Loading...
HomeMy WebLinkAboutS-387505NW 1/ SEC 9, T 23 N, R 5 E, W.M. W w Q z z U w W Z a Q _J a I-— w z 0 0 N 00 CONSTRUCTION NOTES 01 NOT USED O2 CONNECT EXISTING PIPE TO NEW SEWER MANHOLE. O NOT USED. O NOT USED. O5 INSTALL 8 IN. DIAM. SEWER CLEAN -OUT PER CDR STD. PLAN 403.1 O PROTECT EXISTING SEWER, UNTIL NEW SS SYSTEM IS LIVE. OREMOVE EXISTING MANHOLE AND EXTEND EXISTING PIPE TO NEW MANHOLE CALL 2 BUSINESS DAYS BEFORE YOU DIG Per'tee't 1 800 4 2 4— 5 5 5 5 206-436-0515 1 1-800-615-91 UTILITIES UNDERGROUND LOCATION CENTER 505 5th Avenue S, Suite 300 Seattle, Washington 98104 DEKO aO 49442 \ AC. lENG\�t21t9 N c� r) w w U) 0 LO LO H N W Z J 2 U Q GENERAL NOTES 1. THE CONTRACTOR SHALL POTHOLE ALL UTILITY CROSSINGS PRIOR TO STARTING CONSTRUCTION OF THE PIPE RUN. 2.ALL NEW 12" SEWER PIPE SHALL BE C900 PVC. 0 J m SS SANITARY SEWER PIPE SD STORM DRAIN PIPE W WATER LINE PIPE — —SS— — SANITARY SEWER PIPE (EXISTING) — —SD— — STORM DRAIN PIPE (EXISTING) — — W — — WATER LINE PIPE (EXISTING) O SANITARY SEWER MANHOLE PIPE REMOVAL O CONSTRUCTION NOTE 6cxm. =20 °Mww�3 °°„ ® CITY OF xeoM JAIN RENTON J. BEAN �� DATUM P. DE BOLDOEKK Planning/Building/Public Works Dept. N0. REVISION BY DATE APPR rA D. DEKOEKKOEK suit ncc°aaxs�r KEY MAP SCALE 20 0 20 40 FEET RECORD DRAWING THIS RECORD DRAWING WAS PREPARED USING INFORMATION PROVIDED TO CONSULTANT AND CONTAINS ONLY THE LEVEL OF DETAIL AS PROVIDED. THE INFORMATION WAS NOT INDEPENDENTLY FIELD VERIFIED. THE CONSULTANT DOES NOT WARRANT OR GUARANTEE THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. CITY OF RENTON �.E 4/2016 SUNSET LANE NE IMPROVEMENTS �SS5 SEWER PLAN 47 '9,