Loading...
HomeMy WebLinkAboutR-397829SE 1/4, SECTION 18, TOWNSHIP T 23 N, RANGE 5 E, W.M. NE 1/4, SECTION 19, TOWNSHIP T 23 N, RANGE 5 E, W.M TREE TRUNK Y2"-1" WIDE WEBBED FABRIC TAPE (ARBOR TIE / OR APPROVED EQUAL), SECURE TO TREE STAKE W/ #2 PENNY COMMON NAIL (ONE PER STAKE) \ V TREE STAKE _ ROOTBALL LOOP DIAMETER SHALL BE 6"-8" GREATER THAN TREE TRUNK DIAMETER, SECURE LOOP WITH PAN OVERHAND SLIPKNOT, PULLED AGAINST A SECOND TREE TRUNK OVERHAND KNOT, TIED ON THE WEBBED FABRIC TAPE (2) 2" DIA WOOD DOWELED TREE STAKES W/ CHAMFERED TOP Y & 6" CONICAL POINT BOTTOM, KEEP CLEAR OF ROOTBALL a v~i WEBBED FABRIC TAPE o = o TOP OF ROOT CROWN TO BE 1" HIGHER THAN FINISH GRADE I 3" BARK OR WOOD CHIP MULCH DEPTH " 3" HEIGHT WATER RING a = I 2.5:1 MAX UPHILL & DOWNHILL SLOPES m Lu - FINISH GRADE PRIOR TO PLACING 0 0 -I I BARK OR WOOD CHIP MULCH o' 1=1I II "— BACKFILL W/ 2/3 TOPSOIL TYPE A & 1/3 TL� EX SOIL, THOROUGHLY WATER SETTLE UNDISTURBED EX SOIL OR EX SOIL--!—' COMPACTED TO 85% MAX DRY 12" GREATER DENSITY, VERIFY POSITIVE DRAINAGE THAN DIA 014 -SLOPE SUBGRADE TO PROVIDE POSITIVE WATER DRAINAGE PRIOR TO CONSTRUCTION ROOTBALL AFTER PLACING TREE IN PLANTING PIT, CUT AND COMPLETELY REMOVE STRINGS, TWINE, AND/OR WIRE BASKETS FROM ROOTBALL; COMPLETELY REMOVE FABRIC GROW BAGS; CUT BURLAP FROM TOP 1/3 OF ROOTBALL AND REMOVE CUT BURLAP FROM PLANTING PIT SECTION A DECIDUOUS TREE PLANTING ON A SLOPE NOT TO SCALE TOP OF ROOT CROWN TO BE 1" HIGHER THAN FINISH GRADE 3" BARK OR WOOD CHIP MULCH DEPTH; KEEP BARK MULCH LAYER AWAY FROM FOLIAGE FINISH GRADE PRIOR TO PLACING BARK OR WOOD CHIP MULCH LIGHTLY SCARIFY ROOTBALL TO LOOSEN ROOTS PRIOR TO PLANTING 1:1 SLOPE ON SIDES OF PLANTING HOLE BACKFILL W/ 2/3 TOPSOIL TYPE A & 1/3 EX SOIL, THOROUGHLY WATER SETTLE UNDISTURBED EX SOIL OR EX SOIL COMPACTED TO 85% MAX DRY DENSITY; VERIFY POSITIVE DRAINAGE PRIOR TO CONSTRUCTION PLANTING HOLE TO BE 6" LARGER THAN DIA OF ROOTBALL FOR GROUNDCOVER SECTION GROUNDCOVER PLANTING NOT TO SCALE FEDAID: CM-1 CALL 48 HOURS BEFORE YOU DIG 1-800-424-5555 'v�VQ STAT OF W SHI GTON CE SED LANDS( E ARCHITECT RECORD DRAWING i VA Information shown on this record dmwing JULIET 8. NG describes as —designed components and/or —constructed components. Information LICENSE re"ming as—constmcled components was EXPIRES ON pRMad by others and was not verified. REVISION LEVEL WITH TOP OF ADJACENT CURB OR PAVING I I I I_ UNDISTURBED EXISTING SOIL OR FLL COMPACTED I TO 8D MUM Y DENISITY,—� TYP; VERIFY III POSITIVE = DRAINAGE PRIOR TO CONSTRUCT ON STEP 1 STEP 1 EXCAVATE EXISTING SOIL TO 14" DEPTH BELOW ADJACENT CURB OR PAVING. AVOID UNDERMINING ADJACENT CURB OR PAVING SUBBASE MATERIAL. REMOVE SUBBASE FILL MATERIAL FROM PLANTING AREA AND PROVIDE PERCOLATION TEST PER SPECS, PRIOR TO PROCEEDING TO STEP 2. 3" DEPTH BARK OR WOOD CHIP MULCH, INSTALL TOP OF WOOD CHIP MULCH FLUSH WITH TOP OF ADJACENT CURB OR PAVING INSTALL PLANTS FINISH GRADE TOPSOIL TYPE A r I I I I I FINE I I COMPOSTI N c STEP 2 STEP 3 STEP 2 INSTALL 2" DEPTH FINE COMPOST. STEP 3 SCARIFY COMPOST TO A MINIMUM 6" DEPTH INTO SUBGRADE. ENGINEER SHALL REVIEW & APPROVE WORK PRIOR TO PROCEEDING TO STEP 4. SOIL PREPARATION NOT TO SCALE 3" BARK OR WOOD CHIP MULCH DEPTH; KEEP BARK MULCH LAYER AWAY FROM FOLIAGE i1f�9[i]»iP►�91�7� OF PLANTING HOLE J m 0 0 0-1 UNDISTURBED EX SOIL OR EX SOIL COMPACTED TO 85% MAX DRY DENSITY; VERIFY POSITIVE DRAINAGE PRIOR TO CONSTRUCTION PLANTING HOLE TO BE 6" LARGER THAN DIA OF ROOTBALL FOR GROUNDCOVER SECTION STEP 4 STEP 5 STEP 6 SECTION STEP 4 NOTES INSTALL MINIMUM 9" DEPTH OF 1. ALL DIMENSIONS INDICATE TOPSOIL TYPE A. REVIEW COMPACTED DEPTHS. FINISH GRADE WITH ENGINEER 2. SEE SPECS FOR SOIL PRIOR TO PLANTING. PREPARATION IN SOB PLANTING AREAS. STEP 5 INSTALL PLANTS. STEP 6 INSTALL 3" DEPTH BARK OR WOOD CHIP MULCH. TOP OF ROOT CROWN TO BE 1" HIGHER THAN FINISH GRADE LIGHTLY SCARIFY ROOTBALL TO LOOSEN ROOTS PRIOR TO PLANTING FINISH GRADE PRIOR TO PLACING BARK OR WOOD CHIP MULCH 2.5:1 MAX UPHILL & DOWNHILL SLOPES -I i IBACKFILL W/ 2/3 TOPSOIL TYPE A & II 1/3 EX SOIL, THOROUGHLY WATER SETTLE SLOPE SUBGRADE TO PROVIDE POSITIVE WATER DRAINAGE GROUNDCOVER PLANTING ON A SLOPE NOT TO SCALE AFC BY I DATE I APPR I .P 1—o: AS SHOWN om:om . vDs �i�ss, DATUM �� Approved For Bid CITY OF RENTON Public Works Department Approved For Construction Robert M. Hanson P.E. Date S 7TH ST. AND SHATTUCK AVE S PLANTING DETAILS rw 04a/02/15 a—.aL-3