HomeMy WebLinkAboutR-387558NW 1/ SEC 9, T 23 N, R 5 E, W.M.
PHASE 3
�O 30" CONSTRUCTION PHASING NOTES:
\\ 1. ALL EXISTING AND FUTURE IMPROVEMENTS, INCLUDING UTILITIES, ARE
l" NOT SHOWN ON THIS DRAWING. FOR ADDITIONAL INFORMATION, SEE THE
9L APPLICABLE CONTRACT DRAWINGS.
I � 30„
\ I \ 2. IN ALL CASES, UNDERGROUND UTILITIES SHALL BE CONSTRUCTED PRIOR
L� TO START OF FINAL SURFACE IMPROVEMENTS SUCH AS, BUT NOT
0
\ 48" LIMITED To, PAVEMENT BASE MATERIAL, SIDEWALKS, CURBS AND
R3-2
GUTTERS PAVEMENTS ETC.
SS ....::.;. .ii� - R/B/W 30" 3 AGENCY'S
ROAD
'• " \ •. � ..... :...... ; ...... ' .'.'.'.'.'.' '„ .. • "^ CONSTRUCTION PHASING SHOWN ON THESE PLANS IS THE AGENC '
PREFERRED COURSE OF ACTION. ALTERNATIVE PHASING MAY BE
24" BY
, _\ 21 00 —22 00 — 23 / CLOSED 30" DEVELOPED
APPROVAL.TA CEPTANCE OF ALTERNATIVE HE CONTRATOAND SUBMTPHHAS ED TO INTHE
CONCEPTSER
SHALL BE AT THE SOLE DISCRETION OF THE ENGINEER AND THE
/ � ai .e/ ~ / •< RNOT PSUME 1-
B/Wr2 ACOCEPTED. THEH ALL CONTRACTOR SHALLTHAT USE T ISR PLAN EASWILL THE BASIS FOR
R3-1 THE CONTRACT BID.
R/B/W 4. CONSTRUCTION ACTIVITIES NOT SPECIFICALLY SEQUENCED HEREON
{/ ? SHALL BE CONDUCTED IN A MANNER TO MINIMIZE PUBLIC IMPACT, FULL
/ • / PROGRESS SCHEDULES IN ACCORDANCE WITH SECTION 1-08.3 OF THE
STANDARD SPECIFICATIONS ARE STILL NECESSARY.
J ro • ( ^, 5. CONSTRUCTION EQUIPMENT AND MATERIALS SHALL BE RESTRICTED TO
THE CONSTRUCTION AREA AT ALL TIMES. UNDER NO CIRCUMSTANCE
J SHALL EQUIPMENT OR MATERIALS BE ALLOWED IN AN AREA OTHER
OTL' - / THAN CONSTRUCTION STAGING AREA FOR A PERIOD OF ONE DAY
\ SS— \ �? '7 Y EITHER BEFORE OR AFTER ACTUAL UTILIZATION.
ST 6. THE CONTRACTOR SHALL PROVIDE A SAFE ROUTE ALONG NE 10TH ST
FROM SUNSET BOULEVARD TO THE RENTON HIGHLANDS LIBRARY
n I 1 1 \ S \ \ O ••; ,�` ENTRANCE FOR PEDESTRIANS AT ALL TIMES.
7. WHEN WORKING ON CURB RAMPS AND SIDEWALK SEGMENTS, PROVIDE
A 5 FOOT WIDTH ADA PEDESTRIAN ACCESS DETOUR PER WSDOT
1\ TRAFFIC CONTROL PLAN TC16. PROVIDE THIS DETOUR DURING WORKING
0
HOURS ONLY. DURING NON -WORKING HOURS PROVIDE ADA PEDESTRIAN
4`g" OS \\ << Y. / ACCESS THROUGH THE WORK ZONE BY THE USE of TEMPORARY
MEASURES SUCH AS STEEL PLATES, CRUSHED SURFACING, COLD MIX
OA \/i l(\n_ / / ASPHALT, OR OTHER MEASURES APPROVED BY THE ENGINEER.
' `a \ J/ 4 \ \ / y5 8. PROVIDE A 5 FOOT WIDTH ADA PEDESTRIAN ACCESS DETOUR BEHIND
-� 24 OSED \ P `SS / EXISTING SIDEWALK AT LOCATIONS SPECIFIED IN THE PLANS. MATERIALS
'� �,' AND LOCATION TO BE APPROVED BY THE ENGINEER.
4 9. A FLAGGER MUST BE PROVIDED AT ALL TIMES WHILE WORK IS
R11WHRU SID
2 ///�,(X b '~ \ _ //�J/ y TORRING ON DETOURS. CUR RAMP TO SERVE AS A PEDESTRIAN ESCORT
$5 / / �1 ��V - /// 10. CONTRACTOR SHALL MAINTAIN THE TEMPORARY DRIVEWAY ACCESS TO
Id" �0� s V E / THE RENTON HIGHLANDS LIBRARY AT ALL TIMES.
11. CONTRACTOR SHALL REMOVE OR COVER CONFLICTING EXISTING
CHANNELIZATION OR SIGNS.
12. SIGN PLACEMENT IS SUBJECT TO REVISION BY THE INSPECTOR
ON -SITE IF NEEDED TO ADDRESS TRAFFIC OR PEDESTRIAN SAFETY OR
TRAVEL.
13. TEMPORARY CHAIN LINK FENCE POSTS SHALL BE PLACED ON STANDS
AND NOT PENETRATE THE GROUND SURFACE.
1p \
14. CONTRACTOR IS REQUIRED TO COMPLETE CITY OF RENTON TRAFFIC I CONTROL PLAN FORM AND LAYOUT FOR EACH CONSTRUCTION PHASE.
\ I
15. CONTRACTOR SHALL INSTALL UTILITY CONNECTIONS/EXTENSIONS OUTSIDE
p J THE CONSTRUCTION ZONE AS NECESSARY TO PROVIDE FULLY
\ r TOO RENTON HIGHLANDS LIBRARY AT ALL TIMES �� FUNCTIONING UTILITY SYSTEMS THE ENTIRE CONSTRUCTION DURATION.
\ rn l �! �� / / 301, ANY
PAVEMENT T OUTSIDE PARTICULARPHASESHALLCONSTRUCTION
PATCHED WITHHOTN OT MIX ASPHALT. FULL
�X ROAD CLOSURE ARE NOT ALLOWED OUTSIDE THOSE SHOWN ON THE
/.... �•* >� / PLANS.
/ SS / 5' / / / / 30" 16. CONTRACTOR SHALL COORDINATE WITH PRIVATE DEVELOPMENT
CONTRACTOR TO MINIMIZE ACCESS CONFLICTS.
30" LEGEND
CONSTRUCTION ZONE
30" 7L6/ TYPE 3 BARRICADE
R3-2 ® BARREL
N ti — — • SS " \ .� ss / 95 a / / R/B/W
ROAD
CLOSED
24 CLOSED AHEAD
X$�
\ / R11-2 W20-3
/ B/W
1p
g5
SCALE
RECORD DRAWING wwMeIlmimmomml
/ THIS RECORD DRAWING WAS PREPARED USING 40 0 4 RO
INFORMATION PROVIDED TO CONSULTANT AND FEET
/ CONTAINS ONLY THE LEVEL OF DETAIL AS PROVIDED.
m - THE INFORMATION WAS NOT INDEPENDENTLY FIELD
SD VERIFIED. THE CONSULTANT DOES NOT WARRANT OR
o — - / GUARANTEE THE ACCURACY OR COMPLETENESS OF THE
T o D E S�F _ °E° INFORMATION SHOWN.
ti
CALL 2 BUSINESS DAYS BEFORE YOU DIG 1", 40 "' CITY OF RENTON o.E 4/2016
Perteet o _ _� °K BUSBY CITY OF
RENTON SUNSET LANE NE IMPROVEMENTS
x 1 800 4 2 4— 5 5 5 5 206-436-0515 1 1-800-615-990 \ 0 49442 a J. BEAN w
UTILITIES UNDERGROUND LOCATION CENTER 1 0
505 5th Avenue S, Suite 300 �Y,S GIS EE�G�� t21t4 Pq"mD. DEKOEKKOEK DATUM Plo l y/B� Id y/Publ works Deft. CONSTRUCTION PHASE 3 CP3
Seattle, Washington 98104 21 No. REVISION BY DATE APPR "' p DE BOLDT CONSTRUCTION PHASING PLAN