Loading...
HomeMy WebLinkAboutR-398146►50 a 0 12 i 0 N N 0 a Q -o 0 a WATER SERVICE CONNECTION RIGID COPPER PIPE TYPE L WATER METER 1 SCHEDULE 40 PVC MAINLINE z w �-- IRRIGATION MAINLINE FLOW METER DOUBLE CHECK MASTER VALVE VALVE ASSEMBLY WATER SERVICE CONNECTIONRIGID COPPER PIPE I TYPE L IRRIGATION POINT OF CONNECTION DIAGRAM NOT TO SCALE 1 LV 1� JLIVJVFI\ RAIN BIRD S150P -MASTER VALVE FLOW SENSOR NOT TO SCALE 2 EXTENSIONS COPPER TRACE WIRE MAINLINE SCHEDULE 40 CONDUIT ­1 PE-89 CABLE TO (TROLLER (7-1 /2" FOR 1-1 /2") FINISH GRADE CARSON12" STANDARD VALVE BOX WITH LOCKING LID EXTENSIONS (AS REQUIRED) LINE SIZE BRASS BALL VALVE DOUBL PLASTIC UTILITY VAULT 25" WIDTH X 40" LENGTH WYE STRAINEF REDUCER (BOTH SIDES; RIGID COPPER PIPE TYPE L, TO WATEF SUPPLI BRICK (EACH CORNER) ELEVATION NOTE: ALL PIPE FROM WATER METER TO DOUBLE CHECK VALVE SHALL BE RIGID COPPER, TYPE L. BRASS NIPPLES, FITTINGS, UNIONS, AND OTHER NECESSARY CONNECTIONS THROUGH THE DOUBLE CHECK VALVE TO THE PVC COUPLING SHALL BE BRASS OR BRONZE. DOUBLE CHECK VALVE ASSEMBLY NOT TO SCALE CARSON VALVE BOX WITH LOCKING LID LINE SIZE BRASS BALL VALVE SCHEDULE 40 PVC BUSHING AS REQUIRED NOT TO SCALE 90 DEGREE SCHEDULE 40 PVC ELL �— SCHEDULE 80 PVC NIPPLE SCH 40 ,H 40I._ _I I I- UNION FIPT PVC BRASS '= '� BRASS *SCH 40 PVC -t SCH. 80 THREAD[ MAINLINE BRASS UNION _ - 6 j NOTES: *EXCEPT © POINT OF I _ CONNECTION APPURTENANCES. 6" PEA GRAVEL USE TEFLON TAPE ON ALL THREADED FITTINGS. NOTE: BALL VALVE INSTALLATION UP FLOW FROM THE CROSS —CONNECTION CONTROL DEVICE SHALL RECEIVE ALL RIGID COPPER, TYPE L PIPE AND BRASS OR BRONZE FITTINGS AS REQUIRED. BALL VALVE NOT TO SCALE PVC ADAPTER ASSEMBLY NOT TO SCALE \DE - 1" BELOW TOP OF NIPPLES AND S MAINLINE TO CONTROL VALVES - 18" BELOW FINISHED GRADE (TYP.) MAX. DEPTH SEE DETAIL FOR PVC ADAPTER ASSEMBLY (THIS SHEET) "KFILL FOR DRAINS. 12" MIN. DEPTH UNDER VAULT WATER PROOF CONNECTION FINISHED GRADE STATI 0 N ID TAG 18" COIL OF WIRE - IRRIGATION VALVE PER PLANS PVC SLIP -FIX FITTING DOWNSTREAM OF VALVE IRRIGATION LATERAL BRICK (EACH CORNER) 6" PEA GRAVEL SCHEDULE 80 UNION, UPSTREAM OF VALVE SURVEYED: JFS Q r� i STATE OF �6 �-= CITY OF RENTON HIGHLANDS TO LANDING DRAWING No. 8.OJ DRAWN BY: AGB �� WASHINGTON PROJECT NO, 31796 k, DESIGN BY: ACB REGISTERED Public Works Department PEDESTRIAN CONNECTION PROJECT CM-1070(007 LAN ARCHITECT P \ FED AID NO. CM-1070(007) CHECK BY: LBM HanmiGlobal Partner �• �[ 10230 Ns Points Drive `T -goiciAPPROVED FOR CONSTRUCTION IRRIGATION DETAILS DATE: June. 2013 PROD MGR: LBM suite 400 EO hnd wasw*on p8033 CURTIS LAPIERRE Phone: (425) 822-4448 CERTIFICATE NO. 474 BY: DATE: SHEET NO. 35 OF 44 FAX: (425) 827-9577 NUMBER REVISION DESCRIPTION BY APP. DATE77� www.otak.com