HomeMy WebLinkAboutR-387556SEE DETOUR PLANAN DETAIL BELOW -� NW 1/ SEC 9, T 23 N, R 5 E, W.M. DET ROAD 200'f PHASE 1 CLOSED CONSTRUCTION PHASING NOTES: DETOUR AHEAD 200'f AHEAD 1. ALL EXISTING AND FUTURE IMPROVEMENTS, INCLUDING UTILITIES, ARE \ \O AHEAD NOT SHOWN ON THIS DRAWING. FOR ADDITIONAL INFORMATION, SEE THE ! APPLICABLE CONTRACT DRAWINGS. W20-3 2. IN ALL CASES, UNDERGROUND UTILITIES SHALL BE CONSTRUCTED PRIOR TO START OF FINAL SURFACE IMPROVEMENTS SUCH AS, BUT NOT LIMITED yp J I I W20-2 LIMITED T0, PAVEMENT BASE MATERIAL, SIDEWALKS, CURBS AND 48" o Z"� I GUTTERS, PAVEMENTS, ETC. ROAD ° 3. CONSTRUCTION PHASING SHOWN ON THESE PLANS IS THE AGENCY'S ° \�— ----- ------ P PREFERRED COURSE OF ACTION. ALTERNATIVE PHASING MAY BE 30" 24" _ SS '- ��� / DETOUR DEVELOPED BY THE CONTRACTOR AND SUBMITTED TO THE ENGINEER CLOSED ` \\ / FOR APPROVAL. ACCEPTANCE OF ALTERNATIVE PHASING CONCEPTS F 2a SHALL BE AT THE SOLE DISCRETION OF THE ENGINEER AND THE a z 00 21 00 _{ �\ CONTRACTOR SHALL NOT PRESUME THAT ALTERNATIVES WILL BE R61 W2S B/W // y A %�� 7 � - ~�`;(���\\ / M4-9L ACCEPTED. THE CONTRACTOR SHALL USE THIS PLAN AS THE BASIS FOR THE CONTRACT BID. w / -- 4. CONSTRUCTION ACTIVITIES NOT SPECIFICALLY SEQUENCED HEREON SHALL BE CONDUCTED IN A MANNER TO MINIMIZE PUBLIC IMPACT, FULL a PROGRESS SCHEDULES IN ACCORDANCE WITH SECTION 1-08.3 OF THE / \ NN STA 20+20.4 \ �r STANDARD SPECIFICATIONS ARE STILL NECESSARY. *. LA /5. CONSTRUCTION EQUIPMENT AND MATERIALS SHALL BE RESTRICTED TO ° THE CONSTRUCTION AREA AT ALL TIMES. UNDER NO CIRCUMSTANCE ( SHALL EQUIPMENT OR MATERIALS BE ALLOWED IN AN AREA OTHER IV \ /�/ THAN CONSTRUCTION STAGING AREA FOR A PERIOD OF ONE DAY EITHER BEFORE OR AFTER ACTUAL UTILIZATION. 6. Op �� THE CONTRACTOR SHALL PROVIDE A SAFE ROUTE ALONG NE 10TH ST 1 8S \' w. ', y FROM SUNSET BOULEVARD TO THE RENTON HIGHLANDS LIBRARY ENTRANCE FOR PEDESTRIANS AT ALL TIMES. 7. WHEN WORKING ON CURB RAMPS AND SIDEWALK SEGMENTS, PROVIDE aRn 1 \ SS Qs, \ S / \ \ y+ A 5 FOOT WIDTH ADA PEDESTRIAN ACCESS DETOUR PER WSDOT OS / �L \ X� \ TRAFFIC CONTROL PLAN TC16. PROVIDE THIS DETOUR DURING WORKING HOURS ONLY. DURING NON -WORKING HOURS PROVIDE ADA PEDESTRIAN Op \ ACCESS THROUGH THE WORK ZONE BY THE USE OF TEMPORARY h\ Op MEASURES SUCH AS STEEL PLATES, CRUSHED SURFACING, COLD MIX " S ASPHALT, OR OTHER MEASURES APPROVED BY THE ENGINEER. N r !k ROAD I \ \ \ /✓� ?e \\ 8. PROVIDE A 5 FOOT WIDTH ADA PEDESTRIAN ACCESS DETOUR BEHIND W \ \ s \ EXISTING SIDEWALK AT LOCATIONS SPECIFIED IN THE PLANS, MATERIALS AND LOCATION TO BE APPROVED BY THE ENGINEER. '1. O tLGSEp / I I \ \ / \ \ SS \\`\ / 0� 9. A FLAGGER MUST BE PROVIDED AT ALL TIMES WHILE WORK IS \ N / \ \ OCCURRING ON A CURB RAMP TO SERVE AS A PEDESTRIAN ESCORT y> �� THRU SIDEWALK DETOURS ` \ RB�w2 \ \ \\ �� 10. CONTRACTOR SHALL MAINTAIN THE TEMPORARY DRIVEWAY ACCESS TO �(�� THE RENTON HIGHLANDS LIBRARY AT ALL TIMES F \ ?� 11. CONTRACTOR SHALL REMOVE OR COVER CONFLICTING EXISTING S5 �� \ S �. CHANNELIZATION OR SIGNS. N `•` S — — — V 12. SIGN PLACEMENT IS SUBJECT TO REVISION BY THE INSPECTOR ON -SITE IF NEEDED TO ADDRESS TRAFFIC OR PEDESTRIAN SAFETY OR E TRAVEL (v 13. TEMPORARY CHAIN LINK FENCE POSTS SHALL BE PLACED ON STANDS O \ \ AND NOT PENETRATE THE GROUND SURFACE. 14. CONTRACTOR IS REQUIRED TO COMPLETE CITY OF RENTON TRAFFIC CONTROL PLAN FORM AND LAYOUT FOR EACH CONSTRUCTION PHASE. \ \ I I wry% 15. CONTRACTOR SHALL INSTALL UTILITY CONNECTIONS/EXTENSIONS OUTSIDE �(\ THE CONSTRUCTION ZONE AS NECESSARY TO PROVIDE FULLY FUNCTIONING UTILITY SYSTEMS THE ENTIRE CONSTRUCTION DURATION. ANY PAVEMENT CUTS OUTSIDE THE CONSTRUCTION ZONE FOR A PARTICULAR PHASE SHALL BE PATCHED WITH HOT MIX ASPHALT. FULL NE 12TH ST N N \ (� v ROAD CLOSURE ARE NOT ALLOWED OUTSIDE THOSE SHOWN ON THE PLANS. 16. CONTRACTOR SHALL COORDINATE WITH PRIVATE DEVELOPMENT CONTRACTOR TO MINIMIZE ACCESS CONFLICTS. LEGEND 24" AD CONSTRUCTION ZONE CL SED 1-7z7z TYPE 3 BARRICADE oz R11-2 z B/W w \ i O1 y o 13 W SIGN MUTCD CODE DESCRIPTION 30" W20-3 ROAD CLOSED AHEAD 481, lo ist,� I I O R11-2 ROAD CLOSED 24„ ROAD k R/B/W a O M4-9 MOD DETOUR, STRAIGHT ARROW CLOSED $` �� INSTALL TRAFFIC SIGNAL COVER OVER O M4-9L DETOUR, LEFT ARROW ' LEFT —TURN SIGNAL HEAD DURING THIS O4 30" R 2 PHASE (EASTBOUND NE SUNSET BLVD) SCALE 2t� O M4-9R DETOUR, RIGHT ARROW B/W W20-2 DETOUR AHEAD 30" RECORD DRAWING 40 0 40 �f JL THIS RECORD DRAWING WAS PREPARED USING FCL t 30" INFORMATION PROVIDED TO CONSULTANT AND o E R3-2 CONTAINS ONLY THE LEVEL OF DETAIL AS PROVIDED. N ° I R/B/W SS \ \ THE INFORMATION WAS NOT INDEPENDENTLY FIELD o (PLACE IN MEDIAN). R3-2 VERIFIED. THE CONSULTANT DOES NOT WARRANT OR o S R/B/W GUARANTEE THE ACCURACY OR COMPLETENESS OF THE 6 o D E SOe Iq 200'f INFORMATION SHOWN. F ti o CALL 2 BUSINESS DAYS BEFORE YOU DIG �m 1"=40 CITY OF RENTON �.E 4/2016 Perteet o _ _� �K BDSBY CITY OF RENTON SUNSET LANE NE IMPROVEMENTS x 1 800 4 2 4- 5 5 5 5 206-436-0515 1 1-800-615-990 \ 0 49442 a "" J. BEAN w, UTILITIES UNDERGROUND LOCATION CENTER 505 5th Avenue S, Suite 300 �FSS/�NAL EE�G�� t21t4 Pq"mo. DEKOEKKOEK DATUM Plo l y/B� Id y/Publ works Deft. CONSTRUCTION PHASE 1(,'P� B Seattle, Washington 98104 21 N0. REVISION BY DATE APPR ^' p DE BOLDT CONSTRUCTION PHASING PLAN 92 '9