RESPONSIBILITIES OF THE CITY
T
(� DOCUMENTATION
1. THE CITY & THEIR CONTRACTOR SHALL ATTEND A PRE -CONSTRUCTION MEETING
r SPECIFICALLY FOR INSTALLATION OF BARE DUCT & VAULT SYSTEM.
N
2. PSE WILL PROVIDE TO THE CITY CONTRACTOR CONSTRUCTION PLANS FOR THE
INSTALLATION OF PSE'S DUCT & VAULT SYSTEM.
3. ALL INSTALLATIONS SHALL CONFORM TO SPECIFICATIONS CONTAINED IN THIS
DOCUMENT & ALL RELEVANT PSE STANDARDS.
SAFETY
1. FIELD CHANGES SHALL BE PRE -APPROVED BY PSE OR DESIGNATED REPRESENTATIVE
CO PRIOR TO CONSTRUCTION WITH PROOF OF ACCEPTANCE REQUIRED PRIOR TO PSE
z ACCEPTANCE OF COMPLETED DUCT & VAULT SYSTEM.
w 2. THE CITY CONTRACTOR SHALL NOT ACCESS ENERGIZED POWER VAULTS WITHOUT THE
2 ASSISTANCE OF PSE LINE WORKERS.
W
o TRENCH AND EXCAVATION
0- a- 1. THE CITY CONTRACTOR SHALL NOT EXPOSE ENERGIZED POWER CONDUCTORS (DIRECT
BURIED OR IN CONDUIT) WITHOUT THE ASSISTANCE OF PSE LINE WORKERS.
2. THE CITY SHALL PROVIDE ALL TRENCH EXCAVATION & BACKFILL FOR THE
INSTALLATION OF NEW OR MODIFIED PSE UNDERGROUND DISTRIBUTION SYSTEM WITHIN
0 THE CONSTRUCTION AREA.
0
jr 3. ALL TRENCH EXCAVATION SHALL CONFORM TO PSE STANDARDS 6790.0075,
cc 6790.0130, 6790.0140, 6790.0250, & 6790.3050.
U
4. THE CITY CONTRACTOR SHALL CONSTRUCT THE SHARED UTILITY TRENCH SUCH THAT
THE VARIOUS UTILITIES CAN TRANSITION IN AND OUT OF THE TRENCH LINE IN AN
ORDERLY FASHION WITHOUT ALTERING DUCT BANK ALIGNMENTS OF OTHER UTILITY.
SEPARATION DISTANCE OF CROSSING UTILITIES SHARING THE COMMON UTILITY TRENCH
SHALL BE 6".
co 5. AFTER THE NEW UNDERGROUND SYSTEM IS INSTALLED & ENERGIZED, ADDITIONAL
W EXCAVATION MAY BE NECESSARY TO RE-TRAIN EXISTING UNDERGROUND CABLES INTO
z THE NEW VAULTS. THIS EXCAVATION WILL BE PROVIDED BY THE CITY WITH 48
HOURS NOTICE.
6. PLACEMENT OF OTHER UTILITY VAULTS WITHIN THE TRENCH LINE ALIGNMENT
ENCUMBERING ACCESS TO PSE FACILITIES IS NOT ALLOWED.
VAULT INSTALLATION
1. THE CITY CONTRACTOR SHALL INSTALL PSE VAULTS IN ACCORDANCE WITH PSE
STANDARDS 6775.0035 AND 6775.0040.
2. VAULT HOLE EXCAVATION SHALL BE PREPARED LEVEL & FREE OF DEBRIS WITH A
MINIMUM 6" BASE OF CRUSHED ROCK TO PREVENT VAULT SETTLING.
3. PSE VAULTS IN PLANTER AREAS SHALL BE SET 2" ABOVE FINAL GRADE.
4. PSE VAULTS IN HARD SURFACE LOCATIONS SHALL BE ADJUSTED TO MATCH FINISHED
GRADE, IN ACCORDANCE WITH PSE STANDARD 6775.0500, PRIOR TO THE
INSTALLATION OF PSE CONDUCTORS & EQUIPMENT. MAXIMUM ADJUSTMENT UP IS 5"-
MORE THAN 5" REQUIRE & ADDITIONAL RISER.
5. NOTE: THE CITY CONTRACTOR WILL NOT BE ALLOWED TO MAKE VAULT ADJUSTMENTS
AFTER PSE CONDUCTORS & EQUIPMENT ARE ENERGIZED. PSE LINE CREW WILL
PERFORM THE ADJUSTMENTS ON A CHANGE ORDER BASIS.
6. THE CITY CONTRACTOR SHALL PROVIDE ALL SURVEYING NECESSARY TO ASSURE ALL
PSE VAULTS ARE INSTALLED IN THE ALIGNMENT LOCATION SPECIFIED IN THIS
DOCUMENT. THE CITY CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING GRADE
ELEVATION FOR PSE VAULTS.
7. ALL PSE VAULTS SHALL BE CLEAN & CLEAR OF CONSTRUCTION DEBRIS WITH ALL
KNOCKOUTS & COVER ADJUSTMENTS GROUTED TO PSE SATISFACTION PRIOR TO PSE
ACCEPTING DELIVERY OF BARE CONDUIT & VAULT SYSTEM.
CONDUIT INSTALLATION
1. ALL PSE CONDUIT INSTALLATIONS SHALL CONFORM TO PSE STANDARDS 6800.6000,
6800.6050, 6800.8050, & 6825.6505.
2. ALL CONDUITS SHALL BE ROUTED & INSTALLED PER CONDUIT TABLES, INSTALLATION
DIAGRAMS, & DETAILS IN THESE PLANS.
3. THE CITY CONTRACTOR SHALL PROOF EVERY PSE CONDUIT RUN PRIOR TO FINAL PSE
ACCEPTANCE. PROOFING IS DEFINED AS PULLING A MANDREL OF THE SAME
DIAMETER THROUGH THE CONDUIT. MULE TAPE PROVIDED BY PSE SHALL BE PULLED
IN BEHIND THE MANDREL IN EACH CONDUIT RUN AS EVIDENCE OF PROOFING. A
PLUG SHALL BE INSTALLED IN ALL SPARE CONDUITS.
�gLES SC
W 0
y.
CALL 48 HOURS
33242 BEFORE YOU DIG
STEg��'�
��SIONAL��. 1-800-424-5555
REVISED TO CONFORM WITH
CONSTRUCTION RECORDS
DATE: 1/3/14 BY: ECS
TIB # 8-1-102(033)-1
4. ALL CONDUITS ENTERING PSE VAULTS SHALL BE THROUGH THE APPROPRIATE KNOCKOUTS
TO ENSURE PROPER CABLE LAY. VAULT ENTRIES CAUSING CABLES TO CROSS EACH OTHER
IN THE VAULT, OR LAY IN THE VAULT UNEVENLY, WILL BE REJECTED & CORRECTED AT THE
EXPENSE OF THE CITY CONTRACTOR.
5. ALL CONDUITS ENTRIES INTO PSE VAULT SHALL BE STRAIGHT & LEVEL WITH A MINIMUM OF
2' STRAIGHT SECTION OUTSIDE THE VAULT WALL & 2" OF CONDUIT EXTENDING INTO THE
VAULT WITH BELL ENDS INSTALLED.
6. PSE CONDUITS SHALL BE PLACED IN THE TRENCH MAINTAINING A MINIMUM OF 1-1/2" OF
SEPARATION. USE CONDUIT SPACERS (PROVIDED BY PSE) EVERY 10'.
7. PSE CONDUIT RUNS SHALL BE PLACED STRAIGHT & LEVEL. SHOULD IT BECOME
NECESSARY TO ALTER CONDUIT ALIGNMENTS TO AVOID OTHER UTILITIES, THE MAXIMUM BEND
PERMITTED IS 22-1 /2 DEGREES. BENDS GREATER THAN 22-1 /2 DEGREES REQUIRE
PRIOR APPROVAL FROM PSE ENGINEERING REPRESENTATIVES.
8. BEND RADII DIFFER FOR DIFFERENT CONDUIT SIZES; TRENCH ACCORDINGLY.
9. ALL PSE CONDUITS SHALL BE PLACED WITH THE MINIMUM SEPARATION BETWEEN OTHER
UTILITY FACILITIES AS SPECIFIED IN PSE STANDARD 6790.0130. REFER TO THE TYPICAL
UTILITY TRENCH CROSS SECTION DETAIL IN THIS WORK SKETCH.
10. ALL PSE CONDUITS SHALL HAVE A MINIMUM OF 36" OF COVER. COVER OF LESS THAN
36" IS PERMISSIBLE ON A CASE BY CASE BASIS PROVIDED THAT SUCH INSTALLATIONS
ADHERE TO PSE STANDARD 6790.0130 FIGURE 2. PRE -APPROVAL BY THE ENGINEER AND
PSE ENGINEERING REPRESENTATIVES IS REQUIRED.
INSPECTION
1. PSE WILL PROVIDE AN INSPECTOR DURING CITY CONTRACTOR INSTALLATION OF PSE BARE
DUCT & VAULT SYSTEM.
2. THE ROLE OF THE PSE INSPECTOR IS LIMITED TO VERIFICATION OF
COMPLIANCE TO ALL RELEVANT PSE STANDARDS & PRACTICES. THE PSE INSPECTOR WILL
NOT APPROVE CHANGES TO PLANNED PSE FACILITY LOCATIONS OR CHANGE ORDERS.
3. THE PSE INSPECTOR WILL BE THE CONTACT FOR ALL ISSUES CONCERNING INSTALLATION OF
BARE DUCT & VAULT SYSTEM FOR PSE AND PROVIDE A LIAISON BETWEEN THE FIELD &
ENGINEERING FOR CHANGE REQUESTS.
4. THE CITY CONTRACTOR SHALL PROVIDE THE PSE INSPECTOR THE MEANS (SURVEY STAKING)
TO VERIFY PROPER DEPTH OF BURIAL & LOCATION FOR ALL PSE FACILITIES TO THE
SATISFACTION OF THE PSE INSPECTOR ON SITE. IF THE INSPECTOR IS UNABLE TO VERIFY
PROPER DEPTH OF BURIAL, LOCATION, OR GRADE OF PSE FACILITIES A NON-COMPLIANCE
DOCUMENT WILL BE ISSUED AFFECTING PSE FINAL ACCEPTANCE OF CITY INSTALLED
FACILITIES FOR PSE.
MATERIALS
1. THE CITY CONTRACTOR SHALL NOT BACKFILL PSE FACILITIES UNTIL AUTHORIZED BY THE
PSE INSPECTOR.
2. THE CITY CONTRACTOR SHALL BE RESPONSIBLE FOR THE SECURITY ALL PSE MATERIALS
DELIVERED TO THE JOB SITE.
3. THE CITY CONTRACTOR SHALL SIGN MATERIAL MANIFEST SLIPS FOR ALL PSE AND OTHER
FRANCHISE UTILITY MATERIALS DELIVERED TO THE JOB SITE FOR THIS PROJECT.
4. INITIAL DELIVERY OF PSE MATERIALS TO THE JOB SITE REQUIRES A MINIMUM OF 10 DAYS
ADVANCED NOTICE TO PSE STORES.
5. AFTER THE INITIAL DELIVERY OF MATERIALS, SUBSEQUENT BULK MATERIAL DELIVERIES TO
THE JOB SITE BY PSE VENDORS REQUIRE A MINIMUM OF 5 DAYS ADVANCED NOTICE TO
PSE STORES.
6. PSE REPRESENTATIVES WILL PROVIDE DELIVERY OF ALL MISCELLANEOUS MATERIAL
NECESSARY FOR DUCT & VAULT INSTALLATION, SUCH AS COUPLINGS, GLUE, BENDS, ETC.,
WITH MINIMUM 3 DAYS ADVANCED NOTICE TO THE PSE STORES.
7. THE CITY CONTRACTOR SHALL PROVIDE EQUIPMENT & LABOR NECESSARY TO OFF LOAD
MATERIAL ON SITE.
8. ALL VAULTS WILL BE DELIVERED BY THE MANUFACTURER TO THE JOB SITE AS FOLLOWS:
575 & SMALLER WITH A MINIMUM 3 DAYS ADVANCED NOTICE TO PSE STOREROOM. 5106 &
LARGER WITH A MINIMUM 5 DAYS ADVANCED NOTICE TO PSE STOREROOM.
9. IF VAULT EXCAVATION IS NOT READY WHEN VAULTS ARE DELIVERED, THE CITY CONTRACTOR
WILL PROVIDE NECESSARY EQUIPMENT TO INSTALL VAULTS. THE CONTRACTOR INSTALL
MASTIC SEALANT BETWEEN
THE SECTIONS OF MOLT -SECTION VAULTS (SEALANT PROVIDED BY MANUFACTURER).
10. ALL UNUSED MATERIAL SHALL BE RETURNED TO PSE AND OTHER FRANCHISE UTILITY
STORES & RECONCILED AFTER DUCT & VAULT INSTALLATIONS ARE COMPLETE.
1019 39TH AVENUE SE, SUITE 100
PUYALLUP, WASHINGTON 98374
T.253.604.6600 F.253.604.6799
www.parametdx.com
1 RECORD DRAWINGS
NO.
REVISION
I r- /_� r- n 1 r1
JOINT UTILITY TRENCH PER 1
C,P,T LATERAL TRENCH PER 2
-�-- EXISTING UTILITY
-SD STORM DRAINAGE (SEE DWGS PP1 - PP4)
S SANITARY SEWER
w W WATER MAIN (BY OTHERS)
• (Tb SPLICE PIT FOR EXISTING UTILITY INTERCEPT
X CONSTRUCTION NOTE
CONDUIT RUN NUMBER (SEE CONDUIT SCHEDULE)
x# PSE NEW EQUIPMENT NUMBER
X# PSE EXISTING EQUIPMENT NUMBER
WIDTH VARIES PER
TOP OF SIDEWALK NUMBER OF UTILITIES
OR TOP OF ROADWAY (20" MIN, 60" MAX)
FINISH GRADE
SIGNAL & ILLUMINATIC
CONDUITS. SEE DWGS
IL1 THRU IL8 --
CSTC & NATIVE
BACKFILL
9" TYP (W/PSE
PROVIDED CONDUIT
SPACERS)
99.1 l 1mel,
CITY OF RENTON
z COMMUNICATION
04 CONDUITS. SEE
DWGS IL1 THRU IL8
-o �- 1.5" MIN
(l Cl
OF CONDUITS PER 2" MIN 2" MIN
PLANS (TYP) 9" 12"
MIN 1.5" MIN
SURVEYED:
DESIGNED:
C. SCHOTT
DRAWN:
J. BETZVOG
ECS 1/3/141 CHECKED:
BY DATE I APPR APPROVED:
3" MIN
SAND SHADING
1.5" MIN
3" MIN
SAND BEDDING
PSE QWEST & COMCAST
CONDUITS CONDUITS
TYP J I T UTILITY TRENCH
ABBREVIATIONS
C COMCAST
P PUGET SOUND ENERGY
Q CENTURY LINK
T CENTURY LINK
WIDTH VARIES PER
NUMBER OF UTILITIES
(12" MIN)
FINISH GRADE
CSTC & NATIVE
BACKFILL
tl Cl
3" MIN
SAND BEDDING
SIZE AND NUMBER
OF CONDUITS PER
PLANS (TYP)
* to l
z
o 2
NIQ
TYP LATERALTRENCH
* ADJUST DEPTH OF COVER AS REQUIRED TO
PROVIDE 6" MIN CLEARANCE FROM EXISTING
AND PROPOSED UTILITIES INCLUDING STORM
DRAIN (SEE DWGS PP1-PP2) AND WATER
MAIN (SEE DWGS W1-W4).
MIN MAX
CITY CONDUIT 24" 60"
PSE CONDUIT 36" 60"
ALL OTHERS 30" 60"
THIS DRAWING HAS BEEN REVISED TO REFLECT INFORMATION PROVIDED BY THE CONSTRUCTION CONTRACTOR, OBSERVING ENGINEER, AND PROJECT ENGINEER DEFlNING KNOWN
DIFFERENCES BETWEEN THE FACILITIES SHOWN ON THE ORIGINAL CONSTRUCTION DOCUMENTS TO THOSE CONSTRUCTED. THE INFORMATION PROVIDED ON THESE RECORDS, HAS BEEN
ASSUMED TO BE CORRECT AND HAS NOT BEEN VERIFIED BY THE ENGINEER, WHO IS UNDER NO OBLIGATION OR DUTY TO VERIFY SUCH ACCURACY AND/OR COMPLETENESS. SAID
ENGINEER, BY PLACING HER/HIS PROFESSIONAL SEAL ON THIS DRAWING, HAS REVIEWED THE REVISION(S) TO VERIFY THAT THE CHANGES AS DEFINED BY THESE RECORDS DO NOT
APPEAR TO BE ADVERSE TO THE PLANNED USE AND/OR INTENT OF THE ORIGINAL DESIGN. THERE IS NO WARRANTY HEREIN FOR THE ACCURACY OF THE CHANGES SHOWN, NOR
ASSURANCE THAT ALL DIFFERENCES TO THE ORIGINAL DRAWING HAVE BEEN IDENTIFIED.
SCALE:
AS SHOWN HORIZONTAL- NAD 1983/1991 NE 3rd / 4th CORRIDOR IMPROVEMENTS 8/8/12
CITY OF PHASE 1 INTERSECTION IMPROVEMENTS FIELDBOOK:
ML eRENTON PAGE:
ONE INCH DATUM Planning/Building/Public Works Dept. DRAWING NO:
IF AT FULL SCALE Approved For Construction UTILITY UNDERGROUNDING UG 1
NOT ONE INCH
SCALE ACCORDINGLY GENERAL NOTES AND DETAILS SHEET: OF:
Robert M. Hanson P.E. Date 21 43