HomeMy WebLinkAboutPre-application Comments PREAPPLICATION MEETING FOR
Faith Temple CUP
300 S 3rd Street
PRE 17-000159
CITY OF RENTON
Department of Community & Economic Development
Planning Division
April 6, 2017
Contact Information:
Planner: Jill Ding, 425.430.6598
Public Works Plan Reviewer: Jan Illian, 425.430.7216
Fire Prevention Reviewer: Corey Thomas, 425.430.7024
Building Department Reviewer: Craig Burnell, 425.430.7290
Please retain this packet throughout the course of your project as a reference. Consider
giving copies of it to any engineers, architects, and contractors who work on the
project. You will need to submit a copy of this packet when you apply for land use
and/or environmental permits.
Pre-screening: When you have the project application ready for submittal, call and
schedule an appointment with the project manager to have it pre-screened.
The pre-application meeting is informal and non-binding. The comments provided on
the proposal are based on the codes and policies in effect at the time of review. The
applicant is cautioned that the development regulations are regularly amended and the
proposal will be formally reviewed under the regulations in effect at the time of project
submittal. The information contained in this summary is subject to modification and/or
concurrence by official decision-makers (e.g., Hearing Examiner, Planning Director,
Development Services Director, Department of Community & Economic Development
Administrator, Public Works Administrator and City Council).
Fire & Emergency
Services Department
M E M O R A N D U M
DATE:
TO:
FROM:
SUBJECT:(Faith Temple Community Church) PRE17-000159
Jill Ding, Senior Planner
4/3/2017 12:00:00AM
Corey Thomas, Plan Review/Inspector
No comments.
Page 1 of 1
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-binding
and may not subject to modification and/or concurrence by official city decision -makers. Review comments
may also need to be revised based on site planning and other design changes required by City staff or made by
the applicant.
I have completed a preliminary review for the above-referenced proposal. The following comments are based
on the pre-application submittal made to the City of Renton by the applicant.
DEPARTMENT OF
COMMUNITY AND
ECONOMIC
DEVELOPMENT M E M O R A N D U M
DATE:
TO:
FROM:
SUBJECT:(Faith Temple Community Church) PRE17-000159
Jan Illian, Plan Reviewer
Jill Ding, Senior Planner
4/5/2017 12:00:00AM
1. Plan Review has no comments
Page 1 of 1
h:\ced\planning\current planning\preapps\2017 preapps\17-000159.jill\17-000159 faith temple cup (cd
zone, urban design a, seismic).doc
DEPARTMENT OF
COMMUNITY AND
ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE:April 6, 2017
TO:Pre-Application File No. 17-000159
FROM:Jill Ding, Senior Planner
SUBJECT:Faith Temple CUP
300 S 3rd Street
General: We have completed a preliminary review of the pre-application for the above-
referenced development proposal. The following comments on development and permitting
issues are based on the pre-application submittals made to the City of Renton by the applicant
and the codes in effect on the date of review. The applicant is cautioned that information
contained in this summary may be subject to modification and/or concurrence by official
decision-makers (e.g., Hearing Examiner, Community & Economic Development Administrator,
Public Works Administrator, Planning Director, Development Services Director, and City
Council). Review comments may also need to be revised based on site planning and other
design changes required by City staff or made by the applicant. The applicant is encouraged to
review all applicable sections of the Renton Municipal Code. The Development Regulations are
available for purchase for $50.00 plus tax, from the Finance Division on the first floor of City Hall
or online at www.rentonwa.gov
Project Proposal: The project site is comprised of two parcels (parcel nos. 0007200184 and
0007200157) located at the northeast corner of the intersection of S 3rd Street and Shattuck
Avenue S and is a former funeral home. The existing building totals 7,000 square feet in area
with surface parking including 29 stalls. No renovations or expansions of the existing building
are proposed. The church use has been operating on the site under a Temporary Use Permit
that was granted in 2010. Seismic hazard areas are mapped on the project site.
Current Use: Currently the Faith Temple is operating on the site under an existing Temporary
Use Permit (LUA10-062).
Development Standards: The project would be subject to RMC 4-2-120B, “Development
Standards for Commercial Zoning Designations” effective at the time of complete application
(noted as “CD standards” herein).
Zoning: The property is located within the Urban Center Downtown (UCD) land use designation,
the Center Downtown (CD) zoning designation, Urban Design District A, Downtown Business
District, and City Center Sign Regulation Area. Religious Institutions are allowing with a
Hearing Examiner Conditional Use Permit within the CD zone.
Faith Temple CUP
Page 2 of 4
April 6, 2017
h:\ced\planning\current planning\preapps\2017 preapps\17-000159.jill\17-000159 faith temple cup (cd
zone, urban design a, seismic).doc
Minimum Lot Size, Width and Depth – There are no minimum lot size, width, or depth
requirements within the CD zone.
Lot Coverage – There are no maximum building coverage requirements in the CD zone.
Setbacks – Setbacks are the distance between the building and the property line or any private
access easement. Setback requirements in the CD zone are as follows: 0-foot minimum
front/side yard along a street setback; a 15-foot maximum front/side yard along a street setback
for buildings 25 feet or less in height, none for that portion of the building over 25 feet in height;
and no rear or side yard setbacks. The existing structure has a front yard setback of
approximately 42 feet, a side yard along a street setback of 0 feet, a side yard setback of 30
feet and a rear yard of 14 feet. No expansions of the existing structure are proposed under the
current proposal.
Building Height – The maximum building height permitted in the CD zone is 95 feet. The existing
building has a total of 3 stories and it is anticipated that the existing building would not
exceed the maximum allowable height of 95 feet.
Landscaping – All development in the CD zone is exempt from all but the maintenance of any
existing landscaping, parking lot landscaping, and street tree requirements of the Landscaping
Regulations. No new parking lots are proposed under the current proposal; therefore new
landscaping is not required.
Tree Preservation – A tree inventory and a tree retention plan along with a tree retention
worksheet shall be provided with the formal land use application. According to the proposed
regulations, the tree retention plan must show preservation of at least 10 percent (10 %) of
significant trees, and indicate how proposed building footprints would be sited to accommodate
preservation of significant trees that would be retained. The Administrator may authorize the
planting of replacement trees on the site if it can be demonstrated to the Administrator’s
satisfaction that an insufficient number of trees can be retained.
Significant trees shall be retained in the following priority order:
Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees
on slopes greater than twenty percent (20%); Significant trees adjacent to critical areas and their
associated buffers; and Significant trees over sixty feet (60') in height or greater than eighteen
inches ( 18") caliper.
Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; other
significant native evergreen or deciduous trees; and other significant non-native trees.
Priority Three: Alders and cottonwoods shall be retained when all other trees have been
evaluated for retention and are not able to be retained, unless the alders and/ or cottonwoods
are used as part of an approved enhancement project within a critical area or its buffer.
The Administrator may require independent review of any land use application that involves
tree removal and land clearing at the City’s discretion. A tree retention plan is required at the
time of formal land use application.
Screening - All operating equipment located on the roof of any building shall be enclosed so as
to be screened from public view in accordance with the requirements outline under RMC 4-4-
095.
Faith Temple CUP
Page 3 of 4
April 6, 2017
h:\ced\planning\current planning\preapps\2017 preapps\17-000159.jill\17-000159 faith temple cup (cd
zone, urban design a, seismic).doc
Fences/Retaining Walls – If the applicant intends to install any fences as part of this project, the
location must be designated on the landscape plan. A fence taller than six feet (6') requires a
building permit. New or existing fencing would need to comply with RMC 4-4-040.
Retaining walls shall be composed of brick, rock, textured or patterned concrete, or other
masonry product that complements the proposed building and site development. There shall be
a minimum three-foot (3') landscaped setback at the base of retaining walls abutting public
rights-of-way. Please refer to retaining wall standards (RMC 4-4-040) for additional information.
Parking – Within the CD zone, only the area exceeding the area of the original structure shall be
used to calculate required parking. No expansions to the existing building are proposed;
therefore compliance with the parking requirements is not required.
Refuse and Recyclables – In office, educational and institutional developments, a minimum of
two (2) square feet per every one thousand (1,000) square feet of building gross floor area shall
be provided for recyclables deposit areas and a minimum of four (4) square feet per one
thousand (1,000) square feet of building gross floor area shall be provided for refuse deposit
areas. A total minimum area of one hundred (100) square feet shall be provided for recycling
and refuse deposit areas. Based on a building square footage of 7,000 square feet, the
applicant would be required to provide a total minimum of 100 square feet of refuse and
recyclable deposit areas.
Access – Driveway widths are limited by the driveway standards, in RMC 4-4080I.
Building Design Standards – Compliance with Urban Design Regulations, District ‘A’, would be
required if exterior modifications such as façade changes, windows, awning are proposed.
Only those portions of the structure which are changes would be reviewed under Design
District A standards. See the attached checklist and Renton Municipal Code section 4-3-100.
The following bullets are a few of the standards outlined in the regulations.
A primary entrance of each building shall be located on the facade facing a street, shall
be prominent, visible from the street, connected by a walkway to the public sidewalk,
and include human-scale elements.
Parking shall be located so that no surface parking is located between a building and the
front property line, or the building and side property line, on the street side of a corner
lot.
The number of driveways and curb cuts shall be minimized, so that pedestrian
circulation along the sidewalk is minimally impeded.
All building facades shall include modulation or articulation at intervals of no more than
forty feet (40').
Modulations shall be a minimum of two feet (2') deep, sixteen feet (16') in height, and
eight feet (8') in width.
On any facade visible to the public, transparent windows and/or doors are required to
comprise at least fifty percent (50%) of the portion of the ground floor facade that is
between four feet (4') and eight feet (8') above ground (as measured on the true
elevation).
Buildings shall use at least one of the following elements to create varied and
interesting roof profiles (see illustration, subsection RMC 4-3-100.I5f):
(a) Extended parapets;
(b) Feature elements projecting above parapets;
Faith Temple CUP
Page 4 of 4
April 6, 2017
h:\ced\planning\current planning\preapps\2017 preapps\17-000159.jill\17-000159 faith temple cup (cd
zone, urban design a, seismic).doc
(c) Projected cornices;
(d) Pitched or sloped roofs.
Buildings shall employ material variations such as colors, brick or metal banding,
patterns, or textural changes.
Critical Areas: The site is mapped with seismic hazard areas. A geotechnical report may be
required if any expansions of the existing building are proposed.
Environmental Review: The proposal would require Environmental (SEPA) Review in accordance
with WAC 197-11-800, as a change in use of a building that is larger than 4,000 square feet is
proposed.
Permit Requirements: The proposal would require a Hearing Examiner Conditional Use Permit
and Environmental (SEPA) Review. Both applications would be processed concurrently within an
estimated time frame of 10 to 12 weeks. The fee would be is $4,635 ($3,000 CUP + $1,500 SEPA
+ 135 Technology Fee).
Detailed information regarding the land use application submittal requirements is provided on
the Renton website, Rentonwa.gov. Once Conditional Use Permit approval is obtained, the
applicant must complete the required improvements and dedications, as well as satisfy any
conditions of the approval.
The City now requires electronic plan submittal for all applications and with the change to
electronic submittals, the City’s 3% technology fee may be increasing.
Impact Mitigation Fees: In addition to the applicable building and construction fees, impact
mitigation fees are required for the construction of new building areas or changes of use to a
more intensive you. If any building expansions or new buildings are proposed or a change in use
to a more intense you, fire and transportation impact fees assessed based on the use of the
building may be assessed.
Public Notice: The applicant will be required to install a public information sign on the property.
Expiration: Once the Conditional Use Permit application has been approved, the applicant has
two years to comply with all conditions of approval and to apply for any necessary permits
before the approval becomes null and void. A single two-year extension may be granted.
Note: When the formal application materials are complete, the applicant is strongly
encouraged to bring an electronic copy for pre-screening at the 6th floor front counter prior to
submitting the complete application package. Please contact Jill Ding, Senior Planner at 425-
430-6598 or jding@rentonwa.gov for an appointment.