Loading...
HomeMy WebLinkAboutR-394615FLOW LINE POINTS 1 NUMBER STATION OFFSET ELEV DESCRIPTION 50 30+85.64 15.70' RT 42.72 PC, 8'R 51 30+78.72 11.72' RT 42.91 PRC, 5'R 52 30+74.41 9.25' RT 43.03 PT 53 30+63.46 9.25' RT 43.12 PC 15'R 54 30+37.59 16.47' RT 43.25 RAMP CL 55 30+36.84 16.78' RT 43.26 MIDPOINT 15'R 56 16+93.15 27.89' LT 43.42 PT 57 17+04.53 27.90' LT 43.52 MATCH SIDEWALK POINTS NUMBER STATION OFFSET ELEV DESCRIPTION 60 30+86.00 29.25' RT 43.61 BSW, MATCH 61 30+77.85 29.25' RT 43.76 1 BSW 62 30+65.85 29.25' RT 43.98 BSW 63 17+04.51 35.66' LT 44.07 1 BSW 64 30+75.85 17.17' RT 43.62 PLANTER 65 30+75.85 13.18' RT 43.55 PLANTER 66 30+65.85 17.16' RT 43.74 PLANTER 67 30+65.85 13.16' RT 43.67 PLANTER 50 6 25 64Al > 52 a 67 61 Z - 66 1 62 63 a / 0 57 °° ° 24 °° 56 7 54 35 55 22 y� �P °° cJ 21 �O 46 47 90 (_45 � 91 92 � 93 34 44 94 �� 104 19 ��/ 142 1 43 cJ 33 J� 95 �i 141 �1 1 106 18 0 105 FF=45.51 c 96 z 42 0= 107 1 STA 52+72.06, 34.85' LT STA 15+95.21, 29.37' RT �� r 32 A 52+53.57, 26.91' LT 41 97 S A 15+83.72, 29.74' RT 30 39 16 vJ� R 108 1 111 zL 31 ° °°°° 40 °°000°° I 0° x 109 112 113 °° (38 ° 1 0° °°°°°° 99 110 1 37 °°0°00o°°° 00 140 ° D2°° 17 ° STA 5 +31 15, 21.00' LT 14 15 G ° S 53+39.15, 18.00' LT ° °° 11 13 P °° °°°°° 12 °°° CURB TRANSITION �, CURB &GUTTER` G�6, 100 101 102 103 CURB TRANSITION CURB & GUTTER S 2ND ST 52 3 S 2ND ST 54 PLAN 0 N Al 0 5 10 20 30 SCALE IN FEET SURVEYED: KPG MAIN AVENUE S DRAWING NO. 15 DRAWN BY: OBI KIPG� RECORD DRAWING r;R) CITY OF RENTONInterdisciplinary Design (S 3RD STREET TO MILL AVENUE S) PROJECT NO. 14080 DESIGN BY: KPF Information shown on this record drawing Public Works Department 3131 Elliott Ave 2502JeffersonAve FED AID NO. ---- CHECK BY: JF describes as -designed components and/or RECORD DRAWING VS OBP 9 2018 Suite Tacoma, WA98402 as -constructed components. Information APPROVED FOR CONSTRUCTION DATE: OCT2016 A REVISE POINT ELEVATIONS KPF OBP 04 04 17 PROJ MGR: JF Seattle, WA98121 (253)627.0720 regarding as -constructed components was FLOW LINE & SIDEWALK LAYOUT PLAN (206) 286-1640 www.kpg.com provided by others and was not verified. BY: DATE: SHEET NO. 15 OF 44 NUMBER REVISION DESCRIPTION BY APP. DATE FILE: 14080SWPLN.dwg &BSW FLOW LINE POINTS - NW CORNER NUMBER STATION OFFSET ELEV DESCRIPTION 10 51 +90.10 21.92' LT 42.97 MATCH 11 52+00.10 20.00' LT 43.10 AP 12 52+10.10 20.00' LT 43.23 AP 13 52+33.44 22.33' LT 43.54 BEGIN CONC RAMP 14 52+51.92 24.18' LT 43.93 PC, 42'R 15 52+53.44 24.33' LT 43.96 END CONC RAMP 16 52+75.14 34.14' LT 44.23 BEGIN CONC RAMP 17 52+74.67 33.74' LT 44.23 MIDPOINT 42'R 18 16+10.81 15.37' LT 43.95 PRC, 129'R 19 16+22.84 15.41' LT 43.79 END CONC RAMP 20 16+33.09 15.85' LT 43.70 PC, 30'R 21 16+47.54 25.43' LT 43.55 MIDPOINT 30'R 22 30+35.25 14.23' LT 43.47 RAMP CL 23 30+41.78 14.98' LT 43.38 PRC, 15'R 24 30+49.14 16.27' LT 43.19 PT 25 30+78.13 24.21' LT 43.50 MATCH n N 0 N N \ IN 0 0 00 0 z 0 z w w i c-) w D O i -. SIDEWALK POINTS - NW CORNER NUMBER STATION OFFSET ELEV DESCRIPTION 30 51+90.20 30.00' LT 43.84 BSW 31 52+00.15 30.00' LT 43.77 BSW 32 52+10.10 30.00' LT 43.89 BSW 33 52+40.06 57.54' LT 44.50 BSW 34 16+27.21 43.33' LT 44.65 BSW 35 30+47.89 31.39' LT 43.96 BSW 36 30+78.13 30.00' LT 43.67 BSW 37 52+27.70 24.27' LT 43.99 BEGIN PLANTER 38 52+27.70 26.92' LT 44.02 PC, 38.95'R 39 52+51.73 29.22' LT 44.03 PT 40 52+51.73 26.68' LT 44.00 END PLANTER 41 15+96.96 23.94' LT 44.26 BEGIN PLANTER 42 15+99.54 28.52' LT 44.30 PC, 20'R, BEGIN SEAT WALL-C 43 16+12.45 25.50' LT 44.35 PCC, 40'R, BEGIN SEAT WALL-B 44 16+31.63 29.17' LT 44.36 BEGIN SEAT WALL A 45 16+39.69 27.45' LT 44.21 PT, END SEAT WALL -A 46 16+42.55 26.56' LT 44.15 AP 47 16+44.98 22.54' LT 44.07 END PLANTER FLOW LINE POINTS - NE CORNER NUMBER STATION OFFSET ELEV DESCRIPTION 90 16+95.09 28.50' RT 43.24 MATCH, PC, 10'R 91 16+88.02 25.57' RT 43.30 PT 92 16+85.88 23.43' RT 43.33 PC, 10'R 93 16+78.81 20.50' RT 43.39 PT 94 16+69.60 20.50' RT 43.47 PC, 70'R 95 16+34.55 24.27' RT 43.72 MIDPOINT 70'R 96 16+25.31 25.12' RT 43.77 BEGIN CONC RAMP 97 15+95.77 26.85' RT 44.27 END CONC RAMP 98 15+92.35 26.95' RT 44.31 PT 99 15+85.59 27.00' RT 44.39 PC, 10'R 100 53+37.15 15.50' LT 44.64 PT 101 53+39.65 15.50' LT 44.67 BEGIN CONC RAMP 102 53+63.65 15.50' LT 44.18 END CONC RAMP 103 53+98.65 15.50' LT 44.04 MATCH SIDEWALK POINTS - NE CORNER NUMBER STATION OFFSET ELEV DESCRIPTION 104 16+95.09 35.00' RT 43.96 1 BSW 105 16+35.30 33.30' RT 44.39 BSW 106 16+34.61 34.75' RT 44.40 BSW 107 16+29.58 33.81' RT 44.43 1 BSW 108 53+39.67 33.83' LT 44.50 BSW 109 53+43.14 31.83' LT 44.65 BSW 110 53+43.14 30.00' LT 44.82 1 BSW 111 53+66.18 30.00' LT 44.50 BSW 112 53+67.25 27.79' LT 44.65 BSW 113 53+98.65 27.84' LT 44.89