Loading...
HomeMy WebLinkAboutR-38755730" 36" 0 N LY R3-5R B/W w z z z 4tl 24 ROAD a CLOSED a __J l­_ w R11-2 B/W (n z (l NE 12TH ST I T— O � I I w z a z 0 w z z I o_ o 13 I z I I I I 2� \ �1 \ V ROAD '4 CLOSED R71-2 B/W NW 1/ SEC 9, T 23 N, R 5 E, W.M. PHASE 2 SEE HARRINGTON DETOUR PLAN DETAIL BELOW f SS 21 0 0 7 -22 00 � 23t ... STA 20+20.4 30 \ 36" SS B OS \ \ \ S lk R­99N LY O \ SO \ S 24+609 �S� A B/4V X \ y�70 y� SIGN MUTCD CODE DESCRIPTION O1 W20-3 ROAD CLOSED AHEAD O2 R11-2 ROAD CLOSED O M4-9 MOD DETOUR, STRAIGHT ARROW O4 M4-9L DETOUR, LEFT ARROW O5 M4-9R DETOUR, RIGHT ARROW O W20-2 DETOUR AHEAD CALL 2 BUSINESS DAYS BEFORE YOU DIG Per'tee't 1 800 4 2 4— 5 5 5 5 206-436-0515 1 1-800-615-91 UTILITIES UNDERGROUND LOCATION CENTER 505 5th Avenue S, Suite 300 Seattle, Washington 98104 /.\ o U E S 0�. F T o \ 49442cl p �" �F�s/NNAL EENG\�21121t9 yy� 1r \\r—s — — — IO �` I I\ 1 I\ I I\ 1 � 1 \ Sg \ 0 I No. REVISION 1 48" ROAD 24 CLOSED / R11-2 B W / / 48" ROAD 24 CLOSED R11-2 B/W 464 Op \ • p� S r7� s /✓ hex_ �- 1` S\ S�, F / \ 30" R3-5R / B/W / 30" 36" 0 N LY R3-5L B/W / / / / / RECORD DRAWING / THIS RECORD DRAWING WAS PREPARED USING / INFORMATION PROVIDED TO CONSULTANT AND CONTAINS ONLY THE LEVEL OF DETAIL AS PROVIDED. - THE INFORMATION WAS NOT INDEPENDENTLY FIELD VERIFIED. THE CONSULTANT DOES NOT WARRANT OR GUARANTEE THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. 1 ", 40 oM BUSBY CITY OF nccH K. xn BEAN ' RENTON DATUM D. DEKOEKKOEK Planning/Building/Public Works Dept. BY DATE APPR APPA p DE BOLDT CONSTRUCTION PHASING NOTES: 1. ALL EXISTING AND FUTURE IMPROVEMENTS, INCLUDING UTILITIES, ARE NOT SHOWN ON THIS DRAWING. FOR ADDITIONAL INFORMATION, SEE THE APPLICABLE CONTRACT DRAWINGS. 2. IN ALL CASES, UNDERGROUND UTILITIES SHALL BE CONSTRUCTED PRIOR TO START OF FINAL SURFACE IMPROVEMENTS SUCH AS, BUT NOT LIMITED To, PAVEMENT BASE MATERIAL, SIDEWALKS, CURBS AND GUTTERS, PAVEMENTS, ETC. 3. CONSTRUCTION PHASING SHOWN ON THESE PLANS IS THE AGENCY'S PREFERRED COURSE OF ACTION. ALTERNATIVE PHASING MAY BE DEVELOPED BY THE CONTRACTOR AND SUBMITTED TO THE ENGINEER FOR APPROVAL. ACCEPTANCE OF ALTERNATIVE PHASING CONCEPTS SHALL BE AT THE SOLE DISCRETION OF THE ENGINEER AND THE CONTRACTOR SHALL NOT PRESUME THAT ALTERNATIVES WILL BE ACCEPTED. THE CONTRACTOR SHALL USE THIS PLAN AS THE BASIS FOR THE CONTRACT BID. 4. CONSTRUCTION ACTIVITIES NOT SPECIFICALLY SEQUENCED HEREON SHALL BE CONDUCTED IN A MANNER TO MINIMIZE PUBLIC IMPACT, FULL PROGRESS SCHEDULES IN ACCORDANCE WITH SECTION 1-08.3 OF THE STANDARD SPECIFICATIONS ARE STILL NECESSARY. 5. CONSTRUCTION EQUIPMENT AND MATERIALS SHALL BE RESTRICTED TO THE CONSTRUCTION AREA AT ALL TIMES. UNDER NO CIRCUMSTANCE SHALL EQUIPMENT OR MATERIALS BE ALLOWED IN AN AREA OTHER THAN CONSTRUCTION STAGING AREA FOR A PERIOD OF ONE DAY EITHER BEFORE OR AFTER ACTUAL UTILIZATION. 6. THE CONTRACTOR SHALL PROVIDE A SAFE ROUTE ALONG NE 10TH ST FROM SUNSET BOULEVARD TO THE RENTON HIGHLANDS LIBRARY ENTRANCE FOR PEDESTRIANS AT ALL TIMES. 7. WHEN WORKING ON CURB RAMPS AND SIDEWALK SEGMENTS, PROVIDE A 5 FOOT WIDTH ADA PEDESTRIAN ACCESS DETOUR PER WSDOT TRAFFIC CONTROL PLAN TC16. PROVIDE THIS DETOUR DURING WORKING HOURS ONLY. DURING NON -WORKING HOURS PROVIDE ADA PEDESTRIAN ACCESS THROUGH THE WORK ZONE BY THE USE OF TEMPORARY MEASURES SUCH AS STEEL PLATES, CRUSHED SURFACING, COLD MIX ASPHALT, OR OTHER MEASURES APPROVED BY THE ENGINEER. 8. PROVIDE A 5 FOOT WIDTH ADA PEDESTRIAN ACCESS DETOUR BEHIND EXISTING SIDEWALK AT LOCATIONS SPECIFIED IN THE PLANS, MATERIALS AND LOCATION TO BE APPROVED BY THE ENGINEER. 9. A FLAGGER MUST BE PROVIDED AT ALL TIMES WHILE WORK IS OCCURRING ON A CURB RAMP TO SERVE AS A PEDESTRIAN ESCORT THRU SIDEWALK DETOURS. 10. CONTRACTOR SHALL MAINTAIN THE TEMPORARY DRIVEWAY ACCESS TO THE RENTON HIGHLANDS LIBRARY AT ALL TIMES. 11. CONTRACTOR SHALL REMOVE OR COVER CONFLICTING EXISTING CHANNELIZATION OR SIGNS. 12. SIGN PLACEMENT IS SUBJECT TO REVISION BY THE INSPECTOR ON -SITE IF NEEDED TO ADDRESS TRAFFIC OR PEDESTRIAN SAFETY OR TRAVEL. 13. TEMPORARY CHAIN LINK FENCE POSTS SHALL BE PLACED ON STANDS AND NOT PENETRATE THE GROUND SURFACE. 14. CONTRACTOR IS REQUIRED TO COMPLETE CITY OF RENTON TRAFFIC CONTROL PLAN FORM AND LAYOUT FOR EACH CONSTRUCTION PHASE. 15. CONTRACTOR SHALL INSTALL UTILITY CONNECTIONS/EXTENSIONS OUTSIDE THE CONSTRUCTION ZONE AS NECESSARY TO PROVIDE FULLY FUNCTIONING UTILITY SYSTEMS THE ENTIRE CONSTRUCTION DURATION. ANY PAVEMENT CUTS OUTSIDE THE CONSTRUCTION ZONE FOR A PARTICULAR PHASE SHALL BE PATCHED WITH HOT MIX ASPHALT. FULL ROAD CLOSURE ARE NOT ALLOWED OUTSIDE THOSE SHOWN ON THE PLANS. 16. CONTRACTOR SHALL COORDINATE WITH PRIVATE DEVELOPMENT CONTRACTOR TO MINIMIZE ACCESS CONFLICTS. LEGEND CONSTRUCTION ZONE 7Z7Z7 TYPE 3 BARRICADE SCALE 40 0 40 80 FEET CITY OF RENTON SUNSET LANE NE IMPROVEMENTS CONSTRUCTION PHASE 2 CONSTRUCTION PHASING PLAN �B0/2016 CP2 s"E�. 939