HomeMy WebLinkAboutT-387516w w
z
Q
z
U w
w z
a Q
a -_J
I-
w
U)
z
D
VAULT SCHEDULE
GROUP
#
FRANCHISE
UTILITY
VAULT
TYPE
NORTHING*
EASTING*
COMMENTS
PV#1
PSE
575-LA
185065.88
1306972.98
PV#2
PSE
575-LA
185281.71
1306656.00
PV#3
PSE
575-LA
185461.48
1306633.18
PV#4
PSE
575-LA
185515.14
1306764.71
PV#5
PSE
575-LA
185507.91
1307034.65
PV#6
PSE
575-LA
185495.87
1307066.69
PV#7
PSE
575-LA
185390.35
1307221.88
PV#B
PSE
575-LA
185098.18
1307018.18
HH #1
PSE
VERIFY
WITH PSE
185337.83
1307296.12
CV#1A
TELECOM
25-TA
185148.32
1306740.89
COMCAST
253-TA
185072.84
1306917.59
CV#,
CITY OF RENTON
25-TA
185072.58
1306914.22
CV#2
COMCAST
253-TA
185309.53
1306639.65
CV#2A
TELECOM
25-TA
185381.43
1306612.12
CV#3
COMCAST
253-TA
185481.84
1306651.27
CV#4
TELECOM
25-TA
185514.12
1306742.27
COMCAST
253-TA
185514.82
1306745.93
CITY OF RENTON
25-TA
185515.89
1306894.32
CV#5
COMCAST
253-TA
185515.90
1306897.32
CV#6
TELECOM
25-TA
185515.48
1306984.64
COMCAST
253-TA
185515.85
1306988.50
CENTURYLINK
HANDHOLE
85401.34
1307204.75
CV#7
COMCAST
253-TA
185399.76
1307208.14
CITY OF RENTON
25-TA
185397.89
1307210.80
CV#8
COMCAST
253-TA
185335.84
1307298.93
COMCAST
253-TA
185069.18
1307015.47
CV#9
CV#10
COMC
253-TA
184985.19
13 7 9. 5
-NORTHING & EASTING COORDINATES ARE TO CENTER OF STRUCTURE. FIELD VERIFY
AND CONFIRM VAULT ORIENTATION PRIOR TO CONSTRUCTION.
FRANCHISE UTILITY VAULTS ARE TO BE FURNISHED BY THEIR RESPECTIVE OWNER.
IF VAULTS TYPE AND SIZE DIFFER FROM SCHEDULE, ADJUST LOCATION TO MAINTAIN
2' CLEARANCE (1' MINIMUM) BETWEEN VAULTS.
VAULT LOCATION WAS DESIGNED ON VAULT DIMENSIONS PER OLDCASTLE PRECAST 2
PRODUCT CUTSHEETS.
COMCAST: VAULT 253-TA: 5'-2.5" x 2'-3.0" x 3'-4.5"
CITY OF RENTON: VAULT 25-TA: 5'-3.0" x 2'-3.5" x 2'-6.0"
TELECOMMUNCATION: VAULT 25-TA: 5'-3.0" x 2'-3.5" x 2'-6.0"
CENTURYLINK: FIBERGLASS HANDHOLE: 2'-6.0" x 4'-0.0" x 3'-0.0"
CALL 2 BUSINESS DAYS BEFORE YOU DIG Per'tee't
1 800 4 2 4- 5 5 5 5 206-436-0515 1 1-800-615-91
UTILITIES UNDERGROUND LOCATION CENTER 505 5th Avenue S, Suite 300
Seattle, Washington 98104
ROUTE CONDUITS TO
l BASE OF UTILITY POLE
ROUTE CONDUITS TO 2L IIL14
BASE OF UTILITY POLE y
00
"9 2 1-4" COMCAST -
2-4" PSE 2-4" PSE 1-4" CDR
' GO CAST ```�.. H ,-4" TELE
AAA �/ 2- CAST
1-4' TELE ���. '\ v`-- /\IL15A ?_4" TELE r D IL14
2 _ HIL14 i _.........
2-4" PSE
1-4" COMCAST COMCV 4 P NE 10 L SDT
PV #4
2-4" PSE
I/
` � / Q
/
i Q
/ 1 IL74
L L
�o
r-vD
1 2-4" PSE
ST
\Q
JJ
2-4" TELE
f
2
DEKO
rn
49442 p
\ �F�SNN� E AEG\�Z�t21tp
2 4" PSE 1 -4" CDR
2 AST
2_4" TELE
LEGEND
M
Z 2-6" PSE (STUB -OUT)
�I 0 z '
z
jE LJI ;
F1' Q
Q Q
2,,II
r�I IL15 �, -- � IL74 IL
CV #5 M
L►
2-4" P
2�___
T
1-4" GAS
----------------- MAIN TRUNK LINE (JUT)
.............. PSE SPARE LINE (JUT)
---------- SIDE STREET CONNECTORS
---- ----- EXISTING CONDUIT (VARIES)
PSE POWER VAULT
(VARIES, SEE VAULT SCHEDULE)
COMMUNICATION VAULT GROUP
COM (VARIES, SEE VAULT SCHEDULE)
PV # POWER VAULT GROUP #
CV # COMMUNICATION VAULT GROUP #
A� Al - SECTION A -A IS SHOWN ON SHEET 1
A SECTION A -A
- 2-4" PSE
2-4" TE E
2
o�
/ 2-4" PSE
T
TELE
C
CIL14
RECORD DRAWING
THIS RECORD DRAWING WAS PREPARED USING
INFORMATION PROVIDED TO CONSULTANT AND
CONTAINS ONLY THE LEVEL OF DETAIL AS PROVIDED.
THE INFORMATION WAS NOT INDEPENDENTLY FIELD
VERIFIED. THE CONSULTANT DOES NOT WARRANT OR
GUARANTEE THE ACCURACY OR COMPLETENESS OF THE
INFORMATION SHOWN.
2-6" PSE
1-4" PSE -
2-4" PSE
2-4" COMCAST
, -h
4" COR 2
1-4" GAS
2-4" PSE
5-4" COMICAST /\
1-4" GAS n
#1
CV #1
2-4" PSE
3-4" COMCAST
2 AST
2_4" TEL
BIL14
2-6" PSE
1 2-4" PSE
1-2" COMCAST
3
MAM
11/2/16
DID
Es1GNE°M MACIAS
2
JJH
9/27/16
DID
�""" 1. BEAN
1
ADDENDUM 1
MAM
6/6/16
"EC -
"mP
NO.
REVISION
BY
I DATE
I APPR
DE BOLDT
""At MACIAS
NONE
CV #6 l - � A
ILA i
i pC
E Y ' #6
i
i
i
2-4" PSE S
NE 1OTH ST
2-4" PSE
• S IL, 5
...![[ •..� 2-6" PSE �V
F
2-4" PSE
�ST
EX. 1-3" PSE CCQ�
1-4" GAS
NIL75
2-4" PSE
'.. T
1-2" PSE (STUB -OUT) J
1-3" PSE (STUB -OUT)
EX. 2-6" PSE i
i
2-6" PSE
i
G�
j
2-6" PSE ' f
i
PV #8
LIL15
IN
IL15
m lnG0
JB Ai .#10
1 T ii `i-^r��wh--1�
AIL14 2-4" TELE
2-4" PSE r
2-4" COMCAST
1-4" CLINK
- ROUTE CONDUITS TO
BASE OF UTILITY POLE
J IL14
2-4" COMCAST
1-4" CLINK
/ 2-6" PSE
2_4" PSE
T
1 _4" CLI K
R
1-4" GAS
4-4" PSE
41-C
TT11L15 1-4" GAS
U5 1-3" PSE
ST
4" PSE
1-4" CLI K
zz� 3-4" COMCAST
(INTERCEPT EX.
2
IL15
1-4
IL1 � \�
�,Q
- 2-4" COMCAST v - EX. 1 -4" PSE
1-4" CDR `0
!V
•
EX. 2-4" PSE
i
1-4" GAS
EX. 2-4" PSE
2-4" PSE
2-4" COMCAST
GIL14
1-4" CDR
1-4" GAS
1-4" PSE (BUILDING STUB -OUT)
2-4" PSE
2-4" COMCAST
1-4" CDR
1-4" GAS
4-4"
s�NS� e�vo `vy
, CITY OF
RENTON
DATUM
Planning/Building/Public Works Dept
SEE DETAIL 3 ON DRAWING IL10
FOR CONDUITS BELOW EXISTING
DRIVEWAY
GENERAL NOTES
1. FRANCHISE UTILITIES (PSE POWER AND GAS, COMCAST, AND
CENTURYLINK) AND CITY'S INTERCONNECT CONDUITS SHALL RUN
UNINTERRUPTED BETWEEN VAULT GROUPS AS SHOWN ON THIS SHEET.
ILLUMINATION CONDUIT, NOT SHOWN ON THIS SHEET, SHALL BE
INSTALLED AS PART OF THE JOINT UTILITY TRENCH (JUT) AS SHOWN ON
IL14 AND IL15. SEE SHEETS IL1 THRU IL5 FOR ILLUMINATION CONDUIT.
f 2. SEE SECTION 1-07.17 OF THE SPECIAL PROVISIONS FOR
CONSTRUCTION COORDINATION REQUIREMENTS.
3. SEE APPENDIX D OF THE SPECIAL PROVISIONS FOR FRANCHISE UTILITY
CONSTRUCTION REQUIREMENTS, GUIDELINES. AND ADDITIONAL
INFORMATION.
4. INDIVIDUAL VAULT STUB -OUTS ARE SHOWN AND CALLED OUT ON SHEETS
IL1 THRU IL5 UNLESS NOTED ON THIS SHEET.
5. JOINT UTILITY TRENCH CONDUIT DIAGRAM AND SECTIONS WERE
DEVELOPED BY COMPILING ALL THE INFORMATION PROVIDED BY THE
FRANCHISE UTILITIES IN APPENDIX D OF THE SPECIAL PROVISIONS.
TRENCH SECTIONS HAVE BEEN PROVIDED TO ASSIST THE CONTRACTOR
ON THE BIDDING AND BUILDING OF THE PROJECT. CONTRACTOR SHALL
COORDINATE WITH ALL FRANCHISE UTILITIES DURING CONSTRUCTION AND
RECEIVE FINAL APPROVAL FROM EACH INDIVIDUAL FRANCHISE UTILITY
PRIOR TO BACKFILLING THE TRENCH
CITY OF RENTON 4/2016
SUNSET LANE NE
IL11
JOINT UTILITY TRENCH ONE -LINE CONDUIT DIAGRAM 74 ° 9,