Loading...
HomeMy WebLinkAboutT-387516w w z Q z U w w z a Q a -_J I- w U) z D VAULT SCHEDULE GROUP # FRANCHISE UTILITY VAULT TYPE NORTHING* EASTING* COMMENTS PV#1 PSE 575-LA 185065.88 1306972.98 PV#2 PSE 575-LA 185281.71 1306656.00 PV#3 PSE 575-LA 185461.48 1306633.18 PV#4 PSE 575-LA 185515.14 1306764.71 PV#5 PSE 575-LA 185507.91 1307034.65 PV#6 PSE 575-LA 185495.87 1307066.69 PV#7 PSE 575-LA 185390.35 1307221.88 PV#B PSE 575-LA 185098.18 1307018.18 HH #1 PSE VERIFY WITH PSE 185337.83 1307296.12 CV#1A TELECOM 25-TA 185148.32 1306740.89 COMCAST 253-TA 185072.84 1306917.59 CV#, CITY OF RENTON 25-TA 185072.58 1306914.22 CV#2 COMCAST 253-TA 185309.53 1306639.65 CV#2A TELECOM 25-TA 185381.43 1306612.12 CV#3 COMCAST 253-TA 185481.84 1306651.27 CV#4 TELECOM 25-TA 185514.12 1306742.27 COMCAST 253-TA 185514.82 1306745.93 CITY OF RENTON 25-TA 185515.89 1306894.32 CV#5 COMCAST 253-TA 185515.90 1306897.32 CV#6 TELECOM 25-TA 185515.48 1306984.64 COMCAST 253-TA 185515.85 1306988.50 CENTURYLINK HANDHOLE 85401.34 1307204.75 CV#7 COMCAST 253-TA 185399.76 1307208.14 CITY OF RENTON 25-TA 185397.89 1307210.80 CV#8 COMCAST 253-TA 185335.84 1307298.93 COMCAST 253-TA 185069.18 1307015.47 CV#9 CV#10 COMC 253-TA 184985.19 13 7 9. 5 -NORTHING & EASTING COORDINATES ARE TO CENTER OF STRUCTURE. FIELD VERIFY AND CONFIRM VAULT ORIENTATION PRIOR TO CONSTRUCTION. FRANCHISE UTILITY VAULTS ARE TO BE FURNISHED BY THEIR RESPECTIVE OWNER. IF VAULTS TYPE AND SIZE DIFFER FROM SCHEDULE, ADJUST LOCATION TO MAINTAIN 2' CLEARANCE (1' MINIMUM) BETWEEN VAULTS. VAULT LOCATION WAS DESIGNED ON VAULT DIMENSIONS PER OLDCASTLE PRECAST 2 PRODUCT CUTSHEETS. COMCAST: VAULT 253-TA: 5'-2.5" x 2'-3.0" x 3'-4.5" CITY OF RENTON: VAULT 25-TA: 5'-3.0" x 2'-3.5" x 2'-6.0" TELECOMMUNCATION: VAULT 25-TA: 5'-3.0" x 2'-3.5" x 2'-6.0" CENTURYLINK: FIBERGLASS HANDHOLE: 2'-6.0" x 4'-0.0" x 3'-0.0" CALL 2 BUSINESS DAYS BEFORE YOU DIG Per'tee't 1 800 4 2 4- 5 5 5 5 206-436-0515 1 1-800-615-91 UTILITIES UNDERGROUND LOCATION CENTER 505 5th Avenue S, Suite 300 Seattle, Washington 98104 ROUTE CONDUITS TO l BASE OF UTILITY POLE ROUTE CONDUITS TO 2L IIL14 BASE OF UTILITY POLE y 00 "9 2 1-4" COMCAST - 2-4" PSE 2-4" PSE 1-4" CDR ' GO CAST ```�.. H ,-4" TELE AAA �/ 2- CAST 1-4' TELE ���. '\ v`-- /\IL15A ?_4" TELE r D IL14 2 _ HIL14 i _......... 2-4" PSE 1-4" COMCAST COMCV 4 P NE 10 L SDT PV #4 2-4" PSE I/ ` � / Q / i Q / 1 IL74 L L �o r-vD 1 2-4" PSE ST \Q JJ 2-4" TELE f 2 DEKO rn 49442 p \ �F�SNN� E AEG\�Z�t21tp 2 4" PSE 1 -4" CDR 2 AST 2_4" TELE LEGEND M Z 2-6" PSE (STUB -OUT) �I 0 z ' z jE LJI ; F1' Q Q Q 2,,II r�I IL15 �, -- � IL74 IL CV #5 M L► 2-4" P 2�___ T 1-4" GAS ----------------- MAIN TRUNK LINE (JUT) .............. PSE SPARE LINE (JUT) ---------- SIDE STREET CONNECTORS ---- ----- EXISTING CONDUIT (VARIES) PSE POWER VAULT (VARIES, SEE VAULT SCHEDULE) COMMUNICATION VAULT GROUP COM (VARIES, SEE VAULT SCHEDULE) PV # POWER VAULT GROUP # CV # COMMUNICATION VAULT GROUP # A� Al - SECTION A -A IS SHOWN ON SHEET 1 A SECTION A -A - 2-4" PSE 2-4" TE E 2 o� / 2-4" PSE T TELE C CIL14 RECORD DRAWING THIS RECORD DRAWING WAS PREPARED USING INFORMATION PROVIDED TO CONSULTANT AND CONTAINS ONLY THE LEVEL OF DETAIL AS PROVIDED. THE INFORMATION WAS NOT INDEPENDENTLY FIELD VERIFIED. THE CONSULTANT DOES NOT WARRANT OR GUARANTEE THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. 2-6" PSE 1-4" PSE - 2-4" PSE 2-4" COMCAST , -h 4" COR 2 1-4" GAS 2-4" PSE 5-4" COMICAST /\ 1-4" GAS n #1 CV #1 2-4" PSE 3-4" COMCAST 2 AST 2_4" TEL BIL14 2-6" PSE 1 2-4" PSE 1-2" COMCAST 3 MAM 11/2/16 DID Es1GNE°M MACIAS 2 JJH 9/27/16 DID �""" 1. BEAN 1 ADDENDUM 1 MAM 6/6/16 "EC - "mP NO. REVISION BY I DATE I APPR DE BOLDT ""At MACIAS NONE CV #6 l - � A ILA i i pC E Y ' #6 i i i 2-4" PSE S NE 1OTH ST 2-4" PSE • S IL, 5 ...![[ •..� 2-6" PSE �V F 2-4" PSE �ST EX. 1-3" PSE CCQ� 1-4" GAS NIL75 2-4" PSE '.. T 1-2" PSE (STUB -OUT) J 1-3" PSE (STUB -OUT) EX. 2-6" PSE i i 2-6" PSE i G� j 2-6" PSE ' f i PV #8 LIL15 IN IL15 m lnG0 JB Ai .#10 1 T ii `i-^r��wh--1� AIL14 2-4" TELE 2-4" PSE r 2-4" COMCAST 1-4" CLINK - ROUTE CONDUITS TO BASE OF UTILITY POLE J IL14 2-4" COMCAST 1-4" CLINK / 2-6" PSE 2_4" PSE T 1 _4" CLI K R 1-4" GAS 4-4" PSE 41-C TT11L15 1-4" GAS U5 1-3" PSE ST 4" PSE 1-4" CLI K zz� 3-4" COMCAST (INTERCEPT EX. 2 IL15 1-4 IL1 � \� �,Q - 2-4" COMCAST v - EX. 1 -4" PSE 1-4" CDR `0 !V • EX. 2-4" PSE i 1-4" GAS EX. 2-4" PSE 2-4" PSE 2-4" COMCAST GIL14 1-4" CDR 1-4" GAS 1-4" PSE (BUILDING STUB -OUT) 2-4" PSE 2-4" COMCAST 1-4" CDR 1-4" GAS 4-4" s�NS� e�vo `vy , CITY OF RENTON DATUM Planning/Building/Public Works Dept SEE DETAIL 3 ON DRAWING IL10 FOR CONDUITS BELOW EXISTING DRIVEWAY GENERAL NOTES 1. FRANCHISE UTILITIES (PSE POWER AND GAS, COMCAST, AND CENTURYLINK) AND CITY'S INTERCONNECT CONDUITS SHALL RUN UNINTERRUPTED BETWEEN VAULT GROUPS AS SHOWN ON THIS SHEET. ILLUMINATION CONDUIT, NOT SHOWN ON THIS SHEET, SHALL BE INSTALLED AS PART OF THE JOINT UTILITY TRENCH (JUT) AS SHOWN ON IL14 AND IL15. SEE SHEETS IL1 THRU IL5 FOR ILLUMINATION CONDUIT. f 2. SEE SECTION 1-07.17 OF THE SPECIAL PROVISIONS FOR CONSTRUCTION COORDINATION REQUIREMENTS. 3. SEE APPENDIX D OF THE SPECIAL PROVISIONS FOR FRANCHISE UTILITY CONSTRUCTION REQUIREMENTS, GUIDELINES. AND ADDITIONAL INFORMATION. 4. INDIVIDUAL VAULT STUB -OUTS ARE SHOWN AND CALLED OUT ON SHEETS IL1 THRU IL5 UNLESS NOTED ON THIS SHEET. 5. JOINT UTILITY TRENCH CONDUIT DIAGRAM AND SECTIONS WERE DEVELOPED BY COMPILING ALL THE INFORMATION PROVIDED BY THE FRANCHISE UTILITIES IN APPENDIX D OF THE SPECIAL PROVISIONS. TRENCH SECTIONS HAVE BEEN PROVIDED TO ASSIST THE CONTRACTOR ON THE BIDDING AND BUILDING OF THE PROJECT. CONTRACTOR SHALL COORDINATE WITH ALL FRANCHISE UTILITIES DURING CONSTRUCTION AND RECEIVE FINAL APPROVAL FROM EACH INDIVIDUAL FRANCHISE UTILITY PRIOR TO BACKFILLING THE TRENCH CITY OF RENTON 4/2016 SUNSET LANE NE IL11 JOINT UTILITY TRENCH ONE -LINE CONDUIT DIAGRAM 74 ° 9,