Loading...
HomeMy WebLinkAboutR-398155it i It W12-501 R { (IMPACT ATTENUATOR MARKING) INSTALL IMPACT ATTENUATOR d • o� % ;:''!� SEE NOTE 5 ® k • NOTES: • Ake --44 1. ALL SIGNS ARE BLACK ON ORANGE. - -�" 2. PROTECTIVE VEHICLE SHALL BE A WORK VEHICLE STRATEGICALLY LOCATED TO SHIELD THE WORK AREA. ® 1,01� 3. TRAFFIC SAFETY DRUMS WITH TYPE C STEADY BURNING WARNING LIGHTS SHALL BE USED. 'r 4. CONTACT JUAN REYES WSDOT TRAFFIC AT 206 440-4467 FIVE pk ,�� .�-�~,�.� �� � � � ( ) ( > EXISTING PAVEMENT MARKING W20-1 t � DAYS PRIOR TO WORK FOR COORDINATION. �� )I, � �+ TO BE REMOVED (TYP.) ', ;j 5. IMPACT ATTENUATORS SHALL BE ONE OF THE FOLLOWING: (ROAD WORK AHEAD) I� � I \ QUADGUARD CZ 3 BAY MANUFACTURED BY ENERGY ABSORPTION SYSTEMS, INC. ' REUSABLE ENERGY ABSORBING CRASH TERMINAL (REACT 350) 5g CONSTRUCTION CHANNELIZATON j` i t MANUFACTURED BY ENERGY ABSORPTION SYSTEMS, INC. t {� ABSORB 350 WITH 5 ABSORBING ELEMENTS MANUFACTURED PER DRAWING 10.01 (TYP.) I ` 1 � BY BARRIER SYSTEMS, INC. } ' , ' TRITON CET MANUFACTURED BY ENERGY ABSORPTION W152 401 R I SYSTEMS, INC. USE TL-2 FOR 45 MPH OR LESS. (LATERAL CLEARANCE MARKER) ll� l SCI100GM, SC170GM MANUFACTURED BY SCI PRODUCTS INC. W4-1 R t� (MERGING FROM RIGHT) i It r R1-2 It s ; (YIELD) I, ( �I ® % 1 1 CONCRETE BARRIER WITH 0 REFLECTORS I 50' 0' 50' 100' Omnii SCALE IN FEET , REVISION DESCRIPTION BY I APP.I DATE / / / WORK AREA A / / / 100'/ QPP W20-1 (ROAD WORK AHEAD) CHANNELIZATION DEVICE (DRUM TYP.) SEE INSERT ABOVE FOR DETAILS CONSTRUCTION CHANNELIZATION PER DRAWING 10.0 DOUBLE YELLOW CENTER LINE 12" SHY WB LANE WB LANE _I EB LANE WORK AREA 10' MIN. 10' MIN. 10' MIN. TEMP. CONCRETE BARRIER WITH REFLECTORS SECTION A NOT TO SCALE SURVEYED: JFS • , M C 'P DRAWN BY: CMF ti wpg w�s�►j��l ��- CITY OF IZENTON G► Y M1 DESIGN BY: TJP o — Public Works Department tj CHECK BY: LBM HanmiGlobal Partner 10230 NE Points naive APPRQUfD FOR CONSTRUCTION PROJ MGR: LBM �n� asbin& EM 73TEg�� Phone: (425) 82--577 BY: DATE: I A /©/� FAX: (425) 8279577 jOjljAj, � w_.,a� www.otak.com W20-5R (RIGHT LANE CLOSE AHEAD) EB LANE 11' MIN. W20-1 (ROAD WORK AHEAD) 100' 0' 100' 200' SCALE IN FEET HIGHLANDS TO LANDING DRAWING NO. 10.04 PEDESTRIAN CONNECTION PROJECT CM-1070(007) PROJECT NO. 31796 FED AID NO. CM-1070(007) TRAFFIC CONTROL PLAN - DATE: Jan.2014 ONE LANE CLOSURE AT BRIDGE (WB) SHEET NO. 44 OF 44