HomeMy WebLinkAbout1 old - Central Island Short Plat Submitted Material
Pham Nguyen Short Plat, Phcl2-019 Page 2 of 5 March 8, 2012
net density. While lot dimensions and dimensions for the access easement are not indicated in the pre-application
materials, it appears that the access easement would be approximately 5,670 square feet. This would yield a net
density for the proposed project of 7.55 dulac which conforms to the required R-8 zone density range.
Development Standards: The project would be subject to RMC 4-2-110A, "Development Standards for Single Family
Zoning Designations" effective at the time of complete application. A copy of these standards is included.
Minimum Lot Size, Width and Depth -The minimum lot size permitted in Zone R-8 is 5,000 square feet for parcels
less than one acre. Minimum lot width for interior lots is 50 feet and minimum lot depth is 65 feet. While proposed lot
dimensions are not indicated in the pre-application materials, it appears that the proposal can comply with the
minimum lot size, width and depth standards.
Building Standards-The R-8 zone allows a maximum building coverage of 35% ofthe lot area or 2,500 square feet,
whichever is greater for lots over 5,000 square feet in size. The maximum impervious coverage in the R-8 zone is
75%. Building height is restricted to 30 feet. Detached accessory structures must remain below a height of 15 feet and
one-story. Accessory structures are also included in building lot coverage calculations. Compliance with building
standards will be determined at the time of building permit review for any new structures.
Setbacks -Setbacks are the minimum required distance between the building footprint and the property line and any
private access easement. The required setbacks in the Zone R-8 are:
Front yard -15 feet for the primary structure. Rear yard -20 feet.
Side yards -5-feet, except is-feet for side yards along a street.
Should the existing house remain on Proposed Lot 2, the above setbacks would be required. As proposed the front
yard of the existing house would be oriented to the east (toward the proposed access easement) and, therefore, it
would not comply with the setback standards. Additionally, the front yard of Proposed Lot 1 should be oriented toward
NE J'h Street and the front yards of Proposed Lots 2 through 4 should be oriented to the east. Setbacks will be
verified at the time of formal short plat application.
Residential Design and Open Space Standards: The Residential Design and Open Space Standards contained in
RMC 4-2-1215 would be applicable to any new residential structures. A handout indicating the applicable guidelines
and standards is enclosed. As applicable to the R-8 zone, the guidelines are:
Garages -The visual impact of garages shall be minimized, while porches and front doors shall be the emphasis of
the front of the home. Garages shall be located in a manner that minimizes the presence of the garages and shall
not be located at the end
h:\ced\planning\current planning\preapps\12-019.jerry\pre012-019,pham nguyen short platA-lot shpl, r-8.doc
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\TreeRetentionWorksheet.doc 12/08
City of Renton
TREE RETENTION
WORKSHEET
1. Total number of trees over 6” in diameter1 on project site: 1. ____________ trees
2. Deductions: Certain trees are excluded from the retention calculation:
Trees that are dead, diseased or dangerous2 ________ trees
Trees in proposed public streets ________ trees
Trees in proposed private access easements/tracts ________ trees
Trees in critical areas3 and buffers ________ trees
Total number of excluded trees: 2. ____________ trees
3. Subtract line 2 from line 1: 3. ____________ trees
4. Next, to determine the number of trees that must be retained4, multiply line 3 by: 0.3 in zones RC, R-1, R-4, or R-8
0.1 in all other residential zones
0.05 in all commercial and industrial zones 4. ____________ trees
5. List the number of 6" or larger trees that you are proposing5 to retain4:
5. ____________ trees
6. Subtract line 5 from line 4 for trees to be replaced: 6. ____________ trees (If line 6 is less than zero, stop here. No replacement trees are required).
7. Multiply line 6 by 12” for number of required replacement inches:
7. ____________ inches
8. Proposed size of trees to meet additional planting requirement:
(Minimum 2” caliper trees required) 8. ____________ inches
per tree
9. Divide line 7 by line 8 for number of replacement trees6:
(if remainder is .5 or greater, round up to the next whole number)
9. ____________ trees
1. Measured at chest height.
2. Dead, diseased or dangerous trees must be certified as such by a forester, registered landscape architect, or certified arborist, and approved by the City.
3. Critical Areas, such as wetlands, streams, floodplains and protected slopes, are defined in Section 4-3-050 of
the Renton Municipal Code (RMC). 4. Count only those trees to be retained outside of critical areas and buffers. 5. The City may require modification of the tree retention plan to ensure retention of the maximum number of
trees per RMC 4-4-130H7a 6. Inches of street trees, inches of trees added to critical areas/buffers, and inches of trees retained on site that
are less than 6" but are greater than 2" can be used to meet the tree replacement requirement.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
1
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Environmental Checklist.doc 05/14
ENV
PLANNING DIVISION
ENVIRONMENTAL CHECKLIST
City of Renton Planning Division
1055 South Grady Way-Renton, WA 98057
Phone: 425-430-7200 Fax: 425-430-7231
PURPOSE OF CHECKLIST:
Governmental agencies use this checklist to help determine whether the environmental impacts
of your proposal are significant. This information is also helpful to determine if available
avoidance, minimization or compensatory mitigation measures will address the probable
significant impacts or if an environmental impact statement will be prepared to further analyze
the proposal.
INSTRUCTIONS FOR APPLICANTS:
This environmental checklist asks you to describe some basic information about your proposal.
Please answer each question accurately and carefully, to the best of your knowledge. You may
need to consult with an agency specialist or private consultant for some questions. You may use
“not applicable” or “does not apply” only when you can explain why it does not apply and not
when the answer is unknown. You may also attach or incorporate by reference additional studies
reports. Complete and accurate answers to these questions often avoid delays with the SEPA
process as well as later in the decision-making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a
period of time or on different parcels of land. Attach any additional information that will help
describe your proposal or its environmental effects. The agency to which you submit this
checklist may ask you to explain your answers or provide additional information reasonably
related to determining if there may be significant adverse impact.
INSTRUCTIONS FOR LEAD AGENCIES:
Additional information may be necessary to evaluate the existing environment, all interrelated
aspects of the proposal and an analysis of adverse impacts. The checklist is considered the first
but not necessarily the only source of information needed to make an adequate threshold
determination. Once a threshold determination is made, the lead agency is responsible for the
completeness and accuracy of the checklist and other supporting documents.
USE OF CHECKLIST FOR NONPROJECT PROPOSALS:
2
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Environmental Checklist.doc 05/14
For nonproject proposals (such as ordinances, regulations, plans and programs), complete the
applicable parts of sections A and B even though questions may be answered “does not apply”.
In addition the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D).
Please completely answer all questions that apply and note that the words “project”, “applicant”,
and “property or site” should be read as “proposal”, “proponent”, and “affected geographic area”
respectively. The lead agency may exclude (for non-projects) questions in Part B - Environmental
Elements –that do not contribute meaningfully to the analysis of the proposal.
A. BACKGROUND
1. Name of proposed project, if applicable:
2. Name of applicant:
3. Address and phone number of applicant and contact person:
4. Date checklist prepared:
5. Agency requesting checklist:
6. Proposed timing or schedule (including phasing, if applicable):
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain.
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal.
3
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Environmental Checklist.doc 05/14
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain.
10. List any government approvals or permits that will be needed for your proposal, if known.
11. Give brief, complete description of your proposal, including the proposed uses and the size of
the project and site. There are several questions later in this checklist that ask you to
describe certain aspects of your proposal. You do not need to repeat those answers on this
page. (Lead agencies may modify this form to include additional specific information on
project description.)
12. Location of the proposal. Give sufficient information for a person to understand the precise
location of your proposed project, including a street address, if any, and section, township,
and range, if known. If a proposal would occur over a range of area, provide the range or
boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic
map, if reasonably available. While you should submit any plans required by the agency, you
are not required to duplicate maps or detailed plans submitted with any permit applications
related to this checklist.
B. ENVIRONMENTAL ELEMENTS
1. EARTH
a. General description of the site
(circle one): Flat, rolling, hilly, steep slopes, mountainous, other _____________
b. What is the steepest slope on the site (approximate percent slope)?
4
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Environmental Checklist.doc 05/14
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them and note any
agricultural land of long-term commercial significance and whether the proposal results in
removing any of these soils.
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe.
e. Describe the purpose, type, total area, and approximate quantities and total affected area
of any filling, excavation, and grading proposed. Indicate source of fill.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)?
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
2. AIR
a. What types of emissions to the air would result from the proposal during construction,
operation, and maintenance when the project is completed? If any, generally describe and
give approximate quantities if known.
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe.
5
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Environmental Checklist.doc 05/14
c. Proposed measures to reduce or control emissions or other impacts to air, if any:
3. WATER
a. Surface Water:
1) Is there any surface water body on or in the immediate vicinity of the site (including
year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe
type and provide names. If appropriate, state what stream or river it flows into.
2) Will the project require any work over, in, or adjacent to (within 200 feet) the
described waters? If yes, please describe and attach available plans.
3) Estimate the amount of fill and dredge material that would be placed in or removed
from surface water or wetlands and indicate the area of the site that would be
affected. Indicate the source of fill material.
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known.
5) Does the proposal lie within a 100-year floodplain? If so, note location on the site
plan.
6
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Environmental Checklist.doc 05/14
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge.
b. Ground Water:
1) Will groundwater be withdrawn from a well for drinking water or other purposes? If
so, give a general description of the well, proposed uses and approximate quantities
withdrawn from the well. Will water be discharged to groundwater? Give general
description, purpose, and approximate quantities if known.
2) Describe waste material that will be discharged into the ground from septic tanks or
other sources, if any (for example: Domestic sewage; industrial, containing the
following chemicals. ; agricultural; etc.). Describe the general size of the system, the
number of such systems, the number of houses to be served (if applicable), or the
number of animals or humans the system(s) are expected to serve.
c. Water runoff (including stormwater):
1) Describe the source of runoff (including storm water) and method of collection
and disposal, if any (include quantities, if known). Where will this water flow?
Will this water flow into other waters? If so, describe.
2) Could waste materials enter ground or surface waters? If so, generally
describe.
3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of
the site? If so, describe.
7
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Environmental Checklist.doc 05/14
d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage
pattern impacts, if any:
4. PLANTS
a. Check the types of vegetation found on the site:
____deciduous tree: alder, maple, aspen, other
____evergreen tree: fir, cedar, pine, other
____shrubs
____grass
____pasture
____crop or grain
____orchards, vineyards or other permanent crops.
____wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
____water plants: water lily, eelgrass, milfoil, other
____other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
c. List threatened and endangered species known to be on or near the site.
d. Proposed landscaping, use of native plants, or other measures to preserve or
enhance vegetation on the site, if any:
e. List all noxious weeds and invasive species known to be on or near the site.
5. ANIMALS
a. List any birds and other animals which have been observed on or near the site or
are known to be on or near the site. Examples include:
8
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Environmental Checklist.doc 05/14
Birds: hawk, heron, eagle, songbirds, other:
Mammals: deer, bear, elk, beaver, other:
Fish: bass, salmon, trout, herring, shellfish, other
b. List any threatened and endangered species known to be on or near the site.
c. Is the site part of a migration route? If so, explain.
d. Proposed measures to preserve or enhance wildlife, if any:
e. List any invasive animal species known to be on or near the site.
6. ENERGY AND NATURAL RESOURCES
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the
completed project's energy needs? Describe whether it will be used for heating,
manufacturing, etc.
b. Would your project affect the potential use of solar energy by adjacent properties? If so,
generally describe.
c. What kinds of energy conservation features are included in the plans of this proposal? List
other proposed measures to reduce or control energy impacts, if any:
9
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Environmental Checklist.doc 05/14
7. ENVIRONMENTAL HEALTH
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of
fire and explosion, spill, or hazardous waste that could occur as a result of this proposal?
If so, describe.
1) Describe any known or possible contamination at the site from present or past uses.
2) Describe existing hazardous chemicals/conditions that might affect project
development and design. This includes underground hazardous liquid and gas
transmission pipelines located within the project area and in the vicinity.
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced
during the project's development or construction, or at any time during the
operating life of the project.
4) Describe special emergency services that might be required.
5) Proposed measures to reduce or control environmental health hazards, if any:
b. Noise
1) What types of noise exist in the area which may affect your project (for example: traffic,
equipment, operation, other)?
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)?
Indicate what hours noise would come from the site.
10
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Environmental Checklist.doc 05/14
3) Proposed measures to reduce or control noise impacts, if any:
8. LAND AND SHORELINE USE
a. What is the current use of the site and adjacent properties? Will the proposal affect
current land uses on nearby or adjacent properties? If so, describe.
b. Has the project site been used as working farmlands or working forest lands? If so,
describe. How much agricultural or forest land of long-term commercial significance will
be converted to other uses as a result of the proposal, if any? If resource lands have not
been designated, how many acres in farmland or forest land tax status will be converted
to nonfarm or non-forest use?
1) Will the proposal affect or be affected by surrounding working farm or forest land
normal business operations, such as oversize equipment access, the application of
pesticides, tilling, and harvesting? If so, how:
c. Describe any structures on the site.
d. Will any structures be demolished? If so, what?
e. What is the current zoning classification of the site?
f. What is the current comprehensive plan designation of the site?
11
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Environmental Checklist.doc 05/14
g. If applicable, what is the current shoreline master program designation of the site?
h. Has any part of the site been classified as a critical area by the city or county? If so,
specify.
i. Approximately how many people would reside or work in the completed project?
j. Approximately how many people would the completed project displace?
k. Proposed measures to avoid or reduce displacement impacts, if any:
l. L. Proposed measures to ensure the proposal is compatible with existing and projected
land uses and plans, if any:
m. Proposed measures to ensure the proposal is compatible with nearby agricultural and
forest lands of long-term commercial significance, if any:
9. HOUSING
a. Approximately how many units would be provided, if any? Indicate whether high, middle,
or low-income housing.
12
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Environmental Checklist.doc 05/14
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing.
c. Proposed measures to reduce or control housing impacts, if any:
10. AESTHETICS
a. What is the tallest height of any proposed structure(s), not including antennas; what is the
principal exterior building material(s) proposed?
b. What views in the immediate vicinity would be altered or obstructed?
c. Proposed measures to reduce or control aesthetic impacts, if any:
11. LIGHT AND GLARE
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur?
b. Could light or glare from the finished project be a safety hazard or interfere with views?
c. What existing off-site sources of light or glare may affect your proposal?
13
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Environmental Checklist.doc 05/14
d. Proposed measures to reduce or control light and glare impacts, if any:
12. RECREATION
a. What designated and informal recreational opportunities are in the immediate vicinity?
b. Would the proposed project displace any existing recreational uses? If so, describe.
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any:
13. HISTORIC AND CULTURAL PRESERVATION
a. Are there any buildings, structures, or sites, located on or near the site that are over 45
years old listed in or eligible for listing in national, state, or local preservation registers
located on or near the site? If so, specifically describe.
b. Are there any landmarks, features, or other evidence of Indian or historic use or
occupation? This may include human burials or old cemeteries. Is there any material
evidence, artifacts, or areas of cultural importance on or near the site? Please list any
professional studies conducted at the site to identify such resources.
c. Describe the methods used to assess the potential impacts to cultural and historic
resources on or near the project site. Examples include consultation with tribes and the
department of archeology and historic preservation, archaeological surveys, historic
maps, GIS data, etc.
14
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Environmental Checklist.doc 05/14
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and
disturbance to resources. Please include plans for the above and any permits that may be
required.
14. TRANSPORTATION
a. Identify public streets and highways serving the site or affected geographic area and
describe proposed access to the existing street system. Show on site plans, if any.
b. Is the site or affected geographic area currently served by public transit? If so, generally
describe. If not, what is the approximate distance to the nearest transit stop?
c. How many additional parking spaces would the completed project or non-project
proposal have? How many would the project or proposal eliminate?
d. Will the proposal require any new or improvements to existing roads, streets, pedestrian,
bicycle or state transportation facilities, not including driveways? If so, generally describe
(indicate whether public or private).
e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe.
f. How many vehicular trips per day would be generated by the completed project or
proposal? If known, indicate when peak volumes would occur and what percentage of the
volume would be trucks (such as commercial and non-passenger vehicles). What data or
transportation models were used to make these estimates?
15
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Environmental Checklist.doc 05/14
g. Will the proposal interfere with, affect or be affected by the movement of agricultural and
forest products on roads or streets in the area? If so, generally describe.
h. Proposed measures to reduce or control transportation impacts, if any:
15. PUBLIC SERVICES
a. Would the project result in an increased need for public services (for example: fire
protection, police protection, public transit, health care, schools, other)? If so, generally
describe.
b. Proposed measures to reduce or control direct impacts on public services, if any.
16. UTILITIES
a. Circle utilities currently available at the site:
electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system,
other ___________
b. Describe the utilities that are proposed for the project, the utility providing the service,
and the general construction activities on the site or in the immediate vicinity which might
be needed.
16
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Environmental Checklist.doc 05/14
C. SIGNATURE
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is relying on them to make its decision.
Proponent Signature:
Name of Signee (printed):
Position and Agency/Organization:
Date Submitted:
17
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Environmental Checklist.doc 05/14
D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS
(These sheets should only be used for actions involving decisions on policies, plans and
programs. You do not need to fill out these sheets for project actions.)
Because these questions are very general, it may be helpful to read them in conjunction with
the list of the elements of the environment.
When answering these questions, be aware of the extent of the proposal, or the types of
activities likely to result from the proposal, would affect the item at a greater intensity or at a
faster rate than if the proposal were not implemented. Respond briefly and in general terms.
1. How would the proposal be likely to increase discharge to water; emissions to air;
production, storage, or release of toxic or hazardous substances; or production of noise?
Proposed measures to avoid or reduce such increases are:
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
Proposed measures to protect or conserve plants, animals, fish, or marine life are:
3. How would the proposal be likely to deplete energy or natural resources?
Proposed measures to protect or conserve energy and natural resources are:
4. How would the proposal be likely to use or affect environmentally sensitive areas or areas
designated (or eligible or under study) for governmental protection; such as parks,
wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or
cultural sites, wetlands, floodplains, or prime farmlands?
18
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Environmental Checklist.doc 05/14
Proposed measures to protect such resources or to avoid or reduce impacts are:
5. How would the proposal be likely to affect land and shoreline use, including whether it
would allow or encourage land or shoreline uses incompatible with existing plans?
Proposed measures to avoid or reduce shoreline and land use impacts are:
6. How would the proposal be likely to increase demands on transportation or public
services and utilities?
Proposed measures to reduce or respond to such demand(s) are:
7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or
requirements for the protection of the environment.
R:\PW\DEVSERV\Forms\Planning\density.doc Last updated: 11/08/2004 1
DENSITY
WORKSHEET
City of Renton Development Services Division
1055 South Grady Way-Renton, WA 98055 Phone: 425-430-7200 Fax: 425-430-7231
1. Gross area of property: 1. ____________ square feet
2. Deductions: Certain areas are excluded from density calculations.
These include:
Public streets** ________ square feet
Private access easements** ________ square feet
Critical Areas* ________ square feet
Total excluded area: 2. ____________ square feet
3. Subtract line 2 from line 1 for net area: 3. ____________ square feet
4. Divide line 3 by 43,560 for net acreage: 4. ____________ acres
5. Number of dwelling units or lots planned: 5. ____________ units/lots
6. Divide line 5 by line 4 for net density: 6. ________ = dwelling units/acre
*Critical Areas are defined as “Areas determined by the City to be not suitable for
development and which are subject to the City’s Critical Areas Regulations
including very high landslide areas, protected slopes, wetlands or floodways.”
Critical areas buffers are not deducted/excluded.
** Alleys (public or private) do not have to be excluded.