DATE: June 23, 2016
TO: Matthew Herrera, Senior Planner
FROM: Ian Fitz-James, Civil Plan Reviewer
SUBJECT: Utility and Transportation Comments for 16837 108TH Avenue SE
Townhomes
PRE 16-000412
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-
binding and may be subject to modification and/or concurrence by official City decision-makers. Review
comments may also need to be revised based on site planning and other design changes required by
City staff or made by the applicant.
I have completed a preliminary review of the application for the 16837 108th Avenue SE Townhomes.
The King County Parcel Number is 0087000310. The applicant is proposing to subdivide the lot into two
parcels that contain four townhomes each.
WATER COMMENTS
1. Please obtain a water availability certificate from Soos Creek Water and Sewer District and
provide it with the utility permit submittal.
2. Review of the water plans will be conducted by Soos Creek Water and Sewer District and the
City of Renton Fire Department.
3. Plans approved by Soos Creek Water and Sewer District shall be routed to the City for final
review prior to permit issuance.
SEWER COMMENTS
1. Please obtain a sewer availability certificate from Soos Creek Water and Sewer District and
provide it with the utility permit submittal.
16837 108th Avenue SE Townhomes – PRE16-000412
Page 2 of 3
June 23, 2016
H:\CED\Planning\Current Planning\PREAPPS\2016 Preapps\PRE16-000412.Matt\16-0623 PRE16-000412 Civil Pre-App
Comments.docx
2. Review of the sewer plans will be conducted by Soos Creek Water and Sewer District.
3. Plans approved by Soos Creek Water and Sewer District shall be routed to the City for final
review prior to permit issuance.
STORM DRAINAGE COMMENTS
1. There is no existing storm drainage infrastructure on site. The site slopes and drains gently
towards the southwest.
2. Refer to Figure 1.1.2.A – Flow Chart to determine what type of drainage review is required for
this site. The site falls within the City’s Flow Control Duration Standard (Forested Conditions).
The site falls within the Black River drainage basin. Drainage plans and a drainage report
complying with the adopted 2009 King County Surface Water Design Manual (KCSWDM) and the
2010 City of Renton amendments will be required. Enhanced water quality treatment is
required as this is a multifamily development.
3. Flow Control BMPs will be required per Section 5.2 of the 2009 KCSWDM.
4. A geotechnical report for the site is required. Information on the water table and soil
permeability, with recommendations of appropriate flow control BMP options with typical
designs for the site from the geotechnical engineer, shall be submitted with the application.
5. The development would be subject to system development charges (SDCs) for stormwater. The
current SDC is $0.594 per square foot of new impervious area, but not less than $1,485.00.
TRANSPORTATION/STREET COMMENTS
1. The current transportation impact fee is $1,546.31 per townhome / condominium. Fees are
payable at the time of permit issuance.
2. The site is a landlocked parcel and has no public street frontage.
3. This site gains access through a 26’ access and utilities easement through 16839 108th Avenue SE
from 108th Avenue SE. Please provide the King County recording number for this easement.
4. The access road through the utilities and access easement shall conform to the shared driveway
standards found in RMC 4-6-060. The pavement width shall be a minimum of 20’ per fire
department standards. Drainage improvements per City standards are required to capture
stormwater runoff from the access road. Pavement thickness shall be a minimum of 4” asphalt
over 6” of crushed rock. The maximum grade shall be 15%. The portion of the access road
located on 16837 108th Avenue NE shall be located in a tract.
5. No street lighting is required as the site does not front a public street.
6. Paving and trench restoration within the City of Renton right of way shall comply with the City’s
Restoration and Overlay requirements.
16837 108th Avenue SE Townhomes – PRE16-000412
Page 3 of 3
June 23, 2016
H:\CED\Planning\Current Planning\PREAPPS\2016 Preapps\PRE16-000412.Matt\16-0623 PRE16-000412 Civil Pre-App
Comments.docx
GENERAL COMMENTS
1. The SDCs listed are for 2016. The fees that are current at the time of the utility permit
application will be levied. Please see the City of Renton website for current SDCs.
2. Retaining walls that are 4’ or taller from bottom of footing will require a separate building
permit. Structural calculations and plans prepared by a licensed engineer will be required.
3. The survey and all civil plans shall conform to the current City of Renton survey and drafting
standards. Current drafting standards can be found on the City of Renton website.
4. A final survey that is stamped and signed by the professional land surveyor of record will need
to be provided. All existing utilities need to be surveyed and shown. Please reference COR
Maps for mapping and records of existing utilities in the project vicinity.
5. Separate plan submittals will be required for construction permits for utility work and street
improvements. All plans shall be prepared by a licensed Civil Engineer in the State of
Washington.
6. When utility plans are complete, please submit four (4) copies of the plans, two (2) copies of the
drainage report, an electronic copy of each, the permit application, an itemized cost of
construction estimate, and application fee to the counter on the sixth floor.