EXECUTIVE DEPARTMENT
M E M O R A N D U M
DATE: October 21, 2019
TO: Don Persson, Council President
Members of Renton City Council
FROM: Denis Law, Mayor
Robert Harrison, Chief Administrative Officer
SUBJECT: Administrative Report
The Forestry Division in Parks Planning & Natural Resources has finalized a tree
planting contract to replace trees in the downtown core. A number of trees did not
do well in grated planting locations due to drought, disease, soil volume, and species
selection. 34 trees have been removed and these will be replaced with six different
varieties of trees over the next couple of months. Disruption to traffic and
businesses should be minimal and courtesy notices have been sent out.
Fall rainy season is here! Street sweepers are dispatched daily to clean up debris
along major arterials, but the Public Works Department would like to remind
residents to help us prevent local residential street flooding. Be sure to monitor
catch basins near your home and keep them clear of leaves and other debris. If you
notice excessive water collecting in areas where catch basins may be clogged, please
call 425‐430‐7400.
Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at http://rentonwa.gov/traffic. All
projects are weather permitting and unless otherwise noted, streets will always
remain open. Preventative street maintenance, traffic impact projects, and road
closures will be at the following locations:
Monday, October 21 through Friday, October 25, 7:00 a.m. to 4:00 p.m.
A geotechnical contractor will be conducting soil sampling along Williams
Avenue South and Wells Avenue South between South Grady Way and South
2nd Street. Expect intermittent lane closures and minor traffic delays.
Monday, October 21 through Friday, October 25. Road closure on South 14th
Street between Smithers Avenue South and Davis Avenue South for utility
construction. Questions may be directed to Patrick DeCaro at 425‐207‐6013.
Monday, October 21 through Friday, October 25, 8:30 a.m. to 3:30 p.m. Single
lane closures on Talbot Road South in the vicinity of Valley Medical Hospital
Don Persson, Council President
Members of Renton City Council
Page 2 of 2
October 21, 2019
related to the construction of the new Medical Office Building, with trucks
entering and existing the hospital. Questions may be directed to Tom Main at
206‐999‐1833.
Monday, October 21 through Friday, October 25, 8:30 a.m. to 3:30 p.m. Single
lane closures on Talbot Road South in the vicinity of South 45th Street related to
the construction of the new Weatherly Inn project, with trucks entering and
existing the site. Questions may be directed to Tom Main at 206‐999‐1833.
Monday, October 21 through Friday, October 25, 8:30 a.m. to 3:30 p.m.
Intermittent lane closures on Talbot Road South from South 55th Street to South
45th Street due to utility construction. Questions may be directed to Tom Main
at 206‐999‐1833.
Monday, October 21 through Friday, October 25, 8:30 a.m. to 3:30 p.m.
Intermittent lane closures on Lind Avenue SW from SW Grady Way to SW 7th
Street due to utility construction. Questions may be directed to Tom Main at
206‐999‐1833.
Monday, October 21 through Friday, October 25, 8:30 a.m. to 3:30 p.m.
Intermittent lane closures on SW 7th Street from Lind Avenue SW to Morris
Avenue South due to utility construction. Questions may be directed to Tom
Main at 206‐999‐1833.
Friday, October 25, 2019, 7:00 a.m. to 7:00 p.m. The foundation for the new
Kennydale reservoir is being poured. Two pumper trucks will be onsite and
several concrete trucks will be queing along North 30th Street and Park Avenue
North intermittently throughout the day. Flaggers will be onsite to provide traffic
control.
Monday, October 21 through Wednesday, January 1, 2020. Intermittent single
and double lane closures along Logan Avenue North between North 8th Street
and North 10th Street in support of the King County Eastside Sewer Interceptor
Rehabilitation project. Questions may be directed to Brad Stocco at 425‐282‐
2373 or Justin Johnson at 425‐430‐7291.
Monday, October 21 through Wednesday, January 1, 2020. Full road closure on
Burnett Avenue North at North 6th Street in support of the King County Eastside
Sewer Interceptor Rehabilitation project. Resolution 4378 has been approved by
City Council for the roadway closure of Burnett Avenue North. Questions may be
directed to Brad Stocco at 425‐282‐2373 or Justin Johnson at 425‐430‐7291.