RJ Development Date: October 21. 2019
401 Central Street SE ESNW No.: ES- 895.06
Olympia, WA 98501 Project: _Weatherly Inn
Attn: Mr. Duane Meyer
Email: duanegaccrete. build
No. of
Copies Date Description
1 10/15-10/18/19 Daily Field Report(s) # 52-55
Comments:
CC:
1: John Wilson
2: Mark Richardson
3: Jeff Brain
4: Jennifer Vo ele
5: Jonathan Chavez
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
ATTN: iohnwO..rinocon.com
ATTN:
markaaccrete. build
ATTN:
Ieffe-accrete. build
ATTN:
'ennifer accrete. build
ATTN.
_jchavez a@rentonwa ;gov
1805 —136t' PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
Earth Solutions W.
Ir I 1805 136" Place NE, FAX:
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425) 449-4704 (866) 366-8710 111:30 AM
DAILY FIELD REPORT Travel Time
1.25 Hr. RT
Project Name
Weatherly Inn
General Contractor
Field Rep. Project No. Page of Report No.
AK 1 0895 1 1/2 52
Time On Site I Time Off Site I Date Day of Week
Job Location
4500 Talbot Rd. S., Renton, WA
General Contractor's Superintendent
1:00 PM ' 10/15/19 ' Tuesday
Weather
60s°F, Overcast
Client / Owner
RJ Development, LLC
Received Onsite By
Grading Contractor Grading Foreman
Checked By
to 1�q
Rino Construction Rod
/
Are approved Plans/Permits onsite YES ❑ NO
Project No
Permit No.
Test
Reference
Maximum Fill
Test Dry
% of
Number Test Location (Sewer Backfill)
Elevation
Compaction
Dry Density Moisture
Density
Maximum
Curve
lbs./cu.ft. %
lbs./cuff.
Dry Density
41 See map for approximate location
4
1
130.7 12.3
124.5
95
42 See map for approximate location
-2'
1
130.7 11.4
124.0
95
43 See map for approximate location
SG
1
130.7 11.8
125.1
96
FAhe client's request, ESNW rep was onsite to observe
and
test sewer line
backfill, vault excavation
and earthwork
ivities.
Sewer Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a sewer line (W1 2'xL1 2'xD1 1'). Rep observed
contractor place a sewer manhole structure at the toe of the excavation on a 6" lift of pea gravel. Rep observed
contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting with a hoe pack. Rep took
compaction tests on backfill and observed material to be adequate of at least 95% of its maximum dry density (130.7
lbs./cu. ft.).
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
ESNW rep will return to observe earthwork activities when requested by client.
4-1--S �_
Andrew Kimn, Field Technician, 206-430-9183
LCOPY TO: CONTINUED ON NEXT PAGE
Earth Solutions NWLLC Field Rep.
AK
t TT 1=1 1805 136" Place NE. FAX:
Suite 201 (425) 449-4711 Time On Site
Bellevue, WA 98005 TOLL FREE:
(425) 449-4704 (866) 366-8710 11:30 AM
DAILY FIELD REPORT Travel Time
1.25 Hr. RT
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
General Contractor General Contractor's Superintendent
Grading Contractor Grading Foreman
Rino Construction Rod
Project No.
Page of
Report No.
0895.06
2/2
52
Time Off Site
Date
Day of Week
1:00 PM
10/15/19
Tuesday
Weather
60s°F, Overcast
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
Are approved Plans/Permits onsite ❑ YES ❑ NO Project No Permit No.
COPY TO:
CONTINUED ON NEXT PAGE
41, 42, 43
-31
•-h tl�� «f�r�r F p..,. �
COPY TO:
CONTINUED ON NEXT PAGE
EarthAK
Earth Solutions NWLLC
Field Rep.
Project No.
Page of
Report No.
Test
0895.06
1/2
53
I
1805 136" Place NE, FAX:
Time On Site
Time Off Site
Date
Day of Week
Dry Density
Suite 201 (425) 449-4711
Density
Maximum
Bellevue, WA 98005 TOLL FREE:
9:30 AM
11:45 AM
10/16/19
Wed
44
(425) 449-4704 (866) 366-8710
-2'
1
130.7
11.5
Travel Time
96
Weather
See map for approximate location
DAILY FIELD REPORT
1
130.7 1
1.25 Hr. RT
124.3
60s°F, Overcast
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
General Contractor
General Contractor's Superintendent
Received Onsite By
Grading Contractor Grading Foreman
Rino Construction I Rod
Checked By ` Alio J1-1
Are approved Plans/Permits onsite ❑ YES ❑ NO
Project No.
Permit No.
Test
Reference
Maximum
Fill
Test Dry
% of
Number
Test Location (Sewer Backfill)
Elevation
Compaction
Dry Density
Moisture
Density
Maximum
Curve
lbs./cu.ft.
%
lbs./cu.ft.
Dry Density
44
See map for approximate location
-2'
1
130.7
11.5
124.8
96
45
See map for approximate location
SG
1
130.7 1
12.8
124.3
95
At the client's request, ESNW rep was onsite to observe and test storm line backfill, vault excavation and earthwo6
activities.
Storm Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a storm line (W3'xD5'). Rep observed
contractor place a 12" corrugated pipe at the toe of the trench. Rep observed contractor bedding the pipe in a 12" lift
of pea gravel. Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting
with a hoe pack. Rep took compaction tests on backfill and observed material to be adequate of at least 95% of its
maximum dry density (130.7 lbs./cu. ft.).
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
L - -
f
COPY TO:
CONTINUED ON NEXT PAGE
Earth Solutions NW«C
Field Rep.
'
AK
I rR I t 1805 136" Place NE, FAX:
Time On Site
Suite 201 (425) 449-4711
Weather
Bellevue, WA 98005 TOLL FREE:
9:30 AM
(425)449-4704 (866)366-8710
DAILY FIELD REPORT
Travel Time
1.25 Hr. RT
Project Name
Job Location
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
General Contractor
General Contractor's Superintendent
Wed
Weather
Grading Foreman
Grading Contractor
Rino Construction
Rod
Project No.
0895.06
Page of
2/2
Report No.
53
Time Off Site Date
Day of We
11:45 AM 10/16/19
Wed
Weather
60s°F, Overcast
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
Are approved Plans/Permits onsite ❑ YES ❑ NO Project No. Permit No.
COPY TO: CONTINUED ON NEXT PAGE
Grading Contractor
Rino Construction
Grading Foreman
Rod
Are approved Plans/Permits onsite ❑ YES F-] NO Project No,
Project No.
Earth Solutions NW«C
Field Rep.
0895.06
1/1
AK
�' I
1805 136" Place NE, FAX:
Time On Site
2:30 PM
Suite 201 (425) 449-4711
Thursday
Bellevue, WA 98005 TOLL FREE:
2:00 PM
(425) 449-4704 (866) 366-8710
DAILY FIELD REPORT
Travel Time
1.25 Hr. RT__
Project Name
Job Location
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
General Contractor
General Contractor's Superintendent
Grading Contractor
Rino Construction
Grading Foreman
Rod
Are approved Plans/Permits onsite ❑ YES F-] NO Project No,
Project No.
Page of
Report No.
0895.06
1/1
54
Time Off Site
Date
Day of Week
2:30 PM
10/17/19
Thursday
Weather
50s°F, Rain
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
Permit No.
At the client's request, ESNW rep was onsite to observe vault excavation and earthwork activities.
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
ESNW rep will return to observe earthwork activities when requested by client
Andrew Kimn, Field Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE
i
Grading Contractor Grading Foreman
Rino Construction Rod
Are approved Plans/Permits onsite F YES ❑ NO Project No.
At the client's request, ESNW rep was onsite to observe earthwork activities.
Project No.
Earth Solutions NWILLC
Field Rep.
0895.06
1/1
AK
I I M 1=1
1805 136t1 Place NE, FAX:
Time On Site
2:45 PM
Suite 201 (425) 449-4711
Friday
Bellevue. WA 98005 TOLL FREE:
2:30 PM
(425) 449-4704 (866) 366-8710
DAILY FIELD REPORT
Travel Time
1.25 Hr. RT
Project Name
Job Location
_Weatherly Inn
4500 Talbot Rd. S., Renton, WA
General Contractor
General Contractor's Superintendent
i
Grading Contractor Grading Foreman
Rino Construction Rod
Are approved Plans/Permits onsite F YES ❑ NO Project No.
At the client's request, ESNW rep was onsite to observe earthwork activities.
Project No.
Page of
Report No.
0895.06
1/1
55
Time Off Site
Date
Day of Week
2:45 PM
10/18/19
Friday
Weather
50s0F, Rain
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By L+
16/1.1
Permit No.
While onsite, rep observed that contractor had postponed work due to the current weather conditions. Contractor
expressed plans to continue work onsite when weather conditions have improved. Rep will return to observe and test
earthwork activities as needed and to observe vault excavation.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO: CONTINUED ON NEXT PAGE R