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION. THE SURFACEWATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS. ANY DEVIATION FROM THEAPPROVED PLANS WILL REQUIRE COORDINATION FOLLOWED BY WRITTEN APPROVAL FROM THE CITY.5.A COPY OF THE APPROVED PLANS SHALL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.6.THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED BY FIELD SURVEY OR OBTAINED FROMAVAILABLE RECORDS AND SHALL THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THESOLE RESPONSIBILITY OF THE APPLICANT AND THE APPLICANTS CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OFALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN HEREON THAT MAYBE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. THE APPLICANT SHALL RECORD ON THE AS-BUILT DRAWINGS ALLUNDOCUMENTED UTILITIES DISCOVERED AND ANY CHANGES TO THE APPROVED PLANS. THE APPLICANT SHALL IMMEDIATELYNOTIFY THE ENGINEER OF RECORD IF A CONFLICT EXISTS.7.VERTICAL DATUM SHALL BE NAVD 88 AND HORIZONTAL DATUM SHALL BE NAD 83 (WA STATE PLANE, NORTH), UNLESS OTHERWISEAPPROVED BY THE CITY. REFERENCE BENCHMARK, DATUM, AND ELEVATIONS SHALL BE NOTED ON THE PLANS.8.ALL UTILITY TRENCH BACKFILL AND ROADWAY SUBGRADE SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY PER SECTION2-03.3(14)D - COMPACTION AND MOISTURE CONTROL TESTS OF THE WSDOT STANDARD SPECIFICATIONS. IN PERMEABLEPAVEMENT AND OTHER INFILTRATION AREAS, ALL TRENCH BACKFILL SHALL BE FIRM AND UNYIELDING BUT IN NO CASE SHALL BECOMPACTED TO MORE THAN 92% OF MAXIMUM DRY DENSITY.9.OPEN CUTTING OF EXISTING ROADWAYS FOR STORM DRAINAGE WORK IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BYTHE CITY AND NOTED ON THESE APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITYTRENCH RESTORATION STANDARDS.10.ALL PIPE AND STRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR TO THE START OF CONSTRUCTION. WHERESHOWN ON THE PLANS OR WHERE DIRECTED BY THE CITY, THE EXISTING MANHOLES, CATCH BASINS, OR INLETS SHALL BEADJUSTED TO THE GRADE AS STAKED.11.ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED AND IN OPERATION PRIOR TO, OR IN CONJUNCTION WITH, ANYCONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE CITY.12.ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE CURRENTSTATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARYLEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OFREQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON AUNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING AND BACKFILL SHALL BE AS SHOWN ON THE CITY STANDARD PLAN220.00, 220.10, AND 220.20.13.STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT 1, 2, OR 5 INSIDE AND OUTSIDE.14.ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SHALL BE FITTED WITH DUCTILE IRON, BOLT-LOCKING LIDSPER THE CITY STANDARD PLAN 204.10, 204.20, 204.30, AND 204.50. STRUCTURES SHALL HAVE: • RECTANGULAR OR ROUND, SOLIDLIDS WHEN NOT COLLECTING RUNOFF, AND OUTSIDE OF THE ROADWAY. • ROUND, SOLID LIDS WHEN NOT COLLECTINGRUNOFF, AND LOCATED WITHIN THE ROADWAY, BUT OUTSIDE OF THE CURB/GUTTER LINE. • ROUND, SOLID LIDS DISPLAYING THECITY LOGO WHEN WITHIN THE PUBLIC RIGHT-OF-WAY OR IN AN EASEMENT TO THE CITY. PRIVATE STRUCTURE LIDS OUTSIDEPUBLIC RIGHT-OF-WAY AND EASEMENTS TO THE CITY SHALL NOT DISPLAY THE CITY LOGO.15.BUILDINGS AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT WIDTHS AND BUILDINGSETBACKS LINES OF THE RENTON SWDM.16.LIDS OF MANHOLES/CATCH BASINS WITHIN PUBLIC RIGHT-OF-WAY SHALL NOT BE ADJUSTED TO FINAL GRADE UNTIL AFTERPAVING. ALL MANHOLE/CATCH BASIN RIMS SHALL BE ADJUSTED TO BE FLUSH WITH FINAL FINISHED GRADES, UNLESS OTHERWISESHOWN.17.ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY RIGHT-OF-WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1SLOPE FROM THE EDGE OF THE DRIVEWAY TO THE BOTTOM OF THE DITCH.18.ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK PLACED TO AMINIMUM DEPTH OF ONE (1) FOOT AND SHALL MEET THE FOLLOWING SPECIFICATIONS: • 4 - 8 INCHROCK / 40 - 70% PASSING; • 2 - 4 INCH ROCK / 30 - 40% PASSING; AND • LESS THAN 2 INCH ROCK / 10 - 20% PASSING.19.FOOTING DRAINAGE SYSTEMS AND ROOF DOWNSPOUT SYSTEMS SHALL NOT BE INTERCONNECTED AND SHALL SEPARATELYCONVEY COLLECTED FLOWS TO THE CONVEYANCE SYSTEM OR FLOW CONTROL FACILITY ON THE SITE, UNLESS APPROVED BYTHE CITY. FOOTING DRAINS SHALL NOT BE CONNECTED TO ON-SITE BMPS.20.THE END OF EACH STORM DRAIN STUB SHALL BE CAPPED. A CLEANOUT TOPPED WITH A BOLT-LOCKING LID MARKED "STORM"SHALL BE LOCATED AT THE PROPERTY LINE OR AT THE POINT OF CONNECTION OF A PRIVATE STORM DRAINAGE CONVEYANCESYSTEM PER THE CITY STANDARD PLAN 227.00.21.ALL STORM SYSTEM EXTENSIONS SHALL BE STAKED FOR LINE AND GRADE BY A SURVEYOR LICENSED IN WASHINGTON STATE,AND CUT SHEETS SHALL BE PROVIDED TO THE CITY PRIOR TO CONSTRUCTION.22.ALL NEWLY-INSTALLED AND NEWLY-REHABILITATED (PUBLIC AND PRIVATE) STORM CONVEYANCE SYSTEMS SHALL BE INSPECTEDBY MEANS OF REMOTE CCTV ACCORDING TO THE CITY STANDARD PLAN 266.00. CCTV INSPECTIONS AND REPORTS SHALL BESUBMITTED TO THE CITY PRIOR TO RECEIVING APPROVAL TO INSTALL PROJECT CURBS, GUTTERS AND/OR PAVEMENT.23.ALL STORM SYSTEMS AND CONNECTIONS TO EXISTING MAINS SHALL BE TESTED IN ACCORDANCE WITH SECTION 7-04.3(1) OF THEWSDOT STANDARD SPECIFICATIONS AND IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY. STORM DRAIN STUBS SHALL BETESTED FOR ACCEPTANCE AT THE SAME TIME THE MAIN STORM IS TESTED.24.FOR ALL DISTURBED PERVIOUS AREAS (COMPACTED, GRADED, LANDSCAPED, ETC.) OF THE DEVELOPMENT SITE, TO MAINTAINTHE MOISTURE CAPACITY OF THE SOIL EITHER STOCKPILE AND REDISTRIBUTE THE EXISTING DUFF LAYER AND NATIVE TOPSOILOR AMEND THE SOIL WITH COMPOST IN ACCORDANCE WITH STANDARD PLAN 264.00.25.ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY DOES NOT RELIEVE THE APPLICANT OF THE CONTINUINGLEGAL OBLIGATION AND/OR LIABILITY CONNECTED WITH STORMWATER DISPOSAL. THE CITY DOES NOT ACCEPT ANY OBLIGATIONFOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE STORM SYSTEM PROVIDED DURING CONSTRUCTION.26.ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER ACTIONS NEEDED TOPROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THEPERFORMANCE OF WORK SHALL BE PROVIDED. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT NORMALTRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE CITY. ALL SECTIONS OF THE WSDOT STANDARDSPECIFICATIONS 1-10 TEMPORARY TRAFFIC CONTROL SHALL APPLY.27.PROJECTS LOCATED WITHIN THE CITY'S AQUIFER PROTECTION AREA (APA) SHALL COMPLY WITH SPECIAL REQUIREMENT #6 OFTHE RENTON SWDM AND AQUIFER PROTECTION REGULATIONS (RMC 4-3-050).28.PLACEMENT OF SURFACE APPURTENANCES (CATCH BASIN/MANHOLE LIDS, CLEANOUTS, INLETS, ETC.) IN THE STREET TRAVELLANE WHEEL PATH, INTERSECTIONS OF STREET TRAVEL LANES, BIKE LANES, SIDEWALKS, AND CROSSWALKS SHALL BE AVOIDEDWHENEVER POSSIBLE. ANY SURFACE APPURTENANCE PLACED IN A SIDEWALK OR CROSSWALK SHALL BE FITTED WITH ANON-SLIP OR NON-SKID LID PER ADA REQUIREMENTS.29.CLEARLY LABEL PUBLIC AND PRIVATE SYSTEMS ON THE PLANS. PRIVATE SYSTEMS SHALL BE MAINTAINED BY THE APPLICANT.30.MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL CONFORM TO TABLE 4.2.1.A2 OF THE RENTON SWDM.31.CONSTRUCTED PERMEABLE PAVEMENT SHALL BE PERMEABLE ENOUGH TO ABSORB WATER AT A MINIMUM RATE OF 20 INCHESPER HOUR IMMEDIATELY AFTER THE PAVEMENT SURFACE HAS BEEN WETTED CONTINUOUSLY FOR AT LEAST 10 MINUTES.COMPLIANCE WITH THIS MINIMUM RATE SHALL BE CHECKED PRIOR TO CONSTRUCTION APPROVAL OF THE PAVEMENT.COMPLIANCE MAY BE CHECKED USING A SIMPLE BUCKET TEST IN WHICH 5 GALLONS OF WATER IS POURED ONTO THE PAVEMENTSURFACE ALL AT ONCE. IF ONLY A MINOR AMOUNT OF WATER PONDS OR RUNS OFF THE SURFACE, THEN THE PAVEMENT ISCONSIDERED TO MEET THE MINIMUM RATE OF ABSORPTION. AT LEAST ONE TEST SHALL BE CONDUCTED PER 1,000 SQUARE FEETOF PERMEABLE PAVEMENT. IF THIS TEST IS NOT CONCLUSIVE, THEN ANOTHER TEST PER ASTM C1701 SHALL BE CONDUCTED. FORLARGE AREAS (E.G., PARKING AREAS), TESTING OBSERVATION MAY BE ACCOMPLISHED WHILE WALKING BEHIND A SLOWLYMOVING WATER TRUCK DISCHARGING WATER AT A RATE SIMILAR TO THE BUCKET TEST. PERMEABLE PAVERS SHALL BE TESTEDUSING ASTM C1781.Erosion And Sediment Control (ESC) Standard Plan Notes THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE EROSION AND SEDIMENT CONTROL(ESC) PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEREBYREFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THEAPPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFICASPECTS, THEY SHALL BE ADDED AFTER THE ESC STANDARD PLAN NOTES.1.BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE-CONSTRUCTION MEETING SHALL BE HELD AMONGTHE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR.2.THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY)CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THECITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATERGENERAL PERMIT.3.THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BEFOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST-PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESCREQUIREMENTS.4.THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATIONPRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING ANDPROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL(RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYONDTHE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISORFOR THE DURATION OF CONSTRUCTION.5.STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FORTHE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS,MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK-OUT TO ROAD RIGHT OF WAY DOES NOTOCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANEDTHOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENTSEDIMENT FROM ENTERING WATERS OF THE STATE.6.WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF-SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY.DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON-SITE DUMPING OFEXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS.7.ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TOPREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESCBMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION ISCOMPLETE AND POTENTIAL FOR ON-SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION ISCOMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON-SITE EROSION DOES NOT EXIST. THEIMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITYOF THE APPLICANT.8.ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OFPROPERLY.9.THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITECONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALLANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE.DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESSANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVEMINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVINGDRAINAGE SYSTEM.10.APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NORLOCATION OF PIPES, RESTRICTORS, CHANNELS, OR STORMWATER FACILITIES.11.ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THECITY FOR REVIEW AND APPROVAL.12.ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURINGTHE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGHSEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING,PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM.13.WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESSOTHERWISE APPROVED BY THE CITY.14.ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN(7) DAYS.15.THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24HOURS FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THECITY.16.BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTIONAREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASININSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION.17.AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINSAND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT-LADENWATER INTO THE DOWNSTREAM SYSTEM.18.ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THENECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELYFUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SOTHAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY.19.AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON-SITE BMPS (AMENDED SOILS,BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOIDSEDIMENTATION AND COMPACTION DURING CONSTRUCTION.20.PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFYWHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDEDOR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF THOSE AREAS TO BE SODDED ORSEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW.21.PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT-LADEN WATERFROM LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES,AND ON-SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECTSITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDEDOR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCHWITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST.22.ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BECONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS-OF-WAY SHALL BE CONSTRUCTED INACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS-OF-WAY SHALL BE CONSTRUCTED INACCORDANCE WITH THE INTERNATIONAL BUILDING CODE.PROJECT NUMBER:DRAWN BY:PROJECT MANAGER:COPYRIGHT 2017BAYLIS ARCHITECTS INCORPORATEDALL RIGHTS RESERVEDCTHIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATEDHEREIN, IS THE PROPERTY OF BAYLIS ARCHITECTS INC., AND MAYNOT BE REUSED, IN WHOLE OR IN PART, WITHOUT THE WRITTENCONSENT OF BAYLIS ARCHITECTS INCORPORATED.REVISIONS:C180040-01PRWAJFFAMILY FIRST COMMUNITY
CENTER
RENTON, WA09/06/19NO.DESCRIPTIONDATECall Before You Dig. 8-1-1 or 1-800-424-5555 Underground Service (USA)50441STA
T
E OF WASHINGTONREGISTEREDPROFESSIONALENGIN
EER
AA
R
ONJ.FJELSTADLAND USE
PERMIT SETOUO
UNRGDTHEELERINNCLP801 SECOND AVENUE, SUITE 900 (206) 343-0460 SEATTLE, WA 98104 www.cplinc.com C000COVER SHEET
Corporate Office
17522 Bothell Way Northeast
Bothell, Washington 98011
Phone 425.415.0551 ♦ Fax 425.415.0311
www.riley-group.com
GEOTECHNICAL ENGINEERING REPORT
PREPARED BY:
THE RILEY GROUP, INC.
17522 BOTHELL WAY NORTHEAST
BOTHELL, WASHINGTON 98011
PREPARED FOR:
MS. KELLY BEYMER
ADMINISTRATOR OF COMMUNITY SERVICE DEPARTMENT
CITY OF RENTON
1055 SOUTH GRADY WAY
RENTON, WASHINGTON 98057
RGI PROJECT NO. 2018-130
FAMILY FIRST COMMUNITY CENTER
16022 116TH AVENUE SOUTHEAST
RENTON, WASHINGTON 98058
JUNE 8, 2018
PHASE ONE ENVIRONMENTAL SITE ASSESSMENT
Renton Family First Community Center
16022 116th Avenue Southeast
Renton, Washington 98058
September 14, 2018
Prepared for:
City of Renton
1055 South Grady Way
Renton, Washington 98057
Prepared by:
V Environmental LLC
PO Box 819
Hayden, Idaho 83835
OWNEROWNEROWNEROWNER
CITY OF RENTON, COMMUNITY SERVICESCITY OF RENTON, COMMUNITY SERVICESCITY OF RENTON, COMMUNITY SERVICESCITY OF RENTON, COMMUNITY SERVICES
Phone: (425) 430-6617
Email: kbeymer@rentonwa.gov
Email: rwoodruff@rentonwa.gov
ARCHITECTARCHITECTARCHITECTARCHITECT
BAYLIS ARCHITECTS, INC.BAYLIS ARCHITECTS, INC.BAYLIS ARCHITECTS, INC.BAYLIS ARCHITECTS, INC.Phone: (425) 454-0566
Fax: (425) 453-8075
STRUCTURAL ENGINEERSTRUCTURAL ENGINEERSTRUCTURAL ENGINEERSTRUCTURAL ENGINEER
COUGHLIN PORTER LUNDEEN Phone: (206) 343-0460
Email: benb@cplinc.com
CIVIL ENGINEERCIVIL ENGINEERCIVIL ENGINEERCIVIL ENGINEER
COUGHLIN PORTER LUNDEENCOUGHLIN PORTER LUNDEENCOUGHLIN PORTER LUNDEENCOUGHLIN PORTER LUNDEEN Phone: (206) 343-0460
Email: keithk@cplinc.com
SURVEYORSURVEYORSURVEYORSURVEYOR
TERRANETERRANETERRANETERRANE Phone: (425)458-4488
Fax: (425) 671-0170
Email: theresaa@terrane.net
TRAFFIC ENGINEERTRAFFIC ENGINEERTRAFFIC ENGINEERTRAFFIC ENGINEER
TRANSPORTATION ENGINEERS NORTHWEST (TENW)TRANSPORTATION ENGINEERS NORTHWEST (TENW)TRANSPORTATION ENGINEERS NORTHWEST (TENW)TRANSPORTATION ENGINEERS NORTHWEST (TENW)
Phone: (206) 361-7333 x101
Fax: (206) 361-7333
Email: mikeread@tenw.com
LANDSCAPE ARCHITECTLANDSCAPE ARCHITECTLANDSCAPE ARCHITECTLANDSCAPE ARCHITECT
WEISMAN DESIGN GROUP, INCWEISMAN DESIGN GROUP, INCWEISMAN DESIGN GROUP, INCWEISMAN DESIGN GROUP, INC Phone: (206) 322-xxxx
Fax: (xxx) xxx-xxxx
Email: Nick@wdginc.com
GEOTECHNICAL GEOTECHNICAL GEOTECHNICAL GEOTECHNICAL ----SOILS ENGINEERSOILS ENGINEERSOILS ENGINEERSOILS ENGINEER
RILEY GROUPRILEY GROUPRILEY GROUPRILEY GROUP Phone: (425) 415-0551
Fax: (425) 415-0311
Email: rwang@riley-group.com
MECHANICAL/PLUMBING/FIREMECHANICAL/PLUMBING/FIREMECHANICAL/PLUMBING/FIREMECHANICAL/PLUMBING/FIRE
SIDER + BYERSSIDER + BYERSSIDER + BYERSSIDER + BYERS Phone: (206) 285-2966
Email: Nathan@siderbyers.com
ELECTRICAL ELECTRICAL ELECTRICAL ELECTRICAL
SIDER + BYERSSIDER + BYERSSIDER + BYERSSIDER + BYERS Phone: (206) 285-2966
Email: ryan@siderbyers.com
INTERIORSINTERIORSINTERIORSINTERIORS
OBJECT SPACEOBJECT SPACEOBJECT SPACEOBJECT SPACE Phone: (206) 819-5020
Email: dwight@objectandspace.com
1055 S Grady Way
Renton, WA 98057
Contact: Kelly Beymer
Contact: Russ Woodruff
10801 Main Street, Suite 110
Bellevue, WA 98004
Contact: Meredith Everist
801 Second AVE, Suite 900
Seattle, Washington 98104
Contact: Ben Barlow
801 Second AVE, Suite 900
Seattle, Washington 98104
Contact: Keith Kruger
10801 Main Street, STE 102
Bellevue, WA 98004
Contact: Theresa Auld
PO BOX 65254
Seattle, WA 98155
Contact: Mike Read
2329 E Madison ST
Seattle, Washington 98112
Contact: Nick Hagan
17522 Bothell Way NE
Bothell, WA 98011
Contact: Ricky Wang
192 Nickerson ST, Suite 300
Seattle, Washington 98109
Contact: Nathan Byers
192 Nickerson ST, Suite 300
Seattle, Washington 98109
Contact: Ryan Arp
3445 California AVE SW, Studio 1
Seattle, WA 98116
Contact: Dwight Doty
BUILDING ENVELOPEBUILDING ENVELOPEBUILDING ENVELOPEBUILDING ENVELOPE
JRS ENGINEERINGJRS ENGINEERINGJRS ENGINEERINGJRS ENGINEERING Phone: (206) 728-2358
Email: bcarmichael@jrsengineering.com12721 30th Avenue Northeast
2nd Floor
Seattle, WA 98125
Contact: Brad Carmichael
SUSTAINABILITY SUSTAINABILITY SUSTAINABILITY SUSTAINABILITY
ARCH ECOLOGYARCH ECOLOGYARCH ECOLOGYARCH ECOLOGY
Phone: (206) 860-2904
Email: nancyh@archecology.com1808 Bellevue Ave #202
Seattle, WA 98122
Contact: Nancy Henderson
1.GENERAL NOTES DO NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITIES
DOCUMENTED IN AIA FORM A201 GENERAL CONDITIONS AND SUPPLEMENTAL
GENERAL CONDITIONS OR INFORMATION CONTAINED WITHIN THE DRAWINGS OR
PROJECT MANUAL.
2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF
ALL TRADES TO ASSURE COMPLIANCE WITH DRAWINGS AND PROJECT MANUAL.
3.CONSULTANT'S DRAWINGS INCLUDING BUT NOT LIMITED TO STRUCTURAL, CIVIL,
MECHANICAL, ELECTRICAL, AND INTERIOR DESIGN ARE SUPPLEMENTARY TO THE
DRAWINGS. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY AND ALL
DISCREPANCIES IDENTIFIED BETWEEN THE CONSULTANT'S DRAWINGS WITH A WRITTEN
REQUEST FOR CLARIFICATION. WORK INSTALLED IN CONFLICT WITH THE DRAWINGS
AND PROJECT MANUAL SHALL BE CORRECTED BY THE CONTRACTOR AT THE
CONTRACTOR'S EXPENSE.
4.DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION . WHERE
CONDITIONS ARE NOT SPECIFICALLY INDICATED, BUT ARE OF A SIMILAR CHARACTER
TO DETAILS SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED, SUBJECT
TO APPROVAL BY THE ARCHITECT.
5.THE CONTRACTOR SHALL INVESTIGATE EXISTING CONDITIONS BEFORE BEGINNING
WORK.
6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL ROUGH-IN
DIMENSIONS FOR EQUIPMENT INDICATED IN THE DRAWINGS AND PROJECT MANUAL,
AND PROVIDED BY OTHERS.
7.THE CONTRACTOR SHALL PROVIDE ALL BLOCKING, BUCK-OUTS, BACKING AND
JACKS AS REQUIRED FOR THE WORK, UNLESS NOTED OTHERWISE.
8.SUBCONTRACTORS SHALL BE RESPONSIBLE FOR INSPECTING THE WORKMANSHIP
OF SUBCONTRACTORS PRECEDING. DISCREPANCIES IN WORK SHALL BE REPORTED
TO THE CONTRACTOR IMMEDIATELY. FAILURE TO DO SO IN A TIMELY MANNER SHALL
BE CONSTRUED AS ACCEPTANCE OF THAT WORK.
9.SUBCONTRACTORS SHALL BE RESPONSIBLE FOR DAMAGE TO ADJACENT WORK
CAUSED BY THE SUBCONTRACTOR, IT'S AGENTS, OR EMPLOYEES. SUBCONTRACTOR
SHALL REPAIR SAID DAMAGE AT THE SUBCONTRACTOR'S EXPENSE.
10.THE USE OF WORD "PROVIDE" SHALL ALWAYS MEAN, "FURNISH, INSTALL, CONNECT
OR SECURE" AS REQUIRED.
11.ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE
WITH MANUFACTURERS WRITTEN INSTRUCTIONS AND TRADE ASSOCIATES ACCEPTED
STANDARDS.
12.DO NOT SCALE DRAWINGS; USE WRITTEN DIMENSIONS. IN THE EVENT THAT
DISCREPANCIES ARE FOUND IN THE DRAWINGS, THE CONTRACTOR SHALL
IMMEDIATELY CLARIFY SAID CONDITION WITH THE ARCHITECT BEFORE PROCEEDING
WITH THE WORK.
13.ALL INFORMATION RELATED TO EXISTING CONDITIONS HAS BEEN REPRESENTED
TO THE BEST KNOWLEDGE OF THE ARCHITECT. THE CONTRACTOR SHALL BE
RESPONSIBLE TO FIELD VERIFY EXISTING CONDITIONS AND NOTIFY THE ARCHITECT
OF ANY DISCREPANCIES THAT WOULD EFFECT THE CONSTRUCTION OF THE PROJECT
BEFORE STARTING THE WORK.
14.DIMENSIONS ARE TO THE FACE OF FRAMING, FACE OF CONCRETE, GRID LINES, OR
CENTERLINE OF COLUMNS, DOORS AND WINDOWS UNLESS NOTED OTHERWISE.
15.REFER TO ARCHITECTS' STANDARDS FOR SYMBOLS AND ABBREVIATIONS FOR
CLARITY OF DRAWINGS. IF A SYMBOL OR ABBREVIATION IS IDENTIFIED ON THE
ARCHITECTURAL DRAWINGS THAT IS IN DISCREPANCY WITH THE STANDARDS THE
CONTRACTOR SHALL NOTIFY THE ARCHITECT FOR CLARIFICATION.
16.REPETITIVE FEATURES NOT FULLY SHOWN OR NOTED ON THE DRAWINGS SHALL
BE COMPLETELY PROVIDED AS IF DRAWN IN FULL.
PROJECT NAME:PROJECT NAME:PROJECT NAME:PROJECT NAME:FAMILY FIRST COMMUNITY CENTER
PROJECT NUMBER:PROJECT NUMBER:PROJECT NUMBER:PROJECT NUMBER:TBD
PROJECT ADDRESS:PROJECT ADDRESS:PROJECT ADDRESS:PROJECT ADDRESS:16022 116TH AVE SE
TAX ASSESSOR'S #:TAX ASSESSOR'S #:TAX ASSESSOR'S #:TAX ASSESSOR'S #:282305-9034
PROJECT JURISDICTION:PROJECT JURISDICTION:PROJECT JURISDICTION:PROJECT JURISDICTION:CITY OF RENTON
SITE AREA: SITE AREA: SITE AREA: SITE AREA: 100,165 SF
LAND USE ZONING: LAND USE ZONING: LAND USE ZONING: LAND USE ZONING: R-6
OCCUPANCY GROUP (PER IBC 303):OCCUPANCY GROUP (PER IBC 303):OCCUPANCY GROUP (PER IBC 303):OCCUPANCY GROUP (PER IBC 303):A-3, B, E
TYPE OF CONSTRUCTIONTYPE OF CONSTRUCTIONTYPE OF CONSTRUCTIONTYPE OF CONSTRUCTION VB
BUILDING HEIGHT:BUILDING HEIGHT:BUILDING HEIGHT:BUILDING HEIGHT:31'-3"
ALL WORK SHALL CONFORM TO ALL APPLICABLE BUILDING CODES AND
ORDINANCES. ANY CONFLICT WHERE THE METHOD OR STANDARDS OF
INSTALLATION OF THE MATERIALS SPECIFIED DO NOT EQUAL OR EXCEED THE
REQUIREMENTS OF THE APPLICABLE CODE OR ORDINANCES, THE CODE OR
ORDINANCES SHALL GOVERN, IN THE EVENT THIS OCCURS, THE CONTRACTOR SHALL
NOTIFY THE ARCHITECT IMMEDIATELY. SUBSECTIONS OF THE CODE ARE LISTED HERE
FOR GENERAL REFERENCE, BUT DO NOT RELEASE THE CONTRACTOR FROM
CONFORMING TO ALL APPLICABLE BUILDING CODES AND ORDINANCES
APPLICABLE CODES:
2015 INTERNATIONAL BUILDING CODE (IBC)
2015 WASHINGTON STATE AMENDMENTS TO IBC
2015 WASHINGTON STATE ENERGY CODE
2015 INTERNATIONAL FIRE CODE WITH WASHINGTON STATE AMENDMENTS
2015 INTERNATIONAL MECHANICAL CODE WITH WASHINGTON STATE AMENDMENTS
2015 UNIFORM PLUMBING CODE WITH WASHINGTON STATE AMENDMENTS
2014 NATIONAL ELECTRICAL CODE
ICC/ANSI A117.1-2009 AS INCLUDED IN THE GOVERNING JURISDICTION
THE APPLICANT PROPOSES TO DEVELOP A ONE-STORY BUILDING
WITH SURFACE PARKING ON PARCEL # 282305-9034. THE
PROPOSED PROJECT WILL BE LOCATED SOUTH OF THE EXISTING
ELEMENTARY SCHOOL.
THE PROPOSED DEVELOPMENT WILL BE A COMMUNITY CENTER WITH
APPROXIMATELY 21,100 GSF AND 92 PARKING STALLS. THE
PROPOSED COMMUNITY CENTER WILL BE OPEN TO THE GENERAL
PUBLIC AND WILL OFFER SERVICES SUCH AS AFTER SCHOOL
PROGRAMS AND ACTIVITIES, HEALTH CARE OFFICES WITH LABS,
COUNSELING SERVICES, CHILDCARE FOR FACILITY USERS,
COMMUNITY GARDEN AND DEMONSTRATION KITCHEN, A GYM, YOGA,
DANCE AND FITNESS PROGRAMS.
THE CONSTRUCTION TYPE IS V-B. THE PROPOSED BUILDING WILL BE
A SUSTAINABLE DESIGN WITH THE GOAL OF LEED SILVER AND WILL
INCLUDE SUCH FEATURES AS HEAVY TIMBER WOOD FRAMING AND
NATURAL LIGHT.
BUILDING MATERIALS: WOOD FRAME CONSTRUCTION INCLUDING
GLULAM BEAMS AND COLUMNS, METAL SIDING FOR EXTERIOR WALLS,
FIBERGLASS WINDOWS AND PVC ROOF MEMBRANE.
S 800 FT OF N 830 FT OF W 840 FT OF NW 1/2 OF NW 1/4 LESS CO
RD
MAXIMUM BUILDING COVERAGE:MAXIMUM BUILDING COVERAGE:MAXIMUM BUILDING COVERAGE:MAXIMUM BUILDING COVERAGE:40%
BUILDING COVERAGE PROVIDED:BUILDING COVERAGE PROVIDED:BUILDING COVERAGE PROVIDED:BUILDING COVERAGE PROVIDED:
MAXIMUM IMPERVIOUS SURFACE AREA:MAXIMUM IMPERVIOUS SURFACE AREA:MAXIMUM IMPERVIOUS SURFACE AREA:MAXIMUM IMPERVIOUS SURFACE AREA:55%
IMPERVIOUS SURFACE PROVIDED:IMPERVIOUS SURFACE PROVIDED:IMPERVIOUS SURFACE PROVIDED:IMPERVIOUS SURFACE PROVIDED:
MAXIMUM WALL PLATE HEIGHT:MAXIMUM WALL PLATE HEIGHT:MAXIMUM WALL PLATE HEIGHT:MAXIMUM WALL PLATE HEIGHT:24'-0"
MAXIMUM BUILDING HEIGHT PROPOSEDMAXIMUM BUILDING HEIGHT PROPOSEDMAXIMUM BUILDING HEIGHT PROPOSEDMAXIMUM BUILDING HEIGHT PROPOSED 31'31'31'31'----3"3"3"3"
PROJECT SITE
PROJECT NUMBER:
DRAWN BY:
PROJECT MANAGER:
COPYRIGHT 2019
BAYLIS ARCHITECTS INCORPORATED
ALL RIGHTS RESERVED
C
THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED
HEREIN, IS THE PROPERTY OF BAYLIS ARCHITECTS INC., AND MAY
NOT BE REUSED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN
CONSENT OF BAYLIS ARCHITECTS INCORPORATED.
REVISIONS:9/10/2019 7:43:41 PMA001
COVER SHEET
16-0996
Author
CheckerFAMILY FIRST COMMUNITYCENTERRENTON, WALAND USE PERMITDRAWINGS09/05/19ARCHITECTURALARCHITECTURALARCHITECTURALARCHITECTURAL
A100.a OVERALL SITE PLAN
A100.b SITE PLAN
A101 FLOOR PLAN
A102 ENLARGED FLOOR PLAN
A103 ENLARGED FLOOR PLAN
A104 ROOF PLAN
A105 RCP
A201 EXTERIOR ELEVATIONS
A301 BUILDING SECTIONS
A504 WINDOW SCHEDULE
A505 GALLERY GLAZING ELEVATION
A601 CONCRETE AND SITE DETAILS
A602 CONCRETE DETAILS
A603.1 EXTERIOR DETAILS
A603.2 EXTERIOR DETAILS
A604 DOOR DETAILS - EXTERIOR
A605 WINDOW DETAILS - EXTERIOR
A607 ROOF DETAILS
A608 ROOF DETAILS
SHEET INDEX
GENERAL INFORMATION AND DATA SHEETSGENERAL INFORMATION AND DATA SHEETSGENERAL INFORMATION AND DATA SHEETSGENERAL INFORMATION AND DATA SHEETS
A001 COVER SHEET
A003 CODE SUMMARY
A010a ACCESSIBILITY STANDARDS GENERAL AND COMMON AREAS
SURVEYSURVEYSURVEYSURVEY
SURVEY SURVEY
CIVILCIVILCIVILCIVIL
C100 DEMOLITION & TESC PLAN
C110 DEMOLITION & TESC DETAIL
C200 GRADING & DRAINAGE PLAN
C300 PAVING PLAN
C400 UTILITY PLAN
STRUCTURALSTRUCTURALSTRUCTURALSTRUCTURAL
S101 FOUNDATION PLAN
S102 ROOF FRAMING PLAN
PROJECT DATA
VICINITY MAP
BUILDING ENVELOPEBUILDING ENVELOPEBUILDING ENVELOPEBUILDING ENVELOPE
BE-000 GENERAL NOTES AND INDEX
BE-010 AIR BARRIER DIAGRAMS
BE-020 WATERPROOFING ASSEMBLIES
BE-030 WATERPROOFING EXTENTS DIAGRAMS
BE-100 SLAB ON GRAGDE DETAILS
LANDSCAPELANDSCAPELANDSCAPELANDSCAPE
L100 SITE PLAN
L200 LANDSCAPE PLAN
L201 LANDSCAPE SCHEDULE & DETAILS
L300 IRRIGATION PLAN
L301 IRRIGATION LEGEND & DETAILS
L302 IRRIGATION DETAILS
L400 LANDSCAPE DETAILS
L401 LANDSCAPE DETAILS
ELECTRICALELECTRICALELECTRICALELECTRICAL
E001 COVER SHEET
E002 SCHEDULES
E100 SITE PLAN - NEW UTILITY POWER AND TELECOMM PLAN
E101 FLOOR PLAN - POWER PLAN
E201 FLOOR PLAN - LIGHTING PLAN
GENERAL NOTES PROJECT DESCRIPTION
LEGAL DESCRIPTION
PROJECT DIRECTORY
APPLICABLE CODES
FAMILY FIRST COMMUNITY CENTER
LAND USE REQUIREMENTS
MECHANICALMECHANICALMECHANICALMECHANICAL
M001 COVER SHEET
M002 SCHEDULES
M101 HVAC FLOOR PLAN
M102 HVAC ROOF PLAN
M301 DETAILS
INTERIORSINTERIORSINTERIORSINTERIORS
I-1.0 FLOOR PLAN
I-1.1 FLOOR FINISH PLAN
I-3.0 INTERIOR ELEVATIONS
I-3.1 INTERIOR ELEVATIONS
I-3.2 INTERIOR ELEVATIONS
I-3.3 INTERIOR ELEVATIONS
I-3.4 INTERIOR ELEVATIONS
I-3.5 INTERIOR ELEVATIONS
I-3.6 INTERIOR ELEVATIONS
I-3.7 INTERIOR ELEVATIONS
I-3.8 INTERIOR ELEVATIONS
I-7.0 FINISH SCHEDULES
PARKING
PLUMBINGPLUMBINGPLUMBINGPLUMBING
P001 COVER SHEET
P002 SCHEDULES
P101 PLUMBING FLOOR PLAN
P102 ROOF PLAN
P301 DETAILS
NO. DESCRIPTION DATE
PROPOSED BLDG HEIGHT
492'-6"
ROOF
479'-6"
GROUND FLOOR
461'-6"
E1E3E7
E6
E9 E8
E1
E10
E12
E12
E5
E4
E1E2
31' - 0"E9
9/5/2019FAMILY FIRST COMMUNITY
CENTER
P1.05
ELEVATION
RENTON, WA
82
0
3216 64
1/16"=1'-0"
4
1/16" = 1'-0"
NORTH ELEVATION - COLOR
NUMBER DESCRIPTION
E1 MEMBRANE ROOF, TYP W PRE-FINISHED METAL FASCIA
E2 GREEN ROOF (BID ALTERNATE)
E3 BEAM PER STRUCTURAL
E4 RAIN COLLECTION CISTERN (BID ALTERNATE)
E5 GUTTER
E6 GLULAM COLUMN
E7 FIBERGLASS GLAZING SYSTEM
E8 METAL SIDING W ALTERNATING 1" REVEAL PATTERN
E9 CORRUGATED METAL SIDING
E10 HOLLOW METAL DOOR
E12 FIBERGLASS WINDOW, TYP.
E13 ALUMINUM SUNSHADE
2
3 4 121 2
3 414
PROPOSED MATERIAL BOARD
FAMILY FIRST COMMUNITY CENTER
NORTH ELEVATION
FAMILY FIRST COMMUNITY CENTER SOUTHWEST PERSPECTIVE
SMOOTH PANEL METAL
SIDING WITH ALTERNATING
1” REVEAL PATTERN - TIME-
LESS SILVER
1 CORRUGATED METAL SIDING
- COOL TAHOE BLUE2 GLULAM STRUCTURAL FRAME3
FIBERGLASS WINDOW4
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9/5/2019FAMILY FIRST COMMUNITY
CENTER
P1.04
SITE AERIAL VIEW
RENTON, WA
1
Clark Close
From:Gustaves, Clay <Clay.Gustaves@Williams.com>
Sent:Tuesday, October 01, 2019 2:21 PM
To:Clark Close
Cc:everistm@baylisarchitects.com; Vaughn, Nick; Tarter, Randy C
Subject:PR18-000336 Family First Community Center
Attachments:2019 Developers Handbook.pdf
Importance:High
Mr. Close,
Williams – Northwest Pipeline operates two interstate high pressure natural gas transmission pipelines within an
easement held on School District property referenced in the application materials. The approximate location of these
pipelines are shown in red on the attached aerial image. I have attached our Developers Handbook, which specifies
approved land uses and restrictions within our transmission easements. These specifications must be strictly adhered to.
I didn’t see any plans or drawings in the mailed or electronic application materials, but we would need to see and
approve any activity within our easement and most likely have a representative present during any work within the
easement. Please forward the development plans for review when available.
https://edocs.rentonwa.gov/Documents/Browse.aspx?id=7984927&dbid=0&repo=CityofRenton&cr=1
October 2, 2019
Clay Gustaves
22909 NE Redmond Fall City Rd.
Redmond, WA 98053
SUBJECT: FAMILY FIRST COMMUNITY CENTER COMMENT RESPONSE LETTER
LUA19-000212, SA-A, CU-H, ECF, V-A, MOD
Dear Mr. Gustaves:
Thank you for your comments related to Family First Community Center (received October 1, 2019)
wherein you identified two interstate high pressure natural gas transmission pipelines within an
easement held on Renton School District’s property. The approximate location of the Williams –
Northwest Pipeline was shown near the north property line of subject parcel (APN 2823059034). Your
comments will be added to the public record for consideration by the reviewing official and you have
been added as a party of record.
As part of the application submittal, the applicant provided an overall site plan prepared by Baylis
Architects (see enclosure). Digital copies of these submittal items and other project information is also
available on the City’s website for review. Please note that the proposed project would be located south
of the existing Cascade Elementary School building (over 500 feet south of the natural gas transmission
pipeline).
Thank you for interest in this project and if you have any further questions please feel free to contact
me at 425-430-7289 or cclose@rentonwa.gov.
Sincerely,
Clark H. Close
Senior Planner
Enclosure: Overall Site Plan
TENW
Transportation Engineering NorthWest
Transportation Planning | Design | Traffic Impact & Operations
PO Box 65254, Seattle, WA 98155 | Office (206) 361-7333
MEMORANDUM
DATE: February 13, 2019
TO: Bob Mahn, Transportation Review Engineer
Public Works Department - City of Renton
CC: Russ Woodruff, Capital Project Coordinator – Facilities
Community Services Department - City of Renton
FROM: Michael J. Read, PE, Principal, TENW
SUBJECT: Family First Community Center – Traffic Impact Study
TENW Project No. 3612
This memorandum summarizes the results of a traffic impact analysis for a proposed
development known as Family First Community Center, which would construct an approximate
22,000 square foot building with 18,300 square feet dedicated to a recreational community
center and roughly 3,700 square feet dedicated to a community health clinic. Currently,
approximately 133 new on-site parking stalls (112 are net new stalls) would be constructed at
16022 116th Avenue SE in Renton, WA. The project proposes to provide all access via two
existing site access driveways onto 116th Avenue SE that would be shared with the adjacent
Cascade Elementary School (CES) located north of the project site.
Project Description
The proposed development is located at 16022 116th Avenue SE in Renton, WA. A new
22,000 square foot recreational community center and 3,700 square feet community health
clinic would be constructed with a total of 136 new on-site parking stalls with 112 net new
stalls (21 existing parking stalls would be reconstructed as part of the development to provide
38 on-site parking stalls). The total size of the building would be approximately 22,000
square feet. Site access would be provided via two existing site access driveways (Center
and South Driveways) onto 116th Avenue SE that would be shared with the adjacent Cascade
Elementary School (CES) located north of the project site, but controlled by a gate during peak
school arrival/dismissal periods. A loading area would be provided on the south side of the
new community center building. A site vicinity map is provided in Figure 1 and a conceptual
site plan is illustrated in Figure 2.
Existing Transportation Conditions
This section includes an inventory of existing roadway conditions, existing peak hour traffic
volumes, intersection levels of service, Cascade Elementary School arrival-dismissal period
observations, public transportation services, nonmotorized facilities and planned transportation
improvements.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: October 10, 2019
TO: Clark Close, Senior Planner
FROM: Brianne Bannwarth, Development Engineering Manager
SUBJECT: Traffic Concurrency Test – Family First Community Center;
LUA19-000212
The applicant, City of Renton, is requesting Administrative Site Plan Review, Hearing Examiner
Conditional Use Permit review, Height Variance, Driveway Design Modification, Street
Modification and Waiver, and Environmental (SEPA) Review to construct a community center
(Family First Community Center) at 16022 116th Ave SE (APN 2823059034). The other
government facility is proposed on the south portion of Renton School District’s (RSD) Cascade
Elementary School in the Benson Community Planning Area. RSD will also be requesting to
subdivide the 14.88-acre school property to create a separate 2.72-acre parcel for the community
center. The existing site is zoned Residential-6 (R-6) and is currently occupied by Cascade
Elementary School, supplemental portable classrooms, and related play areas, parking, and
mechanical equipment. The existing elementary school would remain and the biofiltration swale
and associated storm piping would be removed to accommodate the new Modular Wetland
System. The proposed 21,110 square foot one-story community center would be open to the
general public and would offer services such as after school programs and activities, health care
offices with labs, counseling services, childcare for facility users, community garden and
demonstration kitchen, lunch room, locker rooms, gym, and fitness programs.
The large parcel has an overall elevation drop of 13 feet from the northwest corner to the
southeast corner of the site. Access to the new facility would be provided via an existing driveway
at the south end of the property off 116th Ave SE and ingress and egress improvements would
be completed on the next adjacent driveway to the north for two-way traffic plus a proposed Bus
Only lane. Site improvements would also include 90 new onsite parking spaces and 29 shared
parking spaces with the school in front of the proposed community center. A 10 -foot wide fully
sight-obscuring landscape visual barrier would be provided along the south property line within
Transportation Concurrency Test – Family First Community Center
Page 2 of 3
October 10, 2019
the construction limits. No critical areas were identified on the site. The applicant is proposing to
remove eight (8) significant trees on the existing parcel.
The applicant is also requesting a variance to the maximum building height in the R-6 zone to 31’-
3” to primarily accommodate the gymnasium use with sport courts. The applicant is also
requesting a street modification and waiver to retain the existing frontage improvements and a
driveway design modification to allow modifications to the maximum driveway width to minimize
existing traffic impacts. The proposed driveway re-configuration would consist of a 24-foot wide
driveway for two-way load/unload traffic, a 14-foot wide driveway for Bus Only access lane, and
an approximately 11-foot wide island that separates these two access points. Construction of the
Family First Community Center is expected to begin in May 2020 and end in July 2021. The
applicant submitted a Geotechnical Engineering Report, a Phase One Environmental Site
Assessment, a Technical Information Report, a Tree Inventory & Retention Plan, and a Traffic
Impact Study.
The proposed development would generate approximately 669 net new average weekday daily
trips. During the weekday AM peak hour, the project would generate approximately 46 net new
trips (32 inbound and 14 outbound). During the weekday PM peak hour, the project would
generate approximately 54 net new trips (23 inbound and 31 outbound). The proposed project
passes the City of Renton Traffic Concurrency Test per RMC 4-6-070.D as follows:
Traffic Concurrency Test Criteria Pass
Implementation of citywide Transportation Plan Yes
Within allowed growth levels Yes
Project subject to transportation mitigation or impact fees Yes
Site specific street improvements to be completed by project Yes
Traffic Concurrency Test Passes
Evaluation of Test Criteria
Implementation of citywide Transportation Plan: The City’s investment in completion of the
forecast traffic improvements is 130% of the scheduled expenditure through 2020.
Within allowed growth levels: As shown on the attached citywide traffic concurrency summary,
the calculated citywide trip capacity for concurrency with the city adopted model for 201 9 is
1,711 trips, which provides sufficient capacity to accommodate approximately 54 additional trips
from this project. A resulting 1,657 trips are remaining.
Transportation Concurrency Test – Family First Community Center
Page 3 of 3
October 10, 2019
Project subject to transportation mitigation or impact fees: The project will be subject to
transportation impact fees at time of building permit for the project.
Site specific street improvements to be completed by project: The project has requested a waiver
to construct frontage improvements and install a wider driveway. City staff is in support of the
requested waiver provided all ramps along the property street frontage are brought up to current
ADA standards and right of way dedication is provided for the future street improvements.
Frontage improvements will be required to be completed prior to occupancy of the building. Any
additional off-site improvements identified through SEPA or land use approval will also be
completed prior to final occupancy.
Background Information on Traffic Concurrency Test for Renton
The City of Renton Traffic Concurrency requirements for proposed development projects are
covered under Renton Municipal Code (RMC) 4-6-070. The specific concurrency test requirement
is covered in RMC 4-6-070.D, which is listed for reference:
D. CONCURRENCY REVIEW PROCESS:
1. Test Required: A concurrency test shall be conducted by the Department for each
nonexempt development activity. The concurrency test shall determine consistency with
the adopted Citywide Level of Service Index and Concurrency Management System
established in the Transportation Element of the Renton Comprehensive Plan, according
to rules and procedures established by the Department. The Department shall issue an
initial concurrency test result describing the outcome of the concurrency test.
2. Written Finding Required: Prior to approval of any nonexempt development activity
permit application, a written finding of concurrency shall be made by the City as part of
the development permit approval. The finding of concurrency shall be made by the
decision maker with the authority to approve the accompanying development permits
required for a development activity. A written finding of concurrency shall apply only to
the specific land uses, densities, intensities, and development project described in the
application and development permit.
3. Failure of Test: If no reconsideration is requested, or if upon reconsideration a project
fails the concurrency test, the project application shall be denied by the decision maker
with the authority to approve the accompanying development activity permit application.
The Concurrency Management System established in the Transportation Element on page XI -65
of the Comprehensive Plan states the following:
Based upon the test of the citywide Transportation Plan, consideration of growth levels
included in the LOS-tested Transportation Plan, payment of a Transportation Mitigation
Fee, and an application of site specific mitigation, development will have met City of
Renton concurrency requirements.
SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 1 of 14
SEPA ENVIRONMENTAL CHECKLIST
Purpose of checklist:
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance, minimization
or compensatory mitigation measures will address the probable significant impacts or if an environmental
impact statement will be prepared to further analyze the proposal.
Instructions for applicants:
This environmental checklist asks you to describe some basic information about your proposal. Please
answer each question accurately and carefully, to the best of your knowledge. You may need to consult
with an agency specialist or private consultant for some questions. You may use “not applicable” or
"does not apply" only when you can explain why it does not apply and not when the answer is unknown.
You may also attach or incorporate by reference additional studies reports. Complete and accurate
answers to these questions often avoid delays with the SEPA process as well as later in the decision-
making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your proposal
or its environmental effects. The agency to which you submit this checklist may ask you to explain your
answers or provide additional information reasonably related to determining if there may be significant
adverse impact.
Instructions for Lead Agencies:
Please adjust the format of this template as needed. Additional information may be necessary to
evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse
impacts. The checklist is considered the first but not necessarily the only source of information needed to
make an adequate threshold determination. Once a threshold determination is made, the lead agency is
responsible for the completeness and accuracy of the checklist and other supporting documents.
Use of checklist for nonproject proposals:
For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable
parts of sections A and B plus the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). Please
completely answer all questions that apply and note that the words "project," "applicant," and "property or
site" should be read as "proposal," "proponent," and "affected geographic area," respectively. The lead
agency may exclude (for non-projects) questions in Part B - Environmental Elements –that do not
contribute meaningfully to the analysis of the proposal.
A. Background [HELP]
1. Name of proposed project, if applicable: Family First Community Center
2. Name of applicant: City of Renton
September 5, 2019
Family First Community Center
PROPOSED CONSTRUCTION MITIGATION DESCRIPTION
Proposed Construction Dates
May 2020 – July 2021
Haul Routes
A construction plan indicating haul routes and hours, construction hours, and a traffic control plan will be
submitted to the Development Services Division for approval.
Haul Hours
Haul hours shall be restricted to the hours between eight-thirty (8:30) a.m. and three-thirty (3:30) p.m.,
Monday through Friday unless otherwise approved in advance by the Development Services Division.
Permitted Work Hours in or Near Residential Areas
Construction activities for the project shall be restricted to the following hours:
b. Construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and eight
o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours
between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on
Sundays.
Emergency Extensions to Permitted Work Hours
The Development Services Division Director is authorized to grant an extension of working time during an
emergency. An emergency shall include but is not limited to natural and manmade disasters.
Temporary Erosion Control
Temporary erosion control must be installed and maintained for the duration of the project. This work will
comply with the Surface Water Design Manual and must be approved by the Renton Development Services
Division. (Ord. 5526, 2-1-2010)
Hydroseeding Required:
a. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an
appropriate ground cover over any portion of the site that is graded or cleared of vegetation and
where no further construction work will occur within ninety (90) days.
b. Alternative measures to hydroseeding such as mulch, sodding, or plastic covering as specified in
the Surface Water Design Manual may be proposed between the dates of October 1st and April
30th of each year. Plastic covering may be used for soil protection for soils that will be utilized as
structural or fill materials only; provided, that soils that are to be reused for other purposes shall
be covered for no more than fourteen (14) days.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 2 LUA19-000212
ADVISORY NOTES TO APPLICANT
The following notes are supplemental information provided in conjunction with the administrative land use
action. Because these notes are provided as information only, they are not subject to the appeal process for
the land use action.
Planning:
(Contact: Clark H. Close, 425-430-7289, cclose@rentonwa.gov)
1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unl ess
otherwise approved by the Development Services Division.
2. Commercial and other nonresidential construction activities shall be restricted to the hours between
seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturd ays shall
be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall
be permitted on Sundays.
3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an
appropriate ground cover over any portion of the site that is graded or cleared of vegetation and where
no further construction work will occur within ninety (90) days. Alternative measures such as mulch,
sodding, or plastic covering as specified in the current King County Surface Water Management Design
Manual as adopted by the City of Renton may be proposed between the dates of November 1st and
March 31st of each year. The Development Services Division’s approval of this work is required prior to
final inspection and approval of the permit.
4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is
being cleared.
5. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or
fluids, operate any equipment, install impervious surfaces, or compact the earth in any way within the
area defined by the drip line of any tree to be retained.
6. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around
the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be
placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected Trees” or on
each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or groups
of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the
applicant shall provide supervision whenever equipment or trucks are moving near trees.
7. This permit is shall comply with the Bald and Golden Eagle Protection Act. The permitted is responsible
for adhering to the U.S. Fish and Wildlife Service National Bald Eagle Management Guidelines (2007) and
/or your U.S. Fish and Wildlife Service permit.
Development Engineering:
(Contact: Justin Johnson, 425-430-7291, jtjohnson@rentonwa.gov)
1. See Attached Development Engineering Memo dated October 10, 2019.
Fire Authority:
(Contact: Corey Thomas, 425-430-7024, cthomas@rentonwa.gov)
Environmental Impact Comments:
1. Fire impact fees are applicable at the rate of $2.36 per square foot. This fee is paid at time of building
permit issuance.
ADVISORY NOTES TO APPLICANT
Page 2 of 2 LUA19-000212
Fire Code Related Comments:
1. The preliminary fire flow is 2,750 gpm. A minimum of three fire hydrants are required. One within 150-
feet and two others within 300-feet of the building. One hydrant is required within 50-feet of the fire
department connection for the sprinkler system. A certificate from Soos Creek Water is required. A
looped water main is required around the building as fire flow exceeds 2,500 gpm.
2. Approved fire sprinkler and fire alarm systems are required throughout the building. Direct outside
access is required to the fire sprinkler riser room. Fire alarm system is required to be fully addressable
and full detection is required. Separate plans and permits required by the fire department.
3. Fire department apparatus access roadways are required within 150 -feet of all points on the buildings.
Fire access roads are required to be a minimum of 20-feet unobstructed width with turning radius of
25-feet inside and 45-feet outside minimum. Fire lane signage required for the onsite roadways.
Roadways shall support a minimum of a 30-ton vehicle and 75-psi point loading.
Technical Services:
(Contact: Amanda Askren, 425-430-7369, aaskren@rentonwa.gov)
1. No comments at this time.
Community Services:
(Contact: Leslie Betlach, 425-430-6619, lbetlach@rentonwa.gov)
1. Parks Impact fee per Ordinance 5670 applies.
Police:
(Contact: Cyndie Parks, 425-430-7521, cparks@rentonwa.gov)
1. No comments at this time.
Building:
(Contact: Craig Burnell, 425-430-7290, cburnell@rentonwa.gov)
1. Recommendations of the geotechnical report must be followed as a condition of building permits.
DEPARTMENT OF COMMUNITY
& ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: October 10, 2019
TO: Clark Close, Senior Planner
FROM: Brianne Bannwarth, Development Engineering Manager
SUBJECT: Utility and Transportation Comments for Family First Community Center
16022 116th Avenue SE
LUA19-000212
I have reviewed the application for the Family First Community Center at 16022 116th Avenue SE
(APN 2823059034). The project proposes to construct a 27,000 square foot recreational center
with 120 surface parking stalls. The following are the civil review comments for the proposed
project:
EXISTING CONDITIONS
The site is approximately 14.9 acres in size and is rectangular in shape. Cascade Elementary School
with associated parking lot resides on the west portion of existing property and the remaining
portion is open fields with lawn.
Water Water service is provided by Soos Creek Water and Sewer District.
Sewer Wastewater service is provided by the Soos Creek Water and Sewer District.
Storm There is an existing storm drainage system in 116th Avenue SE. Stormwater runoff from
the existing site consists of surface, shallow, and piped flow to the existing biofiltration
swale located on the south side of the site, which then discharges to the existing
stormwater system at the southeast corner of the site as defined by the project
Technical Information Report dated August 22, 2019 prepared by Coughlin Porter
Lundeen.
Streets 116th Avenue SE is a Minor Arterial Street with an existing right of way (ROW) width of
60 feet as measured using the King County Assessor’s Map. The pavement width is 35
feet (two 11-foot lanes with 7 foot shoulder on the west side of the roadway) with a
0.5-foot curb, 6-foot planter strip, and 5-foot sidewalk on the west side of the roadway.
Family First Community Center – LUA19-000212
Page 2 of 6
October 10, 2019
CODE REQUIREMENTS
WATER
1. Please obtain a water availability certificate from Soos Creek Water and Sewer District
and provide it with the construction permit submittal.
2. Review of the water plans will be conducted by Soos Creek Water and Sewer District and
the Renton Regional Fire Authority.
3. Plans approved by Soos Creek Water and Sewer District shall be routed to the City for
final review prior to permit issuance.
SEWER
1. Please obtain a sewage availability certificate from Soos Creek Water and Sewer District
and provide it with the construction permit submittal.
2. Review of the sewage plans will be conducted by Soos Creek Water and Sewer District.
3. Plans approved by Soos Creek Water and Sewer District shall be routed to the City for
final review prior to permit issuance.
SURFACE WATER
1. A geotechnical report, dated June 8, 2018, completed by Riley Group, Inc. for the site has
been provided. Erosion control measures will need to be in place prior to starting grading
activities on the site. The report discusses the soil and groundwater characteristics of the
site including a very brief discussion regarding the infiltration potential and provide
recommendations for project design and construction. The report notes that the site is
underlain by up to 11 feet of fill material. Geotechnical recommendations presented need
to be address within the project plans.
2. A Preliminary Drainage Plan and Technical Information Report (TIR), dated August 22,
2019, was submitted by Coughlin Porter Lundeen with the Land Use Application. Based
on the City of Renton’s flow control map, the site falls within the Flow Control Duration
Standard area matching Forested Site Conditions and is within the Lower Cedar River
Drainage Basin. The development is subject to Full Drainage Review in accordance with
the 2017 Renton Surface Water Design Manual (RSWDM). All nine core requirements and
five out of the six special requirements discussed in the Technical Information Report.
a. Discharge at the Natural Location, RSWDM Core Requirement #1: The existing
project site’s surface water discharges to an existing conveyance system located
at the southeast portion of the site. The surface water is then directed to the
storm drainage system within the adjacent residential neighborhood.
b. Off-site Analysis, RSWDM Core Requirement #2: The project off-site analysis
evaluated the upstream and downstream area. The analysis identified that there
were no downstream concerns.
c. Flow Control, RSWDM Core Requirement #3: The proposed detention system
shall be designed in accordance with the RSWDM that is current at the time of
civil construction permit application. Separate structural plans will be required to
be submitted for review and approval under a separate building permit for the
detention system ensuring that system can withstand fire truck loading. Special
inspection from the building department is required. The project proposes two
Family First Community Center – LUA19-000212
Page 3 of 6
October 10, 2019
proprietary detention Stormtech Chamber system (SC-310 and MC-3500) to
address the flow control requirements. The following are items that will need to
be addressed as part of the Civil Construction Permit Application:
i. In accordance with the Flow Control Duration Standard Matching
Forested Site Conditions, the developed mitigated 2-year and 10-year
peak flow rates shall match the pre-developed (forested) 2-year and 10-
year peak flow rates. Additionally, the developed mitigated flow
duration extending from 50% of the 2-year to the full 50-year flow must
match the pre-developed (forested) condition.
ii. Targeted area not able to be routed to the detention vault shall be
modeled as bypass area (i.e. unmitigated flow directed to the projects
downstream point of compliance). This includes the slope area that is
surrounding the parking lot on the east side of the development.
iii. Lid and access panels for the detention vault shall be located outside of
the ADA paths and stalls.
iv. Applicant shall provide flow control model calculations to verify that the
storage volume proposed can adequately mitigate created flows.
d. Conveyance, RSWDM Core Requirement #4: All new conveyance systems
constructed as part of the project must be sized to RSWDM standards for the total
tributary area (onsite and offsite) that the storm systems serve.
i. Pipe connects into the proposed structures shall be evaluated for
constructability as part of the Civil Construction Permit Applications.
Details of structure connections shall be provided.
e. Core Requirements #5 through #7: Core Requirements shall be fully addressed as
part of the Civil Construction Permit Application.
f. Water Quality, RSWDM Core Requirement #8: Based on the commercial use of
the project, Enhanced Basic Water Quality Treatment is required. The project
proposes to use two proprietary system to meet the water quality assessment.
One of the system will replace the existing bioretention swale providing water
quality for the existing site impervious area. The second will be downstream of
the proposed detention system for the proposed improvements.
i. Applicant shall provide model calculations showing the required volume
to be treated by the water quality facilities, per Core Requirement 8. .
g. Onsite BMPs, RSWDM Core Requirement #9: Appropriate on-site BMPs will be
required to help mitigate the new runoff created by this development. A
preliminary drainage plan, including the application of on-site BMPs, has been
included with the land use application. Infiltration has been determined to be
infeasible based on the fill material on site, therefore, the project proposes to
implement non-infiltrative bioretention, soil quality preservation, and vegetated
roof to meet this requirement. The final drainage plan and drainage report must
be submitted with the civil construction permit application.
i. Final evaluation of the application of on-site BMPs to the maximum
extent feasible will be completed during civil construction permit
review. The applicant may be required to apply additional on-site BMPs
in order to meet the minimum requirements outlined in Core
Requirement #9.
ii. Non-infiltrative bioretention (bioretention with underdrain) does not
meet the requirements of Core Requirement #9, unless approved via an
Family First Community Center – LUA19-000212
Page 4 of 6
October 10, 2019
adjustment per Section 1.4 of the RSWDM that, at minimum, addresses
comparable hydraulic performance, water quality concerns, and
maintainability.
iii. Permeable pavement is deemed infeasible in the TIR, yet the design
plans call out pervious concrete parking stalls.
h. Aquifer Protection Area, RSWDM Special Requirement #6: The existing site is
outside of the City’s Aquifer Protection Area, however, the Technical
Information Report shall be revised as part of the Civil Construction Permit
Application to address this requirement.
3. The current City of Renton Surface Water Standard Plans that shall be used in all
drainage submittals are available online at the City of Renton website.
4. A Construction Stormwater General Permit from Department of Ecology will be required
since grading and clearing of the site exceeds one acre. A Stormwater Pollution
Prevention Plan (SWPPP) is required for this site.
5. Surface water system development fee is $0.720 per square foot of new impervious
surface, but not less than $1,800.00. This is assessed based on the final approved civil
construction plans and payable prior to issuance of the construction permit.
TRANSPORTATION
1. The transportation impact fee that is current at the time of building permit application
will be levied, payable at issuance of building permit.
2. The proposed development fronts along 116th Avenue SE, a Minor Arterial street. Existing
right-of-way (ROW) width is approximately 60 feet. The City’s Transportation Division has
established a corridor plan for this section of 116th Ave SE. The corridor determined by
the City’s Transportation Division which supports recommendations in the Benson Hill
Community Plan, requires a right-of-way width of 71-ft. The paved roadway section is 44-
ft, consisting of two 11-ft travel lanes, one 12-ft center turn lane, and two 5-ft bike lanes.
A 0.5-ft vertical curb, 8-ft planter and 5-ft sidewalk are required along each side of the
roadway. Dedication of 5.5-ft of right-of-way would be required.
a. The applicant submitted a waiver request as part of the land use application to
maintain the existing roadway improvements fronting the subject property.
Community and Economic Development Staff in conjunction with Pubic Works
Transportation staff have reviewed the street waiver request. Staff
recommends approval of the waiver given that the existing street section meets
the transportation needs for connectivity, pedestrian access, and separation
between vehicular and pedestrian movements. Staff does recommend a
condition of approval to dedicate the required 5.5-feet right of way required to
complete the proposed corridor plan and upgrading all of the existing driveway
curb ramps along the west property line to meet current ADA requirements.
3. Transportation Engineering NorthWest (TENW) provided a transportation memorandum
dated February 13, 2019. The site generated traffic volumes were calculated using data
from the Institute of Transportation Engineers (ITE) Trip Generation Manual, 10th Edition,
(2017). The TIA evaluated traffic operations at seven intersections around the site. The
intersections evaluated during the PM Peak Hour were:
a. 116th Avenue SE / S Puget Drive / Royal Hills Drive SE
b. 116th Avenue SE / SE 22nd Street
c. 116th Avenue SE / SE 164th Street
Family First Community Center – LUA19-000212
Page 5 of 6
October 10, 2019
d. 116th Avenue SE / SE Petrovitsky Road
e. 116th Avenue SE / Project North Driveway (AM Peak Hour as well)
f. 116th Avenue SE / Project Center Shared Site Driveway (AM Peak Hour as well)
g. 116th Avenue SE / Project South Shared Site Driveway (AM Peak Hour as well)
The intersections were evaluated using Level of Service (LOS) methodology under existing
conditions, existing plus project conditions, and project opening year conditions. LOS
evaluation was done in accordance with the industry standard 2010 Highway Capacity
Manual (HCM). Study intersections were visited by Idax Data Solutions in May 2018 during
the AM and PM Peak periods.
Traffic counts were done between 7:00 AM and 9:00 AM and between 4:00 PM and 6:00
during the weekday. From this data, existing LOS was determined for each intersection.
The report concludes that in the existing condition, each intersection operates at LOS D
or better. It was noted that the circulation of pedestrians and vehicles during the peak
arrival and dismissal periods are not operating efficiently.
Project trip generation was completed using the 10th Edition of the Institute of
Transportation Engineers (ITE) trip generation manual. The 10th Edition of the ITE manual
is the industry and City standard for determining trip generation. The Recreational
Community Center use (Code 495) and Clinic use (Code 630) were used for the proposed
trip generation. The Family First Community Center is projected to generate
approximately 46 AM net new AM peak hour trips, 54 PM peak hour trips, and 669 net
new daily trips. New trip distribution was projected for the AM and PM peak hours. Trips
were assigned to the existing City streets at the study intersections based on field
observations by TENW and the proposed configuration of the parking lot and site
circulation. City staff has reviewed the trip generation and trip assignment and found that
the tables in the report do not match the tables referenced in the Attachments. Please
reconcile values and provide updated impact fee calculations based on the actual trip
values.
Using the trip assignments, the LOS for the existing plus project conditions was
determined for each intersection. The report concludes that in the existing plus project
condition, the signalized, unsignalized intersection, and the minor street driveway
approaches are projected to operate at acceptable LOS.
The report identifies several recommendations related to the arrival and dismissal periods
to help with circulation including:
Restricting parent’s drop-off/pick-up operations on-site within the existing
southern parking lots,
Reconfiguring the parking lot to provide more perpendicular parking and “by-
pass” lane to accommodate peak dismissal periods, and
Consolidate the central drive providing a more elongated on-site queuing area.
City staff is in support of the recommendations identified in the Transportation Impact
Analysis.
Family First Community Center – LUA19-000212
Page 6 of 6
October 10, 2019
Driveway sight distance was evaluated at the two existing site driveways (center and
south driveways) are anticipated to meet minimum AASHTO entering and stopping sight
distance requirements.
4. ADA access ramps shall be installed at all street crossings. Ramps shall be shown at each
intersection. Ramps shall be oriented to provide direct pedestrian crossings.
5. The project exceeds 5,000 square feet of new additional building, therefore, street
lighting will be required along 116th Avenue SE as per RMC 4-6-060.
6. If frontage improvements are required, undergrounding of utilities along 116th Avenue SE
will be required as per the requirements of RMC 4-6-090.
7. Paving and trench restoration within the City of Renton right of way shall comply with the
City’s Restoration and Overlay requirements. The document is available at
https://edocs.rentonwa.gov/Documents/0/edoc/1074326/Trench%20Restoration%20a
nd%20Street%20Overlay%20Requirements.pdf.
8. Parking lot construction shall be in accordance with City code 4-4-80G.Street lighting and
street trees are required to meet current city standards. Lighting plans are required to
be submitted with the land use application and will be reviewed during the construction
utility permit review.
9. Transportation Concurrency under separate cover.
GENERAL COMMENTS
1. All existing and proposed utility lines (i.e. electrical, phone, and cable services, etc.) along
property frontage or within the site must be underground. The construction of these
franchise utilities must be inspected and approved by a City of Renton inspector.
2. Maximum exposed retaining wall height is 6-ft and shall be setback a minimum of 3-ft
from the right-of-way as outlined in RMC 4-4-040 – Fences, Hedges and Retaining Walls.
3. Adequate separation between utilities as well as other features shall be provided in
accordance with code requirements.
a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other
utilities is required with the exception of water lines which require 10-ft
horizontal and 1.5-ft vertical.
b. The stormwater line should be minimum 5 feet away from any other structure or
wall or building.
c. Trench of any utility should not be in the zone of influence of the retaining wall
or of the building.
4. A civil construction permit for the site, utility and street improvements will require a
separate plan submittal. Civil construction plans shall conform to the City Renton
Drafting Standards. A licensed Civil Engineer shall prepare the civil plans. Please visit the
City’s website for submittal requirements:
https://rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=9687014
5. A landscaping plan shall be included with the civil plan submittal. Each plan shall be on
separate sheets.
6. Fees quoted in this document reflect the fees applicable in the year 2019 only and will be
assessed based on the fee that is current at the time of the permit application or issuance,
as applicable to the permit type. Please visit www.rentonwa.gov for the current
development fee schedule.
7. * An additional 5% technology fee will be added to each fee marked with an asterisk (*).