HomeMy WebLinkAboutRS_ Drainage_TIR_FFCC_191022_v2 ENGINEERING REPORT TECHNICAL INFORMATION REPORT FAMILY FIRST COMMUNITY CENTER RENTON, WA October 22, 2019 PREPARED FOR: City of Renton 1055 South Grady Way Renton, WA 98057 PREPARED THROUGH: City of Renton 1055 South Grady Way Renton, WA 98057 PREPARED BY: COUGHLIN PORTER LUNDEEN 801 Second Avenue, Suite 900 Seattle, WA 98104 P 206.343.0460 CONTACT / Keith Kruger, P.E. i Technical Information Report Renton School District Coughlin Porter Lundeen Project No. C180040-01 October 22, 2019 TABLE OF CONTENTS I PROJECT OVERVIEW ................................................................................................................................ 1 GENERAL DESCRIPTION .............................................................................................................................. 1 EXISTING CONDITIONS ................................................................................................................................. 1 PROPOSED CONDITIONS ............................................................................................................................. 2 II. CONDITIONS AND REQUIREMENTS SUMMARY ..................................................................................... 3 CORE REQUIREMENTS: ................................................................................................................................ 3 SPECIAL REQUIREMENTS: ........................................................................................................................... 3 PROJECT-SPECIFIC REQUIREMENTS: ....................................................................................................... 4 III. OFF-SITE ANALYSIS .................................................................................................................................. 5 TASK 1 – STUDY AREA DEFINITION AND MAPS ........................................................................................ 5 TASK 2 - RESOURCE REVIEW ...................................................................................................................... 5 TASK 3 - FIELD INSPECTION ........................................................................................................................ 6 TASK 4 - DRAINAGE SYSTEM DESCRIPTION AND PROBLEM DESCRIPTIONS .................................... 7 UPSTREAM ANALYSIS ................................................................................................................................... 7 CONCLUSION .................................................................................................................................................. 7 IV. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN ..................................... 8 EXISTING SITE HYDROLOGY (PART A) ...................................................................................................... 8 DEVELOPED SITE HYDROLOGY (PART B) ................................................................................................. 8 PERFORMANCE STANDARDS AND FLOW CONTROL SYSTEM (PARTS C) .......................................... 9 WATER QUALITY SYSTEM (PART D) ........................................................................................................... 9 FLOW CONTROL BEST MANAGEMENT PRACTICES (PART E) ............................................................... 9 V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN ................................................................................ 11 CONVEYANCE STANDARDS.......................................................................................................................11 ON-SITE CONVEYANCE SYSTEMS ............................................................................................................11 VI. SPECIAL REPORTS AND STUDIES ........................................................................................................ 12 VII. OTHER PERMITS ...................................................................................................................................... 13 VIII. CSWPPP ANALYSIS AND DESIGN ......................................................................................................... 14 STANDARD REQUIREMENTS .....................................................................................................................14 IX. BOND QUANTITY, FACILITY SUMMARIES, AND DECLARATION OF COVENANT ............................ 15 X. OPERATION AND MAINTENANCE MANUAL ......................................................................................... 16 APPENDIX A - FIGURES ................................................................................................................................... 17 FIGURE 1 – VICINITY MAP ...........................................................................................................................17 FIGURE 2 – EXISTING SITE CONDITIONS ................................................................................................17 FIGURE 3 – PROPOSED SITE CONDITIONS .............................................................................................17 FIGURE 4 – DRAINAGE BASIN MAP ...........................................................................................................17 FIGURE 5 – 100-YR FLOODPLAIN MAP .....................................................................................................17 ii FIGURE 6 – OFF-SITE DRAINAGE ANALYSIS MAP ..................................................................................17 FIGURE 7 – SOILS MAP ...............................................................................................................................17 FIGURE 8 – UPSTREAM MAP ......................................................................................................................17 APPENDIX B – ENGINEERING CALCULATIONS ............................................................................................ 18 APPENDIX C – CSWPPP ................................................................................................................................... 19 APPENDIX D – OPERATIONS AND MAINTENANCE MANUAL...................................................................... 20 APPENDIX E – FACILITIES SUMMARY AND DECLARATIONS OF COVENANT .......................................... 21 LIST OF TABLES TABLE 1 - DEVELOPED SITE CONDITIONS AREA BREAKDOWN ................................................ 2 TABLE 2 - EXISTING SITE CONDITIONS AREA BREAKDOWN ..................................................... 8 TABLE 3 – SUB-BASIN AREAS .................................................................................................... 8 TABLE 3 – DETENTION FACILITY SUMMARY .............................................................................. 9 FAMILY FIRST COMMUNITY CENTER 1 I PROJECT OVERVIEW GENERAL DESCRIPTION The following Technical Information Report (TIR) provides the technical information and design analysis required for developing the Stormwater Drainage and Temporary Erosion and Sedimentation Control (TESC) Plans for the Family First Community Center. The stormwater design for the project is based on the requirements set forth by the 2017 City of Renton Surface Water Design Manual (2017 CRSWDM) The Family First Community Center is located at 16022 116th Avenue SE, Renton WA 98058 (See Figure 1 – Vicinity Map) adjacent to the existing Cascade Elementary School. The property is owned by Renton School District and is bound by an easement to Pacific Northwest Pipe Line Corporation to the north, 116th Avenue SE to the west and single-family residences to the east and south. The project is located on a 14.9 acre parcel and the parcel number 152823059034. The project is in the NW ¼ of Section 28, Township 23 North, Range 5 East, Willamette Meridian. The project is currently pursuing a short plat for the development area, which is 3.02 acres, to separate the Family First Community Center property from the existing Cascade Elementary School property. The project consists of the construction of a new one-story community recreational center that is 27,000 square feet and approximately 120 surface parking stalls. The community center will include a new gymnasium, activity rooms, gathering places, offices, a kitchen, parking lot and associated landscaping and sidewalks. An existing biofiltration swale and associated storm piping will be removed to accommodate the new development. The project will be removing the existing water quality treatment facility for the Cascade Elementary School (biofiltration swale) and replacing the facility with a Modular Wetland System to treat the pollution generating runoff from the existing site. The project will result in 2.03 -acres of new or replaced impervious area and 0.99-acres of new or replaced pervious area within the parcel. The total project area is 3.01 acres. EXISTING CONDITIONS The existing site consists of an 0.6-acre parking lot, a grass field and an existing biofiltration swale on the southern side of the existing Cascade Elementary School site. The project site is fully developed with existing stormwater facilities. The topography generally slopes from west to east with the project site outfall located on the southeast corner of the site. (See Figure 2 – Existing Site Conditions). The project has two high points located in the center portion of the site and at the western property line, at elevations of 464 and 465 respectively. The existing low point is located at the southeast corner of the site at an elevation of 452 feet. The overall drop across the site from the northwest corner down to the southeast corner is 13 feet. Stormwater runoff flows from north to south. Stormwater runoff from the existing site consists of surface, shallow, and piped flow to the existing biofiltration swale located on the south side of the site, which then discharges to the existing stormwater system at the southeast corner of the site. There are no critical areas within with the existing site. The adjacent street is 116th Avenue SE located to the west. 116th Avenue SE is generally flat but slopes down to the south at slopes ranging from 0 percent to 0.5 percent. It is developed with a sidewalk, curb, landscape strip and catch basins on the side adjacent to the site. The Soils Conservation Service maps the soils as generally Arents, Alderwood material. A geotechnical analysis of the site was performed by The Riley Group, Inc (RGI) and published in a report dated June 8, 2018. The RGI investigation found “The site is underlain by up to 11 feet of fill comprised of loose to medium dense silty sand with varying amounts of gravel over medium dense to very dense silty sand with varying amounts of gravel, and localized silty sand, sandy gravel, and sand with some silt and gravel.” FAMILY FIRST COMMUNITY CENTER 2 PROPOSED CONDITIONS The proposed project consists of the construction of a new one-story community recreational center that is 27,000 square feet and approximately 120 surface parking stalls (see Figure 3 – Proposed Site Conditions). The community center will include a new gymnasium, activity rooms, gathering places, offices, a kitchen, parking lot and associated landscaping and sidewalks. The proposed project, including frontage improvements, will result in 3.01 acres of new or replaced impervious surface, which triggers a “Full Drainage Review” (2017 City of Renton Surface Water Manual 1.1.2.4) and the analysis of all “Core” and “Special” requirements. Please see Table 1 – Developed Site Conditions Area breakdown for a summary of the proposed land coverages. TABLE 1 - DEVELOPED SITE CONDITIONS AREA BREAKDOWN LAND COVER AREA (ACRES) DESCRIPTION Impervious Surface 2.03 Parking and drive aisles, building, and sidewalk Pervious Surface (Landscape) 0.98 Lawn and landscape area Total Disturbed Area 3.01 Disturbed area % Impervious Area 67.4% The Core Requirements include MR #3 flow control for the total disturbed area. The detention facilities are to be modeled using MGSFlood software with 15-minute time steps. Two detention facilities will provide flow control: an SC-740 Stormtech Chamber System and a MC-3500 Stormtech Chamber System. Both Stormtech Chamber systems will discharge to the existing storm system located in the southeast corner of the site. The Core Requirements also include MR #8 water quality treatment which will be provided by proprietary Modular Wetland Systems that will be used to mitigate pollution generating areas. In order to meet Core Requirement #9: On-Site BMPs, Flow Control Best Management Practices (FCBMPs) include bioretention and green roof to mitigate target impervious surfaces to the maximum extent feasible. See Section IV for further detail for the flow control and water quality systems. FAMILY FIRST COMMUNITY CENTER 3 II. CONDITIONS AND REQUIREMENTS SUMMARY This section addresses the requirements set forth by the Core and Special Requirements listed in Chapter 1 of the City of Renton Surface Water Design Manual. CORE REQUIREMENTS: 1. Discharge at the Natural Location (1.2.1): Stormwater runoff from the existing site discharges to the existing City of Renton Stormwater system via surface flow and via a ditch and pipe conveyance system on the southeast corner of the site. In the developed condition, stormwater runoff will continue to discharge to the City’s stormwater system via surface and pipe flow. 2. Off-site Analysis (1.2.2): A Level 1 analysis of the upstream and downstream flow paths for the project was performed on September 9, 2018 and is detailed in Section III. This analysis showed that no downstream problems will occur by the construction of the project. 3. Flow Control (1.2.3): Level II flow control will be provided by two Stormtech Chamber detention systems. Further information is presented in Section IV of this report. 4. Conveyance System (1.2.4): Closed pipe systems will be provided for on-site stormwater conveyance. Further details are provided in Section V. 5. Erosion and Sedimentation Control (1.2.5): Erosion and Sediment Control (ESC) measures will be provided during construction to address the specific conditions at the site. Further details can be found in Section VIII. 6. Maintenance and Operations (1.2.6): The proposed storm drainage system will be owned, operated and maintained by the City of Renton. Further details can be found in Section X. 7. Financial Guarantees and Liability (1.2.7): The Owner and Contractor will obtain all necessary permits prior to the beginning of construction. 8. Water Quality (1.2.8): The project is considered a “commercial” project and drains to the City of Renton Stormwater system, therefore, Enhanced Basic water quality is required for this project. Enhanced Basic water quality treatment will be addressed using proprietary Modular Wetland Systems to treat runoff from all target surfaces. Further details are provided in Section IV of this report. 9. Flow Control BMPs (1.2.9): Flow Control BMPs will be utilized to maximum extent feasible and will include bioretention to prevent development-related increases in runoff. Further details are provided in Section IV of this report. SPECIAL REQUIREMENTS: 1. Other Adopted Area-Specific Requirements (1.3.1): · Critical Drainage Areas (CDAs): The project site is not located within any Critical Drainage Areas. · Master Drainage Plans (MDPs): There are no known master drainage plans covering this project site. · Basin Plans (BPs): The project is located within the Lower Cedar River Drainage Basin (see Figure 4 – Drainage Basin Map). The basin plan does not include any special drainage requirements. · Stormwater Compliance Plans (SWCPs): There are no Stormwater Compliance Plans that are applicable to this project. · Lake Management Plans(LMPs): There are no Lake Management Plans that are applicable to this project. · Shared Facility Drainage Plans(SFDPs): There are no shared Facility Drainage Plans that are applicable to this project. 2. Flood Hazard Area Delineation (1.3.2): The project site is not located within the 100-year floodplain (see Figure 5 – 100-yr Floodplain Map). 3. Flood Protection Facilities (1.3.3): The project will not rely on or modify an existing flood protection facility. FAMILY FIRST COMMUNITY CENTER 4 4. Source Controls (1.3.4): Not applicable. This project will not include any activities or infrastructure that will require source control measures. 5. Oil Control (1.3.5): Vehicular traffic on the site will not reach levels that require oil control facilities. PROJECT-SPECIFIC REQUIREMENTS: There are no additional requirements for the project. Design and construction will abide by requirements set forth in these documents and the 2017 City of Renton Surface Water Design Manual. FAMILY FIRST COMMUNITY CENTER 5 III. OFF-SITE ANALYSIS TASK 1 – STUDY AREA DEFINITION AND MAPS This off-site analysis examines the stormwater systems upstream and downstream of the Family First Community Center project, located at 16022 116th Avenue SE, Renton WA, 98058. The Family First Community Center project consists of the construction of a new recreational center that is approximately 27,000 square feet and will include a new gymnasium, activity rooms, gathering spaces, and a demonstration kitchen. The community center project will construct 120 surface parking lot stalls and associated sidewalks and landscape areas. The existing site is roughly 3.01 acres with about 0.55 acres of impervious area and is not constrained by any critical areas or corresponding buffers. The proposed project will add or replace roughly 2.03 acres of impervious surface and will not convert any square feet of impervious area to landscape. The Figure 1 - Vicinity Map and Figure 6 - Off-Site Drainage Analysis Map in the Appendix depict the location of the project site and the basins being analyzed. TASK 2 - RESOURCE REVIEW a) Adopted Basin Plans: According to the King County Drainage Basin iMap, this project is in the Lower Cedar River Drainage Basin, as depicted in Figure 4 - Drainage Basin Map. The Lower Cedar River Basin and Nonpoint Pollution Action Plan, adopted in 1997, depicts basin boundaries that are slightly different than the basin boundaries in the King County Drainage Basin iMap. According to the Lower Cedar River Basin and Nonpoint Pollution Action Plan, there are not issues regarding potential flooding erosion and water quality problems upstream nor one mile downstream of the project site, as of 1997. b) Floodplain/Floodway FEMA Maps: The project site nor the downstream flow path is not located within a Floodplain/floodway (FEMA). See Figure 5 – 100-Year Floodplain c) Other Offsite Analysis Reports: No offsite analysis reports were available within one mile of the site as of September 2018. d) Critical Areas: None of the following Critical Areas are mapped on-site in the downstream flow path: · Coal Mine Hazard Areas · Erosion Hazard Areas · Landslide Hazard Areas · Steep Slope Hazard Areas · Seismic Hazard Areas · Critical Aquifer Recharge Areas See Figure 6 – Off-Site Drainage Analysis Map. e) Soils Survey: The soils that are expected to underlay the project site have been classified by the USDA Natural Resources Conservation Service (NRCS) as Arents, Alderwood material, 6 to 15 percent slopes (AmC). See Figure 7 - Soils map. FAMILY FIRST COMMUNITY CENTER 6 f) Wetland Inventory Map: As of September 2018, no wetlands within the study area are identified on King County’s of City of Renton’s iMap. g) Section 303d List of Polluted Waters: Not applicable to the study area. h) City of Renton Erosion Maps and Landslide Maps: No Erosion or Landslide Hazards are included within the study are for this Project. See Figure 6 – Off-Site Drainage Analysis Map. i) Other reports: Cascade Elementary School Portables Project TIR. TASK 3 - FIELD INSPECTION A Level 1 Downstream Analysis site visit was made on 9/6/2018 under dry conditions. Total precipitation for 9/6/2018 was 0 inches. No rainfall occurred on the day prior to the site visit. Results of the field inspection are shown in the Off-Site Drainage Systems Table attached to Figure 6 - Off-Site Drainage Analysis Map in the Appendix. 1. Investigate any problems reported or observed during the resource review. · No problems were reported or observed during the resource review. 2. Locate all existing/potential constrictions or lack of capacity in the existing drainage system. · No constrictions or lack of capacity in the existing drainage system was observed. 3. Identify all existing/potential downstream drainage problems as defined in Section 1.2.2.1. · No existing/potential downstream drainage problems were observed. 4. Identify existing/potential overtopping, scouring, bank sloughing, or sedimentation. · No existing/potential overtopping, scouring, bank sloughing, or sedimentation was observed. 5. Identify significant destruction of aquatic habitat or organisms (e.g., severe siltation, bank erosion, or incision in a stream). · No significant destruction of aquatic habitat or organisms was observed. 6. Collect qualitative data on features such as land use, impervious surfaces, topography, and soil types. · The land use of the project site is a school site that consists of approximately 30% impervious area and sports fields to the east side. The conveyance system drains through a residential area to the east before reaching 119th Avenue SE, where the road slopes down to a catch basin before being conveyed farther east. The upstream basin was delineated by determining what portion of the existing Cascade Elementary School site drains to the existing bioswale. This existing bioswale will be replaced as a part of the proposed development and the same basin draining to the bioswale is the upstream basin for the proposed project. Based on the survey and observations on site, no other upstream basin was delineated. 7. Collect information on pipe sizes, channel characteristics, drainage structures, and relevant critical areas (e.g., wetlands, streams, steep slopes). FAMILY FIRST COMMUNITY CENTER 7 · See Figure 6 for information on pipe sizes and drainage structures. No critical areas were observed. 8. Verify tributary basins delineated in Task 1. · Based on the topography onsite, the basin delineation based on the survey and COR maps was confirmed. 9. Contact neighboring property owners or residents in the area about past or existing drainage problems and describe these in the report (optional). · This requirement is not applicable for this project. 10. Note the date and weather conditions at the time of the inspection. · The site visit occurred on September 6, 2018. The weather was sunny, and temperature was 65 degrees. TASK 4 - DRAINAGE SYSTEM DESCRIPTION AND PROBLEM DESCRIPTIONS See Figure 6 for a map of the downstream drainage system. The site currently discharges from a catch basin at the southeast corner of the site located directly downstream of an existing bioswale and then through a series of catch basins in residential streets. This catch basin and bioswale will be replaced as a part of the proposed development. Downstream of the replaced catch basin, stormwater is conveyed approximately 200 feet through an existing 15” pipe to an existing type 1 catch basin located at the southeast corner of the Cascade Elementary School property. Stormwater is then conveyed roughly 320 feet to a type two catch basin located in 119th Ave SE, which is adjacent to the property. Stormwater is then conveyed approximately 300 feet through a 24” concrete pipe at approximately 2% to another type two catch basin located in 120th Ave SE. From here stormwater is directed through a 24” concrete pipe at 2% slope to a type two catch basin located in 121st Ave SE, approximately 300 feet downstream. See Off-Site Drainage System (attached to Figure 6) for more information regarding the downstream drainage system. UPSTREAM ANALYSIS Approximately 2.5 acres of upstream area currently flows to the existing bioswale located onsite. The upstream basin was delineated by determining what portion of the existing Cascade Elementary School site drains to the existing bioswale. This existing bioswale will be replaced as a part of the proposed development and the same basin draining to the bioswale is the upstream basin for the proposed project. Based on the survey and observations on site, no other upstream basin was delineated. See Figure 8 for the upstream basin delineation. CONCLUSION Based on the observations made during the Level 1 downstream analysis that was performed on 9/6/2018, no existing or potential downstream drainage issues such as flooding, overtopping, or erosion were evident. FAMILY FIRST COMMUNITY CENTER 8 IV. FLOW CONTROL AND WATER QUALITY FACILITY ANALYS IS AND DESIGN EXISTING SITE HYDROLOGY (PART A) The existing site consists of a park with a grass field, parking lot and landscaping area (See Figure 2 – Existing Site Conditions). The site slopes in a southeasterly direction with drainage described in Section III Downstream Analysis. These conditions are summarized in Table 2 below. TABLE 2 - EXISTING SITE CONDITIONS AREA BREAKDOWN LAND COVER AREA (ACRES) DESCRIPTION Impervious Area 0.55 Existing parking lot Pervious & Landscape 2.46 Grass Field and Native vegetation Total Project Area 3.01 % Impervious Area 18.3% DEVELOPED SITE HYDROLOGY (PART B) The developed site will increase the amount of impervious area to 2.03 acres and the remaining site area with be pervious landscaping or bioretention and green roof areas. (See Figure 3 – Proposed Site Conditions). The area impacted by the development is 3.01 acres. The project will be using two Stormtech Chamber detention systems to meet the project’s flow control requirements. By dividing into two different size chamber systems, the project can utilize the existing topography to minimize earthwork. However, the project will only have one discharge location. The site has been divided into two separate sub-basins, one for each of the Stormtech Chamber detention systems. The table below provides a breakdown of the areas of each of the sub-basins. See Figure 4 – Sub-basin Map for more information. TABLE 3 – SUB-BASIN AREAS SUB-BASIN LAND COVER AREA (ACRES) DESCRIPTION East Impervious Area 0.76 Parking lot, Sidewalk Pervious Area 0.45 Landscaping, Planters West Impervious Area 1.33 Parking lot, Sidewalk, Roof Pervious Area 0.13 Landscaping, Planters Bypass Pervious Area 0.34 Landscaping Total Project Area 3.01 % Impervious Area 69.4% FAMILY FIRST COMMUNITY CENTER 9 PERFORMANCE STANDARDS AND FLOW CONTROL SYSTEM (PARTS C) Level II flow control (conservation flow control assuming historic site conditions) is required for this project. Level II flow control requires the proposed discharge durations to match the predeveloped durations for the range of predeveloped discharge rates from 50 percent of the 2-year peak flow up to the full 50-year peak flow. MGSFlood software was used to size the detention facilities in compliance with the CRSWDM standards. The calculations for the detention facilities are included in Appendix B. Runoff from the site will be detained in two detention facilities, an SC-310 Stormtech Chamber system and a MC-3500 Stormtech Chamber system. The proposed detention volumes are summarized in Table 3 below. TABLE 3 – DETENTION FACILITY SUMMARY DETENTION FACILITY PROVIDED [CF] SC-310 StormTech Chambers 18,415 MC-3500 StormTech Chambers 30,087 WATER QUALITY SYSTEM (PART D) Under Core Requirement #8 the project is required to provide Enhanced Basic water quality treatment for the pollution generating surfaces. To meet the water quality standards, the project will treat pollution generating surfaces by using two proprietary Modular Wetland Systems (MWS). Water quality design calculations will be provided in Appendix B of the final report. The Family First Community Center project will be removing the biofiltration swale that is currently being used as a water quality treatment facility for the Cascade Elementary School site. One of the proposed Modular Wetland System will be used to treat the pollution generating runoff from the existing Cascade Elementary School site in replacement of the biofiltration swale. The other Modular Wetland System will be used to treat the pollution generating runoff from the proposed pollution generating surfaces that will be constructed as a part of the Family First Community Center project before discharging to the existing City of Renton stormwater system. The MWSs are sized according to flow rates. They are located downstream of the detention facilities and so are sized to treat the full 2-year release rate post detention. Runoff enters each MWS vault via pipe. In the vault, trash, sediment and debris are separated before runoff enters the pre-filter cartridges. The pre-filter cartridges utilize a media filter material which removes over 80 percent of total suspended solids and over 90 percent of hydrocarbons. After pre-filtering, the runoff enters a chamber with a patented wetland media. The wetland media removes any phosphorous in the water. The MWSs have an internal bypass weir for large storm events (up to the 100-year event). FLOW CONTROL BEST MANAGEMENT PRACTICES (PART E) Flow Control Best Management Practices (FCBMP) are required to be implemented to the Maximum Extent Feasible (MEF) in accordance with Core Requirement #9. FCBMP rely heavily on infiltration and/or dispersion over flat or gentle slopes. The geotechnical analysis concludes that site soils are not infiltrative, which renders most FCBMPs infeasible. The project site is larger than 22,000 square feet and therefore must comply with Section 1.2.9.2.2 Large Lot BMP Requirements. Flow control BMP requirements that must be applied to the maximum extent feasible are as follows: FAMILY FIRST COMMUNITY CENTER 10 1. Full Dispersion: Due to site constraints, the required length and wide of the flow path for full dispersion cannot be met. 2. Full Infiltration of Roof Runoff: A geotechnical analysis of site soils found that the conditions onsite are not compatible with stormwater infiltration and recommended that the project not utilize infiltration. 3. All target impervious surface not mitigated by #1 or #2 must be mitigated to the maximum extent feasible using one or more of the following BMPs: a. Full Infiltration: Full infiltration is not feasible because the soils do not permit infiltration according to an analysis performed by the geotechnical engineer. b. Limited Infiltration: According to the analysis performed by the geotechnical engineer, the conditions onsite do not allow for infiltration using shallow or deep infiltration strategies. c. Bioretention: Non-infiltrative Bioretention will be utilized to the meet the Core Requirement #9. d. Permeable Pavement: Permeable pavement is not feasible due to the poor infiltrative soils. 4. Basic Dispersion: Due to site constraints, the required length and wide of the flow path for basic dispersion cannot be met. 5. BMP Implementation: The amount of target impervious surfaces required to drain to a FCBMP is detailed in Section 1.2.9.2.2.5 of the CRSWDM. “For projects that will result in impervious surface coverage of 45%-65% on the buildable portion of the site/lot, flow control BMPs must be applied to 50% of the target impervious surfaces reduced by 1.5% for each 1% of impervious surface coverage above 45% (e.g. impervious of 55% results in a requirement of FCBMPs applied to 35% of target impervious surfaces.)” This project will result in impervious surface coverage of 63% on the buildable portion of the parcel. Therefore, FCBMPs must be applied to 23% (0.39 acres) of the target impervious surfaces. The project is providing non-infiltrating bioretention to mitigate the required amount of target impervious area. 6. Soil Quality Preservation: The soil quality of new pervious surfaces will be protected by the application of compost-amended soils and native topsoil will be retained to the maximum extent practicable in accordance with City of Renton requirements. 7. Perforated Pipe Connection: Due to the existing soil, topography, programming needs, and site constraints there are no feasible locations onsite for a perforated pipe connection. FAMILY FIRST COMMUNITY CENTER 11 V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN CONVEYANCE STANDARDS The conveyance systems have been designed to meet the requirements set forth in Chapter 4 of the 2017 CRSWDM. The requirements and the way the design will meet them are presented, below. 1. Facilities must convey the 100-year flow without overtopping the crown of the roadway, flooding buildings, and if sheet flow occurs it must pass through a drainage easement. Facilities will be designed to convey the 100-year storm without affecting surrounding infrastructure. No sheet flow to neighboring properties is expected to occur. 2. New pipe systems and culverts must convey the 25-year flow. New pipe systems are designed to convey the 25-year flow without overtopping structures. 3. Bridges must convey the 100-year flow and provide a minimum of two feet, varying up to six feet, of clearance based on 25% of the mean channel width. This project will not construct bridges. 4. Drainage ditches must convey the 25-year flow with 0.5 feet of freeboard and the 100-year flow without overtopping. This project will not construct drainage ditches. 5. Floodplain Crossings must not increase the base flood elevation by more than 0.01 feet and shall not reduce the flood storage volume. Piers shall not be constructed in the FEMA floodway. There are no floodplain crossings or piers associated with this project. 6. Stream Crossings shall require a bridge for Class 1 Streams that does not disturb or banks. For Type 2 and Type 3 steams, open bottom culverts or other method may be used that will not harm the stream or inhibit fish passage. There are no stream crossings associated with this project. 7. Discharge at natural location is required and produce no significant impacts to the downstream property. This project will provide Level II flow control and will discharge at the natural location. The flow control facilities will reduce the rate of flow discharging from the existing site. ON-SITE CONVEYANCE SYSTEMS Existing Conditions The existing conveyance system consists of catch basins, storm pipes and a biofiltration swale. The existing biofiltration swale and some of the existing catch basins and storm pipes that are located within the development area will be removed and new catch basins and storm pipes will be installed. Developed Conditions The developed on-site conveyance system will consist of catch basins and storm pipes. The existing storm pipe that conveys runoff from the existing Cascade Elementary school site that will be removed to construct the new Family First Community Center building will be rerouted to the existing conveyance system. The conveyance system conveys runoff from the redevelopment and upstream areas to the existing conveyance system. There will be one connection point to the existing storm system. The connection point to the existing system is in the southeast corner of the site, where the Family First project and the rerouted stormwater from the Cascade ES site will discharge. Peak flow rates for the proposed conveyance systems will be calculated using the Rational Method. The hydraulic grade line will be calculated using the Direct Step Backwater Method. Calculations showing the sizing of the on-site system will be included in the final report. FAMILY FIRST COMMUNITY CENTER 12 VI. SPECIAL REPORTS AND STUDIES 1. Geotechnical Engineering Report. Renton, Washington. Prepared by The Riley Group, Incorporated on June 8, 2018. FAMILY FIRST COMMUNITY CENTER 13 VII. OTHER PERMITS This project will require building and demolition permits from the City of Renton and an NPDES permit from the Department of Ecology. The NPDES will include a SWPPP and a spill prevention and cleanup report (included in the SWPPP). FAMILY FIRST COMMUNITY CENTER 14 VIII. CSWPPP ANALYSIS AND DESIGN This section lists the requirements that were met when designing the TESC plan for this site. The project will be publicly bid and a contractor will be determined at a future date. STANDARD REQUIREMENTS Erosion/Sedimentation Plan shall include the following: 1. Clearing Limits – Construction limits are delineated on the project erosion control plans and shall be physically surveyed and marked on site. 2. Cover Measures – Contractor will use plastic sheeting, hydroseeding, and mulching to protect soils from erosion. 3. Perimeter Protection – Temporary construction fencing will be used to delineate and protect the project clearing limits and provide a secure site. Silt fencing and interceptor swales will be used to prevent sediment-laden water from discharging from the site. 4. Traffic Area Stabilization – Stabilized construction entrances, wheel wash, and quarry spalls will be used for traffic area stabilization. 5. Sediment Retention – Site temporary erosion and sediment control plans will include baker tanks, temporary sediment pond, and catch basin protection to provide sediment control. 6. Surface Water Collection – Interceptor swales will be used in the appropriate areas of the site to collect stormwater runoff. The swales are then routed to the sediment pond and baker tanks. 7. Dewatering Control – Dewatering is not necessary for this site; therefore, no dewatering control measures are implemented. 8. Dust Control – Soils will be appropriately sprinkled with water to limit airborne dust during dry weather. 9. Flow Control –Discharge from the baker tanks and sediment pond will be restricted and will therefore serve as a flow control measure during construction. 10. Control Pollutants – The discharged runoff from the construction site will be monitored for turbidity and pollutants before leaving the site. 11. Protect Existing and Proposed Flow Control BMPs – Proposed FCBMPs consist of bioretention, and green roof. The bioretention areas will be protected during construction. 12. Maintain BMPs – BMPs for the project will be monitored for effectiveness on a regular basis. The Construction Stormwater Pollution Prevention (CSWPP) Supervisor will typically monitor the BMPs and ensure they are repaired and replaced as necessary. 13. Manage the Project – The BMPs will be inspected maintained and repaired as needed to ensure their intended performance. Site inspections and monitoring will be in accordance with the Construction Stormwater General Permit, specific BMP conditions and the City of Renton requirements. The SWPP will be maintained and updated and any updates will be coordinated with the site inspector. FAMILY FIRST COMMUNITY CENTER 15 IX. BOND QUANTITY, FACILITY SUMMARIES, AND DECLARAT ION OF COVENANT A Facility Summary, Bond Quantity Worksheet and Declaration of Covenants for Leachable Materials, Stormwater Facilities and BMPs, and Clearing Limits will be included in Appendix E of the final report. FAMILY FIRST COMMUNITY CENTER 16 X. OPERATION AND MAINTENANCE MANUAL The Operations and Maintenance manual will be provided in Appendix D of the final drainage report. FAMILY FIRST COMMUNITY CENTER APPENDIX A - FIGURES FIGURE 1 – VICINITY MAP FIGURE 2 – EXISTING SITE CONDITIONS FIGURE 3 – PROPOSED SITE CONDITIONS FIGURE 4 – SUB-BASIN MAP FIGURE 5 – DRAINAGE BASIN MAP FIGURE 6 – 100-YR FLOODPLAIN MAP FIGURE 7 – OFF-SITE DRAINAGE ANALYSIS MAP FIGURE 8 – SOILS MAP FIGURE 9 – UPSTREAM MAP FIGURE 1 - VICINITY MAP Family First Community Center Baylis Architects 9/4/2018CPS AJF 1 OF 12014 801 SECOND AVENUE, SUITE 900 SEATTLE, WA 98104 / P 206.343.0460 / cplinc.com Project Site EXISTING BIOFILTRATIO N SWALE EXISTING CASCADE ELEMTARY SCHOOL HIGH POINT LOW POINT LEGEND DESCRIPTION PERVIOUS AREA IMPERVIOUS AREA QUANTITY 2.46 AC 0.55 AC SCALE 1'=40" LEGEND DESCRIPTION PERVIOUS AREA IMPERVIOUS AREA QUANTITY 0.98 AC 2.03 AC SCALE 1" = 40' PROPOSED BUILDING FAMILY FIRST COMMUNITY CENTER 10/16/19 FIGURE 4 SUB-BASIN MAP SCALE 1" = 40' LEGEND BASIN EAST WEST BYPASS TOTAL IMPERVIOUS AREA (AC) 0.76 1.33 0 2.09 PERVIOUS AREA (AC) 0.45 0.13 0.34 0.92 WEST BASIN EAST BASIN GRAVEL (50% IMPERVIOUS / 50% PERVIOUS) BYPASS AREA Project Site Drainage Basin Boundary NTS Project Site 100-YR FLOODPLAIN NTS FIGURE 6 - 100-YR FLOODPLAIN MAP 4,514752 City of Renton Print map Template This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATIONWGS_1984_Web_Mercator_Auxiliary_Sphere Notes None 09/04/2018 Legend 512 0 256 512 Feet Information Technology - GIS RentonMapSupport@Rentonwa.gov Erosion hazard - high Floodway Special Flood Hazard Areas (100 year flood) Landslide Very High High Moderate Unclassified Slope City of Renton >15% & <=25% >25% & <=40% (Sensitive) >40% & <=90% (Protected) >90% (Protected) Environment Designations Natural Shoreline High Intensity Shoreline Isolated High Intensity Shoreline Residential Urban Conservancy Jurisdictions Streams (Classified) <all other values> Type S Shoreline Type F Fish Type Np Non-Fish Type Ns Non-Fish Seasonal Unclassified Not Visited Wetlands 5' Primary 5' Intermediate Network Structures Inlet Manhole Utility Vault Unknown Structure Control Structure Pump Station Discharge Point Water Quality Detention Facilities Pond Tank Vault Wetland Stormwater Main Culvert Open Drains Facility Outline Private Network Structures Inlet Manhole Utility Vault Unknown Structure Private Control Structure Private Discharge Point Private Water Quality Project Site Site Discharge Point FIGURE 7 - OFF SITE DRAINAGE MAP Downstream Flow Path 1/4 Mile Downstream 0 1 2 3 4 24" Concrete Pipe at 2.4% slope 24" Concrete Pipe at 2.3% slope 24" Concrete Pipe at approximately 2% slope 24" Concrete Pipe at 4.4% slope Soil Map—King County Area, Washington (Family First Community Center) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/4/2018 Page 1 of 3525625052563005256350525640052564505256500525655052566005256650525625052563005256350525640052564505256500525655052566005256650561340561390561440561490561540561590561640 561340 561390 561440 561490 561540 561590 561640 47° 27' 37'' N 122° 11' 10'' W47° 27' 37'' N122° 10' 55'' W47° 27' 24'' N 122° 11' 10'' W47° 27' 24'' N 122° 10' 55'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS84 0 50 100 200 300 Feet 0 30 60 120 180 Meters Map Scale: 1:2,030 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. Project Site FIGURE 8 - SOILS MAP See Attached Table for Soil Types MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: King County Area, Washington Survey Area Data: Version 13, Sep 7, 2017 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 31, 2013—Oct 6, 2013 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map—King County Area, Washington (Family First Community Center) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/4/2018 Page 2 of 3 FIGURE 8 - SOILS MAP (CONT) Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI AgC Alderwood gravelly sandy loam, 8 to 15 percent slopes 0.2 1.1% AmC Arents, Alderwood material, 6 to 15 percent slopes 16.8 98.9% Totals for Area of Interest 17.0 100.0% Soil Map—King County Area, Washington Family First Community Center Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/4/2018 Page 3 of 3 FIGURE 8 - SOILS MAP (CONT) 2,400400 City of Renton Print map Template This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATIONWGS_1984_Web_Mercator_Auxiliary_Sphere Notes None 09/07/2018 Legend 272 0 136 272 Feet Information Technology - GIS RentonMapSupport@Rentonwa.gov Environment Designations Natural Shoreline High Intensity Shoreline Isolated High Intensity Shoreline Residential Urban Conservancy Jurisdictions Streams (Classified) <all other values> Type S Shoreline Type F Fish Type Np Non-Fish Type Ns Non-Fish Seasonal Unclassified Not Visited Wetlands 5' Primary 5' Intermediate FIGURE 9 - UPSTREAM BASIN MAP UPSTREAM BASIN = 2.5 ACRES PROJECT SITE HIGH POINT FAMILY FIRST COMMUNITY CENTER APPENDIX B – ENGINEERING CALCULATIONS All engineering calculations will be provided in the final drainage report. ————————————————————————————————— MGS FLOOD PROJECT REPORT Program Version: MGSFlood 4.46 Program License Number: 200610002 Project Simulation Performed on: 10/16/2019 8:55 AM Report Generation Date: 10/16/2019 9:28 AM ————————————————————————————————— Input File Name: 2019-10-15 Stormtech Sizing.fld Project Name: Family First Community Center Analysis Title: CUP Stormtech Sizing Comments: 10-15-19 CPS Stormtech Sizing CUP ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 15 Full Period of Record Available used for Routing Precipitation Station : 96004005 Puget East 40 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961040 Puget East 40 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 3.010 3.010 Area of Links that Include Precip/Evap (acres) 0.000 0.000 Total (acres) 3.010 3.010 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 3.010 ---------------------------------------------- Subbasin Total 3.010 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 3 ---------- Subbasin : West ---------- -------Area (Acres) -------- Till Grass 0.132 Impervious 1.327 ---------------------------------------------- Subbasin Total 1.459 ---------- Subbasin : East ---------- -------Area (Acres) -------- Till Grass 0.448 Impervious 0.761 ---------------------------------------------- Subbasin Total 1.209 ---------- Subbasin : Bypass ---------- -------Area (Acres) -------- Till Grass 0.342 ---------------------------------------------- Subbasin Total 0.342 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: New Copy Lnk1 Link Type: Copy Downstream Link: None ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 3 ------------------------------------------ Link Name: MC-3500 Link Type: Structure Downstream Link Name: New Copy Lnk2 User Specified Elevation Volume Table Used Elevation (ft) Pond Volume (cu-ft) 100.08 0. 100.17 540. 100.25 809. 100.33 1079. 100.42 1349. 100.50 1619. 100.58 1888. 100.67 2158. 100.75 2428. 100.83 2698. 100.92 2968. 101.00 3237. 101.08 3847. 101.17 4454. 101.25 5059. 101.33 5662. 101.42 6263. 101.50 6862. 101.58 7458. 101.67 8052. 101.75 8643. 101.83 9232. 101.92 9818. 102.00 10401. 102.08 10980. 102.17 11557. 102.25 12130. 102.33 12699. 102.42 13265. 102.50 13826. 102.58 14384. 102.67 14936. 102.75 15485. 102.83 16028. 102.92 16566. 103.00 17098. 103.08 17625. 103.17 18146. 103.25 18660. 103.33 19168. 103.42 19668. 103.50 20161. 103.58 20646. 103.67 21122. 103.75 21589. 103.83 22046. 103.92 22492. 104.00 22927. 104.08 23348. 104.17 23756. 104.25 24146. 104.33 24515. 104.42 24851. 104.50 25160. 104.58 25458. 104.67 25747. 104.75 26022. 104.83 26292. 104.92 26562. 105.00 26831. 105.08 27101. 105.17 27371. 105.25 27641. 105.33 27910. 105.42 28180. 105.50 28450. 105.58 28720. 105.67 28990. 105.75 29259. Massmann Infiltration Option Used Hydraulic Conductivity (in/hr) : 0.00 Depth to Water Table (ft) : 100.00 Bio-Fouling Potential : Low Maintenance : Average or Better Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 12.00 Common Length (ft) : 0.020 Riser Crest Elevation : 105.75 ft Hydraulic Structure Geometry Number of Devices: 2 ---Device Number 1 --- Device Type : Circular Orifice Control Elevation (ft) : 100.00 Diameter (in) : 0.62 Orientation : Horizontal Elbow : No ---Device Number 2 --- Device Type : Circular Orifice Control Elevation (ft) : 104.20 Diameter (in) : 1.75 Orientation : Horizontal Elbow : Yes ------------------------------------------ Link Name: New Copy Lnk2 Link Type: Copy Downstream Link: None ------------------------------------------ Link Name: SC-310 Link Type: Structure Downstream Link Name: New Copy Lnk2 User Specified Elevation Volume Table Used Elevation (ft) Pond Volume (cu-ft) 100.08 0. 100.17 1759. 100.25 2638. 100.33 3518. 100.42 4397. 100.50 5277. 100.58 6156. 100.67 7036. 100.75 7915. 100.83 9911. 100.92 11898. 101.00 13878. 101.08 15851. 101.17 17818. 101.25 19777. 101.33 21729. 101.42 23673. 101.50 25609. 101.58 27536. 101.67 29453. 101.75 31361. 101.83 33259. 101.92 35146. 102.00 37022. 102.08 38886. 102.17 40737. 102.25 42575. 102.33 44400. 102.42 46210. 102.50 48004. 102.58 49782. 102.67 51543. 102.75 53287. 102.83 55011. 102.92 56716. 103.00 58400. 103.08 60061. 103.17 61699. 103.25 63313. 103.33 64900. 103.42 66458. 103.50 67987. 103.58 69482. 103.67 70943. 103.75 72365. 103.83 73745. 103.92 75077. 104.00 76353. 104.08 77560. 104.17 78658. 104.25 79666. 104.33 80639. 104.42 81580. 104.50 82478. 104.58 83357. 104.67 84237. 104.75 85116. 104.83 85996. 104.92 86875. 105.00 87754. 105.08 88634. 105.17 89513. 105.25 90393. 105.33 91272. 105.42 92152. 105.50 93031. Massmann Infiltration Option Used Hydraulic Conductivity (in/hr) : 0.00 Depth to Water Table (ft) : 100.00 Bio-Fouling Potential : Low Maintenance : Average or Better Riser Geometry Riser Structure Type : Circular Riser Diameter (in) : 12.00 Common Length (ft) : 0.000 Riser Crest Elevation : 105.50 ft Hydraulic Structure Geometry Number of Devices: 2 ---Device Number 1 --- Device Type : Circular Orifice Control Elevation (ft) : 100.00 Diameter (in) : 0.50 Orientation : Horizontal Elbow : Yes ---Device Number 2 --- Device Type : Circular Orifice Control Elevation (ft) : 104.20 Diameter (in) : 1.88 Orientation : Horizontal Elbow : Yes **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 1 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 3 Number of Links: 3 ***********Groundwater Recharge Summary ************* Recharge is computed as input to Perlnd Groundwater Plus Infiltration in Structures Total Predeveloped Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: Subbasin 1 519.011 Link: New Copy Lnk1 0.000 _____________________________________ Total: 519.011 Total Post Developed Recharge During Simulation Model Element Recharge Amount (ac-ft) ----------------------------------------------------------------------------------------------- Subbasin: West 16.132 Subbasin: East 54.750 Subbasin: Bypass 41.796 Link: MC-3500 Not Computed Link: New Copy Lnk2 0.000 Link: SC-310 Not Computed _____________________________________ Total: 112.678 Total Predevelopment Recharge is Greater than Post Developed Average Recharge Per Year, (Number of Years= 158) Predeveloped: 3.285 ac-ft/year, Post Developed: 0.713 ac-ft/year ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 1 ********** Link: New Copy Lnk1 ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 273.96 Inflow Volume Including PPT-Evap (ac-ft): 273.96 Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 273.96 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00% ----------------------SCENARIO: POSTDEVELOPED Number of Links: 3 ********** Link: New Copy Lnk2 ********** Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 1288.62 Inflow Volume Including PPT-Evap (ac-ft): 1288.62 Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 1288.62 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Link: New Copy Lnk1 Scenario Postdeveloped Compliance Link: New Copy Lnk2 *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 6.414E-02 2-Year 5.008E-02 5-Year 0.105 5-Year 7.973E-02 10-Year 0.141 10-Year 0.109 25-Year 0.179 25-Year 0.145 50-Year 0.228 50-Year 0.170 100-Year 0.247 100-Year 0.188 200-Year 0.384 200-Year 0.205 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** Flow Duration Performance **** Excursion at Predeveloped 50%Q2 (Must be Less Than or Equal to 0%): -55.0% PASS Maximum Excursion from 50%Q2 to Q2 (Must be Less Than or Equal to 0%): -55.0% PASS Maximum Excursion from Q2 to Q50 (Must be less than 10%): -78.6% PASS Percent Excursion from Q2 to Q50 (Must be less than 50%): 0.0% PASS ------------------------------------------------------------------------------------------------- MEETS ALL FLOW DURATION DESIGN CRITERIA: PASS ------------------------------------------------------------------------------------------------- **** LID Duration Performance **** Excursion at Predeveloped 8%Q2 (Must be Less Than 0%): 598.4% FAIL Maximum Excursion from 8%Q2 to 50%Q2 (Must be Less Than 0%): 548.7% FAIL ------------------------------------------------------------------------------------------------- LID DURATION DESIGN CRITERIA: FAIL ------------------------------------------------------------------------------------------------- FLOW CONTROL CRITERIA IS MET Project: Chamber Model - MC-3500 Units -Imperial Number of Chambers -160 Number of End Caps - 10 Voids in the stone (porosity) - 40 % Base of Stone Elevation - 100.00 ft Amount of Stone Above Chambers - 12 in Amount of Stone Below Chambers - 12 in Amount of Stone Between Chambers - 6 in Height of System Incremental Single Chamber Incremental Single End Cap Incremental Chambers Incremental End Cap Incremental Stone Incremental Ch, EC and Stone Cumulative System Elevation (inches) (cubic feet) (cubic feet) (cubic feet) (cubic feet) (cubic feet) (cubic feet)(cubic feet) (feet) 69 0.00 0.00 0.00 0.00 269.78 269.78 29259.32 105.75 68 0.00 0.00 0.00 0.00 269.78 269.78 28989.54 105.67 67 0.00 0.00 0.00 0.00 269.78 269.78 28719.77 105.58 66 0.00 0.00 0.00 0.00 269.78 269.78 28449.99 105.50 65 0.00 0.00 0.00 0.00 269.78 269.78 28180.21 105.42 64 0.00 0.00 0.00 0.00 269.78 269.78 27910.43 105.33 63 0.00 0.00 0.00 0.00 269.78 269.78 27640.66 105.25 62 0.00 0.00 0.00 0.00 269.78 269.78 27370.88 105.17 61 0.00 0.00 0.00 0.00 269.78 269.78 27101.10 105.08 60 0.00 0.00 0.00 0.00 269.78 269.78 26831.32 105.00 59 0.00 0.00 0.00 0.00 269.78 269.78 26561.55 104.92 58 0.00 0.00 0.00 0.00 269.78 269.78 26291.77 104.83 57 0.06 0.00 9.29 0.00 266.06 275.35 26021.99 104.75 56 0.19 0.02 31.06 0.24 257.26 288.55 25746.64 104.67 55 0.29 0.04 47.03 0.38 250.81 298.22 25458.08 104.58 54 0.40 0.05 64.58 0.52 243.74 308.84 25159.86 104.50 53 0.69 0.07 109.95 0.68 225.53 336.15 24851.02 104.42 52 1.03 0.09 164.53 0.88 203.61 369.02 24514.87 104.33 51 1.25 0.11 199.92 1.07 189.38 390.38 24145.85 104.25 50 1.42 0.13 227.56 1.26 178.25 407.07 23755.47 104.17 49 1.57 0.14 251.70 1.44 168.52 421.67 23348.40 104.08 48 1.71 0.16 273.14 1.63 159.87 434.64 22926.74 104.00 47 1.83 0.18 292.56 1.82 152.03 446.40 22492.09 103.92 46 1.94 0.20 310.04 2.01 144.96 457.01 22045.69 103.83 45 2.04 0.22 326.53 2.18 138.29 467.01 21588.68 103.75 44 2.13 0.23 341.55 2.35 132.22 476.12 21121.68 103.67 43 2.22 0.25 355.88 2.51 126.43 484.81 20645.56 103.58 42 2.31 0.27 369.09 2.66 121.08 492.82 20160.75 103.50 41 2.38 0.28 381.56 2.80 116.03 500.40 19667.93 103.42 40 2.46 0.29 393.46 2.94 111.22 507.61 19167.54 103.33 39 2.53 0.31 404.51 3.08 106.74 514.33 18659.92 103.25 38 2.59 0.32 415.00 3.21 102.49 520.70 18145.59 103.17 37 2.66 0.33 424.97 3.34 98.45 526.77 17624.89 103.08 36 2.72 0.35 434.42 3.47 94.62 532.51 17098.12 103.00 35 2.77 0.36 443.41 3.60 90.98 537.98 16565.61 102.92 34 2.82 0.37 451.94 3.72 87.51 543.18 16027.63 102.83 33 2.88 0.38 460.07 3.84 84.21 548.13 15484.45 102.75 32 2.92 0.40 467.86 3.96 81.05 552.87 14936.33 102.67 31 2.97 0.41 475.18 4.08 78.07 557.33 14383.45 102.58 30 3.01 0.42 481.99 4.19 75.31 561.49 13826.12 102.50 29 3.05 0.43 488.52 4.30 72.65 565.47 13264.64 102.42 28 3.09 0.44 495.08 4.40 69.98 569.47 12699.17 102.33 27 3.13 0.45 500.89 4.51 67.62 573.02 12129.70 102.25 26 3.17 0.46 506.51 4.61 65.33 576.45 11556.68 102.17 25 3.20 0.47 511.91 4.71 63.13 579.75 10980.24 102.08 24 3.23 0.48 516.98 4.80 61.07 582.85 10400.49 102.00 23 3.26 0.49 521.83 4.89 59.09 585.81 9817.64 101.92 22 3.29 0.50 526.44 4.98 57.21 588.63 9231.83 101.83 21 3.32 0.51 530.87 5.06 55.40 591.34 8643.20 101.75 20 3.34 0.51 535.06 5.14 53.70 593.90 8051.86 101.67 19 3.37 0.52 538.98 5.22 52.10 596.30 7457.96 101.58 18 3.39 0.53 542.80 5.30 50.54 598.64 6861.66 101.50 17 3.41 0.54 546.33 5.37 49.10 600.79 6263.03 101.42 16 3.44 0.54 549.92 5.43 47.64 602.99 5662.24 101.33 15 3.46 0.55 553.23 5.49 46.29 605.01 5059.25 101.25 14 3.48 0.56 556.59 5.55 44.92 607.06 4454.23 101.17 13 3.51 0.59 560.81 5.95 43.07 609.84 3847.17 101.08 12 0.00 0.00 0.00 0.00 269.78 269.78 3237.33 101.00 11 0.00 0.00 0.00 0.00 269.78 269.78 2967.55 100.92 10 0.00 0.00 0.00 0.00 269.78 269.78 2697.78 100.83 9 0.00 0.00 0.00 0.00 269.78 269.78 2428.00 100.75 8 0.00 0.00 0.00 0.00 269.78 269.78 2158.22 100.67 7 0.00 0.00 0.00 0.00 269.78 269.78 1888.44 100.58 6 0.00 0.00 0.00 0.00 269.78 269.78 1618.67 100.50 5 0.00 0.00 0.00 0.00 269.78 269.78 1348.89 100.42 4 0.00 0.00 0.00 0.00 269.78 269.78 1079.11 100.33 StormTech MC-3500 Cumulative Storage Volumes Include Perimeter Stone in Calculations Click Here for Metric Project: Chamber Model - MC-3500 Units -Imperial Number of Chambers -529 Number of End Caps - 10 Voids in the stone (porosity) - 40 % Base of Stone Elevation - 100.00 ft Amount of Stone Above Chambers - 12 in Amount of Stone Below Chambers - 9 in Amount of Stone Between Chambers - 6 in Height of System Incremental Single Chamber Incremental Single End Cap Incremental Chambers Incremental End Cap Incremental Stone Incremental Ch, EC and Stone Cumulative System Elevation (inches) (cubic feet) (cubic feet) (cubic feet) (cubic feet) (cubic feet) (cubic feet)(cubic feet) (feet) 66 0.00 0.00 0.00 0.00 879.46 879.46 93031.16 105.50 65 0.00 0.00 0.00 0.00 879.46 879.46 92151.70 105.42 64 0.00 0.00 0.00 0.00 879.46 879.46 91272.24 105.33 63 0.00 0.00 0.00 0.00 879.46 879.46 90392.79 105.25 62 0.00 0.00 0.00 0.00 879.46 879.46 89513.33 105.17 61 0.00 0.00 0.00 0.00 879.46 879.46 88633.87 105.08 60 0.00 0.00 0.00 0.00 879.46 879.46 87754.41 105.00 59 0.00 0.00 0.00 0.00 879.46 879.46 86874.96 104.92 58 0.00 0.00 0.00 0.00 879.46 879.46 85995.50 104.83 57 0.00 0.00 0.00 0.00 879.46 879.46 85116.04 104.75 56 0.00 0.00 0.00 0.00 879.46 879.46 84236.58 104.67 55 0.00 0.00 0.00 0.00 879.46 879.46 83357.13 104.58 54 0.06 0.00 30.73 0.00 867.17 897.89 82477.67 104.50 53 0.19 0.02 102.68 0.24 838.29 941.21 81579.78 104.42 52 0.29 0.04 155.51 0.38 817.11 972.99 80638.57 104.33 51 0.40 0.05 213.53 0.52 793.84 1007.88 79665.58 104.25 50 0.69 0.07 363.52 0.68 733.78 1097.97 78657.70 104.17 49 1.03 0.09 543.97 0.88 661.52 1206.37 77559.72 104.08 48 1.25 0.11 661.00 1.07 614.63 1276.70 76353.35 104.00 47 1.42 0.13 752.36 1.26 578.01 1331.63 75076.65 103.92 46 1.57 0.14 832.19 1.44 546.00 1379.64 73745.02 103.83 45 1.71 0.16 903.08 1.63 517.57 1422.28 72365.39 103.75 44 1.83 0.18 967.28 1.82 491.82 1460.91 70943.10 103.67 43 1.94 0.20 1025.08 2.01 468.62 1495.71 69482.19 103.58 42 2.04 0.22 1079.60 2.18 446.75 1528.52 67986.48 103.50 41 2.13 0.23 1129.25 2.35 426.82 1558.42 66457.96 103.42 40 2.22 0.25 1176.61 2.51 407.81 1586.93 64899.54 103.33 39 2.31 0.27 1220.29 2.66 390.28 1613.23 63312.61 103.25 38 2.38 0.28 1261.54 2.80 373.72 1638.06 61699.38 103.17 37 2.46 0.29 1300.86 2.94 357.94 1661.74 60061.32 103.08 36 2.53 0.31 1337.40 3.08 343.26 1683.75 58399.58 103.00 35 2.59 0.32 1372.09 3.21 329.34 1704.64 56715.84 102.92 34 2.66 0.33 1405.05 3.34 316.10 1724.50 55011.20 102.83 33 2.72 0.35 1436.29 3.47 303.55 1743.31 53286.70 102.75 32 2.77 0.36 1466.01 3.60 291.61 1761.22 51543.39 102.67 31 2.82 0.37 1494.24 3.72 280.27 1778.24 49782.16 102.58 30 2.88 0.38 1521.12 3.84 269.47 1794.43 48003.93 102.50 29 2.92 0.40 1546.87 3.96 259.13 1809.95 46209.49 102.42 28 2.97 0.41 1571.07 4.08 249.40 1824.55 44399.54 102.33 27 3.01 0.42 1593.59 4.19 240.35 1838.12 42574.99 102.25 26 3.05 0.43 1615.17 4.30 231.67 1851.14 40736.87 102.17 25 3.09 0.44 1636.87 4.40 222.95 1864.22 38885.73 102.08 24 3.13 0.45 1656.06 4.51 215.23 1875.80 37021.51 102.00 23 3.17 0.46 1674.64 4.61 207.76 1887.00 35145.71 101.92 22 3.20 0.47 1692.51 4.71 200.57 1897.79 33258.71 101.83 21 3.23 0.48 1709.26 4.80 193.83 1907.89 31360.92 101.75 20 3.26 0.49 1725.28 4.89 187.39 1917.56 29453.02 101.67 19 3.29 0.50 1740.55 4.98 181.25 1926.77 27535.46 101.58 18 3.32 0.51 1755.20 5.06 175.35 1935.62 25608.69 101.50 17 3.34 0.51 1769.04 5.14 169.78 1943.97 23673.07 101.42 16 3.37 0.52 1782.00 5.22 164.57 1951.79 21729.10 101.33 15 3.39 0.53 1794.63 5.30 159.49 1959.41 19777.31 101.25 14 3.41 0.54 1806.29 5.37 154.79 1966.45 17817.90 101.17 13 3.44 0.54 1818.18 5.43 150.01 1973.63 15851.44 101.08 12 3.46 0.55 1829.13 5.49 145.61 1980.23 13877.82 101.00 11 3.48 0.56 1840.23 5.55 141.14 1986.93 11897.59 100.92 10 3.51 0.59 1854.19 5.95 135.40 1995.54 9910.66 100.83 9 0.00 0.00 0.00 0.00 879.46 879.46 7915.12 100.75 8 0.00 0.00 0.00 0.00 879.46 879.46 7035.66 100.67 7 0.00 0.00 0.00 0.00 879.46 879.46 6156.20 100.58 6 0.00 0.00 0.00 0.00 879.46 879.46 5276.74 100.50 5 0.00 0.00 0.00 0.00 879.46 879.46 4397.29 100.42 4 0.00 0.00 0.00 0.00 879.46 879.46 3517.83 100.33 3 0.00 0.00 0.00 0.00 879.46 879.46 2638.37 100.25 2 0.00 0.00 0.00 0.00 879.46 879.46 1758.91 100.17 1 0.00 0.00 0.00 0.00 879.46 879.46 879.46 100.08 StormTech MC-3500 Cumulative Storage Volumes Include Perimeter Stone in Calculations Click Here for Metric FAMILY FIRST COMMUNITY CENTER APPENDIX C – CSWPPP The CSWPPP will be provided in the final drainage report. FAMILY FIRST COMMUNITY CENTER APPENDIX D – OPERATIONS AND MAINTENANCE MANUAL The Operations and Maintenance manual will be provided in the final drainage report. FAMILY FIRST COMMUNITY CENTER APPENDIX E – FACILITIES SUMMARY AND DECLARATIONS OF COVENANT The Facilities Summary and Declarations of Covenant will be provided in the final drainage report.