Loading...
HomeMy WebLinkAboutR-387515zz LL w z J w z CURB BULB DATA CURVE STATION (OFFSET) FLOW LINE ELEVATION DESCRIPTION 13+03.33 (12.90' LT) 336.55 PC C8 13+09.74 (10.00' LT) 336.47 PRC R=10' 51+60.00 (20.00' LT) 335.63 PC R=10' C9 51+68.00 (16.00' LT) 335.75 PRC 51+76.00 (12.00' LT) 335.87 PT R=10' 14+07.60 (10.00' LT) 335.26 PRC R=10' C10 14+14.07 (12.88' LT) 334.98 PRC 14+21.00 (16.00' LT) 334.65 PCC R=10' 14+05.68 (10.00' RT) 335.71 PCC R=10' C11 14+13.63 (13.14' RT) 335.52 PRC 14+21.00 (16.00' RT) 335.29 PRC R=10' NW 1/ SEC 9, T 23 N, R 5 E, W.M. CURB BULB DATA CURB BULB DATA (CONTINUED) CURVE STATION (OFFSET) FLOW LINE ELEVATION DESCRIPTION 14+42.88 (16.00' LT) 333.70 PCC R=10' C12 14+49.80 (12.88' LT) 333.46 PRC 14+56.27 (10.00' LT) 333.24 PRC R=10' 14+96.18 (16.00' RT) 332.02 PRC R=10' C13 15+03.55 (13.14' RT) 331.64 PRC 15+11.51 (10.00' RT) 331.24 PCC R=10' 15+21.31 (10.00' RT) 330.81 PCC R=10' C14 15+29.26 (13.14' RT) 330.55 PRC 15+36.63 (16.00' RT) 330.34 PRC R=10' 15+51.48 (10.00' LT) 329.36 PRC E 15+57.95 (12.88' LT) 329.13 PRC ER- 15+64.87 (16.00' LT) 328.92 PCC CURVE STATION (OFFSET) FLOW LINE ELEVATION DESCRIPTION 15+86.75 (16.00' LT) 328.66 PCC R=10' C16 15+93.68 (12.88' LT) 328.61 PRC 16+00.15 (10.00' LT) 328.56 PRC R=10' 15+86.75 (16.00' RT) 329.24 PRC R=10' C17 15+94.12 (13.14' RT) 329.09 PRC 16+02.07 (10.00' RT) 328.93 PCC R=10' 16+76.22 (10.00' LT) 328.23 PC R=10' C18 16+83.36 (13.00' LT) 328.27 PRC 16+90.50 (16.00' LT) 328.31 PT R=10' 16+76.22 (10.00' RT) 328.63 PC R=11;] C19 16+83.36 (13.00' RT) 328.76 PC 16+90.50 (16.00' RT) 328.89 PT R/W NO 2'x2' SAWCUT SCORING, IN THIS SIDEWALK ZONE Cl PROTECT EX CURB AND GUTTER \ \\ \- R/W REPLACE HMA BETWEEN I) CURBS IN KIND PL3 4+77.\ 100 10.00' LT -.! £�s.'', _ 24' WIDTH; 6' WINGS ` 1 O S R/W S PLS J 10 24' WIDTH; 6' WINGS X 5 y/ `I'S / �� -�44 PL2 / / N ��SS sg �£�'� / O \`� / \ \ / PL1 t') 0 14 \ ` + + 2 yy \ V G � •12 + 26 . ss ,1` \% Q 1 4 6 + 7+ $ + 13�15 18 1 / PL5 y d 3 +1 C9 +* I + ��' � �.'�.. k,2 . 1 `-- -- - 15 � ---- + 29 32 4P KEY MAP SUNSET LANE NE --'UTILITY CONSTRUCTION NOTES CONSTRUCT CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER WSDOT STD PLAN F-10.12-03. 2j s? I 9,CL1 5 R/W 9 (� �, .` \ O CONSTRUCT CEMENT CONCRETE DEPRESSED CURB SECTION PER WSDOT STD PLAN F-10.12-03. w� • • . ° 1 zi ' STA 14+96.18 1 UT \ ' O CONSTRUCT THICKENED 3" CEMENT CONCRETE TRAFFIC CURB AND 16.50 RT TO 18.50 RT 5' \ r\ 22 Q GUTTER PER DETAIL ON DWG MDi. ? 1 -r / \ CONSTRUCT THICKENED CEMENT CONCRETE SsT-`-S DEPRESSED CURB � G 22 \\ SS O4 SECTION PER DETAIL ON DWG MD1. r y \ / CONSTRUCT MONOLITHIC CEMENT CONCRETE CURB, GUTTER, AND STA 14+21.00 STA 15+36.63 r' \ -- _ Q O SIDEWALK PER DETAIL ON DWG MD1. / 1 16.50 RT TO 18.50 RT 16.50 RT TO 18.50 RT / i R/W ,r \ �/ CONSTRUCT CEMENT CONCRETE VALLEY GUTTER PER DETAIL ON M i Q % 0 17 do -- --- STA 15+86.75 / \ r(am/ O DWG MD1. CONSTRUCT CEMENT CONCRETE PEDESTRIAN CURB PER x CITY OF RENTON STD PLAN 101. ------- --- \\ - --;c �, r 3 Qi O INSTALL EXTRUDED CURB TYPE 6 PER WSDOT STD PLAN \ F-10.42-00. spp � \ - �^ xO INSTALL PRECAST SLOPED MOUNTABLE CURB PER WSDOT \ / - STD PLAN F-10.62-02. C \\ �� CONSTRUCT CEMENT CONCRETE DRIVEWAY ENTRANCE TYPE C2B r'9 o \ N T C17 �Q' 10 PER CITY OF RENTON STD PLAN 104.4 OVER 4" CSTC 3 s MD4 FOR H M 1 F R (SEE GENERAL NOTE 1). ADDITIONAL INFORMATION ADDITIONAL INFORMATION �lv 11 CONSTRUCT CURB RAMP TYPE PERPENDICULAR PER DETAIL ON DWG MD2. S \ �\ STA 16+90.50 12 INSTALL DETECTABLE WARNING SURFACE PER WSDOT STD PLAN s 16.50 RT TO 18.50 RT 5 a F-45.10-01. \ �G` 13 CONSTRUCT TRANSITION RAMP PER DETAIL ON DWG MD2. c Os \� 1\ 3 Q` CONSTRUCT ASPHALT DRIVEWAY WITH 4" HMA FOR APPROACH 2 LEGEND 14 CL 1/2" PG 64-22 OVER 4" CSTC. SIDEWALK/DRIVEWAY POINT TABLE SIDEWALK/DRIVEWAY POINT TABLE 15 CONSTRUCT ASPHALT SIDEWALK WITH 3" HMA CL 1/2" PG 64-22 2" HMA CL 1/2" PG 64-22 OVERLAY 3 OVER 4 CSTC. SCALE SIDEWALK/DRIVEWAY POINT TABLE (CONTINUED) (CONTINUED) ®\ 4" CST n CONSTRUCT DECORATIVE EXPOSED AGGREGATE TREATMENT PER 20 0 20 40 FEET RECORD DRAWING7� POINT STATION (OFFSET) ELEVATION 25 15+33.39 (10.50' LT) 329.93 26 15+37.44 (32.50' LT) 330.48 27 15+38.00 (24.50' LT) 330.34 28 15+39.10 (10.50' LT) 330.23 29 15+64.87 (18.50' LT) 329.45 30 15+73.53 (18.50' LT) 329.35 31 15+73.59 (24.50' LT) 329.44 32 15+78.03 (24.50' LT) 329.38 33 15+78.10 (18.50' LT) 329.29 34 15+86.62 (18.50' LT) 329.24 35 16+90.50 (18.50' LT) 328.88 HMA CL 1/2- PG 64-22 OVERLAY LJ ULIAIL UN Uwu MD8. ®2" (FINAL LIFT OF ADJACENT FULL DEPTH PAVEMENT 17 O INSTALL MONUMENT CASE AND COVER (SEE DWG AL1). SHALL BE PLACED SIMULTANEOUSLY WITH OVERLAY) 6" HMA CL 1/2" PG 64-22 OVER 4" CSTC 18 ADJUST EXISTING MONUMENT CASE AND COVER. 19 ADJUST EXISTING CB. 9" HMA CL 1/2" PG 64-22 OVER 4" CSTC 20 ADJUST EXISTING MH. SIDEWALK PER CITY OF RENTON STD PLAN 102 21 ADJUST EXISTING VALVE BOX. WITH 2'x2' SAWCUT SCORING OVER 4" CSTC DECORATIVE EXPOSED AGGREGATE TREATMENT 22 SLOPE OF PARKING LANE VARIES (SEE CURB BULB DATA). PER DETAIL ON DWG MOB GENERAL NOTES �+ + LANDSCAPE (SEE PP DRAWINGS) 1 SIDEWALK GRADE SHALL BE MAINTAINED THROUGH ALL -STA/OFF INFORMATION FOR POINTS ADJACENT TO THE -FILL- FILL LINE DRIVEWAYS; DO NOT DEPRESS SIDEWALK. STATION/OFFSET CURB LINE IS MEASURED TO THE TOP -BACK OF CURB PROVIDED TO CENTER OF DRIVEWAYS AT FACE OF CURB. INFORMATION SHOWN. SIDEWALK THICKNESS SHALL MATCH DRIVEWAY THICKNESS o O E SOF -CUT- CUT LINE IN DRIVEWAY AREA. ti CALL 2 BUSINESS DAYS BEFORE YOU DIG Perteet o ` �� w BuruR � Mom. w ( CITY OF 61 r-zo• '°°'0s"' CITY OF RENTON 4/2016 AR RENTON SUNSET LANE NE IMPROVEMENTS 800 424 - 5 5 5 5 206-436-0515 1 1-800-615-990 \ 49442 a e�N " RFCIsrERE �1 DID 1/4/1 7 DID I ATUMPL2 UTILITIES UNDERGROUND LOCATION CENTER 505 5thAvenue S, Suite 300 Fss/ONA� ENS\ 21t211g No. REVISION BY DATE gppR „RNE°o. oeKOEKKOEK u '-I..y Planning/B�ilding/Publle Works Dept. Seattle, Washington 98104 P. DE BOLDT PAVING AND GRADING PLAN 15'9, THIS RECORD DRAWING WAS PREPARED USING INFORMATION PROVIDED TO CONSULTANT AND CONTAINS ONLY THE LEVEL OF DETAIL AS PROVIDED. THE INFORMATION WAS NOT INDEPENDENTLY FIELD VERIFIED. THE CONSULTANT DOES NOT WARRANT OR GUARANTEE THE ACCURACY OR COMPLETENESS OF THE POINT STATION (OFFSET) ELEVATION 1 51+60.00 (22.50' LT) 336.16 2 14+21.00 (18.50' LT) 335.18 3 14+29.65 (18.50' LT) 334.80 4 14+29.72 (24.50' LT) 334.89 5 14+34.16 (24.50' LT) 334.70 6 14+34.19 (21.00' LT) 3 6 7 14+38.55 (18.50' LT) 334.42 8 14+42.88 (18.50' LT) 4. 3 9 14+61.56 (32.50' LT) 333.70 10 14+61.00 (24.50' LT) 333.60 11 14+59.90 (10.50' LT) 333.58 12 14+66.34 (24.50' LT) 333.37 POINT STATION (OFFSET) ELEVATION 13 14+65.61 (10.50' LT) 332.83 14 14+87.66 (24.50' LT) 332.44 15 14+88.39 (10.50' LT) 331.84 16 14+92.44 (32.50' LT) 332.35 17 14+93.00 (24.50' LT) 332.21 18 14+94.10 (10.50' LT) 332.09 19 15+06.56 (32.50' LT) 331.74 20 15+06.00 (24.50' LT) 331.64 21 15+04.90 (10.50' LT) 331.62 22 15+11.34 (24.50' LT) 331.41 23 15+10.61 (10.50' LT) 330.87 24 15+32.66 (24.50' LT) 330.53