Fkr° Change Order No. 9
Contract Title: Renton Avenue South Resurfacing
Contractor: R.W.Scott Construction
Contract No.: CAG-19-001
Federal Aid No.: STP(UL)-1201(023)
® Ordered by Engineer
❑ Proposed by the Contractor(VECP)
❑ Unilateral
Amount Working Days
Original Contract: $1,585,247.60 60
Current Contract: $1,826,600.30 83
Estimated Net Change This Order: $131,055.20 4
New Contract: $1,839,655.50 87
Prepared By: IS y: ,
Resident Engineer Date ' ngineer City of Renton'Transportation Date
Design Manager)
. Reviewed By: Consent By:
-4' "Ai Ibill*42e2L6:1
En•ineer . •-cord Date Surety(Greater than 25%cost and/or 20%time Date
Increase)
Reviewed By: Endo
la/l4 /lam /D/5h
Ci of Rento roject Manager Date Cbntractor Date
Reviewed By: Exec ted By:
to fc1/o b e
City Attorney Date City of Rena Pu is r Da
Aj ministr to Mayor
Change Order No.9
Contract Title:Renton Avenue South Resurfacing #�
Contract No.CAG-19-001
Page 1 of 3
THE CONTRACT IS MODIFIED AS FOLLOWS:
Description of Change:
Driveway Regrade at Sta. 101+80 RT: The Contractor is directed remove and dispose of
approximately 62.2 SY of the recently constructed and existing cement concrete driveway pavement to
a distance of 35 feet behind the back of sidewalk,and reconstruct the driveway pavement to the grades
shown on the attached Driveway Profiles Sheet 21/RD-7. The Contractor is directed to protect the
recently constructed driveway entrance. The driveway repair shall have a broom finish.
The above changes shall be in accordance with the plans listed below and the attached License
to Construct.
Reason for Change:
Driveway Regrade at Sta. 101+80 RT: The driveway regrade was built per plan,within
the limits of the existing right of way. The property owner found that the regraded
driveway was steeper and had a grade change at the back of the new driveway entrance
that made it problematic to access with his trailer. The property owner agreed to allow
the regrading to extend onto his private property in order to soften the grade and
improve access.
Materials:
This change order will result in the addition of 10.37 tons of bid item 17 (Crushed
Surfacing Top Course) and 62.22 square yards of bid item 39 (Cement Conc. Driveway
Repair).The removal of the existing concrete driveway and preparation of subgrade will
be paid by force account.
Plans:
Driveway Profiles Sheet 21/RD-7.
Adjustment:
The following payment items are added to the Contract:
No. Description Quantity Unit Unit Price Total
8-17 Crushed Surfacing Top <59.96> TN $60.00 <$3,597.60>
Course
9-17 Crushed Surfacing Top 70.33 TN $60.00 $4,219.80
Course
Change Order No.9
Contract Title: Renton Avenue South Resurfacing
Contract No. CAG-19-001
Page 2 of 3
No. Description Quantity Unit Unit Price Total
39 Cement Conc. Driveway <10> SY $150.00 <$1,500.00>
Repair
9-39 Cement Conc. Driveway 72.22 SY $150.00 $10,833.00
Repair
Removal of Existing 1 EST $3,100.00 $3,100.00
Driveway Pavement and
Subgrade Preparation
Total: $13,055.20
Extension of Time:
The Time for Completion is extended 4 Working Days.
Equitable Adjustment:
The City and Contractor agree that this Change Order does not cause an equitable
adjustment.
Sections 1-04.4 and 1-04.5 of the 2018 WSDOT/APWA Standard Specifications shall govern
this Change Order.The Work of the referenced Contract is modified to include the changes
detailed herein.The payment provided for herein shall constitute the complete and final
settlement for all costs of labor, equipment, materials, overhead, profit, permit fees,and all
other claims that may be made by the Contractor as a result of this change.
Attachments:
Forms to be attached to Change Order
® Plans
© Field Directive
❑ Change Order Quotation
Estimated Change Order Cost
❑ Project Labor List
El Force Account Equipment Rate Request (DOT Form 422-010 EF)
El Equitable Adjustment Determination
Change Order No.9
Contract Title: Renton Avenue South Resurfacing
Contract No. CAG-19-001
Page 3 of 3
G`t y o� Renton Ave S Rehabilitation
Contract#CAG 19-001
Federal Aid#STPUL
RF NT 0
Field Work Directive
FWD#010 Date: 7/25/19
Subject: Driveway Regrade at Sta. 101+80 RT
Scope:
The Contractor is directed remove and dispose of approximately 42.7 SY of the recently
constructed and existing cement concrete driveway pavement to a distance of 24 feet
behind the back of sidewalk,and reconstruct the driveway pavement to the grades shown
on the attached Driveway Profiles Sheet 21/RD-7. The Contractor is directed to remove •
and dispose of approximately 14.4 SY of the recently constructed driveway entrance and
reconstruct it with a reverse grade as shown on the attached Driveway Profiles Sheet
21/RD-7. The Contractor is directed to remove and dispose of approximately 26 LF of
the adjacent curb and gutter and reconstructed per the Contract Provisions.
Plans (attached): Driveway Profiles Sheet 21/RD-7.
Measurement and Payment:
Measurement and payment for the removal and disposal of the cement concrete
driveway, cement concrete curb/gutter and cement concrete driveway entrance to be
determined. Payment for the new cement concrete driveway will be via contract item 38
Cement Conc. Driveway Entrance. Payment for the cement concrete driveway repair will
be via contract item 39 Cement Conc. Driveway Repair. Payment for the cement concrete
curb and gutter will be via contract item 37 Cement Concrete Traffic Curb and Gutter.
By:
Sign; re Date
Tani Staff rd
Project Enginee
C ITY OF
Renton
City of Renton Public Works
License to Construct
Project Name: • Renton Avenue South Resurfacing Project
Project Parcel No. 214480-0310
Tax ID No. 214480031001
I, the undersigned property owner, do hereby grant to the City of Renton and its
contractors and other parties acting on its behalf, permission to enter upon my property at
8035 S 130th St and modify:
❑ the property by changing front yard grade(s)to ensure a smooth transition to the
new street, sidewalk and/or driveway improvements;
® the existing driveway(s) by changing the existing grade(s)to ensure a smooth
transition to the new street improvements;
❑ the existing parking lot(s)by revising parking stall(s), driveway aisle(s),
walkways, curbing and/or parking island configuration(s)and grade(s);
❑ the property by installing retaining wall(s);
❑ the existing landscape area(s) by changing grade(s)to ensure a smooth
transition to the new street, sidewalk and/or driveway improvements;
❑ the property by planting tree(s), shrub(s)and/or groundcover;
❑ the property by:
❑ Installing new irrigation system(s);
❑ restoring existing irrigation system(s)to pre-construction operating
condition to match new planting bed configuration(s);
❑ removing existing irrigation system encountered within work areas and
capping at the limits of work(restoration of system by property owner);
❑ providing sleeve(s) under new pavement between existing irrigated
area(s) and new planting areas(restoration of system by property owner);
❑ Other:
❑ the property by:
❑ relocating and/or removing and replacing existing fencing to new location
and/or elevation;
❑ providing temporary fencing if necessary to isolate the work area;
❑ Other:
❑ the property by revising existing storm drainage system(s);
❑ Other:
❑ Other:
Page 1 of 2
.rr"'s
CITY OF
Renton
The City of Renton shall be responsible for repairing/restoring property disturbed during
construction of said improvements;all to be accomplished at no cost to the property owner.
All modifications, repairs and restorations will be completed within two years of the date
of this agreement.
Agreed to this .9-5 day of J , 201.
City of Renton
Trans 9ortation%S tems Division - Design
Property Owner:
roperty Owner ignat re
Owner
Please print the following information:
Franklin & Kay Mc Cuistion
2i:3 297/C
Property Owner Name Property Owner Telephone
8035 S 130th St
Renton, WA 98178
Property Owner(Property)Address
Renton, WA 98058
Property Owner(Mailing)Address
•
Page 2 of 2
Estimated Change Order Cost Change Order No. 9
Prepared By:M.Faltaous
Bid Item No. Description Quantity Unit Unit Price Estimated Cost
Force Account
Item description
Foreman 8 HR $ 75.00 $ 600.00
Operator 8 HR $ 75.00 $ 600.00
Labor 8 HR $ 55.00 _ $ 440.00
Labor Markup 29% $ 475.60
Equipment Estimate
Ford F450 8 HR $ 25.00 $, 200.00
Excavator 8 HR $ 20.00 $ 160.00
Dump Truck 8 HR $ 50.00 $ 400.00
Equipment Markup 21% $ 159.60
Materials Estimate $ -
Materials Markup 21% $ -
Services Estimate $ -
Services Markup 21% $ -
Mobilization Estimate $ -
Subcontractor Work Estimate $ -
Subcontractor Markup 12% $ -
Force Account Total: $ 3,035.20
Force Account Estimate Total: $ 3,100.00
Bid Item Change
17 CRUSHED SURFACING TOP COURSE 10 TN _ $ 60.00 $ 600.00
39 CEMENT CONC.DRIVEWAY REPAIR 65 SY $ 150.00 $ 9,750.00
Equitable Adjustment
IPer attached determination I Estimate $ -
Calculated Cost , $ 13,450.00
GENERAL NOTES 1"1 Oj FLOWLINE ELEVATION
OBACK OF SIDEWALK - �I
CEMENT CONCRETE 104.1,Y ENTRANCE - TYPE R7 2 CEMENT CONCRETE DRNEWAY ENTRANCE - TYPE RI El Z
SEE STD. PLAN 104.1, SHEET 25/RD-11. , w
q.
I
O MATCH EXISTING GROUND AT v. SEE STD. PLAN 104.1, SHEET 25/R0-11. I 0 -U,
. . RIGHT-OF-WAY q. ^m my 1
,71
+n o0 o?p +n 315
315 �7 n II Nw Q� O
- 41 W j
-1.53% -2.105 -1.50R -7.445CVU LioN
310 �- _ 310 g0
1111111111111111111111111111111111111
305 0 ,o - a.0- -
305 WO o.lso m �^U a
0 0
N
101+80 DRIVEWAY 102+20 DRIVEWAY z a
H: 1'..5• z x
H: 1•..5• CI 3 o z
. 0 U Q
0 -- 4 LL 1
102i1430
0 / rn.
I0 _ o
I N
2
I F
u z
I LL' w
Z 3
n 1
i I Co
°°e S 130TH ST ti - .
eeoe= z°
5 ?R°oe8°v°°°VI
w°oa
R o
C. • — — I ------. iz 6
Q NgZ'
\ l ( CD 0 c....1agE 0
2 I \\ I I i � z
T
�} __ — —
�_ • 4 °I d I o Lai
7 o U.
43 --..._ A I \
L \
a I Remove and replace I j F
I u.
° cement concrete ' APPROVED FOR BID j .2
' I — I ' S• 2S' 0 —�
driveway, SCALE: , =s z 'a
i I CITY OF RENTON DATE F- U ; 0
r broom1 finish c� L' a
4 Z
If APPROVED FOR CONSTRUCTION z
w
I I CITY OF RENTON DATE C
Fe,'-' I I
SHEET: 21/RD-7
l� I0 1• 2• OF: 70
o +
z 0
TWO INCHES AT FULL SCALE. JOB NO.: 17534