CLOSED CONSTRUCTION PHASING NOTES:
DETOUR
AHEAD 200'f AHEAD 1. ALL EXISTING AND FUTURE IMPROVEMENTS, INCLUDING UTILITIES, ARE
\ \O AHEAD NOT SHOWN ON THIS DRAWING. FOR ADDITIONAL INFORMATION, SEE THE
! APPLICABLE CONTRACT DRAWINGS.
W20-3 2. IN ALL CASES, UNDERGROUND UTILITIES SHALL BE CONSTRUCTED PRIOR
TO START OF FINAL SURFACE IMPROVEMENTS SUCH AS, BUT NOT
LIMITED
yp J I I W20-2 LIMITED T0, PAVEMENT BASE MATERIAL, SIDEWALKS, CURBS AND
48" o Z"� I GUTTERS, PAVEMENTS, ETC.
ROAD ° 3. CONSTRUCTION PHASING SHOWN ON THESE PLANS IS THE AGENCY'S
° \�— ----- ------ P PREFERRED COURSE OF ACTION. ALTERNATIVE PHASING MAY BE
30"
24" _ SS '- ��� / DETOUR DEVELOPED BY THE CONTRACTOR AND SUBMITTED TO THE ENGINEER
CLOSED ` \\ / FOR APPROVAL. ACCEPTANCE OF ALTERNATIVE PHASING CONCEPTS
F 2a SHALL BE AT THE SOLE DISCRETION OF THE ENGINEER AND THE
a z 00
21 00 _{ �\ CONTRACTOR SHALL NOT PRESUME THAT ALTERNATIVES WILL BE
R61 W2S B/W
// y A %�� 7 � - ~�`;(���\\ / M4-9L ACCEPTED. THE CONTRACTOR SHALL USE THIS PLAN AS THE BASIS FOR
THE CONTRACT BID.
w / -- 4. CONSTRUCTION ACTIVITIES NOT SPECIFICALLY SEQUENCED HEREON
SHALL BE CONDUCTED IN A MANNER TO MINIMIZE PUBLIC IMPACT, FULL
a PROGRESS SCHEDULES IN ACCORDANCE WITH SECTION 1-08.3 OF THE
/ \ NN STA 20+20.4 \ �r STANDARD SPECIFICATIONS ARE STILL NECESSARY.
*.
LA /5. CONSTRUCTION EQUIPMENT AND MATERIALS SHALL BE RESTRICTED TO ° THE CONSTRUCTION AREA AT ALL TIMES. UNDER NO CIRCUMSTANCE
( SHALL EQUIPMENT OR MATERIALS BE ALLOWED IN AN AREA OTHER
IV \ /�/ THAN CONSTRUCTION STAGING AREA FOR A PERIOD OF ONE DAY
EITHER BEFORE OR AFTER ACTUAL UTILIZATION.
6.
Op �� THE CONTRACTOR SHALL PROVIDE A SAFE ROUTE ALONG NE 10TH ST
1 8S \' w. ', y FROM SUNSET BOULEVARD TO THE RENTON HIGHLANDS LIBRARY
ENTRANCE FOR PEDESTRIANS AT ALL TIMES.
7. WHEN WORKING ON CURB RAMPS AND SIDEWALK SEGMENTS, PROVIDE
aRn 1 \ SS Qs, \ S / \ \ y+ A 5 FOOT WIDTH ADA PEDESTRIAN ACCESS DETOUR PER WSDOT
OS / �L \ X� \ TRAFFIC CONTROL PLAN TC16. PROVIDE THIS DETOUR DURING WORKING
HOURS ONLY. DURING NON -WORKING HOURS PROVIDE ADA PEDESTRIAN
Op \ ACCESS THROUGH THE WORK ZONE BY THE USE OF TEMPORARY
h\ Op MEASURES SUCH AS STEEL PLATES, CRUSHED SURFACING, COLD MIX
" S
ASPHALT, OR OTHER MEASURES APPROVED BY THE ENGINEER.
N r !k ROAD I \ \ \ /✓� ?e \\ 8. PROVIDE A 5 FOOT WIDTH ADA PEDESTRIAN ACCESS DETOUR BEHIND
W \ \ s \ EXISTING SIDEWALK AT LOCATIONS SPECIFIED IN THE PLANS, MATERIALS
AND LOCATION TO BE APPROVED BY THE ENGINEER.
'1. O tLGSEp / I I \ \ / \ \ SS \\`\ / 0� 9. A FLAGGER MUST BE PROVIDED AT ALL TIMES WHILE WORK IS
\ N / \ \ OCCURRING ON A CURB RAMP TO SERVE AS A PEDESTRIAN ESCORT
y> �� THRU SIDEWALK DETOURS
` \ RB�w2 \ \ \\ �� 10. CONTRACTOR SHALL MAINTAIN THE TEMPORARY DRIVEWAY ACCESS TO
�(�� THE RENTON HIGHLANDS LIBRARY AT ALL TIMES
F \ ?� 11. CONTRACTOR SHALL REMOVE OR COVER CONFLICTING EXISTING
S5 �� \ S �. CHANNELIZATION OR SIGNS.
N `•` S — — — V 12. SIGN PLACEMENT IS SUBJECT TO REVISION BY THE INSPECTOR
ON -SITE IF NEEDED TO ADDRESS TRAFFIC OR PEDESTRIAN SAFETY OR
E TRAVEL
(v 13. TEMPORARY CHAIN LINK FENCE POSTS SHALL BE PLACED ON STANDS
O \ \ AND NOT PENETRATE THE GROUND SURFACE.
14. CONTRACTOR IS REQUIRED TO COMPLETE CITY OF RENTON TRAFFIC
CONTROL PLAN FORM AND LAYOUT FOR EACH CONSTRUCTION PHASE.
\ \ I I wry% 15. CONTRACTOR SHALL INSTALL UTILITY CONNECTIONS/EXTENSIONS OUTSIDE
�(\ THE CONSTRUCTION ZONE AS NECESSARY TO PROVIDE FULLY
FUNCTIONING UTILITY SYSTEMS THE ENTIRE CONSTRUCTION DURATION.
ANY PAVEMENT CUTS OUTSIDE THE CONSTRUCTION ZONE FOR A
PARTICULAR PHASE SHALL BE PATCHED WITH HOT MIX ASPHALT. FULL
NE 12TH ST N N \ (� v ROAD CLOSURE ARE NOT ALLOWED OUTSIDE THOSE SHOWN ON THE
PLANS.
16. CONTRACTOR SHALL COORDINATE WITH PRIVATE DEVELOPMENT
CONTRACTOR TO MINIMIZE ACCESS CONFLICTS.
LEGEND
24" AD CONSTRUCTION ZONE
CL SED
1-7z7z TYPE 3 BARRICADE
oz R11-2
z B/W
w \
i
O1 y
o
13
W SIGN MUTCD CODE DESCRIPTION 30"
W20-3 ROAD CLOSED AHEAD 481,
lo ist,�
I I O R11-2 ROAD CLOSED 24„ ROAD k R/B/W
a O M4-9 MOD DETOUR, STRAIGHT ARROW CLOSED $` ��
INSTALL TRAFFIC SIGNAL COVER OVER
O M4-9L DETOUR, LEFT ARROW '
LEFT —TURN SIGNAL HEAD DURING THIS
O4 30" R 2 PHASE (EASTBOUND NE SUNSET BLVD) SCALE
2t� O M4-9R DETOUR, RIGHT ARROW B/W
W20-2 DETOUR AHEAD 30" RECORD DRAWING 40 0 40
�f JL
THIS RECORD DRAWING WAS PREPARED USING FCL t
30" INFORMATION PROVIDED TO CONSULTANT AND
o E R3-2 CONTAINS ONLY THE LEVEL OF DETAIL AS PROVIDED.
N ° I R/B/W SS \ \ THE INFORMATION WAS NOT INDEPENDENTLY FIELD
o (PLACE IN MEDIAN). R3-2
VERIFIED. THE CONSULTANT DOES NOT WARRANT OR
o S R/B/W GUARANTEE THE ACCURACY OR COMPLETENESS OF THE
6 o D E SOe Iq 200'f INFORMATION SHOWN.
F ti
o CALL 2 BUSINESS DAYS BEFORE YOU DIG �m 1"=40 CITY OF RENTON �.E 4/2016
Perteet o _ _� �K BDSBY CITY OF
RENTON SUNSET LANE NE IMPROVEMENTS
x 1 800 4 2 4- 5 5 5 5 206-436-0515 1 1-800-615-990 \ 0 49442 a "" J. BEAN w,
UTILITIES UNDERGROUND LOCATION CENTER 505 5th Avenue S, Suite 300 �FSS/�NAL EE�G�� t21t4 Pq"mo. DEKOEKKOEK DATUM Plo l y/B� Id y/Publ works Deft. CONSTRUCTION PHASE 1(,'P�
B Seattle, Washington 98104 21 N0. REVISION BY DATE APPR ^' p DE BOLDT CONSTRUCTION PHASING PLAN
92 '9