NW 1/ SEC 9, T 23 N, R 5 E, W.M.
PHASE 2
SEE HARRINGTON DETOUR
PLAN DETAIL BELOW
f
SS
21 0
0 7 -22 00 � 23t ...
STA 20+20.4
30 \
36" SS B OS \ \ \ S
lk
R99N LY O \ SO \ S 24+609
�S� A B/4V
X \
y�70
y�
SIGN
MUTCD CODE
DESCRIPTION
O1
W20-3
ROAD CLOSED AHEAD
O2
R11-2
ROAD CLOSED
O
M4-9 MOD
DETOUR, STRAIGHT ARROW
O4
M4-9L
DETOUR, LEFT ARROW
O5
M4-9R
DETOUR, RIGHT ARROW
O
W20-2
DETOUR AHEAD
CALL 2 BUSINESS DAYS BEFORE YOU DIG Per'tee't
1 800 4 2 4— 5 5 5 5 206-436-0515 1 1-800-615-91
UTILITIES UNDERGROUND LOCATION CENTER 505 5th Avenue S, Suite 300
Seattle, Washington 98104
/.\ o U E S 0�.
F
T
o
\ 49442cl
p �"
�F�s/NNAL EENG\�21121t9
yy�
1r \\r—s — — —
IO �`
I I\
1 I\
I I\
1 �
1 \
Sg \ 0 I
No.
REVISION
1
48"
ROAD
24 CLOSED
/ R11-2
B W
/
/ 48"
ROAD
24 CLOSED
R11-2
B/W
464
Op \ • p�
S
r7� s /✓ hex_ �-
1` S\
S�, F
/ \ 30"
R3-5R
/ B/W
/
30"
36"
0 N LY
R3-5L
B/W
/
/
/
/
/
RECORD DRAWING
/ THIS RECORD DRAWING WAS PREPARED USING
/ INFORMATION PROVIDED TO CONSULTANT AND
CONTAINS ONLY THE LEVEL OF DETAIL AS PROVIDED.
- THE INFORMATION WAS NOT INDEPENDENTLY FIELD
VERIFIED. THE CONSULTANT DOES NOT WARRANT OR
GUARANTEE THE ACCURACY OR COMPLETENESS OF THE
INFORMATION SHOWN.
1 ", 40 oM BUSBY CITY OF
nccH K. xn
BEAN ' RENTON
DATUM
D. DEKOEKKOEK
Planning/Building/Public Works Dept.
BY DATE APPR APPA p DE BOLDT
CONSTRUCTION PHASING NOTES:
1. ALL EXISTING AND FUTURE IMPROVEMENTS, INCLUDING UTILITIES, ARE
NOT SHOWN ON THIS DRAWING. FOR ADDITIONAL INFORMATION, SEE THE
APPLICABLE CONTRACT DRAWINGS.
2. IN ALL CASES, UNDERGROUND UTILITIES SHALL BE CONSTRUCTED PRIOR
TO START OF FINAL SURFACE IMPROVEMENTS SUCH AS, BUT NOT
LIMITED To, PAVEMENT BASE MATERIAL, SIDEWALKS, CURBS AND
GUTTERS, PAVEMENTS, ETC.
3. CONSTRUCTION PHASING SHOWN ON THESE PLANS IS THE AGENCY'S
PREFERRED COURSE OF ACTION. ALTERNATIVE PHASING MAY BE
DEVELOPED BY THE CONTRACTOR AND SUBMITTED TO THE ENGINEER
FOR APPROVAL. ACCEPTANCE OF ALTERNATIVE PHASING CONCEPTS
SHALL BE AT THE SOLE DISCRETION OF THE ENGINEER AND THE
CONTRACTOR SHALL NOT PRESUME THAT ALTERNATIVES WILL BE
ACCEPTED. THE CONTRACTOR SHALL USE THIS PLAN AS THE BASIS FOR
THE CONTRACT BID.
4. CONSTRUCTION ACTIVITIES NOT SPECIFICALLY SEQUENCED HEREON
SHALL BE CONDUCTED IN A MANNER TO MINIMIZE PUBLIC IMPACT, FULL
PROGRESS SCHEDULES IN ACCORDANCE WITH SECTION 1-08.3 OF THE
STANDARD SPECIFICATIONS ARE STILL NECESSARY.
5. CONSTRUCTION EQUIPMENT AND MATERIALS SHALL BE RESTRICTED TO
THE CONSTRUCTION AREA AT ALL TIMES. UNDER NO CIRCUMSTANCE
SHALL EQUIPMENT OR MATERIALS BE ALLOWED IN AN AREA OTHER
THAN CONSTRUCTION STAGING AREA FOR A PERIOD OF ONE DAY
EITHER BEFORE OR AFTER ACTUAL UTILIZATION.
6. THE CONTRACTOR SHALL PROVIDE A SAFE ROUTE ALONG NE 10TH ST
FROM SUNSET BOULEVARD TO THE RENTON HIGHLANDS LIBRARY
ENTRANCE FOR PEDESTRIANS AT ALL TIMES.
7. WHEN WORKING ON CURB RAMPS AND SIDEWALK SEGMENTS, PROVIDE
A 5 FOOT WIDTH ADA PEDESTRIAN ACCESS DETOUR PER WSDOT
TRAFFIC CONTROL PLAN TC16. PROVIDE THIS DETOUR DURING WORKING
HOURS ONLY. DURING NON -WORKING HOURS PROVIDE ADA PEDESTRIAN
ACCESS THROUGH THE WORK ZONE BY THE USE OF TEMPORARY
MEASURES SUCH AS STEEL PLATES, CRUSHED SURFACING, COLD MIX
ASPHALT, OR OTHER MEASURES APPROVED BY THE ENGINEER.
8. PROVIDE A 5 FOOT WIDTH ADA PEDESTRIAN ACCESS DETOUR BEHIND
EXISTING SIDEWALK AT LOCATIONS SPECIFIED IN THE PLANS, MATERIALS
AND LOCATION TO BE APPROVED BY THE ENGINEER.
9. A FLAGGER MUST BE PROVIDED AT ALL TIMES WHILE WORK IS
OCCURRING ON A CURB RAMP TO SERVE AS A PEDESTRIAN ESCORT
THRU SIDEWALK DETOURS.
10. CONTRACTOR SHALL MAINTAIN THE TEMPORARY DRIVEWAY ACCESS TO
THE RENTON HIGHLANDS LIBRARY AT ALL TIMES.
11. CONTRACTOR SHALL REMOVE OR COVER CONFLICTING EXISTING
CHANNELIZATION OR SIGNS.
12. SIGN PLACEMENT IS SUBJECT TO REVISION BY THE INSPECTOR
ON -SITE IF NEEDED TO ADDRESS TRAFFIC OR PEDESTRIAN SAFETY OR
TRAVEL.
13. TEMPORARY CHAIN LINK FENCE POSTS SHALL BE PLACED ON STANDS AND NOT PENETRATE THE GROUND SURFACE.
14. CONTRACTOR IS REQUIRED TO COMPLETE CITY OF RENTON TRAFFIC
CONTROL PLAN FORM AND LAYOUT FOR EACH CONSTRUCTION PHASE.
15. CONTRACTOR SHALL INSTALL UTILITY CONNECTIONS/EXTENSIONS OUTSIDE
THE CONSTRUCTION ZONE AS NECESSARY TO PROVIDE FULLY
FUNCTIONING UTILITY SYSTEMS THE ENTIRE CONSTRUCTION DURATION.
ANY PAVEMENT CUTS OUTSIDE THE CONSTRUCTION ZONE FOR A
PARTICULAR PHASE SHALL BE PATCHED WITH HOT MIX ASPHALT. FULL
ROAD CLOSURE ARE NOT ALLOWED OUTSIDE THOSE SHOWN ON THE
PLANS.
16. CONTRACTOR SHALL COORDINATE WITH PRIVATE DEVELOPMENT
CONTRACTOR TO MINIMIZE ACCESS CONFLICTS.
LEGEND
CONSTRUCTION ZONE
7Z7Z7 TYPE 3 BARRICADE
SCALE
40 0 40 80
FEET
CITY OF RENTON
SUNSET LANE NE IMPROVEMENTS
CONSTRUCTION PHASE 2
CONSTRUCTION PHASING PLAN
�B0/2016
CP2