HomeMy WebLinkAboutR-398130n
i
Z
M
M
M
C0
eTM
■ ■ .
i
0
rT
XIST. 12!!O-S'rORM 1 _ . _ _ -.. ----
rFR-ONT-FACE---OF -WA-LC
- C4NF'OLLIVE L AY OUT BASED
---,ON-ROADWAYAND'-WALL-SECTIQIVS _ - .-- -� n ,�__ - - - _ - - E7�lD GABION WAIL -~1- _
_ _. _ _ LUMIL�AIRE FOUNDATION TYP SEE�SiGIA4L' - _ _ - - - -
4NDaLLtJMl A7/ON_P4AlS -FflR FOUND TIOl1l ST/�,�.. 5Z_..+-1 J-7,-�-,-6. 98- Li:-�_
-DETAIL.
= = -- - - - - = - - - - - - _ - _ _ _ _ � _ .- . END FENCE AT BRIDGE
e .
/ I f
_ 1 r z z
----
50'-0"
50 )-0))
# #
}
a 1
TION {`
56+00 �
WALL PLAN
GAB/ON WALL 1
318'—O"
GABION HEIGHT (H) = 3'-0
B = 3'-0"
50'-0"
TOP OF GABION (T. 0. G.)
TOP OF SIDEWALK ELEV. 56.27
(TOG )
(rO.G.)
--------------------------------------------\\--BOTIOM OF GABION
h� FINAL GRADE WITH LEVEL BENCH A7
FRONT FACE OF WALL
EXISTING 12" STORM. APPROX. PIPE lE = 40.1
SEE NOTE 7.
3+00
WALL ELEVATION
LOOKING AT BACK OF WALL
WALL 1 NOTES
1. LOCATIONS AND ELEVATIONS OF EXISTING BURIED
UTILITIES ARE APPROXIMATE. CONTRACTOR TO
COORDINATE WITH UTILITIES TO OBTAIN
ACCURATE LOCATIONS AND ELEVATIONS OF EACH
UTILITY PRIOR TO SUBMITTING WALL SHOP
DRAWINGS.
2. ENGINEER SHALL ACCEPT WALL FOUNDATION
SUBGRADE PRIOR TO WALL CONSTRUCTION.
LEGEND
GEOTECHNICAL BORING
i.
S
�
c
4
ELEV. 61.71
(T. 0. G.)
4+00
SURVEYED: JFS • , *SN J. j 9:► DRAWING NO. 5.02
DRAWN BY: XYW ��4wdF ef�l� CITY OF RENTON HIGHLANDS TO LANDING PROJECT NO. 31796
DESIGN BY: XYW �' 02 Public Works Department PEDESTRIAN CONNECTION PROJECT CM-1070(007)
CHECK BY: SJW HanmiGlobal Partner a FED AID NO. CM-1070 007)
10230 NE Points Drive r APPROVED FOR CONSTRUCTION GABION WALL 1 PLAN AND ELEVATION DATE: June. 2013
Suite 400 45633
PROJ MGR: LBM su°. l�
I±irkland, lfastin& 9= °a n y %* I
Phone: (425) 822-4446 S, Csti BY: 0ATE: SHEET NO. 24 OF 44
NUMBER REVISION DESCRIPTION BY APP. DATE FAX: (425) szv-05rr jONAL'�� �" l�
www.otak.com