HomeMy WebLinkAboutPN_Pre_Scope Summary - Boeing _Renton Mitigation Hangar_180318_.V1Renton Mitigation Hangar Pre-Application Scope Summary 1 Global Project Information Title: Mitigation Hangar Location: Renton, Between Buildings 4-81 and 4-20 Boeing Permit Contact: Mark Clement Contact Phone: (206) 617-2944 Overview The Boeing Company is looking to construct a hangar structure measuring approximately 338’x173’ in plan on Apron R as an extension to their existing final assembly building 4-81/82; the height is proposed to match existing 4-81 building. This new hangar will house two 737 aircrafts for the purpose of performing manufacturing activities currently performed in the final assembly building 4-81/82. The new hangar will consist of high bay and low bay buildings. High bay will be located on the northern portion of the building and will house two 737 MAX (Unfueled aircraft). The low bay which is located on the south will house airplane equipment service and storage area on the first floor and office function, break room and restroom facility that include lockers on the second floor. There will be a 10’ separation between the existing building 04-81 and the new hangar structure. Existing utilities within the footprint of the proposed hangar will be relocated, or the system reconfigured and existing lines abandoned in place. The project will require a comprehensive re-evaluation and revision of the existing storm water conveyance system including installation of new storm water tank along with associated treatment system. The project will install a new electrical unit substation dedicated to this building. Mechanical system includes new air handling system located at roof of the hangar. The project is outside the 200 foot shoreline buffer. See the attached Vicinity Map and Site Map for location information. A smaller version of the Vicinity Map is included below as Figure 1; not to scale. Renton Mitigation Hangar Pre-Application Scope Summary 2 Summary Program  Overall Size: ~63,000 SF  Assumed Displaced Impervious SF: ~63,000 SF  Building Components: o Mitigation Hangar (High Bay) – 170’x290’ o Manufacturing/Office – 48’x133’  Assumed Occupancy: S-1  Major Design Components: o Structural o Architectural o Mechanical Figure 1 – Portion of Vicinity Map Renton Mitigation Hangar Pre-Application Scope Summary 3 o Electrical o Civil/Site o Geotechnical o Fire Protection Detailed Summary of Work  High Bay Hangar: o High bay on the north, approximately 290’L x 173’D x 65’H will be a steel frame building supported by steel trusses spanning E-W direction. o Roof will be single ply roofing system on metal decking; Parapet wall provided for minimum height of 42”above roof surface for fall protection. o Exterior siding - Prefinished metal insulated panels and architectural metal panels with interplay of horizontal and vertical lines to create different planes, shadow lines and flavors but need to work as a whole. o Wall base, approximately 7’-2” concrete wall base panel at exterior. o Two (2) large hangar doors on west wall for airplane ingress and egress. o One (1) roll up door opening at the north wall for future use. o One (1) roll up door at the west wall and align with existing roll up door location in 04-81 building for equipment moving purposes across the two (2) buildings. o . o Building canopies will be provided at entrances for added architectural markings. o Existing signage and paint striping to be reconfigured within the proximity area impacted from by the new hangar location.  Low Bay Hangar Support Building: o The low bay, approximately 48’D x 133’D x 45’H will be a steel frame building supported by steel trusses spanning E-W direction. o Roof will be single ply roofing system on metal decking; Parapet wall provided for minimum height of 42”above roof surface for fall protection. o Exterior siding - Prefinished metal insulated panels and architectural metal panels with interplay of horizontal and vertical lines to create different planes, shadow lines and flavors but need to work as a whole. o Wall base, approximately 7’-2” concrete wall base panel at exterior. o Building canopies will be provided at entrances for added architectural markings. o There will be airplane equipment storage on the first floor and office function, break room, restroom facility that include locker on the second floor. See below for additional detail: o Low bay hangar 1st Floor: Renton Mitigation Hangar Pre-Application Scope Summary 4  Low bay 1st floor area will be used for equipment service, machine parts and storage function.  Minimum height clearance of 25’ (TBD) above slab for equipment.  An electrical substation will be located at the east end of the building with code compliant wall and ceiling enclosure/room that includes doors and hardware.  One roll up door at the west wall.  One roll up door at the south wall. o Low bay hangar 2nd Floor:  Office function, conference room, break room and restroom will be located on the 2nd floor. Code compliant occupancy load analysis will be performed including, exiting requirements and stairway system for the Low Bay building area.  Office function area including restroom will be ADA compliant.  Boeing will be exploring the option to take advantage of using building 04-81 West Tower existing floor elevation, exiting and elevator system to provide those horizontal and vertical movement system requirement between the two (2) buildings.  Where infeasible to take advantage of using the Building 4-81 West Tower existing floor exiting and elevator system, a code compliant ADA Accessibility system will be utilized in this low bay.  Depending on the location of the horizontal movement between the two (2) buildings, Boeing may explore utilizing a sky-bridge to link them.  Exterior sun shade device and interior roller window shades will be utilized as required.  ADA compliant restroom facility, that includes lockers, will be provided.  Egress Corridor Between New Hangar and 4-81 Building: o Corridor between building 4-81 and the new hangar will have a “service level” mezzanine” floor at second level with stair access located at the N- W corner. o Mezzanine floor will house electrical and VFD panels; Floor elevation is determined by the height of the existing EBU door at the 4-81 building o Mezzanine floor structural farming will consist of concrete composite metal deck flooring supported by hangar columns at the west face and W columns at the east face independent of the existing building 4-81 framing. Summary of Utility Work & Site Prep Renton Mitigation Hangar Pre-Application Scope Summary 5  General: o NO active buried utilities are assumed to remain underneath the new hangar building footprint.  Utility Trenches: o E-W trench between building 4-81 and the new hangar (Final Location TBD) o N-S trench between aircraft main gear and building columns (Final Location TBD)  Stormwater: o Abandon in place existing wet vault to the west of the hangar building; decommissioning design in progress. o Abandon in place existing diversion vault within footprint of building; decommissioning design in progress. o Relocate existing stormwater lines from beneath the building footprint. o Re-establish stormwater conveyance system within Drainage Basin 25 to route around the new mitigation hangar building. o System to remain operational throughout construction  Site Preload: o Soil Preload will be utilized over the full footprint of the new hangar to better ground conditions prior to installation of the foundation system for the new hangar. o Preload extents assumed to be approximately 6 to 8 feet of soil over the full footprint, in place for approximately 8 to 10 weeks.  Electrical: o Install a new 1500 KVA electrical unit substation in the southeast corner of the lower production and office portion of the new hangar o Demolition of all the electrical in Apron R change incorporation stalls (R5, R6, and R7). (West of proposed hangar) o 480V power to new HVAC. o 480V power and controls for hangar doors. o power, data, and lighting for office, kitchen, and restroom in the second floor of the two-story bump out building. Renton Mitigation Hangar Pre-Application Scope Summary 6 o high bay lighting of the mitigation building and the work area on the first floor of the bump out building o 120V power to the VESDA system. o 480V power to the hydraulic cart and 400HZ system. o 480V, 30A to charging stations.  Mechanical/Fire Protection: o Compressed air; air piping will be run in newly constructed floor trenches which are connected to the existing floor trenches in the 4-81 building. o Relocate existing fire water supply line from within footprint of new hangar. o Establish temporary (permanent if possible) line to provide ongoing fire protection to the existing 4-81/82 building. o Fire protection to hangar space and 2nd floor office area. o Fire protection requirements intended to meet standards of NFPA 409 and other applicable code criteria. o Ventilation and heating to hangar space. Heating, ventilating, and air conditioning to the 2nd floor office area. o Potable water to a floor location centrally positioned between the two airplane positions and stub up. This potable water piping will be run in floor trenches which are connected to the existing floor trenches in the 4- 81 building. o Industrial waste water drainage connection at a floor location centrally positioned between the two airplane positions. This industrial waste water piping will gravity drain to sumps in floor trenches which are pumped to the existing industrial waste water system in the 4-81 building. o Relocated wall PIVs and fire alarm check valves on two risers located on the West wall of the 4-81 building. o Relocate/Reroute and reconnect, underground mechanical utilities piping to be displaced by the new hangar complex footprint. o Relocate outside air louvers and associated supply ducts on the 4-81 building West wall which will be displaced by constructing the new hangar complex. o Provide steam supply to door heaters at hangar openings. o Provide steam supply to HVAC units. o Provide plumbing to 2nd floor restrooms. Renton Mitigation Hangar Pre-Application Scope Summary 7 o Provide plumbing to kitchenette/break area in 2nd floor office area