Loading...
HomeMy WebLinkAboutMFP19005569DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP19005569 IVR Number: 19005569 Permit Informaon Permit Name:Comcast Cable Franchise Permit Address/Locaon :10/17/2019Application Date:7841300175Parcel Number:450 SHATTUCK AVE S Permit Type:10/31/2019Issue Date:Franchise Permit Work Class:10/30/2020Expiration Date:Minor Utility Job Number:JB0000164285Franchise Type:Cable Description:Aerial splice at one location. 450 Shattuck Ave S. APPROVED AS SUBMITTED. Contacts Name Address PhoneTypeBilling Comcast Cable Communication Management & Comcast Cable B: (215) 665-1700Applicant Tom Donnelly Comcast Business Communications 1701 Jfk Blvd, 32nd Floor Philadelphia, PA 19103 B: (215) 286-7347 C: (215) 286-7557 Contact Michael Cannon Cannon Construction Inc 406 Porter Way Milton, WA 98354-9638 B: (253) 922-2787 C: (253) 588-4034 Contractor Business License Number: 20838Construction Contractor: CANNOCI055CS CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES MFP19005569Scott Warlick10/17/2019Nathan Janders10/31/2019 MFP19005569Scott Warlick10/17/2019Monday - Friday8:00AM - 3:00PM THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED CANNON COMPANIES CONTACTS: PROJECT MAP: N CANNON Andrew Perkins-253-363-1646 aperkins@cannonconstructioninc.com COMCAST Kyle Kinney-253-235-7016 Kyle_Kinney@cable.comcast.com ATS AUTOMATION POC:Chris Glidden-206-963-0654 Chrisgl@atsinc.com Review _________________________ 1 - COVER SHEET 2 -TRAFFIC CONTROL *ALL FOOTAGES AND MATERIALS ARE ESTIMATED SCOPE OF WORK: SHEET INDEX: NEW AERIAL = OVERLASH = NEW UNDERGROUND = EXISTING UNDERGROUND = RISER (0)= TOTAL FOOTAGE = 0 FT. 0 FT. 0 FT. 0 FT. 0 FT. 0 FT. PROJECT DESCRIPTION - ROW* NEW BUILDING PATH WAY = EXISTING BUILDING PATH WAY = NEW UNDERGROUND = EXISTING UG = TOTAL FOOTAGE = 0 FT. 0 FT. 0 FT. 0 FT. 0 FT. PROJECT DESCRIPTION -SITE* TOTAL PROJECT FOOTAGE =0 FT. - SPLICE ONLY 450 SHATTUCK AVE S STE 100 RENTON, WA 98057 ATS AUTOMATION JB0000164285 CANNON COMPANIES SAFETY | QUALITY | INTEGRITY | TEAMWORK Connecting The Future Since 1985 COMCAST PC# 500000 METRO-E MFP19005569 ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOPEOPEOPEOPEOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPWTW21-7 W21-7 WORK AREA S 4TH ST SHATTUCK AVE SWHITWORTH AVE SALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D) CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST 6*'&'5+)0'&64#((+%%10641.5%106#+0'&9+6*+0 6*+56%29+..016$'+/2.'/'06'&706+.#22418'& $;6*'27$.+%#76*14+6;*#8+0),74+5&+%6+10 5+6'52'%+(+%64#((+%%10641.2.#0 =#'4+#.914-?%10641.6;2'#%%'55(41/24+8#6' 5+6'016'5 /#+06#+0&4+8'9#;#%%'55#6#..6+/'5 2.#%'6'/2012#4-+0)5+)05#6.'#56 *174524+1461914- 5+&'9#.-5614'/#+012'0&74+0) 41#&914-70.'55016'&16*'49+5' 5+)052#%+0): (''6 FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- #..5+)05#4'Z$.#%-1014#0)'70.'5516*'49+5'&'5+)0#6'& (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 .#0'9+&6*25 30 35 40 45 50 55 60 65 70 /+0+/7/6#2'4.'0)6*+0(''6. 2156'&52''&.+/+6 /2* 52''&25 30 35 45 50 55 155 200 250 360 425 495 570 .10)+67&+0#.$7(('452#%'$ .'0)6* 40 305 60 65 70 780 840 N***TRAFFIC CONTROL ADDITIONAL NOTES *** - At aerial work, will be a moving traffic control setup -Will coordinate with business that will be affected by construction. -Will have Spotter on site to escort pedestrian through work zone. - All work will stop while pedestrians are escorted through work zones. -Will have no more than two work areas active at a time. -Work Areas will have 2-3 Man Work Crews with line truck. OF DATE REVISION BY QC CANNON COMPANIES JB0000164285SPLICING450 SHATTUCK AVE SRENTON, WA 98057 TCP-1 2 2 9/17/2019 DRAFTED BASE W/ GIS REF.DG AP COMCAST MFP19005569