HomeMy WebLinkAboutR-397818NOTES: SE 1 /4 SEC. 18, T. 23 N., R. 5 E., WM
I SEE SG-1 FOR 2. SEE SG-3 FOR WIRING ASCHEDULE, AND TRLUMIINOAIRE OSCHEDULE.
D LEGEND. NE 1 / 4 SEC. 19, T. 2 3 N . , R. 5 E., W M
JER SOURCE
E PHASE)
VIRTUAL VIDEO
DETECTION AREA,
TYP.
SIGNING LEGEND
78"
I Shattuck Al.S
S1
42"
cO S 7th St
S2
12" R
R
12" Y 12"
12" F 12"
12" G 12"
LEFT TURN
YIELD
ON GREEN
•
R10-12
24"X30"
S3
TENON
HEADS NO. HEADS NO. HEADS NO.
31,71 21,22,23,41,42 28, 29, 48, 49
61,62,63,81,82 68, 69, 88, 89
SIGNAL DISPLAY NOTES:
1. ALL NEW VEHICLE SIGNAL HEADS SHALL BE LED TYPE.
INSTALL TUNNEL VISORS AND 5" WIDE LOUVERED ALUMINUM
BACKPLATES WITH A 1" WIDE STRIP OR YELLOW
RETRO—REFLECTIVE TAPE AROUND THE PERIMETER OF THE
BACKPLATE. USE MOUNT TYPE "M" FOR MAST ARM MOUNTS
(PER WSDOT STD PLAN J-75.20-00) AND TYPE "K"FOR
SIDE MOUNTS (PER WSDOT STD PLAN J-75.10-01).
2. ALL NEW PEDESTRIAN SIGNAL HEADS SHALL BE LED TYPE
WITH COUNTDOWN SOLID SYMBOLS AND EQUIPPED WITH Z
CRATE VISORS. USE CLAMSHELL MOUNT STYLE.
3. ALL NEW PEDESTRIAN PUSH BUTTON STATIONS SHALL BE
ACCESSIBLE PUSH BUTTON (APS) ASSEMBLIES.
4. PROTECTED LEFT TURN LANES WITH FLASHING YELLOW
ARROWS EB & WB.
SIGNAL PHASE DIAGRAM PRE EMT
1 NOT
USED
2
3
4--T
5
6
7
8
NOT
USED
yl
� VEHICLE MOVEMENT
F- PEDESTRIAN MOVEMENT
--PERMISSIVE MOVEMENT
A 2
B 4,7
C 6
D 8,3
t T v t t 10 0 10 20 30
Approved For Bid
FEET
Robert M. Hanson P.E. Date . 1 " = 10')
FEDAID: CM-1292(002) ti Rw r "' oo CITY OF
719 Second Ave., Suite 1260 F RECORD DR]d!mng
�_"°°'
CALL 48 HOURS 9 re `"1„ 10"�f"M RENTON SIGNAL 8c ILLUMINATIONSeattle, Washin ton 98104 mformodon shown on thl, a d"°ndh. "s-designed nompPublic Works Department
(206)382-9800 c E4 l o:-constructed component". RECORD DRAWING WST WDATEAPPR
"rnwno. A roved For Construction 7TH AND SHATTUCKBEFORE YOU DIG ' S d t teak. pp SG-2
NAksassoclates.cofn SIONAL ' P nn;di.9 by°others and was
1-800-424-55555 NO. REVISION BY moo. ORD1NG' Robert M. Hanson P.E. Date J.- 18 oF29