Loading...
HomeMy WebLinkAboutAdmin Report EXECUTIVE DEPARTMENT    M   E   M   O   R   A   N   D   U   M       DATE: October 21, 2019    TO: Don Persson, Council President  Members of Renton City Council     FROM: Denis Law, Mayor  Robert Harrison, Chief Administrative Officer     SUBJECT: Administrative Report        The Forestry Division in Parks Planning & Natural Resources has finalized a tree  planting contract to replace trees in the downtown core. A number of trees did not  do well in grated planting locations due to drought, disease, soil volume, and species  selection. 34 trees have been removed and these will be replaced with six different  varieties of trees over the next couple of months. Disruption to traffic and  businesses should be minimal and courtesy notices have been sent out.     Fall rainy season is here! Street sweepers are dispatched daily to clean up debris  along major arterials, but the Public Works Department would like to remind  residents to help us prevent local residential street flooding. Be sure to monitor  catch basins near your home and keep them clear of leaves and other debris. If you  notice excessive water collecting in areas where catch basins may be clogged, please  call 425‐430‐7400.     Information about preventative street maintenance, traffic impact projects, and  road closures happening this week can be found at http://rentonwa.gov/traffic.  All  projects are weather permitting and unless otherwise noted, streets will always  remain open.  Preventative street maintenance, traffic impact projects, and road  closures will be at the following locations:     Monday, October 21 through Friday, October 25, 7:00 a.m. to 4:00 p.m.    A geotechnical contractor will be conducting soil sampling along Williams  Avenue South and Wells Avenue South between South Grady Way and South  2nd Street. Expect intermittent lane closures and minor traffic delays.     Monday, October 21 through Friday, October 25.  Road closure on South 14th  Street between Smithers Avenue South and Davis Avenue South for utility  construction. Questions may be directed to Patrick DeCaro at 425‐207‐6013.     Monday, October 21 through Friday, October 25, 8:30 a.m. to 3:30 p.m. Single  lane closures on Talbot Road South in the vicinity of Valley Medical Hospital  Don Persson, Council President  Members of Renton City Council  Page 2 of 2  October 21, 2019      related to the construction of the new Medical Office Building, with trucks  entering and existing the hospital. Questions may be directed to Tom Main at  206‐999‐1833.     Monday, October 21 through Friday, October 25, 8:30 a.m. to 3:30 p.m.  Single  lane closures on Talbot Road South in the vicinity of South 45th Street related to  the construction of the new Weatherly Inn project, with trucks entering and  existing the site. Questions may be directed to Tom Main at 206‐999‐1833.     Monday, October 21 through Friday, October 25, 8:30 a.m. to 3:30 p.m.   Intermittent lane closures on Talbot Road South from South 55th Street to South  45th Street due to utility construction. Questions may be directed to Tom Main  at 206‐999‐1833.     Monday, October 21 through Friday, October 25, 8:30 a.m. to 3:30 p.m.   Intermittent lane closures on Lind Avenue SW from SW Grady Way to SW 7th  Street due to utility construction. Questions may be directed to Tom Main at  206‐999‐1833.     Monday, October 21 through Friday, October 25, 8:30 a.m. to 3:30 p.m.   Intermittent lane closures on SW 7th Street from Lind Avenue SW to Morris  Avenue South due to utility construction. Questions may be directed to Tom  Main at 206‐999‐1833.     Friday, October 25, 2019, 7:00 a.m. to 7:00 p.m. The foundation for the new  Kennydale reservoir is being poured. Two pumper trucks will be onsite and  several concrete trucks will be queing along North 30th Street and Park Avenue  North intermittently throughout the day. Flaggers will be onsite to provide traffic  control.       Monday, October 21 through Wednesday, January 1, 2020.  Intermittent single  and double lane closures along Logan Avenue North between North 8th Street  and North 10th Street in support of the King County Eastside Sewer Interceptor  Rehabilitation project. Questions may be directed to Brad Stocco at 425‐282‐ 2373 or Justin Johnson at 425‐430‐7291.     Monday, October 21 through Wednesday, January 1, 2020.  Full road closure on  Burnett Avenue North at North 6th Street in support of the King County Eastside  Sewer Interceptor Rehabilitation project. Resolution 4378 has been approved by  City Council for the roadway closure of Burnett Avenue North. Questions may be  directed to Brad Stocco at 425‐282‐2373 or Justin Johnson at 425‐430‐7291.