Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout2008 TIP �SY
Six-Year
‘fP�NT�� Transportation
Planning/Building/ Improvement
Public Works Program
Department
■
Transportation 2008 through 2013
Systems
Division
Hearing: August 20, 2007
Adopted: August 20, 2007
Resolution: 3902
SECTION ONE
PURPOSE OF SIX-YEAR TIP PROGRAM
• Purpose of Six-Year TIP 1-1
• Vision Statement 1-2
• Mission Statement 1-2
• City Business Plan 1-2
CITY OF RENTON
SIX-YEAR TRANSPORTATION IMPROVEMENT
PROGRAM
2008-2013
PURPOSE
• Reflects involvement by citizens and elected officials.
• Implements the City of Renton Mission Statement.
• Used to coordinate transportation projects and programs
with other jurisdictions and agencies.
• Multi-year planning tool for the development of the
transportation facilities within the City.
• Required for State and Federal funding programs.
• Vital part of planning under the Growth Management
Act.
• Mandated by State Law.
1-1
CJTYOFRE
.�, . , • �. \Ii . i Dii
t r Renton The center of opportunity in the Puget Sound
r' J\J\.1 \r4 \r4 I us]
a ' '!'+,. i! Region where families and businesses thrive
r ;
. J J
x The City of Renton, in partnership and communication
.,,;� *, . - with residents, businesses, and schools, is dedicated to:
T_ ■ Providing a healthy, welcoming atmosphere where citizens
• choose to live, raise families, and take pride in their community
} M .. # . _•• • Promoting planned growth and economic vitality
`~"-•-----.-, „; 7• 4'� . • Creating a positive work environment
■ Meeting service demands through innovation and commitment
to excellence
4 � ,te• ti -.� �i , :i
c :.F
s a. a�,
t '-
-j, air, .1 .
zimip.• . .....0.—
..
, _, , ,,. _ . .. •
_ ,,, , . ., , „,,,,, -
,,,,, i
IMP. - . ' . 114 U S I i\j r-Jra je yi i\fl re 0 I\1 e J9000 9u I i.)
Promote citywide • Promote • Manage growth • Meet service • Influence decisions
economic ' neighborhood • through sound urban : demands that : that impact the city
development ; revitalization ; planning •
contribute to the •
• livability of the •
• • • community •
Promote Renton as the • Support the vitality and • Foster development of • Prioritize services at Demonstrate leader-
progressive, opportunity- : positive appearance of : vibrant, sustainable, ; levels that can be • ship by developing and
rich city in the Puget • neighborhoods through . attractive, mixed-use . sustained by revenue : maintaining partner-
Sound region : community involvement • neighborhoods in Plan, develop, and• • ships and investment
•
Capitalize on growth • Encourage and partner . established urban • maintain quality strategies with other
opportunities through ; in the development of • centers • services, infrastructure, . jurisdictions that
bold and creative . quality housing choices , Uphold a high stan- , and amenities ▪ improve services
economic development • for people of all ages and • dard of design and • Aggressively pursue
Respond to growing •
strategies ; income levels : property maintenance , service demands while transportation and other
Recruit and retain ; Ensure the safety, • throughout •the city • meeting the unique : regional improvements
businesses to ensure a . health, and security of . Provide a balance , requirements of a ▪ and services that
dynamic, diversified • citizens through • between housing and • diverse population • improve quality of life
employment base ; effective service delivery ; high-quality jobs ; through partnerships, Advocate Renton's
Continue redevelop- . Promote pedestrian • Maintain services to • innovation,and outcome interests through state
ment efforts downtown, . and bicycle linkages ; current residents while ; management • and federal lobbying
in the Highlands, and • between neighborhoods • welcoming annexation • Retain a skilled • efforts
South Lake Washington ; and community focal , areas that desire to ; workforce by making ;
. points . become part of Renton . Renton the municipal •
• • • employer of choice
• • • Balance development •
• ° with environmental
•
. , protection .
SECTION TWO
SIX-YEAR TIP MAP
• TIP Map, Exhibit A 2-1
• Map Index, Exhibit B 2-2
+. jnl
N4+n r i rW S
- d =N £ i
'i
\\---."-------
a £ . d • 4 ,yy 99'
N _l
9J/ Y OF RENTO . a a
1 f `I~ ■
SIX-YEAR T.1. T. EXHIBIT A
i VI lit V
2008-2013 ./r.�' -1
. 1 a !
Project Ma 10 �,
- N f[ n_.--1
f- l
a nrn
��Y �,< ` /
,� VIf
I ,i.„,....
R
w
+ OP: ,
( _- M
7 �— N N N N (' t N ea i*"
I
s L
_/ wad £ £ _ wweR _ £ c 1 rt .•aOKA/
I $� ?fir b'b♦
NT i, i1/4
___
4,1
, It, .
\-------\\ i-
1
w MU T_ — _I w,, x� „ . NM a
V.
_t
■fWa , a J �n N \iL
yy�` •
ISM n �■swa.. ma_.__,.N stmts. \•A
r / f.,,,,f N 4 y
2-levrkr ,------1":11- '"u171- .1 '1/407, .,„,,,,"oh, ____
^ _. ! arnaa aw_a _.
.� .aW i i �-�. .�.* wu a a NU �� n 40 r
Q 1_ '�I\� P sawa am ■r.
,,...x,n»m« �,d £ R �'P l 4: R'°.!LiLiXdfftl
;� am a�
a awR .. ,. ,w R �' R ate'a" - ---._r o.
aria awa 1 ■ wfa.n ^ - iRa7�-__ r ■wa ant" •mai
„
ift. - ��'-- ■nw sawn
R ' R ni III...,. - f 9A 3 N w aer n Id ♦ a nor a
a■ l -- ; M £e aY w sa:« i.l a ` ■a.n . ' •
■
s��
r,, S. . . ' �S w. `— A. 1 iR. a Q riir Y[aa•n r�.e 6
1 }} ..a
^ : r
� �� t I d �£ QwIW �� ;L� £ 1id Ma a .�■1 Lw!a naR
° jj
��\ "' i aaar ©, w tw a. j�J"♦ y
I
4, % Si'4 124*N.
,����� LAKE wASHINGTDN 1 Q 3g - kip
,n., ( Tv �y�/,■�_ ;
ua.wo,.p.� R Ina w Ina N �4 - ♦ ■, y
111
f3 !a IW Jd: fR -- �� �axwp wa■1/V.�°ti 9 QQJIM lab NI N
\ •_' .- Ja IWa _ ; Q- I._ — -. 6-.Ua IWT L - , I ( 1 -1-
saw a ■
au.' f R a X. �� _. .., ��� £ worn 1O M -' f_ -- : -
' II£ _I a tw a ' I
i. Wlt
._ w w l• __ - w 1W a
t/ , �1 �._ ~w R Q Q�Z, w_W a __-__--w-�1 WT^ --•_ i°'!a .._
\ a IMAM R \li cS 7 R W a i • ff�
lit ---- a aW a a nRa._-, ' F I R� i 1 I £�w a s W a.
a y99
_ i '_—y___�._ J £ { / ___X Ilk s Q w w er _ Rasa -1.
,. �.a a lar R Q —�--- £ rfa eu a w na a—3 £ "� u { Qf ) ji
.— a na,a a ne ni war l'—"'_'a w`n. a W n.) et **"
it, I■■aQ LO
er'O.' 4lb Nilio I
I Haar a1 I & _ __I 1 it —;- [ _ - _._ Q
v✓ Naha*"
r •
Ur;
s,„„ji, edii. , ----1:2 , .
�_ !44
�� • -, a.a --+, .�♦ N q 1!,...a ___-.4 I_ar _ ` �--._ w a
R a
' iLmt,'
: -,.
� rneaf �1! 1/// v ,�' ♦,afwa .. 1 sa..n 1 01) i
11
nif
�n vo �.., sx a '
17
N
n R W ill, a s 11++ 1 ' �� f w _.\� w s�
f
,e,, %ill 1 sw
/ _ aWa :lawn
lii
-iir
,,,-,,,, -
a-- .. a 142v.a et .1 ..-,..., -____ __;
1 r A .ME 41_ ) ., 1 ' , --'<1,'-'-'-1 i i t_ F
ts A1 ri, # i"�\
`. �� 7 M dawn
ffittiorrA":1 1 r __ 1
Nig
, w lW a w�wr R 3 WU& 1 ---i \__ ��.....Y1 ,--....)- ____ — •••• ,::- _Lf0.1?
�..-�... N - "-S,X, A � `• i X ryk v fi
/� s - Iw a. I.s. f` ` q �-t_��_ "'f efr
Q £ atW n.
Y £ i A f IU R ♦ Ts 1 , b
1(1' .— ir
ry :.--/eatWa ■ fix\ �♦. 1 _ {'`_. _ w n l,a n•a. ate n.f _�. yae a.l a.3} `*♦,♦ '\ c� \'t / R ._--�; \ �'ia
_ a� — i \ 7 t �s t ( a roar a a\ at Wu s
a la.l a. -_ a uW _\ /� alwaa_/\/slaWn / (if
__. ,..\ a a t" sut^-
r
1 y e4 w l�i a-.9__L__.
I IC aeua 1 £
- y __a Iwo a. 1
faw T.
f y f aW R ''IR \,,% `:4 S N N
w nu a I a lwa —_Q £ N .( S
> .....
a Z Ii w w
1aR
I :. N a Iaw a.
a_fw n M4. , ,{ N j -
a �a Y N - a n
, as uu.. ,�:n) E .. 0 21 _-1_4_ _ a UV a. _
, ,
___
.MAN 3 v,,,,,v
�.. y Ej ' `l d7 a
.r� '�. �aa f_ a i �, .s.ifsal_._I�
40 _' �ra )-- b
1\1 '
!a
M N _
.� S £
./ teara 4 1 2 P. i
1 N
laaa _ w a dF a atwu R.
M
a R - _ --. - s_nW n.
t .-- s w.l"R ._-+ - r aka•a':
fit
hil,f'a .' , - a 11.. a N
�Y :wan. ' Naloe.. M.'x
ti J uuwn e £
L� Lai Iola Lt■.d1 In,, r.� LA L al L.ri i La..I L. 1...1 C ri L_
EXHIBIT `B'
- City of Renton .
2008—2013 Transportation Improvement Program
- Map Index
TIP No. Project Title ,
1 Street Overlay Program
2 Arterial Rehabilitation Program
3 Duvall Avenue NE
4 Duvall Avenue NE-King County
__ 5 Duval Ave NE-NE 7th to Sunset Blvd NE •
6 SR 169 HOV- SE 140th to SR 900 `
7 Rainier Avenue-Grady Way to S 2n1
___ 8 SW 27th St/Strander Blvd Connection
9 NE 4th Street/Hoquiam Avenue NE
10 Ripley Lane N
11 Garden Avenue
12 May Creek Bridge Replacement
13 Monterrey/NE 20th St Wall Replacement
14 Bridge Inspection and Repair
15 Intersection Safety and Mobility
16 Traffic Safety Program
-- 17 School Zone Sign Upgrades
18 Railroad Crossing Safety Program
19 Loop Replacement Program
- 20 Sign Replacement Program
- 21 21 Pole Replacement Program
22 Traffic Efficiency Program
23 Transit Program -
24 TDM Program
25 Bicycle Route Development Program
-- 26 Walkway Program
- 27 Missing Links Program
28 Barrier Free Transition Plan Implementation
-_ 29 South Renton Project
30 Project Development/Predesign
31 Arterial Circulation Program
32 Transportation Concurrency
33 Environmental Monitoring
34 WSDOT Coordination Program
35 GIS Needs Assessment ,
36 1%for the Arts Program
37 Houser Way S-Main to Burnett
38 NE 3`d/NE 4th Corridor
39 Lake Washington Boulevard-Park Avenue N to Coulon Park
2 - 2
2008—2013 SIX-YEAR Transportation Improvement Program EXHIBIT `B'
Map Index
TIP No. Project Title
40 Lind Avenue—SW 16th to SW 43rd
41 Logan Avenue Concrete Panel Repair
42 Sam Chastain Lake Washington Trail Connection
•
2-3
H:\Division\TRANSP\PLANNINGUuliana\2008 TIP Map Index
SECTION THREE
DEVELOPMENT & PRIORITIZATION
OF THE SIX- YEAR TIP
• General Programming Criteria 3-1
• Specific TIP Development Activities 3-2
• Summary Table of Projects and Programs: 3-5
DEVELOPMENT AND PRIORITIATION OF THE SIX-YEAR TIP
I. General Programming Criteria
The yearly update of the Six-Year Transportation Improvement Program (TIP) is part of an
ongoing process intrinsically linked with the development of the City's Capital Improvement
Program. The Six-Year TIP is also linked with various state and federal funding programs,
regional/inter-jurisdictional planning and coordination processes and the City's Growth
Management Act Comprehensive Land Use Plan.
Projects are developed and prioritized based on both specific goals to be achieved by the program
and on general programming considerations. Those general programming considerations are:
Planning. How, in a local and regional level, a project fits with, or addresses identified future
transportation goals, demands and planning processes must be evaluated. This is strongly
influenced by ongoing land use decisions and by regional highway and transit system plans.
Financing. Many projects are dependent on acquisition of outside grants, formation of LID's or
the receipt of mitigation funds. Prioritization has to take into account the peculiarities of each of
the various fund sources and the probabilities of when,and how much,money will be available.
Scheduling. If a project is interconnected with,or interdependent on,other projects taking place,
this is reflected in their relative priorities.
Past Commitment. The level of previous commitment made by the City in terms of resources,
legislative actions or inter-local agreements also must be taken into consideration in prioritizing
TIP projects.
In addition to the general considerations discussed above,there are five specific project categories
through which the TIP is evaluated and analyzed. They are:
• Preservation of Existing Infrastructure
• Multi-Modal and Transportation Demand Management
• Community Livability and Enhancement
• Economic Development
• Operations and Safety
These categories provide a useful analysis tool and represent goals developed through an
evaluation of the City's transportation program in response to input from citizens and local
officials and to State and Federal legislation.
Taken as a whole, the five categories provide a framework for evaluating projects both
individually and as part of a strategy that seeks to meet and balance the transportation needs of
Renton during a time of increasing transportation demand, decreasing revenues, and growing
environmental concerns.
Although each project can be identified with an important concern that allows it to be classified
into one of the five categories, most projects are intended to address, and are developed to be
compatible with,multiple goals.
3-1
Preservation of the Existing Infrastructure is a basic need that must be met by the program.
The Mayor and City Council have addressed the importance of sustaining strong programs in this
project category. The State Growth Management Act also requires jurisdictions to assess and
address the funding required to maintain their existing transportation systems.
Multi-modal and Transportation Demand Management (TDM) projects and programs are
oriented toward"moving people"through a balanced transportation system that involves multiple
modes of transportation and provides alternatives to the existing heavy reliance on the single
occupant vehicle (SOV). Included are facilities that facilitate the movement of transit and
carpools, and programs that promote the use of high occupancy vehicles (HOV's) and reduce the
number of SOV's. The Federal Transportation Efficiency Act (TEA-21), the State and Federal
Clean Air legislation, and the State Commute Trip Reduction Act(CTR) have added momentum
to regional efforts and placed requirements on local jurisdictions such as Renton to promote these
transportation elements.
Community Livability and Enhancement consists of projects that have been developed with
major emphasis on addressing community quality of life issues by improving and/or protecting
residential livability while providing necessary transportation system improvements. Bicycle and
pedestrian projects are included in this category.
Economic Development projects and programs involve transportation improvements
necessitated by new development that is taking place. Thus,a significant source of local funding
for these projects is projected to come from mitigation payments and from specific access needs
financed by new development.
Operations and Safety projects and programs are developed through ongoing analyses of the
transportation system and are directed mainly toward traffic engineering concerns such as safety
and congestion. Projects are identified not only by analysis of traffic counts,accident records and
geometric data,but also through review and investigation of citizen complaints and requests.
Following this text are tables that display and summarize the six-year funding plan broken out in
accordance with the five program categories.
Below is a more specific discussion of the activities involved in TIP development.
H. Specific TIP Development Activities
TIP project and financial development activities are intricately intertwined and involve
interactions with many groups and agencies at the local,regional,state and federal levels.
Within the Transportation Systems Division of the City of Renton,project development involves
year-around coordination among the Maintenance and Operations Section, the Planning and
Program Section and the Design Section.
The Transportation Maintenance and Operations Section compiles accident and traffic count data,
performs level-of-service calculations needed to identify operational/congestion problems and
tracks all transportation-related complaints,suggestions and requests that come into the City.
3-2
DEVELOPMENT AND PRIORITIATION OF THE SIX-YEAR TIP
I. General Programming Criteria
The yearly update of the Six-Year Transportation Improvement Program (TIP) is part of an
ongoing process intrinsically linked with the development of the City's Capital Improvement
Program. The Six-Year TIP is also linked with various state and federal funding programs,
regional/inter-jurisdictional planning and coordination processes and the City's Growth
Management Act Comprehensive Land Use Plan.
Projects are developed and prioritized based on both specific goals to be achieved by the program
and on general programming considerations. Those general programming considerations are:
Planning. How, in a local and regional level, a project fits with, or addresses identified future
transportation goals, demands and planning processes must be evaluated. This is strongly
influenced by ongoing land use decisions and by regional highway and transit system plans.
__. Financing. Many projects are dependent on acquisition of outside grants, formation of LID's or
the receipt of mitigation funds. Prioritization has to take into account the peculiarities of each of
the various fund sources and the probabilities of when,and how much,money will be available.
Scheduling. If a project is interconnected with,or interdependent on, other projects taking place,
this is reflected in their relative priorities.
Past Commitment. The level of previous commitment made by the City in terms of resources,
legislative actions or inter-local agreements also must be taken into consideration in prioritizing
TIP projects.
In addition to the general considerations discussed above,there are five specific project categories
through which the TIP is evaluated and analyzed. They are:
• Preservation of Existing Infrastructure
• Multi-Modal and Transportation Demand Management
• Community Livability and Enhancement
• Economic Development
• Operations and Safety
These categories provide a useful analysis tool and represent goals developed through an
evaluation of the City's transportation program in response to input from citizens and local
officials and to State and Federal legislation.
Taken as a whole, the five categories provide a framework for evaluating projects both
__.. individually and as part of a strategy that seeks to meet and balance the transportation needs of
Renton during a time of increasing transportation demand, decreasing revenues, and growing
environmental concerns.
Although each project can be identified with an important concern that allows it to be classified
into one of the five categories, most projects are intended to address, and are developed to be
compatible with,multiple goals.
3-1
•
Preservation of the Existing Infrastructure is &basic need that must be met by the program.
The Mayor and City Council have addressed the importance of sustaining strong programs in this
project category. The State Growth Management Act also requires jurisdictions to assess and
address the funding required to maintain their existing transportation systems.
Multi-modal and Transportation Demand Management (TDM) projects and programs are
oriented toward"moving people"through a balanced transportation system that involves multiple
modes of transportation and provides alternatives to the existing heavy reliance on the single
occupant vehicle (SOV). Included are facilities that facilitate the movement of transit and
carpools, and programs that promote the use of high occupancy vehicles (HOV's) and reduce the
number of SOV's. The Federal Transportation Efficiency Act (TEA-21), the State and Federal
Clean Air legislation, and the State Commute Trip Reduction Act(CTR) have added momentum
to regional efforts and placed requirements on local jurisdictions such as Renton to promote these
transportation elements.
Community Livability and Enhancement consists of projects that have been developed with
major emphasis on addressing community quality of life issues by improving and/or protecting
residential livability while providing necessary transportation system improvements. Bicycle and
pedestrian projects are included in this category.
Economic Development projects and programs involve transportation improvements
necessitated by new development that is taking place. Thus, a significant source of local funding
for these projects is projected to come from mitigation payments and from specific access needs
financed by new development.
Operations and Safety projects and programs are developed through ongoing analyses of the
transportation system and are directed mainly toward traffic engineering concerns such as safety
and congestion. Projects are identified not only by analysis of traffic counts, accident records and
geometric data,but also through review and investigation of citizen complaints and requests.
Following this text are tables that display and summarize the six-year funding plan broken out in
accordance with the five program categories.
Below is a more specific discussion of the activities involved in TIP development.
r '
II. Specific TIP Development Activities
TIP project and financial development activities are intricately intertwined and involve •
interactions with many groups and agencies at the local,regional,state and federal levels.
Within the Transportation Systems Division of the City of Renton,project development involves
year-around coordination among the Maintenance and Operations Section, the Planning and
Program Section and the Design Section.
The Transportation Maintenance and Operations Section compiles accident and traffic count data,
performs level-of-service calculations needed to identify operational/congestion problems and
tracks all transportation-related complaints, suggestions and requests that come into the City.
3-2
The Transportation Design Section, through the TIP's Overlay Program and Bridge Inspection
and Repair Program, works closely with the Maintenance Services Division and with its
Pavement Management Systems to establish structural ratings for the City's roads and bridges.
These and other data are being used by the Planning and Program Section to develop
transportation improvement projects, prepare grant applications, interface with ongoing state and
federal transportation programs, and develop a TIP that supports the goals of the City's long
range Comprehensive Plan and short range business plan.
Two important examples of how this data is used are:
1. To complete Transportation Improvement Board (TIB) Arterial Inventory Worksheet
forms for each section of each arterial in the City and
2. To complete Washington State Bridge Inventory System(WSBIS) forms for each bridge.
These forms provide a ranking of overall deficiency both within the City and in comparison with
similar facilities elsewhere in the state. These rankings, in turn, become importance elements in
securing funding from the TIB's Transportation Partnership Program (TPP) and Arterial
Improvement Program(ATP)and from the federal bridge program.
The data are also used in making other grant applications for hazard elimination and safety
projects and for railroad crossing upgrades and other federal programs under TEA-21.
The Transportation Planning Section works with Metro Transit, the Puget Sound Regional
_--- Council, Sound Transit and other groups and agencies to assure consistency between Renton's
transportation policies and programs and those of the region. Such consistency is required by the
Growth Management Act and related legislation and by federal arid state grant programs.
Ongoing transportation planning activities, such as updating the Transportation Element and
traffic model, coordinating with the City's Comprehensive Plan and the development of sub-area
plans, such as the Central Business District,the Valley and North Renton areas,play an important
part in identifying and prioritizing transportation improvement projects. State and regional
transportation projects also play an important role such as those involving Sound Transit, the
Metropolitan Transportation Plan and the State Systems Plan.
Within the City of Renton, there are actions and interactions involving other departments and
divisions, the private sector, the City Council and Administration, which strongly influence the
direction of the transportation program.
For example, the transportation system is significantly impacted by land use decisions, private
development proposals and by public water and sewer extensions which increase transportation
demand by making possible higher density and/or intensity of land uses. Such proposals need to
be monitored and analyzed in regard to how they individually and collectively create the need for
transportation improvements.
All departments and divisions in the City, the City Council, and the Administration are solicited
each year to provide input, discuss,and comment on the Six-Year TIP.
Additional input is also gathered through interactions with other public and private organizations
and through public meetings held in the community concerning specific transportation projects
and programs.
3-3
At the City, State and Federal level there are new laws and regulations that create the need for
new or different kinds of transportation projects and programs. Examples include the
Transportation Efficiency Act (TEA-21), the Growth Management Act, the Clean Air Act, the
Commute Trip Reduction law, the Endangered Species Act and the Surface Water Management
Ordinance. All of these laws have tremendous impacts on the development and costs of
transportation projects.
Interconnection and/or interdependence among TIP projects and with projects by.other City _
departments and by other jurisdictions is another element that affects the development, the
prioritization and the timing of transportation projects. Equally important is the likelihood, the
time frame and the amount of outside funding that will be obtainable to finance transportation
projects.
In summary, with its heavy dependence on many different and unpredictable sources of outside
funding and with the significant impacts created by ongoing local and regional land use decisions,
transportation project development is a continuous activity comprised of a multitude of diverse
elements.
3-4
CITY OF RENTON - PLANNING / BUILDING/ PUBLIC WORKS - TRANSPORTATION SYSTEMS DIVISION - 2008-2013 TIP
Project Previous Six-Year Total Project
Type TIP Project Title No. Costs 2008 2009 2010 2011 2012 2013 Period Total Cost Funded Unfunded
I Street Overlay 12108 1,240,604 685,000 . 685,000 685,000 685,000 685,000 685,000 4,110,000 5,350,604 5,202,582 148,022
2 Arterial Rehab Program 12186 435,000 470,000 310,000 264,000 636,000 220,000 220,000 2,120,000 2,555,000 2,479,000 76,000
3 Duvall Ave NE 12123 4,687,369 2,149,240 1,432,826 3,582,066 8,269,435 7,769,435 500,000
4 Duvall Ave NE - King County 12305 2,564,104 3,533,475 3,533,475 6,097,579 5,953,853
5 Duvall Ave NE - NE 7th St to Sunset NEW 5,000 515,000 2,750,000 1,980,000 5,250,000 5,250,000 65,000 5,185,000
L- 12 May Creek Bridge Replacement 12503 185,809 20,000 550,000 160,000 5,000 735,000 920,809' 225,809 695,000
o 13 Monterrey/ NE 20th St Wall Rep 30,000 30,000 30,000 20,000 10,000
N14 Bridge Inspection & Repair 106 138,273 100,000 330,000 50,000 55,000 50,000 50,000 635,000 773,273 563,273 210,000
L 19 Loop Replacement Program 16 30,000 20,000 25,000 30,000 30,000 30,000 30,000 165,000 195,000 195,000
c 20 Sign Replacement Program 12113 9,953 5,000 5,000 7,500 7,500 7,500 7,500 40,000 49,953 49,953
21 Pole Program 91 39,626 20,000 20,000 25,000 25,000 25,000 25,000 140,000 179,626 179,626 _
29 South Renton Project 12194 406,250 . 2,000 2,000 408,250 408,250
33 Environmental Monitoring 12187 149,969 50,000 30,000 30,000 30,000 30,000 30,000 200,000 349,969 349,969
35 GIS Needs Assessment 12206 40,931 20,000 20,000 20,000 150,000 150,000 150,000 510,000 550,931 472,431 78,500
-- - 41 Logan Av Concrete Panel Repair 12303 460,000 460,000 460,000 50,000 410,000
6 SR 169 HOV- 140th to SR900 12175 6,380,481 1,544,500 2,550,000 4,094,500 10,474,981 8,144,981 2,330,000
7 Rainier Ave - Grady Way to S 2nd St 12501 7,996,391 10,200,000 6,800,000 3,700,000 1,300,000 • 22,000,000 29,996,391 27,396,391 2,600,000
Ts 23 Transit Program 12109 53,346 75,000 75,000 74,000 74,000 74,000 70,000 442,000 495,346 464,346 31,000
O 24 TDM Program 12135 105,207 65,000 65,000 65,000 65,000 65,000 65,000 390,000 495,207 475,207 20,000
30 Project-Development/Predesign 12150 282,729 148,000 200,000 200,000 200,000 200,000 200,000 1,148,000 1,430,729 1,330,727 100,000
- 5 31 Arterial Circulation Program 29 287,806 200,000 250,000 250,000 250,000 250,000 250,000 1,450,000 1,737,806 1,487,806 250,000
34 WSDOT Coordination Program 12146 19,710 65,000 65,000 60,000 60,000 40,000 40,000 330,000 349,710 283,010 66,700
38 NE 3rd/NE 4th Corridor 12176 223,127 2,000 320,000 4,050,000 1,770,000 1,640,000 1,640,000 9,422,000 9,645,127 ' 357,127 9,288,000
39 Lake Wash. By-Park to.Coulon Pk 12191 325,413 82,413 138,325 220,738 546,151 403,838 142,313
- r 26 Walkway Program 9 920,372 250,000 250,000 250,000 250,000 380,000 380,000 1,760,000 2,680,372 2,520,372 160,000
- 0 36 1%for the Arts 12112 77,505 30,000 30,000 50,000 30,000 30,000 30,000 200,000 277,505 277,505
>
_ 42 Sam Chastain Lake WA Trail Connec 12173 50,000 650,000 4,300,000 5,000,000 5,000,000 3,400,000 1,600,000
a
i 8 SW 27th St/Strander By Connect. 12239 9,326,048 8,426,000 8,210,000 1,096,600 1,626,900 5,082,300 20,960,800 . 45,402,600 54,728,648 25,442,649 29,285,999
a io Ripley Lane 12602 200,000 447,000 447,000 647,000 647,000
- 2 11 Garden Ave N Widening 12603 500,000 500,000 500,000 1,000,000 1,500,000 1,300,000 200,000
_ c 25 Bicycle Route Dev Program 12185 139,753 18,000 18,000 . 1.10,000 80,000 80,000 80,000 386,000 525,753 435,753 90,000
0 28 Barrier Free Transition Plan Implementation 50,000 50,000 50,000 50,000 50,000 50,000 300,000 300,000 240,500 59,500
- w 32 Trans Concurrency 12107 , 60,000 40,000 10,000 10,000 40,000 10,000 30,000 140,000 200,000 180,000 20,000
9 NE 4th St/Hoquiam Av NE 12209 366,544 33,456 33,456 400,000 400,000
0' 15 Intersection Safety & Mobility 12601 250,000 400,000 250,000 250,000 250,000 250,000 250,000 1,650,000 1,900,000 1,880,000 20,000
16 Traffic Safety Program 12115 131,663 20,000 20,000 40,000 40,000 40,000 40,000 200,000 331,663 311,663 20,000
o5 17 School Zone Sign Upgrades 12504 200,103 100,000 100,000 300,103 300,103
2 18 RR Crossing Safety Prog. 12166 5,499 5,000 5,000 10,000 20,000 25,499 25,499
22 Traffic Efficiency Program 12162 156,113 50,000 50,000 50,000 30,000 30,000 30,000 240,000 396,113 376,113 20,000
i
m 27 Missing Links Program 12106 59,190 30,000 30,000 30,000 30,000 30,000 30,000 180,000 239,190 239,190
Q- 37 Houser Wy S- Main to Burnett 12213 350,000 350,000 350,000 1,050,000 1,050,000 1,050,000
- O -
4o Lind Av - SW 16th-SW 43rd 24 5,000 5,000 5,000 1,914,000 626,000 2,550,000 2,555,000 15,000 2,540,000
Total Sources 37,999,888 29,828,671 21,610,826' 16,804,513 13,266,725 12,824,800 27,333,300 121,668,835 159,668,723 102,318,960 57,206,034
_ By Type 3-5 FINAL 08/21/2007 12:52 PM
SECTION FOUR
EXPENDITURES & REVENUES
• Total Project Expenditure Summary 4-1
• Summary of Funding Sources 4-2
• Itemized Funding Sources:
■ Vehicle Fuel Tax 4-3
■ Business License Fee 4-4
■ Proposed Fund Balance 4-5
■ Grants In-hand 4-6
■ Mitigation In-Hand 4-7
■ Vehicle License Fee 4-8
■ Other In-Hand 4-9
■ Grants Proposed 4-10
■ Mitigation Proposed 4-11
■ L.I.D.'s Proposed 4-12
■ Other Proposed 4-13
■ Undetermined 4-14
_" l
CITY OF RENTON - PLANNING!BUILDING/PUBLIC WORKS - TRANSPORTATION SYSTEMS DIVISION - 2008-2013 TIP
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
-. Six-Year Project Cost Summary*
Period
- TIP Project Title 2008 2009 2010 2011 2012 2013 Total
1 Street Overlay 685,000 685,000 685,000 685,000 685,000 685,000 4,110,000
2 Arterial Rehab Program 470,000 310,000 264,000 636,000 220,000 220,000 2,120,000
3 Duvall Ave NE 2,149,240 1,432,826 3,582,066
4 Duvall Ave NE-King County 3,533,475 3,533,475
5 Duvall Ave NE-NE 7th St to Sunset BI 5,000 515,000 2,750,000 1,980,000 5,250,000
-- 6 SR 169 HOV-140th to SR900 1,544,500 2,550,000 4,094,500
7 Rainier Ave-Grady Way to S 2nd St 10,200,000 6,800,000 3,700,000 1,300,000 22,000,000
_ 8 SW 27th St/Strander By Connect. 8,426,000 8,210,000 1,096,600 1,626,900 5,082,300 20,960,800 45,402,600
9 NE 4th St/Hoquiam Av NE 33,456 33,456
-- 10 Ripley Lane 447,000 447,000
11 Garden Ave N Widening 500,000 500,000 1,000,000
12 May Creek Bridge Replacement 20,000 550,000 160,000 5,000 735,000
13 Monterrey/NE 20th St Wall Rep 30,000 30,000
14 Bridge Inspection&Repair 100,000 330,000 50,000 55,000 50,000 50,000 635,000
15 Intersection Safety&Mobility 400,000 250,000 250,000 250,000 250,000 250,000 1,650,000 I
_ 16 Traffic Safety Program., - 20,000 20,000 40,000 40,000 .. 40,000 ..40,000 200,000
17 School Zone Sign Upgrades 100,000 100,000
18 RR Crossing Safety Prog. 5,000 5,000 10,000 20,000
19 Loop Replacement Program 20,000 25,000 30,000 30,000 30,000 30,000 165,000
20 Sign Replacement Program 5,000 5,000 7,500 7,500 7,500 7,500 40,000
21 Pole Program 20,000 20,000 25,000 25,000 . 25,000 25,000 140,000
22 Traffic Efficiency Program 50,000 50,000 50,000 30,000 30,000 30,000 240,000
23 Transit Program 75,000 75,000 74,000 74,000 74,000 70,000 442,000
24 TDM Program 65,000 65,000 . 65,000 65,000 65,000 65,000 390,000
25 Bicycle Route Dev Program f 18,000 18,000 110,000 80,000 80,000 80,000 386,000
26 Walkway Program 250,000 250,000 250,000 250,000 380,000 380,000 ' 1,760,000
27 Missing Links Program 30,000 30,000 30,000 30,000 30,000 30,000 180,000
28 Barrier Free Transition Plan Implement 50,000 50,000 50,000 50,000 50,000 50,000 300,000
29 South Renton Project 2,000 2,000
30 Project Development/Predesign 148,000 200,000 200,000 200,000 200,000 200,000 1,148,000
31 Arterial Circulation Program 200,000 250,000 250,000 250,000 250,000 250,000 1,450,000
32 Trans Concurrency 40,000 10,000 10,000 40,000 10,000 30,000 140,000
--- 33 Environmental Monitoring 50,000 30,000 30,000 30,000 30,000 30,000 200,000
34 WSDOT Coordination Program 65,000 65,000 60,000 60,000 40,000 40,000 330,000
35 GIS Needs Assessment 20,000 20,000 . 20,000 150,000 150,000_ 150,000 510,000
36 1%for the Arts 30,000 30,000 50,000 30,000 30,000 30,000 200,000
37 Houser Wy S-Main to Burnett 350,000 350,000 350,000 1,050,000
38 NE 3rdINE 4th Corridor 2,000 320,000 4,050,000 1,770,000 1,640,000 1,640,000 9,422,000
39 Lake Wash.By-Park to Coulon Pk 82,413 138,325 220,738
40 Lind Av-SW 16th-SW 43rd 5,000 5,000 1,914,000 626,000 2,550,000
41 Logan Av Concrete Panel Repair 460,000 460,000
42 Sam Chastain Lake WA Trail Connectic 50,000 650,000 4,300,000 5,000,000
- Total Expenditures 29,828,671 21,610,826 16,804,513 13,266,725 12,824,800 27,333,300 121,668,835
SE,-Year P,oLSufn *Including unfunded amounts. 09212007 12:51
4-1 FINAL
K
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008 - 2013 SIX-YEAR TIP
SUMMARY OF FUNDING SOURCES
. Period
ITEM Period Total 2008 2009 2010 2011 2012 2013
SIX-YEAR PROJECT COSTS:
Project Development 3,889,200 539,300 642,300 667,700 711,300 656,300 672,300
Precon Eng/Admin 7,953,800 2,369,500 269,500 1,712,600 2,848,900 544,300 209,000
R-O-W(includes Admin) 8,785,000 7,600,000 : - 200,000 250,000 250,000 267,000 218,000
Construction Contract 88,685,813 15,930,500 18,034,500 12,713,913 8,454,500 10,053,500 23,498,900
Construction Eng/Admin 10,612,322 2,634,671 2,254,826 1,229,600 814,825 1,123,500 2,554,900
Other 1,742,700 754,700 209,700 230,700 187,200 180,200 180,200
Sub-TOTAL SIX-YEAR COST 121,668,835 29,828,671 21,610,826 16,804,513 13,266,725 12,824,800 27,333,300
SOURCE OF FUNDS:
Vehicle Fuel Tax 1 3,650,000 . 585,000 595,000 610,000 615,000 620,000 625,000
Business License Feel 11,400,000 1,800,000 1,800,000 1,800,000 2,000,000 2,000,000 2,000,000
Proposed Fund Balance. 2,695,325 2,693,347 1,978
Grants In-Hand 16,771,246 6,365,471 7,634,450 1,940,000 831,325
Mitigation In-Hand 1 5,176,049 1,873,229 2,121,720 974,000 207,100
BondsNehicle License Fee 2,500,000 500,000 500,000 500,000 500,000 500,000
Other In-Hand 22,270,181 14,510,675 3,755,956 2,174,550 43,000 743,000 1,043,000
Sub-TOTAL SIX-YEAR FUNDED 64,462 801 27,827,722 16,409,104 7,998,550 4 196 425 3,863,000 4 168 000
Grants Proposed 9,779,000 400,000 2084000 1,160,000 1,435,000 2700000 2,000,000
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed 6,855,949 1,600,949 2,035,000 1,635,000 135,000 750,000 700,000
Undetermined 40,571,085 1,082,722 6,010,963 7,500,300 5,511,800 20,465,300
Sub-TOTAL SIX-YEAR UNFUNDED 57,206,034 2,000,949 5,201,722 8,805,963 9,070,300 8,961,800 23,165,300
TOTAL SOURCES -FUNDED& UNFUNDED 121,668,835 29,828,671 21,610,826 16,804,513 13,266,725 12,824,800 27,333,300
Summ_of_Source
08/212007 12:52
4 - 2 FINAL
1.Some funds are estimated earlier than expected.
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Vehicle Fuel Tax
Period
TIP Project Title 2008 2009 2010 2011 2012 2013 Total
1 Street Overlay 350,000 350,000 400,000 400,000 430,000 430,000 2,360,000
2 Arterial Rehab Program 95,000 140,000 170,000 175,000 580,000
3 Duvall Ave NE
4 Duvall Ave NE-King County
- 5 Duvall Ave NE-NE 7th St to Sunset
6 SR 169 HOV-140th to SR900 70,000 70,000
7 Rainier Ave-Grady Way to S 2nd St 235,000 150,000 210,000 595,000
8 SW 27th St/Strander By Connect.
9 NE 4th St/Hoquiam Av NE
10 Ripley Lane
11 Garden Ave N Widening
12 May Creek Bridge Replacement
13 Monterrey/NE 20th St Wall Rep
14 Bridge Inspection&Repair
15 Intersection Safety&Mobility
16 Traffic Safety Program 20,000 20,000
17 School Zone Sign Upgrades
18 RR Crossing Safety Prog.
19 Loop Replacement Program
20 Sign Replacement Program
21 Pole Program
22 Traffic Efficiency Program
23 Transit Program
24 TDM Program
25 Bicycle Route Dev Program
26 Walkway Program
27 Missing Links Program
28 Barrier Free Transition Plan Implem
29 South Renton Project _ '
30 Project Development/Predesign
31 Arterial Circulation Program
32 Trans Concurrency
-- 33 Environmental Monitoring 5,000 5,000
34 WSDOT Coordination Program
35 GIS Needs Assessment
36 1%for the Arts
37 Houser Wy S-Main to Burnett
38 NE 3rd/NE 4th Corridor 20,000 20,000
39 Lake Wash.By-Park to Coulon Pk
40 Lind Av-SW 16th-SW 43rd
41 Logan Av Concrete Panel Repair
42 Sam Chastain Lake WA Trail Conner
Total Sources 585,000 595,000 610,000 615,000 620,000 625,000 3,650,000
Gas_Tax 0&21/2007 1252
4-3 FINAL
1
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Business License Fee
Period
TIP Project Title 2008 2009 2010 2011 2012 2013 Total
1 Street Overlay 55,000 135,000 135,000 285,000 255,000 255,000 1,120,000
2- Arterial Rehab Program 150,000 215,000 150,000 270,000 50,000 45,000 • 880,000
3 Duvall Ave NE 187,000 120,000 307,000
4 Duvall Ave NE-King County
5 Duvall Ave NE-NE 7th St to Sunset 5,000 20,000 20,000 20,000 65,000
6 SR 169 HOV-140th to SR900 100,000 100,000
7 Rainier Ave-Grady Way to S 2nd SI 300,000 100,000 345,000 745,000
8 SW 27th St/Strander By Connect.
9 NE 4th St/Hoquiam Av NE
10 Ripley Lane
11 Garden Ave N Widening 100,000 50,000 150,000
12 May Creek Bridge Replacement 20,000 20,000
13 Monterrey/NE 20th St Wall Rep 20,000 20,000
14 Bridge Inspection&Repair 40,000 55,000 40,000 40,000 50,000 50,000 275,000
15 Intersection Safety&Mobility. ' 50,000 200,000 200,000 200,000 250,000 250,000 1,150,000
16 Traffic Safety Program 20,000 20,000 20,000 40,000 20,000 40,000 160,000
17 School Zone Sign Upgrades 100,000 100,000
18 RR Crossing Safety Prog. 5,000 5,000 10,000 20,000
19 Loop Replacement Program 20,000 25,000 30,000 30,000 30,000 30,000 165,000
20 Sign Replacement Program 5,000 5,000 7,500 7,500 7,500 7,500 40,000
• 21 Pole Program 20,000 20,000 25,000 25,000 25,000 25,000 140,000
22 Traffic Efficiency Program 50,000 50,000 30,000 30,000 30,000 30,000 220,000
23 Transit Program 43,000 48,000 ,70,000 74,000 74,000 70,000 379,000 1
24 TDM Program 15,000 12,000 12,000 12,000 22,000 22,000 95,000
25 Bicycle Route Dev Program 18,000 18,000 20,000 30,000 80,000 80,000 246,000 ,-
26 Walkway Program 100,000 200,000 180,000 250,000 300,000 300,000 1,330,000
27 Missing Links Program 30,000 30,000 30,000 30,000 30,000 30,000 180,000
28 Barrier Free Transition Plan Implem 20,000 20,000 20,500 30,000 50,000 50,000 190,500
29 South Renton Project 2,000 2,000
30 Project Development/Predesign 130,000 142,000 100,000 150,000 200,000 200,000 922,000
31 Arterial Circulation Program 200,000 200,000 200,000 200;000 200,000 200,000 1,200,000
32 Trans Concurrency 40,000 10,000 10,000 10,000 10,000 10,000 90,000
33 Environmental Monitoring 25,000 25,000 25,000 25,000 30,000 30,000 160,000
34 WSDOT Coordination Program 25,000 25,000 25,000 45,000 40,000 40,000 200,000
35 GIS Needs Assessment 20,000 20,000 20,000 46,500 150,000 150,000 406,500
36 1%for the Arts 30,000 30,000 50,000 30,000 30,000 30,000 200,000
37 Houser Wy S-Main to Burnett •
38 NE 3rd/NE 4th Corridor 46,500 25,500 72,000
39 Lake Wash.By-Park to Coulon Pk
40 Lind Av-SW 16th-SW 43rd
41 Logan Av Concrete Panel Repair 50,000 50,000
42 Sam Chastain Lake WA Trail Conne
Total Sources 1,800,000 1,800,000 1,800,000 2,000,000 2,000,000 2,000,000 11,400,000
4-4 FINAL
1
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Use of Fund Balance
Period
TIP - Project Title 2008 2009 2010 2011 2012 2013 Total
1 Street Overlay 280,000 1,978 281,978
2 Arterial Rehab Program 140,000 140,000
3 Duvall Ave NE 1,239,467 1,239,467
4 Duvall Ave NE-King County
5 Duvall Ave NE-NE 7th St to Sunset
6 SR 169 HOV-140th to SR900 333,280 333,280
7 Rainier Ave-Grady Way to S 2nd SI 41,600 41,600
8 SW 27th St/Strander By Connect.
9 NE 4th St/Hoquiam Av NE
10 Ripley Lane
11 Garden Ave N Widening 250,000 250,000
12 May Creek Bridge Replacement 20,000 20,000
13 Monterrey/NE 20th St Wall Rep
14 Bridge Inspection&Repair
15 Intersection Safety&Mobility 200,000 200,000
16 Traffic Safety Program
17 School Zone Sign Upgrades
18 RR Crossing Safety Prog..
19 Loop Replacement Program
20 Sign Replacement Program
21 Pole Program
22 Traffic Efficiency Program
23 Transit Program 32,000 32,000
24 TDM Program 7,000 7,000
25 Bicycle Route Dev Program
26 Walkway Program 100,000 100,000
27 Missing Links Program
28 Barrier Free Transition Plan Implem 30,000 30,000
29 South Renton Project
30 Project Development/Predesign 18,000 18,000
31 Arterial Circulation Program
32 Trans Concurrency
33 Environmental Monitoring
34 WSDOT Coordination Program
35 GIS Needs Assessment
36 1%for the Arts
-_ 37 Houser Wy S-Main to Burnett
38 NE 3rd/NE 4th Corridor 2,000 • 2,000
39 Lake Wash.By-Park to Coulon Pk
40 Lind Av-SW 16th-SW 43rd
41 Logan Av Concrete Panel Repair
42 Sam Chastain Lake WA Trail Conne
Total Sources 2,693,347 1,978 2,695,325
Proposed Fund Balance O8.21Roo7 12:52
4-5 FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Grants In-Hand
Period
TIP Project Title 2008 2009 2010 2011 2012 2013 Total
1 Street Overlay
2 Arterial Rehab Program
3 Duvall Ave NE
4 Duvall Ave NE-King County
5 Duvall Ave NE-NE 7th St to Sunset
6 SR 169 HOV-140th to SR900 267,020 267,020
7 Rainier Ave-Grady Way to S 2nd St 373,400 1,792,900 1,000,000 792,900 3,959,200
8 SW 27th St/Strander By Connect. 5,725,051 5,341,550 11066,601_
9 NE 4th St/Hoquiam Av NE
10 Ripley Lane
11 Garden Ave N Widening
12 May Creek Bridge Replacement
13 Monterrey/NE 20th St Wall Rep
14 Bridge Inspection&Repair
15 Intersection Safety&Mobility
16 Traffic Safety Program
17 School Zone Sign Upgrades
18 RR Crossing Safety Prog.
19 Loop Replacement Program
20 Sign Replacement Program
21 Pole Program
22 Traffic Efficiency Program
23 Transit Program
24 TDM Program
25 Bicycle Route Dev Program _
26 Walkway Program
27 Missing Links Program
28 Barrier Free Transition Plan Implem
29 South Renton Project
30 Project Development/Predesign
31 Arterial Circulation Program
32 Trans Concurrency
33 Environmental Monitoring
34 WSDOT Coordination Program
35 GIS Needs Assessment
36 1%for the Arts
37 Houser Wy S-Main to Burnett
38 NE 3rd/NE 4th Corridor
39 Lake Wash.By-Park to Coulon Pk 40,000 38,425 78,425
40 Lind Av-SW 16th-SW 43rd
41 Logan Av Concrete Panel Repair
42 Sam Chastain Lake WA Trail Conne 500,000 900,000 1,400,000
Total Sources 6,365,471 7,634,450 1,940,000 831,325 16,771,246
Gra.In HaM
4-6 FINAL
CITY OF RENTON
. PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Mitigation In-Hand
Period
TIP Project Title 2008 2009 2010 2011 2012 2013 Total
1 Street Overlay 100,000 100,000 200,000
2 Arterial Rehab Program 180,000 114,000 294,000
3 Duvall Ave NE 322,773 962,826 1,285,599
4 Duvall Ave NE-King County
5 Duvall Ave NE-NE 7th St to Sunset
6 SR 169 HOV-140th to SR900
7 Rainier Ave-Grady Way to S 2nd St 450,000 765,894 645,000 207,100 2,067,994
8 SW 27th St/Strander By Connect.
9 NE 4th St/Hoquiam Av NE 33,456 33,456
10 Ripley Lane 447,000 447,000
11 Garden Ave N Widening 150,000 150,000
12 May Creek Bridge Replacement
13 Monterrey/NE 20th St Wall Rep
14 Bridge Inspection&Repair 60,000 75,000 135,000
15 Intersection Safety&Mobility 150,000 50,000 30,000 230,000
16 Traffic Safety Program
17 School Zone Sign Upgrades
18 RR Crossing Safety Prog. •
19 Loop Replacement Program
20 Sign Replacement Program
21 Pole Program
22 Traffic Efficiency Program
23 Transit Program
24 TDM Program
25 Bicycle Route Dev Program
26 Walkway Program 50,000 50,000 70,000 170,000
27 Missing Links Program _
28 Barrier Free Transition Plan Implem
29 South Renton Project •
30 Project Development/Predesign 58,000 58,000
31 Arterial Circulation Program
32 Trans Concurrency
33 Environmental Monitoring 25,000 5,000 5,000 35,000
34 WSDOT Coordination Program 10,000 10,000 20,000
35 GIS Needs Assessment
36 1%for the Arts
37 Houser Wy S-Main to Burnett
38 NE 3rd/NE 4th Corridor 40,000 40,000
39 Lake Wash.By-Park to Coulon Pk
40 Lind Av-SW 16th-SW 43rd 5,000 5,000 10,000
41 Logan Av Concrete Panel Repair
42 Sam Chastain Lake WA Trail Conner
Total Sources 1,873,229 2,121,720 974,000 207,100 5,176,049
-- Mil,gation jnband 0821!2007 12 52
4-7 FINAL
•
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Vehicle License Fee
Period
TIP Project Title 2008 2009 2010 2011 2012 2013 Total
1 Street Overlay
2 Arterial Rehab Program 150,000 150,000
3 Duvall Ave NE 250,000 250,000
4 Duvall Ave NE-King County •
5 Duvall Ave NE-NE 7th St to Sunset
6 SR 169 HOV-140th to SR900 50,000 50,000
7 Rainier Ave-Grady Way to S 2nd SI 500,000 500,000 ,-
8 SW 27th St/Strander By Connect. 50,000 500,000 500,000 1,050,000
9 NE 4th St/Hoquiam Av NE
10 Ripley Lane
11 Garden Ave N Widening 250,000 250,000
12 May Creek Bridge Replacement
13 Monterrey/NE 20th St Wall Rep _
14 Bridge Inspection&Repair 15,000 • 15,000
15_ Intersection Safety&Mobility 50,000 50,000
. 16 Traffic Safety.Program
17• School Zone Sign Upgrades
18 RR Crossing Safety Prog.
19 Loop Replacement Program
20 Sign Replacement Program
21 Pole Program
22 Traffic Efficiency Program
23 Transit Program
24 TDM Program 10,000 10,000
25 Bicycle Route Dev Program 50,000 50,000
26 Walkway Program
27 Missing Links Program
28 Barrier Free Transition Plan Implem 20,000 20,000
29 South Renton Project
30 Project Development/Predesign 50,000 50,000
31 Arterial Circulation Program
32 Trans Concurrency 30,000 30,000
33 Environmental Monitoring •
34 WSDOT Coordination Program
35 GIS Needs Assessment 25,000 25,000
36 1%for the Arts
37 Houser Wy S-Main to Burnett -
38 NE 3rd/NE 4th Corridor
39 Lake Wash.By-Park to Coulon Pk
40 Lind Av-SW 16th-SW 43rd
41 Logan Av Concrete Panel Repair
42 Sam Chastain Lake WA Trail Conne _
Total Sources 500,000 500,000 500,000 500,000 500,000 2,500,000
Bends/UVB Fomed _ 08/21/2007 12.82
4-8 FINAL
Need to be approved by Council
• I-
•
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Other-in-Hand
Period
TIP Project Title 2008 2009 2010 2011 2012 2013 • Total
1 Street Overlay
2 Arterial Rehab Program
3 Duvall Ave NE
4 Duvall Ave NE-King County 3,533,475 3,533,475
5 Duvall Ave NE-NE 7th St to Sunset
6 SR 169 HOV-140th to SR900 944,200 944,200
7 Rainier Ave-Grady Way to S 2nd SI 8,800,000 2,691,206 11,491,206
8 SW 27th St/Strander By Connect. 1,100,000 868,450 331,550 700,000 1,000,000 4,000,000
9 NE 4th St/Hoquiam Av NE
10 Ripley Lane
11 Garden Ave N Widening
12 May Creek Bridge Replacement
13 Monterrey/NE 20th St Wall Rep
14 Bridge Inspection&Repair
15 Intersection Safety&Mobility
16 Traffic Safety Program
17 School Zone Sign Upgrades •
18 RR Crossing Safety Prog.
19 Loop Replacement Program
20 Sign Replacement Program
21 Pole Program
22 Traffic Efficiency Program
--- 23 Transit Program
24 TDM Program 43,000 43,000 43,000 43,000 43,000 •43,000 258,000
25 Bicycle Route Dev Program
26 Walkway Program
27 Missing Links Program
28 Barrier Free Transition Plan Implem
29 South Renton Project.
30 Project DevelopmentiPredesign
31 Arterial Circulation Program
32 Trans Concurrency
33 Environmental Monitoring
34 WSDOT Coordination Program 40,000 3,300 43,300
35 GIS Needs Assessment "
36 1%for the Arts
37 Houser Wy S-Main to Burnett
38 NE 3rd/NE 4th Corridor
39 Lake Wash.By-Park to Coulon Pk
40 Lind Av-SW 16th-SW 43rd
41 Logan Av Concrete Panel Repair
42 Sam Chastain Lake WA Trail Conne 50,000 150,000 1,800,000 2,000,000
Total Sources 14,510,675 3,755,956 2,174,550 43,000 743,000 1,043,000 22,270,181
•
OtherNand 0621/207 1252
4-9 FINAL
•
Final 2008-2013 TIP.xls
CITY OF RENTON ---
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Grants Proposed
Period
TIP Project Title 2008 2009 2010 2011 2012 2013 Total _
1 Street Overlay
2 Arterial Rehab Program
3 Duvall Ave NE 400,000 100,000 500,000
4 Duvall Ave NE-King County
5 Duvall Ave NE-NE 7th St to Sunset
6 SR 169 HOV-140th toSR900
7 Rainier Ave-Grady Way to S 2nd SI 1,300,000 1,000,000 300,000 2,600,000
8 SW 27th St/Strander By Connect. 500,000 2,500,000 2,000,000 5,000,000
9 NE 4th St/Hoquiam Av NE
10 Ripley Lane
11 Garden Ave N Widening
12 May Creek Bridge Replacement 484,000 160,000 5,000 649,000
13 Monterrey/NE 20th St Wall Rep
14 Bridge Inspection.&Repair 200,000 200,000
15 Intersection Safety&Mobility
16 Traffic Safety Program
17 School Zone Sign Upgrades
18 RR Crossing Safety Prog.
19 Loop Replacement Program
20 Sign Replacement Program
21 Pole Program
22 Traffic Efficiency Program
23 Transit Program
24 TDM Program
25 Bicycle Route Dev Program
26 Walkway Program
27 Missing Links Program
28 Barrier Free Transition Plan Implem
29 South Renton Project
30 Project Development/Predesign _
31 Arterial Circulation Program
32 Trans Concurrency
33 Environmental Monitoring
34 WSDOT Coordination Program
35 GIS Needs Assessment
36 1%for the Arts
37 Houser Wy S-Main to Burnett _
38 NE 3rd/NE 4th Corridor
39 Lake Wash.By-Park to Coulon Pk
40 Lind Av-SW 16th-SW 43rd 630,000 200,000 830,000
41 Logan Av Concrete Panel Repair
42 Sam Chastain Lake WA Trail Conne
Total Sources 400,000 2,084,000 1,160,000 1,435,000 2,700,000 2,000,000 9,779,000
Gnn„Proposed 08/2112007 12:52
4-10 FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Mitigation Proposed
Period
TIP Project Title 2008 2009 2010. 2011 2012 2013 Total
1 Street Overlay
2 Arterial Rehab Program
3 Duvall Ave NE
4 Duvall Ave NE-King County
5 Duvall Ave NE-NE 7th St to Sunset
6 SR 169 HOV-140th toSR900 •
7 Rainier Ave-Grady Way to S 2nd Si
8 SW 27th St/Strander By Connect
9 NE 4th St/Hoquiam Av NE
10 Ripley Lane
11 Garden Ave N Widening
12 May Creek Bridge Replacement
13 Monterrey/NE 20th St Wall Rep
14 Bridge Inspection&Repair
15 Intersection Safety&Mobility
16 Traffic Safety Program
-- 17 School Zone Sign Upgrades
18 RR Crossing Safety Prog.
19 Loop Replacement Program
20 Sign Replacement Program
21 Pole Program
22 Traffic Efficiency Program
23 Transit Program
24 TDM Program
25 Bicycle Route Dev Program
26 Walkway Program
27 Missing Links Program
28 Barrier Free Transition Plan Implem
29 South Renton Project
30 Project Development/Predesign
31 Arterial Circulation Program
32 Trans Concurrency
33 Environmental Monitoring
34 WSDOT Coordination Program
35 GIS Needs Assessment
36 1%for the Arts
37 Houser Wy S-Main to Burnett
38 NE 3rd/NE 4th Corridor
39 Lake Wash.By-Park to Coulon Pk
40 Lind Av-SW 16th-SW 43rd
41 Logan Av Concrete Panel Repair
42 Sam Chastain Lake WA Trail Conne
Total Sources
MN9ahon Proposed 06/2112007 1252
4-11 FINAL
•
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
L.I.D.'s Proposed
Period
TIP Project Title 2008 2009 2010 2011 2012 2013 Total
1 Street Overlay
2 Arterial Rehab Program
3 Duvall Ave NE
4 Duvall Ave NE-King County
5 Duvall Ave NE-NE 7th St to Sunset
6 SR 169 HOV-140th to SR900
7 Rainier Ave-Grady Way to S 2nd SI
8 SW 27th St/Strander By Connect.
9 NE 4th St/Hoquiam Av NE
10 Ripley Lane
11 Garden Ave N Widening
12 May Creek Bridge Replacement
13 Monterrey I NE 20th St Wall Rep
14 Bridge Inspection&Repair
15 Intersection Safety&Mobility
16 Traffic Safety Program
17 School Zone Sign Upgrades
18 RR Crossing Safety Prog.
19 Loop Replacement Program
20 Sign Replacement Program
_ 21 Pole Program --
22 Traffic Efficiency Program
23 Transit Program
24 TDM Program
25 Bicycle Route Dev Program
26 Walkway Program
27 Missing Links Program
28 Barrier Free Transition Plan Implem
29 South Renton Project
30 Project Development/Predesign
31 Arterial Circulation Program
32 Trans Concurrency
33 Environmental Monitoring
34 WSDOT Coordination Program
35 GIS Needs Assessment
36 1%for the Arts
37 Houser Wy S-Main to Burnett
38 NE 3rd/NE 4th Corridor
39 Lake Wash.By-Park to Coulon Pk
40 Lind Av-SW 16th-SW 43rd
41 Logan Av Concrete Panel Repair
42 Sam Chastain Lake WA Trail Conne
Total Sources
LIUs Roposetl 0821/200/ 12:52
4-12 FINAL
•
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Other Proposed
Period
TIP Project Title 2008 2009 2010 2011 2012 2013 Total
1 Street Overlay
2 Arterial Rehab Program
3 Duvall Ave NE
4 Duvall Ave NE-King County
5 Duvall Ave NE-NE 7th St to Sunset 50,000 250,000 200,000 500,000
6 SR 169 HOV-140th toSR900
7 Rainier Ave-Grady Way to S 2nd Si
8 SW 27th St/Strander By Connect. 1,600,949 2,000,000 50,000 500,000 500,000 4,650,949
9 NE 4th St/Hoquiam Av NE
10 Ripley Lane
11 Garden Ave N Widening
12 May Creek Bridge Replacement
13 Monterrey I NE 20th St Wall Rep
14 Bridge Inspection&Repair
15 Intersection Safety&Mobility
16 Traffic Safety Program
17 School Zone Sign Upgrades
18 RR Crossing Safety Prog.
19 Loop Replacement Program
20 Sign Replacement Program
21 Pole Program
22 Traffic Efficiency Program
23 Transit Program
24 TDM Program
25 Bicycle Route Dev Program
26 Walkway Program
27 Missing Links Program
28 Barrier Free Transition Plan Implem
29 South Renton Project
30 Project Development/Predesign
31 Arterial Circulation Program
32 Trans Concurrency
33 Environmental Monitoring •
34 WSDOT Coordination Program
35 GIS Needs Assessment
36 1%for the Arts
37 Houser Wy S-Main to Burnett 35,000 35,000 35,000 105,000
38 NE 3rd/NE 4th Corridor
39 Lake Wash.By-Park to Coulon Pk
40 Lind Av-SW 16th-SW 43rd
41 Logan Av Concrete Panel Repair
42 Sam Chastain Lake WA Trail Conne 1,600,000 1,600,000
Total Sources 1,600,949 2,035,000 1,635,000 135,000 750,000 700,000 6,855,949
dheryropoud 082112007 1252
4-13 FINAL
CITY OF RENTON -
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Undetermined
Period
TIP Project Title 2008 2009 2010 2011 2012 2013 Total
1 Street Overlay 98,022 50,000 148,022
2 Arterial Rehab Program 76,000 76,000
3 Duvall Ave NE
4 Duvall Ave NE-King County
5 Duvall Ave NE-NE 7th St to Sunset 445,000 2,480,000 1,760,000 4,685,000
6 SR 169 HOV-140th to SR900 2,330,000 2,330,000
7 Rainier Ave-Grady Way to S 2nd SI
8 SW 27th St/Strander By Connect. 765,050 1,026,900 882,300 16,960,800 19,635,050
9 NE 4th St/Hoquiam Av NE
10 Ripley Lane
11 Garden Ave N Widening 200,000 200,000
12 May Creek Bridge Replacement 46,000 46,000
13 Monterrey/NE 20th St Wall Rep 10,000 10,000
14 Bridge Inspection&Repair 10,000 10,000
15 Intersection Safety&Mobility 20,000 20,000
16 Traffic Safety Program 20,000 20,000
17 School Zone Sign Upgrades
18 RR Crossing Safety Prog.
19 Loop Replacement Program
20 Sign Replacement Program
21 Pole Program
22 Traffic Efficiency Program 20,000 20,000
23 Transit Program 27,000 4,000 31,000
24 TDM Program 10,000 10,000 20,000
25 Bicycle Route Dev Program 90,000 90,000
26 Walkway Program 80,000 80,000 160,000
27 Missing Links Program
28 Barrier Free Transition Plan Implem 30,000 29,500 59,500
29 South Renton Project
30 Project Development/Predesign 100,000 100,000
31 Arterial Circulation Program 50,000 50,000 50,000 50,000 50,000 250,000
32 Trans Concurrency 20,000 20,000
33 Environmental Monitoring
34 WSDOT Coordination Program 26,700 25,000 15,000 66,700
35 GIS Needs Assessment 78,500 78,500
36 1%for the Arts
37 Houser Wy S-Main to Burnett 315,000 315,000 315,000 945,000
38 NE 3rd/NE 4th Corridor 280,000 4,050,000 1,770,000 1,593,500 1,594,500 9,288,000
39 .Lake Wash.By-Park to Coulon Pk 42,413 99,900 142,313
40 Lind Av-SW 16th-SW 43rd 1,284,000 426,000 1,710,000
41 Logan Av Concrete Panel Repair 410,000 410,000
42 Sam Chastain Lake WA Trail Conne
Total Sources 1,082,722 6,010,963 7,500;300 5,511,800 20,465,300 40,571,085
UnhmhE_Sum O8/21R007 12 52
4-14 FINAL
SECTION FIVE
PROJECT DESCRIPTIONS
• Summary of TIP Projects & Costs 5-l a
• Detailed Project Descriptions 5-1 to 5-42
{
CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2008-2013 SIX-YEAR TIP
Total Project Costs
Previous Six-Year Total Total Total
TIP Project Title Costs 2008 2009 2010 2011 2012 2013 Period Total Cost Funded Unfunded
1 Street Overlay 1,240,604 685,000 685,000 685,000 685,000 685,000 685,000 4,110,000 5,350,604 - 5,202,582 148,022
2 Arterial Rehab Program 435,000 470,000 310,000 264,000 636,000 220,000 220,000 2,120,000 2,555,000 2,479,000 76,000
3 Duvall Ave NE 4,687,369 2,149,240 1,432,826 3,582,066 8,269,435 7,769,435 500,000
4 Duvall Ave NE-King County 2,564,104 3,533,475 3,533,475 6,097,579 5,953,853
5 Duvall Ave NE-NE 7th St to Sunset E 5,000 515,000 2,750,000 1,980,000 5,250,000- 5,250,000 65,000 5,185,000
6 SR 169 HOV-140th to SR900 6,380,481 1,544,500 2,550,000 4,094,500 10,474,981 8,144,981 2,330,000
7 Rainier Ave-Grady Way to S 2nd St 7,996,391 10,200,000 6,800,000 3,700,000 1,300,000 22,000,000 29,996,391 27,396,391 2,600,000
8 SW 27th St/Strander By Connect. . 9,326,048 8,426,000 8,210,000 1,096,600 1,626,900 5,082,300 20,960,800 45,402,600 54,728,648 25,442,649 29,285,999
9 NE 4th St/Hoquiam Av NE 366,544 33,456 33,456 400,000 400,000
10' Ripley Lane 200,000 447,000 _ 447,000 647,000 647,000 _
11 Garden Ave N Widening . 500,000 500,000 500,000 1,000,000 1,500,000 1,300,000 200,000
12 May Creek Bridge Replacement 185,809 20,000 550,000 160,000 5,000 735,000 920,809 225,809 695,000
13 Monterrey/NE 20th St Wall Rep 30,000 30,000 30,000 20,000 10,000
14 Bridge Inspection&Repair 138,273 100,000 330,000 50,000 55,000 50,000 50,000 635,000 773,273 563,273 210,000
15 Intersection Safety&Mobility 250,000 400,000 250,000 250,000 250,000 250,000 250,000 1,650,000 1,900,000 1,880,000 20,000
16 Traffic Safety Program 131,663 20,000 20,000 40,000 40,000 40,000 . 40,000 200,000 331,663 311,663 20,000
17 School Zone Sign Upgrades 200,103 100,000 100,000 300,103 300,103
18 RR Crossing Safety Prog. 5,499 5,000 5,000 10,000 20,000 25,499 25,499
19 Loop Replacement Program 30,000 20,000 25,000 30,000 30,000 -30,000 30,000 165,000 195,000 195,000
zo Sign Replacement Program, 9,953 5,000 5,000 7,500 7,500 7,500 7,500 40,000 49,953 49,953
21 Pole Program 39,626 20,000 20,000 25,000 25,000 25,000 25,000 140,000 179,626 179,626
22 Traffic Efficiency Program 156,113 50,000 50,000 50,000 30,000 30,000 30,000 240,000 396,113 376,113 - 20,000
23 Transit Program 53,346 75,000 75,000 74,000 74,000 74,000 70,000 442,000 495,346 464,346 - 31,000
24 TDM Program 105,207 65,000 65,000 65,000 65,000 65,000 65,000 390,000 495,207 475,207 20,000
25 Bicycle Route Dev Program 139,753 18,000 18,000 110,000 80,000 80,000 80,000 386,000 525,753 435,753 90,000
26 Walkway Program 920,372 250,000 250,000 250,000 250,000 380,000 380,000 1,760,000 2,680,372 2,520,372 160,000
27 Missing Links Program 59,190 30,000 30,000 30,000 30,000 30,000 30,000 180,000 - 239,190 239,190
28 Barrier Free Transition Plan Implemer 50,000 50,000 50,000 50,000 50,000 50,000 300,000 300,000 240,500 59,500
29 South Renton Project 406,250 2,000 2,000 408,250 408,250
30 Project Development/Predesign 282,729 148,000 200,000 200,000 200,000 200,000 200,000 1,148,000 1,430,729 1,330,727 100,000
31 Arterial Circulation Program 287,806 200,000 250,000 250,000 250,000 250,000 250,000 1,450,000 1,737,806 1,487,806 250,000
32 Trans Concurrency 60,000 40,000 10,000 10,000 40,000 10,000 30,000 140,000 200,000 180,000 20,000
33 Environmental Monitoring . 149,969 50,000 30,000 30,000 30,000 30,000 -30,000 200,000 349,969 349,969
34 WSDOT Coordination Program 19,710 65,000 65,000 60,000 60,000 40,000 40,000 330,000 349,710 283,010 66,700
35 GIS Needs Assessment 40;931 20,000 20,000 20,000 150,000 150,000 150,000 510,000 550,931 472,431 78,500
36 1%for the Arts 77,505 30,000 . 30,000 50,000 30,000 30,000 30,000 200,000 277,505 . 277,505
37 Houser Wy S-Main to Burnett 350,000 350,000 350,000 1,050,000 1,050,000 1,050,000
38 NE 3rd/NE 4th Corridor 223,127 2,000 320,000 4,050,000 1,770,000 1,640,000 1,640,000 9,422,000 9,645,127 357,127 9,288,000
39 Lake Wash.By-Park to Coulon Pk 325,413 82,413 138,325 220,738 546,151 403,838 142,313
4o Lind Av-SW 16th-SW 43rd 5,000 5,000 5,000 1,914,000 626,000 2,550,000 2,555,000 15,000 2,540,000
_41 Logan Av Concrete Panel Repair 460,000 460,000 460,000 50,000 410,000
42 Sam Chastain Lake WA Trail Connect 50,000 650,000 4,300,000 5,000,000 5,000,000 3,400,000 1,600,000
Total Sources 37,999,888 29,828,671 21,610,826 16,804,513 13,266,725 12,824,800 27,333,300 121,668,835 159,668,723 102,318,960 57,206,034
Taal Pr4ec1 Costs 08'212007 1251 PM
5-la FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Street Overlay Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 12106
TIP No. 1 CONTACT: Bill Wressell 425.430.7400
DESCRIPTION: - STATUS:
Annual program for repairing and resurfacing existing roadways,operating the City's Pavement Ongoing yearly program. This program funds overlays on neighborhood streets and
Management System and providing data for deficiency ratings. collector streets. The Arterial Rehabilitation Program funds major and minor arterials.
JUSTIFICATION: CHANGES:
ACP overlay,SMA,and slurry seal of streets provide for improved driving surface and are highly cost Installation of ADA compliant curb ramps has been incorporated into the annual Street
effective ways of avoiding expensive repairs and reconstruction. The computerized Pavement Overlay and Arterial Rehabilitation programs according to new federal requirements.There
Management System and yearly survey of roadway conditions greatly improve the efficiency of the was a sharp increase in the price of asphalt concrete pavement in 2006.The ADA
Overlay Program. The arterial streets are rated every year,while the residential streets are rated every requirement and the ACP price increase raised the yearly expenditure by$200,000. Budget
other year. will change if large annexations occur.
iFunded: 15,202,582 I Unfunded: I 148,022
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent In 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development
Precon Eng/Admin 88,834 4,834 12,000 72,000 12,000 12,000 12,000 12,000 12,000 12,000
R-O-W(includes Admin)
Construction Contract 4,941,770 589,770 554,000 3,798,000 633,000 633,000 633,000 633,000 633,000 633,000
Construction Eng/Admin 320,000 40;000 40,000 240,000 40,000 40,000 40,000 40,000 40,000 40,000
Other
TOTAL EXPENSES 5,350,604 634,604 606,000 4,110,000 685,000 685,000 685,000 685,000 685,000 685,000
SOURCE OF FUNDS:
Vehicle Fuel Tax 3,250,000 440,000 450,000 2,360,000 350,000 350,000 400,000 400,000 430,000 430,000
Business License Fee 1,230,000 55,000 55,000 1,120,000 55,000 135,000 135,000 285,000 255,000 255000
Proposed Fund Balance 522,582 139,604 101,000 281,978 280,000 1,978
Grants In-Hand
Mitigation In-Hand 200,000 200,000 100,000 100,000
Vehicle Fuel Tax
Other In-Hand
Grants Proposed -
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined 148,022 148,022 98,022 50,000
TOTAL SOURCES 5,350,604 634,604 606,000 4,110,000 685,000 685,000 685,000 685,000 685,000 685,000
ovanzy
0821!2007 1238 PM
5-1 FINAL
a i
•
CITY OF RENTON •
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP •
•
Arterial Rehabilitation Program Functional Classification:Various Fund: 317
Proj.Length: N/A Proj: 12186
TIP No. 2 CONTACT: Bill Wressel 425.430.7400
DESCRIPTION: STATUS:
As funding is available,this program will provide for the rehabilitation of arterial streets where the Proposed paving schedule:2007-NE 12th St.,2008-NE 3rd St.,2009-South Carr Rd.,
restoration requirements are beyond that which can be accomplished through the annual Overlay 2010-Puget Dr.SE.,2011 -East Valley Rd.S.,2012-Benson Rd.S.,2013-N 3rd St.
Program. and N 4th St.This order may change depending on future ratings.
JUSTIFICATION: CHANGES:
The Overlay Program concentrates to a great degree on maintaining residential streets,where Installation of ADA compliant curb ramps has been incorporated into the annual Arterial
relatively small traffic volumes and less truck and bus traffic make standard asphalt overlays a Rehabilitation and Overlay programs according to new federal requirements.There was a
long term means of maintenance. Arterial streets can often deteriorate rather quickly and often sharp increase in the price of asphalt concrete pavement in 2006.The ADA requirements
require more costly rehabilitation measures and/or costly temporary repairs to avoid more
extensive deterioration. A number of arterials identified as needing major rehabilitation are being and the ACP price increase raised the yearly expenditures. Budget will change if large
addressed in this program and the Overlay Program. annexations occur.
'Funded: 12,479,000 'Unfunded: 176,000
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent in 2006 2007 Total . 2008 2009 2010 2011 2012 2013
EXPENSES: -
Project Development •
-
Precon Eng/Admin 69,000 9,000 60,000 10,000 10,000 10,000 10,000 10,000 10,000
R-O-W(includes Admin) .
Construction Contract 2,417,000 195,000 222,000 2,000,000 450,000 290,000 244,000 616,000 200,000 200,000
Construction Eng/Admin 69,000 9,000 60,000 10,000 10,000 10,000 10,000 10,000 10,000
Other
TOTAL EXPENSES 2,555,000 195,000 240,000 2,120,000 470,000 - 310,000 264,000 636,000 220,000 220,000
SOURCE OF FUNDS:
Vehicle Fuel Tax 580,000 580,000 95,000 140,000 170,000 175,000
Business License Fee 935,000 55,000 • 880,000 150,000 215,000 150,000 270,000 50,000 45,000
Proposed Fund Balance 140,000 140,000 140,000
Grants In-Hand
Mitigation In-Hand • 674,000 195,000 185,000 294,000 180,000 114,000
Vehicle Fuel Tax 150,000 150,000 150,000
Other In-Hand . -
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined 7.6,000 76,000 76,000
TOTAL SOURCES 2,555,000 195,000 240,000 2,120,000 470,000 310,000 264,000 636,000 220,000 220,000
•
ANwial_Rehab 0821/2007 12:38 PM
5-2 FINAL
•
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION •
2008-2013 SIX-YEAR TIP
Duvall Ave NE -SR-900 to North City Limits Functional Classification: Minor Arterial Fund: 317
Proj.Length: 042 miles Proj: 12123
TIP No. 3 CONTACT: James Wilhoit 425.430.7319
DESCRIPTION: STATUS:
Widening roadway to five lanes, includes:curbs,sidewalks,storm drainage,street lighting, Right-of-way acquisition nearing completion. Construction contract award planned for
channelization,and bikeway from SR-900 to the north City limits. 2007. Received a TIB grant in partnership with King County;the City of Newcastle also
• received a TIB grant for their section of Coal Creek Parkway. The City of Renton's grant
award is$3,095,640. The City is managing King County's project separately.
JUSTIFICATION: CHANGES:
Growing residential areas as well as freight traffic use this route which is also becoming a major through Increases in construction cost estimate and proportional increase in construction
route between Renton and Bellevue. engineering/administration cost estimate. Funding spent is tracked through project
spreadsheet, not Eden,due to project split-out.The total project cost has increased
• approximately$3.3 million for right-of-way and estimated construction costs.
(Funded: 17,769,435 'Unfunded: 1500,000
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent Pre-2007 2007 Total 2008 2009 - 2010 2011 2012 2013
EXPENSES:
Project Development
Precon Eng/Admin 1,446,410 946,410 500,000
R-O-W(includes Admin) 724,959 474,959 250,000
Construction Contract 4,955,000 2,150,000 2,805,000 1,683,000 1,122,000
Construction Eng/Admin 1,143,066 366,000 777,066 466,240 310,826
Other
TOTAL EXPENSES 8,269,435 1,421,369 3,266,000 3,582,066 2,149,240 1,432,826
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 329,274 22,274 307,000 - 187,000 120,000 .
Proposed Fund Balance 2,190,522 196,695 754,360 1,239,467 1,239,467
Grants In-Hand(TIB) 3,095,640 684,000 2,411,640
Mitigation In-Hand 1,903,999 518,400 100,000 1,285,599 322,773 962,826
Vehicle Fuel Tax 250,000 250,000 250,000
Other In-Hand
Grants Proposed(TIB comp.) 500,000 500,000 400,000 100,000
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined •
TOTAL SOURCES 8,269,435 1,421,369 3,266,000 3,582,066 2,149,240 1,432,826
Duval
08r210007 1238 PM
5-3 FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
• TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Duvall Ave NE (Coal Creek Parkway) -King County Functional Classification: Minor Arterial Fund: 317
Proj.Length: 0.35 miles Proj: 12305
TIP No. 4 CONTACT: James Wilhoit 425.430.7319
DESCRIPTION: _ STATUS:
Widening roadway to five lanes, includes:curb,gutter,sidewalk,drainage improvements,street lighting, The City is managing the King County project with full reimbursement from the County per
channelization,signal modification and interconnection,and bikeway from Renton's north City limits to SE approved interlocal agreement,except for utility undergrounding,to be paid by City and
95th Way(Newcastle's south city limits). PSE. Due to project split-out,funding is tracked through project spreadsheet,not Eden.
JUSTIFICATION: CHANGES:
Growing residential areas as well as freight traffic use this route which is also becoming a major through Increases in construction cost estimate.
route between Renton and Bellevue. There are currently two general-purpose lanes with little or no
pedestrian facilities,and left-turn lanes at various locations. Because there are uncompleted gaps
between the five-lane sections from unincorporated King County to NE Sunset Blvd.,the arterial exhibits
congestion and travel-time delays for all modes of traffic.
'Funded: '5,953,853 'Unfunded : i
Project Totals Programmed Pre-2008 Six-Year Program
. ITEM Programmed Spent Pre-2007 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development
Precon Eng/Admin 763,533 717,155 46,378
R-O-W(includes Admin) 520 520
Construction Contract 4,115,000 1,500,000 2,615,000 2,615,000
Construction Eng/Admin 1,218,526 51 300,000 918,475 918,475
Other
TOTAL EXPENSES 6,097,579 717,726 1,846,378 3,533,475 3,533,475
SOURCEOFFUNDS:
Vehicle Fuel Tax
Business License Fee
Proposed Fund Balance
Grants In-Hand
Mitigation In-Hand
Bonds/L.I.D.'s Formed
Other In-Hand(King County) 5,953,853 574,000 1,846,378 3,533,475 3,533,475
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES 5,953,853 574,000 1,846,378 3,533,475 3,533,475
Dwa0-K g County 08212007 00!21120071238
5-4 FINAL
•
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Duvall Ave NE - NE 7th St to Sunset Blvd NE Functional Classification: Minor Arterial Fund: 317
Proj.Length: 0.67 mi Proj: 12702
TIP No. 5 CONTACT: James Wilhoit 425.430.7319
DESCRIPTION: STATUS:
Widening roadway to five lanes, including new pavement,curb,gutter,sidewalk,street lights,storm Construction to be completed in 2013,pending outside funding.
drainage,channelization and bike lanes from NE 7th St to the intersection with NE Sunset Blvd.
JUSTIFICATION: CHANGES:
Complete a missing link of 5-lane roadway,bicycle lanes and sidewalks on Duvall Ave NE,from NE 4th St New project to enhance safe vehicle,bicycle and pedestrian access along a minor arterial
to Sunset Blvd NE.Condition of the existing roadway pavement requires total replacement. street.
I Funded :1 65,0001 Unfunded :I 5,185,000
Project Totals Programmed Pre-2008 Six Year Program
ITEM Programmed Spent Pre-2007 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development 10,000 - 10,000 5,000 5,000
Precon Eng/Admin 510,000 510,000 510,000
R-O-W(includes Admin)
Construction Contract 4,300,000 4,300,000 2,500,000 1,800,000
Construction Eng/Admin 430,000 250,000 180,000
Other
TOTAL EXPENSES 5,250,000 5,250,000 5,000 515,000 2,750,000 1,980,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
Business License Fee 65,000 65,000 5,000 20,000 20,000 20,000
Proposed Fund Balance
Grants In-Hand
Mitigation In-Hand
Vehicle Fuel Tax
Other In-Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed(Utilities) 500,000 500,000 50,000 250,000 200,000
Undetermined 4,685,000 4,685,000 445,000 2,480,000 1,760,000
TOTAL SOURCES 5,250,000 5,250,000 5,000 515,000 2,750,000 1,980,000
Ouvall 7th to Sunset 08/2112007 08/21/200712:38
5-5 FINAL
=
I j = I ti.
-
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
SR 169 HOV - 140th Way SE to SR-900 Functional Classification: Principal Fund: 317 •
- Proj.Length: N/A Proj: 12175
TIP No. 6 CONTACT: Rob Lochmiller 425.430.7303
DESCRIPTION: STATUS:
Construct queue jumps and bypass lanes that provide transit priority traffic signal improvements on SR- WSDOT committed$300,000 to design. KC built a pond at 140th Way SE for our use
169(Maple Valley Hwy.)at 140th Way SE and in the areal-405. Involves roadway widening at ($275,000 value).Grant awards:$2,208,000 from TIB(R/W and construction),$392,947
intersection approaches and modifications to channelization and traffic signals.and widening to improve TEA-21 Countywide funds(construction),$765,993 TEA-21 Countywide for Ph.2
the northbound on-ramp and southbound off-ramp movement at the I-405/SR 169 interchange. Improve (construction),$2.5 M State legislature from gas tax revenue for 2007-2009 biennium(Ph.
access to Cedar River Park and Stoneway site through traffic modifications. 2).WSDOT is providing funding for additional work to be constructed as part of the project
JUSTIFICATION: ($153,298 towards ROW+cost of additional work).
CHANGES: .
This is a high volume,high congestion corridor where providing travel time benefits for transit and car/van The portion of work at the 1-405 location are now phased. Phase 1 constructed the signal
pools can be achieved with high cost effectiveness.There are severe congestion and safety problems that access road and parking lot. Phase 2 will construct the widening improvements on SR 169,
can be addressed by adding a right-turn lane westbound on SR-169 and a protected right-turn lane from Park maintenance building removal and the construction of additional WSDOT
the 1-405 northbound off ramp on to eastbound SR-169. * improvements.Contract award for Phase 2 is planned for 2007. Phase 3 is the intersection
Council allocated$1.2 million from the King County Metro mitigation fund which is included in"proposed at 140th Way SE and is awaiting funding.
fund balance").
ProjectTotals Programmed Pre-2008 •
• I Funded : 18,144,981 I Unfunded : 12,330,000
9 Six-Year Program
ITEM Programmed Spent Pre-2007 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES: _
Project Development
Precon Enq/Admin 1,175,327 1,075,327 50,000 50,000 '" 50,000
R-O-W(includes Admin) 767,389 17,389 750,000
Construction Contract 7,771,648 830,648 3,284,000 3,657,000 . 1,407,000 2,250,000
Construction Enq/Admin 760,617 38,117 335,000 387,500 137,500 250,000
Other
TOTAL EXPENSES 10,474,981 1,961,481 4,419,000 4,094,500 1,544,500 2,550,000
SOURCE OF FUNDS:
Vehicle Fuel Tax 70,000 70,000 70,000
Business License Fee 100,000 100,000 100,000
Proposed Fund Balance* 1,159,177 825,897 333,280. 333,280
Grants In-Hand(TIB/TEA-21) 3,366,944 266,724 2,833,200 267,020 267,020
Mitigation In-Hand 598,860 568,860 30,000
Vehicle Fuel Tax 50,000 50,000 50,000
Other(WSDOT&State Leg.) 2,800,000 300,000 1,555,800 944,200 944,200
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined 2,330,000 2,330,000 • 2,330,000
TOTAL SOURCES 10,474,981 1,961,481 4,419,000 4,094,500 1,544,500 2,550,000
SR169_HOV
08/112007 12:38 PM
5-6 FINAL
CITY OF RENTON
•
PLANNING/BUILDING/PUBLIC WORKS •
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Rainier Ave. Improvements -Grady Way to S 2nd Street Functional Classification: Principal&Minor Fund: 317
Proj.Length: 0.85 mi Proj: 12703
TIP No. 7 CONTACT: Derek Akesson 425.430.7243
DESCRIPTION: STATUS:
Improvements remove barriers,eliminate sub-standard conditions,control and consolidate The Sound Transit(ST)agreement authorizes$14.9 million ST funds for transit
access points to existing major businesses,provide an enhanced pedestrian environment. improvements.Two State Pedestrian and Bicycle Safety Grants have been
Project elements include adding BAT(business access and transit)lanes(north and awarded:$200,000 in 2006 and$230,000 in 2007(to be used for non-motorized
southbound), removing the BNSF railroad bridge support pier,lowering the roadway to provide improvements). TIB awarded$2,202,000 in Transportation Partnership Program
standard clearance under the bridge,adding left-turn lanes at intersections,widening sidewalks (TPP)grant funds in 2003.TIB awarded$1,906,200 in Urban Arterial Program(UAP)
with streetscaping,adding pedestrian-scale illumination,bollards(at crossings),transit facility grant funds in 2006.$950,000 of mitigation funds must be dedicated to fulfill
improvements(shelters,benches,info kiosks),planted buffer strips and landscaped medians. grant requirements to this project.
JUSTIFICATION: CHANGES:
Rainier Ave is a critical corridor in central Renton with existing operational problems and in need of This project has been expanded to extend improvements to Grady Way.The Hardie Ave
infrasructure enhancements to provide greater ease of non-motorized and transit-based travel. Existing project has been dropped due to excessive costs increases and environmental
high level of traffic congestion and accidents. Improvements will enhance traffic flow and reduce issues.Sound Transit(ST)funds are being transferred to the Rainier project.
Design and construction of the main trunk storm water(estimated as$800,000)
accidents. BAT lanes will be provided from S 2nd St to Grady Way southbound and from Grady Way to S will be funded by Utilities and are not included in the TIP. Roadway construction is
3rd St northbound. estimated to start in 2009.
I Funded :1 27,396,3911 Unfunded:1 2,600,000
.. Project Totals Programmed Pre-2008 Six Year Program
ITEM Programmed Spent Pre-2007 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development
Precon Eng/Admin 3,795,227 795,227 1,000,000 2,000,000 2,000,000
R-O-W(includes Admin) 7,000,984 984 200,000 6,800,000 6,800,000
Construction Contract 11,280,180 180 1.1,280,000 880,000 6,000,000 3,300,000 1,100,000
Construction Enq/Admin 1,520,000 1,520,000 120,000 800,000 400,000 200,000
Other 6,400,000 6,000,000 400,000 400,000
TOTAL EXPENSES 29,996,391 796,391 7,200,000 22,000,000 10,200,000 6,800,000 3,700,000 1,300,000
SOURCES OF FUNDS:
Vehicle Fuel Tax 708,000 113,000 595,000 . 235,000 150,000 210,000
Business License Fee 854,487 46,687 62,800 745,000 300,000 100,000 345,000
Proposed Fund Balance 2,767,237 181,437 2,544,200 41,600 41,600 .
Grants In-Hand -4,538,200 399,000 180,000 3,959,200373,400 1,792,900 1,000,000 792,900
Mitigation In-Hand 3,495,365 127,371 1,300,000 2,067,994 450,000 765,894 645,000 207,100
Vehicle Fuel Tax 500,000 500,000 500,000
Other In-Hand(Sound Tran.) 14,533,102 41,896 3,000,000 11,491,206 8,800,000 2,691,206
Grants Proposed(T.I.B.) 2,600,000 2,600,000 1,300,000 1,000,000 300,000
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES 29,996,391 796,391 7,200,000 22,000,000 10,200,000 6,800,000 3,700,000 - 1,300,000
Rainier ST 08212007 12 45 PM
_ 5-7 FINAL
I - i
i i l' " '`
• CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
SW 27th Street/Strander Boulevard Connection Functional Classification: Minor Arterial Fund: 317
Proj.Length: 1.27 miles Proj: 12239,12240
TIP No. 8 CONTACT: Rob Lochmiller 425.430.7303
DESCRIPTION: STATUS:
This project provides a critical four/five-lane arterial that will serve as a connector to West Valley Highway The 30%design includes the environmental documents, base-mapping, road sections,and
(SR-181)and East Valley Road,as well as an arterial connector to SR-167 from the south.The project will project phasing. $1,000,000 was received from the General Fund in 2003. Grants have
provide a grade-separated crossing at the Union Pacific Railroad(UPRR)and Burlington Northern Santa included:TEA-21 funds of$745,563(2003)and$2,398(2005);federal discretionary funds
Fe(BNSF)railroad tracks. Segments 1 and 2 include from West Valley Hwy to East Valley Road. Right- of$679,844 and STP-N funds of$94,420 for Ph. 1,Seg.2a 100%design(2006). Railroad
of-way includes:City of Renton-$2.5 million,City of Tukwila-$0.8 million. Donated ROW:Sound Transit- track realignment to be completed in 2009.
$55,000(not included).
JUSTIFICATION: CHANGES:
A new east-west arterial roadway will connect the cities of Renton and Tukwila,and provide significant Ph. 1,Seg. 1,construction is complete,and has been paid with approximately
congestion relief to existing arterials. The new road will provide direct access to the new Tukwila Station, $3 M in bonds. Both FMSIB and Sound Transit are contributing$4 M each to various
a multi-modal center being developed immediately north of the new alignment,and to the Boeing elements of the project.The City was awarded$684,380 of federal discretionary
funds site. The eventual direct HOV connections to southbound SR-167 will provide significant funds($679,844TMobility allocated rdedtfoe)and Sound$4.6 M of STP Regional funds.willObetu used$5.f r
WSDOT grant awarded for the Transit station,$2.5M for
advantages to HOV and transit usage. By crossing over the UPRR and BNSF railroads,the new arterial the SW 27th project elements directly related to the Sound Transit station.
will provide significant benefits to both freight mobility and general motorists. $500,000 Metro mit reserve to be approved by Council.
Funded :1 25,442,6491 Unfunded :1 29,285,999
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent Pre-2007 2007 Total 2008 2009 2010 2011 • 2012 2013
EXPENSES: -
Project Development 70,000 10,000 60,000 10,000 10,000 10,000 10,000 10,000 10,000
Precon Eng/Admin 5,747,559 1,788,759 800,000 3,158,800 110,000 1,086,600 1,616,900 345,300
R-O-W(includes Admin) 3,585,000 2,500,000 1,085,000 800,000 167,000 118,000
Construction Contract 38,095,400 1,200,000 36,895,400 6,770,000 7,400,000 4,000,000 18,725,400
Construction Enq/Admin 4,203,400 4,203,400 736,000 800,000 560,000 2,107,400
Other(Ph.1,Seg. 1) 3,027,289 2,977,289 50,000
TOTAL EXPENSES 54,728,648 7,266,048 2,060,000 45,402,600 8,426,000 8,210,000 1,096,600 1,626,900 5,082,300 20,960,800
SOURCES OF FUNDS:
Vehicle Fuel Tax
Business License Fee ,
Prop.Fund Bal.&Gen.Fund 2003 665,413 665,413
Grants In-Hand(State&Fed) 13,306,605 '743,635 1,496,369 11,066,601 5,725,051 5,341,550
Mitigation In-Hand 3,057,500 3,057,500
BondsNeh License 3,849,500 2,799,500 • 1,050,000 50,000 500,000 500,000
Other In-Hand Sound Transit 4,563,631 563,631 4,000,000 1,100,000 868,450 331,550 700,000 1,000,000
•
Grants Proposed(T.I.B.) 5,000,000 5,000,000 500,000 2,500,000 . 2,000,000
Mitigation Proposed
L.I.D.'s Proposed •
Other Proposed (Tukwila Agrem.ROW+$) 4,650,949 _ 4,650,949 1,600,949 2,000,000 50,000 500,000 500,000
Undetermined 19,635,050 19,635,050 765,050 1,026,900 882,300 16,960,800
TOTAL SOURCES 54,728,648 7,266,048 2,060,000 45,402,600 8,426,000 8,210,000 1,096,600 1,626,900 5,082,300 20,960,800
Sb nd,r coM,onoo
08212007 1238 PM
5-8 FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
NE 4th Street/Hoquiam Avenue NE Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 12209
TIP No. 9 CONTACT: Bob Hanson 425.430.7223
DESCRIPTION: STATUS:
Install new fully actuated traffic signal,including poles,signal and pedestrian displays,detection Design completed.Advertised call for bids. Bids opening on July 31.
loops,emergency pre-emption, a new signal controller,interconnect to master computer and
associated channelization.
JUSTIFICATION: CHANGES:
Increasing vehicular and pedestrian traffic in this area warrants a traffic signal based on safety and delays. Construction scheduled to start this summer and be substantially completed in winter 2007.
I Funded:1 400,0001 Unfunded :1
Project Totals Programmed Pre-2008 •
Six-Year Program
ITEM Programmed Spent Pre-2007 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development
Precon Eng/Admin 60,944 42,944 17,000 1,000 1,000 •
R-O-W(includes Admin) 20,000 20,000
Construction Contract 300,000 270,000 30,000 30,000
Construction Eng/Admin 19,05616,600 2,456 2,456
Other
TOTAL EXPENSES 400,000 42,944 323,600 33,456 33,456
SOURCE OF FUNDS: _
Vehicle Fuel Tax
Business License Fee 7,944 7,944
Proposed Fund Balance
Grants In-Hand
Mitigation In-Hand 392,056 35,000 323,600 33,456 33,456
Vehicle Fuel Tax
Other In-Hand
Grants Proposed
Mitigation Proposed ,
L.I.D.'s Proposed
Other Proposed .
Undetermined
TOTAL SOURCES 400,000 42,944 323,600 33,456 33,456 •
NE 4t115UHaquiem Av
08212007 12.38 PM
5-9 FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Ripley Lane North Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 12602
TIP No. 10 CONTACT: Ron Straka 425.430.7248
DESCRIPTION: STATUS:
The project will make improvements on Ripley Lane North to support new development. The project Design of the stormwater conveyance system to be completed in the winter of 2007 and
includes street landscaping and shoulder widening for pedestrian/bicycle improvements on a portion of construction will begin in the summer of 2008(pending permitting). Design of roadway
Ripley Lane North,along with stormwater system improvements next to the Seahawks Headquarters and improvements is underway and construction of improvements will begin in the fall of 2008.
Training Facility.
JUSTIFICATION: CHANGES:
Roadway improvements to support development of the Seahawks Headquarters and Training Facility. Stormwater improvements to eliminate flooding of Ripley Lane will be funded by Utilities
Stormwater improvements(Gypsy Creek sub-basin)are necessary to eliminate the flooding problems on and are not included in the TIP.
Ripley Lane.
I Funded :1 647,0001 Unfunded :1
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent Pre-2007 2007 Total 2008 . 2009 2010 2011 2012 2013
EXPENSES:
Project Development
Precon Eng/Admin 200,000 200,000
R-O-W(includes Admin)
Construction Contract 400,000 400,000 400,000
Construction Enq/Admin 47,000 47,000 47,000
Other .
TOTAL EXPENSES 647,000 200,000 447,000 447,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
Business License Fee -
Proposed Fund Balance
Grants In-Hand 147,000 147,000
Mitigation In-Hand 500,000 53,000 447,000 447,000
Vehicle Fuel Tax
Other In-Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined •
TOTAL SOURCES 647,000 200,000 447,000 447,000
Ripley In 08212007 1738 PM
5-10 FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Garden Ave N Widening Functional Classification: Minor Arterial Fund: 317
Proj.Length: 0.38 miles Proj: 12603
TIP No. 11 CONTACT: Rob Lochmiller 425.430.7303
DESCRIPTION: STATUS:
The project will determine necessary roadway, intersection and traffic routes improvements on Garden Preliminary study/design has started.
Ave N, Lake Washington Blvd and Houser Way,to mediate the growing traffic demands in the area. The
project will include widening a portion of Garden Avenue N to better accomodate truck traffic.
JUSTIFICATION: CHANGES:
With the additional development growth in the North Renton area,which includes The Landing, Lowe's Additional construction funds are needed.
development(on Fry's north property)and the Southport residential/office development,this project will
identify and construct improvements to improve traffic flows in the vicinity.
I Funded:1 1,300,000) Unfunded :1 200,000
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent Pre-2007 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development
Precon Eng/Admin 150,000 50,000 100,000 • •50,000 50,000
R-O-W(includes Admin)
Construction Contract 1,215,000 405,000 810,000 405,000 405,000
Construction Eng/Admin 135,000 45,000 90,000 45,000 45,000
Other
TOTAL EXPENSES 1,500,000 500,000 1,000,000 500,000 500,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
Business License Fee 150,000 150,000 100,000 50,000
Proposed Fund Balance 250,000 250,000 250,000
Grants In-Hand
Mitigation In-Hand 650,000 500,000 150,000 150,000
Vehicle Fuel Tax 250,000 250,000 250,000
Other In-Hand(GF)
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined 200,000 200,000 200,000
TOTAL SOURCES 1,500,000 500,000 1,000,000 500,000 500,000
Garden Ave N 08/21/1007 1238 PM
5-11 FINAL
I -� - T - .r ; - -r I i
CITY OF RENTON -
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
May Creek Bridge Replacement Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 12503
TIP No. 12 CONTACT: Derek Akesson 425.430.7243
DESCRIPTION: STATUS:
The bridge is located at N 31st Street.The project will remove the existing bridge structure and the timber The May Creek Bridge was inspected in 2005.The bridge is scheduled to be inspected
piers within the waterway(pier 2 is in the middle of the stream channel). Replace with a single span, again in 2007.With the uncertainty of BRAC funding availability and the current condition of
concrete structure supported on concrete abutments. Adjust the alignment of both approaches to conform the bridge(structurally deficient),the City proceeded with the design of a new bridge with
to the increase in bridge deck height. This replacement will require some right-of-way acquisition due to City funds. Design to be completed in 2007.
the adjustment of the alignment and the new bridge location.
JUSTIFICATION: CHANGES: •
The existing structure is four feet below the 100-year floodwater level standards set by WSDOT. The BRAC is not accepting grant applications until 2.008. BRAC funding is needed to cover the
bridge deck is supported by a timber pier that is vulnerable to the weakening effect of rot and damage construction costs of the new bridge.
from debris flows. Failure of this pier would cause immediate collapse. The timber abutments are
showing evidence of rot and deterioration. May Creek bridge is classified as functionally obsolete,but has
low ADT.
I Funded:1 225,8091 Unfunded :1 695,000
Project Totals Programmed Pre-2008 Six Year Program
ITEM Programmed Spent Pre-2007 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development
Precon Eng/Admin 225,809 12,809 173,000 40,000 20,000 20,000
R-O-W(includes Admin)
Construction Contract 586,000 586,000 440,000 146,000
Construction Eng/Admin 109,000 - 109,000 90,000 14,000 5,000
Other
TOTAL EXPENSES 920,809 12,809 173,000 735,000 20,000 550,000 160,000 5,000
SOURCES OF FUNDS: •
Vehicle Fuel Tax
Business License Fee 102,809 12,809 70,000 20,000 20,000
Proposed Fund Balance 123,000 - 103,000 20,000 20,000
Grants In-Hand •
Mitigation In-Hand
Vehicle Fuel Tax •
Other In-Hand
Grants Proposed-BRAC AC 649,000 649,000 484,000 160,000 5,000
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined • 46,000 46,000 - 46,000
TOTAL SOURCES 920,809 12,809 173,000 735,000 20,000 550,000 160,000 5,000
May Creak _ 08212007 12:38 PM
5-12 FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Monterrey Ave NE - NE 20th Street-Wall Replacement Functional Classification: Residential Fund: 317
Proj.Length: 0.03 miles Proj: 12704
TIP No. 13 CONTACT: Ryan Plut 425.430.7372
DESCRIPTION: STATUS:
Replacement of a 150 If existing gravity wall located behind sidewalk and within existing right-of-way in Construction scheduled for 2011.
Monterrey Ave NE(east side)and NE 20th Street(south side).The wall height varies from 2-4 feet and
does not meet the current standards for rockeries.
JUSTIFICATION: CHANGES:
Replacement of the wall is needed as rocks from the existing wall fall into adjacent sidewalk preventing a
safe movement of pedestrians.
I Funded :1 20,0001 Unfunded :1 10,000
Project Totals Programmed Pre-2008 Six Year Program
ITEM Programmed Spent Pre-2007 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development
Precon Eng/Admin
R-O-W(includes Admin)
Construction Contract 30,000 30,000 30,000
Construction Enq/Admin
Other
TOTAL EXPENSES 30,000 30,000 •
30,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
Business License Fee 20,000 20,000 20,000
Proposed Fund Balance
Grants In-Hand
Mitigation In-Hand
Vehicle Fuel Tax
Other In-Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed -
Other Proposed
Undetermined 10,000 10,000 10,000
TOTAL SOURCES 30,000 30,000 30,000
Montoney Ave 082112007 12:38 PM
5-13 FINAL
-
j
d i 1 - -_
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Bridge Inspection & Repair Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 106
• TIP No. 14 CONTACT: Derek Akesson 425.430.7243
DESCRIPTION: STATUS:
Inspect all roadway bridges owned by the City every two years to determine bridge sufficiency Biennial bridge inspections occur in 2007,2009 and 2011.The Monster Road Bridge
and load ratings,seismic retrofit needs,undertake minor repairs,and preventative maintenance repairs require an annual inspection frequency for the next three inspection cycles,resulting
as needed. in higher annual expenditures.
JUSTIFICATION: CHANGES:
Inspection program must be done for safety and funding purposes and as part of WSBIS Scour and load rating for each of the bridges will be evaluated in 2007 and 2008.
Program to determine structural deficiencies,physical deterioration,or functional obsolescence Repainting of the Houser Way bridge scheduled for 2009 requires additional funds.
and to qualify for Federal bridge replacement grant funding. Repair funding is provided to
accomplish improvements, identified through the inspection program,that will increase the
safety and extend the longevity of the structures.
(Funded : 1563,273 (Unfunded: 1210,000
Project Totals Programmed Pre-2008 Six-Year Program
ITEM - Programmed Spent in 2006 2007 Total 2008 2009 2010 • 2011 2012 2013
EXPENSES:
Project Development 4,924 4,924
Precon Enq/Admin 163,349 63,349 40,000 60,000 10,000 10,000 10,000 10,000 10,000 10,000
R-O-W(includes Admin)
Construction Contract 250,000 250,000 250,000
Construction Eng/Admin 25,000 • 25,000 25,000
Other 330,000 30,000 300,000 90,000 45,000 40,000 45,000 40,000 40,000
TOTAL EXPENSES 773,273 68,273 70,000 635,000 100,000 330,000 50,000 55,000 50,000 50,000
SOURCE OF FUNDS: .
Vehicle Fuel Tax .
Business License Fee 398,273 68,273 55,000 275,000 40,000 55,000 40,000 40,000 50,000 50,000
Proposed Fund Balance 15,000 15,000
Grants In-Hand
Mitigation In-Hand 135,000 135,000 60,000 75,000
Vehicle Fuel Tax 15,000 15,000 15,000
Other In-Hand
Grants Proposed(BRAC) 200,000 200,000 200,000
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined 10,000 ' - 10,000 10,000
TOTAL SOURCES 773,273 68,273 70,000 635,000 100,000 330,000 50,000 55,000 50,000 50,000
B idge-inpe t OLV21/2007 1230 PM
5-14 FINAL .
CITY OF RENTON
. PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Bridge Inspection & Repair Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 106
TIP No. 14 CONTACT: Derek Akesson 425.430.7243
DESCRIPTION: STATUS:
Inspect all roadway bridges owned by the City every two years to determine bridge sufficiency Biennial bridge inspections occur in 2007,2009 and 2011.The Monster Road Bridge
and load ratings,seismic retrofit needs, undertake minor repairs,and preventative maintenance repairs require an annual inspection frequency for the next three inspection cycles, resulting
as needed. in higher annual expenditures.
JUSTIFICATIONS CHANGES: -
Inspection program must be done for safety and funding purposes and as part of WSBIS . Scour and load rating for each of the bridges will be evaluated in 2007 and 2008.
Program to determine structural deficiencies, physical deterioration,or functional obsolescence Repainting of the Houser Way bridge scheduled for 2009 requires additional funds.
and to qualify for Federal bridge replacement grant funding. Repair funding is provided to
accomplish improvements, identified through the inspection program,that will increase the
safety and extend the longevity of the structures.
(Funded : 1563,273 IUnfunded: 1210,000
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent in 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development 4,924 4,924
Precon Enq/Admin 163,349 63,349 40,000 60,000 10,000 10,000 10,000 10,000 10,000 10,000
R-O-W(includes Admin)
Construction Contract 250,000 250,000 250,000
Construction Eng/Admin 25,000 25,000 25,000
Other 330,000 30,000 300,000 90,000 45,000 40,000 45,000 40,000 40,000
TOTAL EXPENSES 773,273 68,273 70,000 635,000 100,000 330,000 50,000 55,000 50,000 50,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 398,273 68,273 55,000 275,000 40,000 55,000 40,000 40,000 50,000 50,000
Proposed Fund Balance 15,000 15,000
Grants In-Hand
Mitigation In-Hand 135,000 135,000 60,000 75,000
Vehicle Fuel Tax 15,000 15,000 15,000
Other In-Hand
Grants Proposed(BRAC) 200,000 200,000 - 200,000
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined 10,000 10,000 10,000
TOTAL SOURCES 773,273 68,273 70,000 635,000 100,000 330,000 50,000 55,000 50,000 50,000
Bridge Inspect
• 0621/2007 1236 PM
5-14 FINAL
_, _ --- -- 1 .-- _ _ -. -
' _. - ti ' - ' - ' __ i -
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Intersection Safety &Mobility Program . Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 12601
TIP No. 15 CONTACT: Bob Cavanaugh 425.430.7222
DESCRIPTION: STATUS:
This program will design and construct traffic signals identified by the transportation system traffic signal The priorities and schedules for new traffic signals will be setby the transportation system
priority needs list, including intersection improvements. Intersections without signalized traffic control will traffic signal warrant priority list. The list is determined by citizen concerns,intersection
be evaluated. safety,mobility needs,and intersections that meet MUTCD traffic signal warrants.
JUSTIFICATION: CHANGES:
Historically,on the average,one traffic signal is designed and constructed every two years to meet safety Traffic signals high on the warrant priority list include: NE Sunset Blvd&Hoquiam Ave NE,
and mobility needs. This program budgets for projects needed to meet increasing demand,and the need SW 41st St&Oakesdale Ave SW,S Carr Road&Mill Ave S, SW 34th St&Lind Ave SW,
for signalized traffic control. Elements used to prioritize project intersections may include vehicular and S 55th St&Talbot Rd.
approach volumes,accident analysis,signal-warrant analysis,and pedestrian volume.
(Funded : 11,880,000 !Unfunded : 120,000
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent in 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development
Precon Eng/Admin 206,000 26,000 180,000 50,000 26,000 26,000 26,000 26,000 26,000
R-O-W(includes Admin)
Construction Contract 1,512,000 202,000 1,310,000 300,000 202,000 202,000 . 202,000 202,000 202,000
Construction Eng/Admin 182,000 22,000 160,000 50,000 22,000 22,000 22,000 22,000 22,000
Other
TOTAL EXPENSES 1,900,000 250,000 1,650,000 400,000 250,000 250,000 250,000 250,000 250,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 1,200,000 50,000 1,150,000 50,000 200,000 200,000 200,000 250,000 250,000
Proposed Fund Balance 400,000 200,000 200,000 200,000
Grants In-Hand
Mitigation In-Hand 230,000 230,000 150,000 50,000 30,000
Vehicle Fuel Tax 50,000 50,000 - 50,000
Other In-Hand
Grants Proposed -
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined 20,000 20,000 20,000
TOTAL SOURCES 1900,000 250,000 1,650,000 400,000 250,000 250,000 250,000 250,000 250,000
Inters Safety
0821/2007 1238 PM
5-15 FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Miscellaneous Traffic Safety Program Functional Classification: N/A Fund: 317
• Proj.Length: N/A Proj: 12115
TIP No. 16 CONTACT: Chris Barnes 425.430.7220
DESCRIPTION: STATUS:
This ongoing yearly program provides for special small-scale traffic safety improvements Uninterruptable power supply(UPS)at various intersections has been completed. Program
that are identified and require materials, labor or equipment beyond the normal scope of City goal is to install UPS at four critical intersections per year(all years),pending sufficient
operations and maintenance crews. funding. LED Replacement Program moved to Traffic Efficiency Program. •
JUSTIFICATION: CHANGES: -
Historically,this level of traffic safety improvements are required on an annual basis. This
program budgets for safety projects to address these needs. Projects are typically identified
•
through citizen concerns,analysis of accident records or observation by City Traffic Operations
and Maintenance personnel. Traffic Operations Section identify and prioritize locations.
'Funded : 1311,663 'Unfunded : 120,000
Project Totals Programmed Pre-2008 Six-Year Program •
ITEM Programmed Spent in 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development
Precon Eng/Admin 32,000 9,000 23,000 2,500 2,500 4,500 4,500 4,500 4,500
R-O-W(includes Admin) -
Construction Contract 250,000 88,000 162,000 16,000 16,000 32,500 32,500 32,500 32,500
Construction Eng/Admin 15,000 15,000 1,500 1,500 3,000 3,000 3,000 3,000
Other 34,663 10,663 24,000
TOTAL EXPENSES 331,663 10,663 121,000 200,000 20,000 20,000 40,000 40,000 40,000 40,000
SOURCE OF FUNDS:
Vehicle Fuel Tax 20,000 20,00020,000
Business License Fee 191,663 10,663 21,000 160,000 20,000 20,000 20,000 40,000 20,000 40,000
Proposed Fund Balance 100,000 . 100,000
Grants In-Hand
Mitigation In-Hand
Vehicle Fuel Tax
• Other In-Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined 20,000 20,000 20,000
TOTAL SOURCES 331,663 10,663 121,000 200,000 20,000 20,000 40,000 40,000 40,000 40,000
Safety •
0821/2007 1238 PM
5-16 FINAL
I f
' l I i s + '
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
School Zone Sign Upgrades Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 12504
TIP No. 17 CONTACT: Dave Whitmarsh 425.430.7423
DESCRIPTION: STATUS:
Three-year program(started in 2006)to upgrade school zone signs to electronic flashing operation. The sites/schools installation schedule for 2007(to be completed prior to the start of the
school year)are:McKnight Middle School,Tiffany Park Elementary,St.Anthony School,
Hillcrest Special Services Center and some signs at Renton Hight School.For 2008 the
installation schedule is completion of Renton High School, Hazen High School, Honeydew
Elementary.
JUSTIFICATION: CHANGES:
Response to citizen concerns. These signs provide a clear directive to the motoring public.
•
(Funded : 1300,103 'Unfunded : 1
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent Pre-2007 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development
Precon Eng/Admin .
R-O-W(includes Admin)
Construction Contract _ 100,103 100,103 •
Construction Eng/Admin
Other 200,000 100,000 100,000 100,000
TOTAL EXPENSES 300,103 100,103 100,000 100,000 100,000 •
SOURCE OF FUNDS: •
Vehicle Fuel Tax •
Business License Fee 247,603 47,603 100,000 100,000 100,000
Proposed Fund Balance
Grants In-Hand _ 52,500 52,500 •
Mitigation In-Hand
Vehicle Fuel Tax
Other In-Hand
Grants Proposed :
Mitigation Proposed
L.I.D.'s Proposed •
Other Proposed . -
Undetermined
TOTAL SOURCES 300,103 100,103 100,000 - 100,000 100,000
School Signs
08/21)2007 1238 PM
5-17 FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION -
2008-2013 SIX-YEAR TIP
Railroad Crossing Safety Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 12166
TIP No. 18 CONTACT: Chris Barnes 425.430.7220
DESCRIPTION: STATUS:
Install railroad crossing upgrade improvements at locations determined to warrant safety Concrete railroad crossing upgrades completed in 2002: Bronson/Houser mainline,SW
improvements. Depending on the needs of the location,work could include rubber crossing 7th Street, Lind Avenue SW spurs,and Mill Avenue. Moved the Railroad Crossing Safety
pads,lighted or unlighted signing,motion detectors,gates and connections to traffic signals to
Programgrant to Lake Washington Blvd-Park Ave N to Coulon Park project in 2003.
provide signal pre-emption. 9 9 p j
JUSTIFICATION: CHANGES:
Railroad roadway crossings can present a serious safety concern that needs to be addressed
when conditions warrant improvements.
'Funded: 125,499 'Unfunded: 1
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent in 2006 • 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development 499 499
Precon Eng/Admin 25,000 5,000 20,000 5,000 5,000 10,000
R-O-W(includes Admin)
Construction Contract
Construction Eng/Admin
Other
TOTAL EXPENSES 25,499 499 5,000 20,000 5,000 5,000 10,000
SOURCE OF FUNDS: • -
Vehicle Fuel Tax
Business License Fee 25,499 499 5,000 20,000 5,000 5,000 • 10,000
Proposed Fund Balance
Grants In-Hand
Mitigation In-Hand
Vehicle Fuel Tax '
Other In-Hand
Grants Proposed
Mitigation Proposed -
• L.I.D.'s Proposed .
Other Proposed
Undetermined
TOTAL SOURCES 25,4991 499 5,00020,000 5,000 5,000 10,000
RR%Ings
• 08212007 72:38 PM
5-18 FINAL
I
1
•
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
•
Traffic Signal Loop Replacement Program Functional Classification: N/A • Fund: 317
Proj.Length: N/A Proj: 16
TIP No. 19 CONTACT: Dave Whitmarsh 425.430.7423
DESCRIPTION: STATUS:
Replace failed or failing traffic signal vehicle detection loops and repair pavement as required to achieve Ongoing yearly program.
proper installation and assure reliability.
JUSTIFICATION: CHANGES:
Most of Renton's signals require extensive vehicle detection systems to provide traffic count data needed
for the intersection controllers and VMS signal coordination system to operate effectively. The detection
loops in the pavement must be properly maintained;their failure results in highly inefficient operation.
Pavement deterioriation due to heavy traffic volumes,trucks,and adverse weather have increased the
need for replacement.
'Funded : 1195,000 (Unfunded: 1-
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent In 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development
Precon Eng/Admin
R-O-W(includes Admin)
Construction Contract 171,000 24,000 • 147,000 17,000 22,000 27,000 27,000 27,000 27,000
Construction Eng/Admin 4,000 1,000 3,000 500 500 500 500 500 500
Other(City Force) 20,000 5,000 15,000 2,500 2,500 2,500 2,500 2,500 2,500
TOTAL EXPENSES 195,000 30,000 165,000 20,000 25,000 30,000 30,000 30,000 30,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 195,000 30;000 165,000 20,000 25,000 30,000 30,000 30,000 . 30,000
Proposed Fund Balance
Grants In-Hand
Mitigation In-Hand
Vehicle Fuel Tax
Other In-Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed _
Other Proposed
Undetermined -
TOTAL SOURCES 195,000 30,000 165,000 20,000 25,000 30,000 30,000 30,000 30,000
Loops
oerz,rmm 7238 PM
5-19 FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Traffic Sign Replacement Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 12113
TIP No. 20 CONTACT: Dave Whitmarsh 425.430.7423.
DESCRIPTION: STATUS:
This program provides for the replacement and/or relocation of signs that are obsolete,faded, Ongoing yearly program.Contract fee amount is for purchase of materials that will be
poorly located or no longer appropriate. assembled and installed by City.
JUSTIFICATION: CHANGES:
Poor signing can create safety problems and driver confusion. Purchase of these materials
falls beyond normal maintenance budget.
'Funded: 149,953 IUnfunded: I
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent in 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development
Precon Eng/Admin
R-O-W(includes Admin)
Construction Contract 35,453 3,753 4,700 27,000 3,500 3,500 5,000 5,000 5,000 5,000
Construction Eng/Admin
Other(City Forces) 14,500 1,500 13,000 1,500 1,500 2,500 2,500 2,500 2,500
TOTAL EXPENSES 49,953 3,753 6,200 40,000 5,000 5,000 7,500 7,500 7,500 7,500
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 49,953 3,753 6,200 40,000 5,000 5,000 7,500 7,500 7,500 7,500
Proposed Fund Balance
Grants In-Hand
Mitigation In-Hand
Vehicle Fuel Tax
Other In-Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES 49,953 3,753 6,200 40,000 5,000 5,000 7,500 7,500 7,500 7,500
Signs
08/2112007 1238 PM
5-20 FINAL
-
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Pole Replacement Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 91
RANK: 21 CONTACT: Dave Whitmarsh 425.430.7423
DESCRIPTION: STATUS:
This program is for the replacement of damaged luminaire and signal poles.These poles have Ongoing yearly program.Contract fee amount is for purchase and repair of poles.
been damaged in unknown incidents where reimbursement through normal channels is
impossible.
•
JUSTIFICATION: CHANGES:
Pedestrian and vehicular safety is highly related to adequate signal displays and street lighting. Purchase
of these poles falls beyond normal maintenance budget. Changing out a single pole costs$10,000 to
$14,000. Damaged and rusting poles that loose galvanization degrade to the point of threatening their
structural integrity.
(Funded : 1179,626 [Unfunded: I
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent In 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development
Precon Eng/Admin 6,000 6,000 1,500 1,5.00 1,500 1,500
R-O-W(includes Admin)
Construction Contract 163,626 10,626 29,000 124,000 20,000 20,000 21,000 21,000 21,000 21,000
Construction Eng/Admin
Other 10,000 10,000 2,500 2,500 2,500 2,500
TOTAL EXPENSES 179,626 10,626 29,000 140,000 20,000 , 20,000 25,000 25,000 25,000 25,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 179,626 10,626 29,000 140,000 20,000 20,000 25,000 25,000 25,000 25,000
Proposed Fund Balance
Grants In-Hand
Mitigation In-Hand
Vehicle Fuel Tax
Other In-Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES 179,626 10,626 29,000 140,000 20,000 20,000 25,000 25,000 25,000 25,000
Poles 081218007 12:38 PM
5-21 FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS '
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Traffic Systems Efficiency Improvements Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 12162
TIP No. 22 CONTACT: Chris Barnes 425.430.7220
DESCRIPTION: STATUS:
Provides for improvements to the operational efficiency of the existing roadway system,including such Upgrading of all signal controllers(to be compatible with the new central system)continues
items as development and implementation of signal coordination programs,signing and channelization into 2008. Program goal is to replace signal indicators at ten intersections per year.
improvements,surveillance control and driver information system(SC&DI),transit signal priority, .
intelligent traffic systems(ITS),signal improvements such as protective/permissive phasing,and matching
funds for possible grants to upgrade the central traffic control system.
JUSTIFICATION: CHANGES:
Improving the capacity and efficiency of the existing roadway system is a very cost effective element of the --
transportation program.
IFunded: 1376,113 'Unfunded : 120,000
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent in 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development
Precon Enq/Admin 37,896 10,896 3,000 24,000 3,000 3,000 3;000 5,000 5,000 5,000
R-O-W(includes Admin)
Construction Contract 85,000 10,000 75,000 10,000 10,000 10,000 15,000 15,000 15,000
Construction Eng/Admin 31,000 4,000 27,000 4,000 4,000 4,000 5,000 5,000 5,000
Other 242,217 . 85,217 43,000 114,000 33,000 33,000 33,000 5,000 5,000 5,000
TOTAL EXPENSES 396,113 96,113 60,000 240,000 50,000 50,000 50,000 30,000 30,000 30,000
SOURCE OF FUNDS:
" Vehicle Fuel Tax
Business License Fee 376,113 96,113 60,000 220,000 50,000 50,000 30,000 30,000 30,000 30,000
Proposed Fund Balance
Grants In-Hand
Mitigation In-Hand •
Vehicle Fuel Tax .
Other In-Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined 20,000 20,000 20,000
TOTAL SOURCES 396,113 96,113 60,000 240,000 50,000 50,000 50,000 30,000 30,000 30,000
Efficiency 08/2112007 12.38 PM
5-22 FINAL
1 ` _ _ _ .� _ _
•
CITY OF RENTON -
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Transit Program Functional Classification: N/A Fund: 317
• Proj.Length: N/A Proj: 12706
TIP No. 23 CONTACT: Nathan Jones 425.430.7217
DESCRIPTION: STATUS: .
Plan and fund short-range and long-range transit services and facilities,including park and ride lots,bus Staff continue to attend regional coordination meetings with KC-DOT,WA-DOT and transit
shelters,and arterial system improvements high occupancy vehicle(HOV)lanes required to facilitate agencies,will monitor service and capital facility improvements within Renton,and will
transit access. Joint projects with King County Metro and Sound Transit will also be pursued to improve pursue and advocate for better-timed arrivals and departures at our major transit facilities.
local and regional transit service in Renton. Coordination with transit agencies,community,and Currently RUSH(aka Metro route 110)provides peak-hour commute services connecting
businesses for implementation. the train station,downtown and north Renton.
JUSTIFICATION: CHANGES:
Transit improvements are a vital component of the transportation system's ability to absorb future traffic 'Increase annual funding and use a portion as local matching funds for Transit Now King
demand and meet level-of-service standards. The City and private developers have invested millions of County Metro program to provide enhanced service hours on local Renton routes. Renton
dollars in capital improvements in support of transit-oriented development and services. Transit will be Urban Shuttle(RUSH),Sound Transit HOV Direct Access and Arterial HOV Program have
one key in meeting the goals of the downtown area as well as development in other parts of the City. been combined into this project.
Coordination with Metro and Sound Transit projects and programs will help leverage these funds and -
increase benefits to Renton. •
-
'Funded: 1464,346 (Unfunded : 131,000
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent in 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development 225,346 23,346 30,000 172,000 30,000 30,000 29,000 29,000 29,000 25,000
Precon Eng/Admin
R-O-W(includes Admin)
Construction Contract
Construction Enq/Admin
Other(Contingency) 270,000 270,000 45,000 45,000 45,000 45,000 45,000 . 45,000
TOTAL EXPENSES - 495,346 23,346 30,000 • 442,000 75,000 75,000 74,000 74,000 74,000 70,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 432,346 23,346 30,000 379,000 43,000 48,000 70,000 " 74,000 74,000 70,000
Proposed Fund Balance 32,000 32,000 32,000
Grants In-Hand
Mitigation In-Hand
Vehicle Fuel Tax
Other In-Hand
Grants Proposed (FTA)
Mitigation Proposed •
L.I.D.'s Proposed
Other Proposed
Undetermined 31,000 31,000 27,000 4,000
TOTAL SOURCES 495,346 23,346 30,000 442,000 75,000 75,000 74,000 74,000 74,000 70,000
Transit
08!212007 1245 PM
5-23 FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Transportation Demand Management Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 12135
TIP No. 24 CONTACT: Nate Jones 425.430.7217
DESCRIPTION: STATUS:
Renton's TDM program implements the State's Commute Trip Reduction(CTR)Act by encouraging a It is expected that technical assistance to employers for the Citywide program will continue
reduction in the use of single occupancy vehicles(SOV). Incentives are offered to employees(at at current levels in future years provided State funds in support of this program continue.
businesses with 100 or more employees)arriving to work between 6 and 9 a.m. The City has two CTR Renton receives a State allotment every two years to help fund the Citywide CTR program.
programs: 1.The Citywide and 2.the City Hall CTR program (see note below). The TIP funds the The actual amount is determined by the number of CTR-affected worksites and the number
Citywide CTR Program and offers technical assistance to Renton businesses affected by the Act. of trips reduced.
JUSTIFICATION: CHANGES:
The City is required by 1991 State Legislation to develop and implement a CTR program. This law applies Worksite count has remained stable. An increase of$10,000 a year was added to use
to areas of the State with continuing air quality problems. TDM is an important element in achieving towards incentive funds for CTR-affected employees within Renton and also for support for
desired transportation,environmental,and land use goals. non-CTR affected employees in congested areas.
Note: Renton City Hall is an affected CTR site and must implement its own CTR program for City
employees;it is funded outside the TIP program.
'Funded: 1475,207 1Unfunded : 120,000
Project Totals Programmed Pre-2008 Six-Year Program •
ITEM Programmed Spent in 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES: -
Project Development 81,559 13,759 67,800 11,300 11,300 11,300 11,300 11,300 11,300
Precon Eng/Admin 36,449 36,449 _-
R-O-W(includes Admin)
Construction Contract '
Construction Enq/Admin
Other(Tech.Assist.Contract) ' 377,200 55,000 322,200 53,700 53,700 53,700 53,700 53,700 53,700
TOTAL EXPENSES 495,207_. 50,207 55,000 390,000 65,000 65,000 65,000 65,000 65,000 65,000
SOURCE OF FUNDS: _
Vehicle Fuel Tax
Business License Fee 134,720 • 1,720 38,000 95,000 15,000 12,000 12,000 12,000 22,000 22,000
Proposed Fund Balance 7,000 7,000 7,000
Grants In-Hand
Mitigation In-Hand
Vehicle Fuel Tax 10,000 10,000 10,000
Other In-Hand(CTR allot.) 323,487: 48,487 17,000 258,000 43,000 43,000 43,000 43,000 43,000 43,000
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed ., -
Other Proposed -
Undetermined 20,000 20,000 10,000 10,000
• TOTAL SOURCES 495,207 50,207 55,000 390,000 65,000 65,000 65,000 65,000 65,000 65,000
TDM
08/11/2007 12.45 PM
5-24 FINAL
LL
i I i I
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Bicycle Route Development Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 12173
TIP No. 25 CONTACT: Dan Hasty 425.430.7246
DESCRIPTION: STATUS:
Partner with other City departments to further develop the City's non-motorized facilities. Sign bicycle The City was awarded a Federal Enhancement Grant: $100,000 to develop and produce a
routes along preferred corridors. Construct missing links in the bicycle route system. Construct site- map that identifies a bicycle network with connections leading into and out of the City of
specific improvements. Upgrade routes as needed to safely accommodate bicycle traffic. Publicize Renton. Public outreach in various forms will be part of the effort to educate the public on
Renton bicycle network. Provides funding to match grant requests for bicycle planning and construction using bicycle routes in the safest manner. The map will identify preferred routes,shared
improvements. - use paths,bicycle lanes,steep grades,etc.
JUSTIFICATION: - CHANGES:
The City does not currently have a well-developed bicycle route system;this program will complete an
integrated system of bicycle routes and trails and upgrade streets to better accommodate bicycles. Many-
locations along existing and potential routes have site-specific safety problems,which would be addressed
in this program. Additionally,there is a strong demand for better-developed non-motorized facilities in
Renton.
'Funded : 1435,753 'Unfunded : 190,000
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent in 2006 2007 Total - 2008 2009 2010 2011 2012 2013
EXPENSES: .
Project Development 15,253 5,253 10,000
Precon Eng/Admin 57,000 10,000 47,000 2,000 2,000 10,000 11,000 11,000 11,000
R-OM(includes Admin) ,
Construction Contract 310,000 310,000 14,000 14,000 90,000 64,000 . 64,000 64,000
Construction Eng/Admin 29,000 29,000 2,000 2,000 10,000 5,000 5,000 5,000
Other(Streetscape Study) 114,500 , 114,500
TOTAL EXPENSES 525,753 5,253 134,500 386,000 18,000 18,000 110,000 80,000 80,000 80,000
SOURCE OF FUNDS:
Vehicle Fuel Tax _
Business License Fee . . 277,053 5,253 25,800 246,000 18,000 18,000 . 20,000 30,000 80,000 80,000
Proposed Fund Balance 8,700 •
8,700
Grants In-Hand 100,000 100,000
Mitigation In-Hand •
Vehicle Fuel Tax 50,000 50,000 50,000
Other In-Hand
Grants Proposed -
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed .
Undetermined 90,000 90,000 90,000
TOTAL SOURCES 525,753 5,253 134,500 386,000 18,000 18,000 110,000 80,000 80,000 80,000
Bike Route
08212087 12:45 PM
5-25 FINAL
CITY OF RENTON ,
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Walkway Program Functional Classification: N/A Fund: 317
Proj.Length: N/A .- Proj: 9
TIP No. 26 CONTACT: Dan Hasty 425.430.7246
DESCRIPTION: STATUS:
This program provides for the design and construction of f high priority non-motorized transportation The Comprehensive Citywide Walkway Study(2003)is being used to select some of the
facilities for pedestrians. Projects will be identified and prioritized in the updated Comprehensive Citywide projects that move into the design and construction phases.
Walkway Study and through coordination with the City's Neighborhood Program.
JUSTIFICATION: CHANGES:
Providing safe and convenient non-motorized facilities is an integral part of a complete transportation The Comprehensive Citywide Walkway Study will be revised in 2007. Completed projects
network. Specific improvements will respond to the needs of school children,the aged and persons with will be removed. "Recognized School Walk Routes"will be added to the criteria for project
disabilities,and will support increased use of transit. prioritization. The study will also score existing sidewalks that have gone beyond repair and
are in need of overhaul.
(Funded : 12,520,372 'Unfunded : 1160,000
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent in 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development 59,121 . 22,121 7,000 30,000 5,000 5,000 5,000 5,000 5,000 5,000
Precon Eng/Admin 235,256 256 35,000 200,000 25,000 25,000 25,000 25,000 50,000 50,000
R-O-W(includes Admin)
Construction Contract 2,239,789 522,789 305,000 1,412,000 203,000 203,000 203,000 203,000 300,000 300,000
Construction Enq/Admin 146,206 2,206 26,000 118,000 17,000 17,000 17,000 17,000 25,000 25,000
Other
TOTAL EXPENSES 2,680,372 547,372 373,000 1,760,000" 250,000 250,000 250,000 250,000 380,000 380,000
SOURCE OF FUNDS: -
Vehicle Fuel Tax
Business License Fee 1,530,000 100,000 100,000 1,330,000 100,000 200,000 180,000 250,000 300,000 300,000
Proposed Fund Balance 591,317 297,372 193,945 100,000 100,000
Grants In-Hand -
Mitigation In-Hand _ 399,055 150,000 79,055 170,000 50,000 50,000 70,000
Vehicle Fuel Tax
Other In-Hand(KC Metro Mit)
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined 160,000 160,000 80,000 80,000
TOTAL SOURCES 2,680,372 547,372 373,000 1,760,000 250,000 250,000 250,000 250,000 380,000 380,000
Walkway
O821/20O7 12:45 PM
5-26 FINAL
J i !
•
•
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Missing Links Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 12106
TIP No. 27 CONTACT: Ryan Plut 425.430.7372
DESCRIPTION: STATUS:
This funding provides for the completion of transportation links that do not qualify for other With the ongoing development in the City,this funds potential City/developer partnership
sources of funding. An example would be a section of roadway between two LID's or between opportunities. The City will continue to identify and complete the priority missing links.
two developer mitigation improvement projects.
JUSTIFICATION: CHANGES:
Making the necessary, and often small-scale,improvements needed to connect other projects The City acquired three parcels from King County for right-of-way in 2006. Programmed for
can achieve significant benefits. 2007 is installation of curb,gutter and sidewalks on NE 18th St,from Duvall Ave NE to
Elma Ave NE.
'Funded: 1239,190 (Unfunded : I
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent in 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development
Precon Enq/Admin 29,000 5,000 24,000 4,000 4,000 4,000 4,000 4,000 4,000
R-O-W(includes Admin) 1,190 1,190
Construction Contract 192,500 48,500 144,000 24,000 24,000 24,000 24,000 24,000 24,000
Construction Eng/Admin 16,500 4,500 12,000 2,000 2,000 2,000 2;000 2,000 2,000
Other
TOTAL EXPENSES 239,190 1,190 58,000 180,000 30,000 30,000 30,000 30,000 30,000 30,000
SOURCE OF FUNDS:
Vehicle Fuel Tax •
Business License Fee 211,190 1,190 30,000 180,000 30,000 30,000 30,000 . 30,000 30,000 30,000
Proposed Fund Balance
Grants In-Hand
Mitigation In-Hand 28,000 28,000 .
Vehicle Fuel Tax
Other In-Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined -
TOTAL SOURCES 239,190 1,190 58,000 180,000 30,000 30,000 30,000 30,000 30,000 30,000
M Unkc 08212007 12:45 PM
5-27 FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION -
2008-2013 SIX-YEAR TIP
Barrier Free Transition Plan Implementation Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 12705
TIP No. 28 CONTACT: Dan Hasty 425.430.7246
DESCRIPTION: STATUS: •
This program will fund implementation of projects that support the City's effort to transition pedestrian An annual project will be will be put together based upon the standing of individual sites as
facilities that lie within the right-of-way into conformity with provisions contained in the Americans with scored in the transition Plan section of the 2007 City of Renton Comprehensive Citywide
Disabilities Act(ADA)Guidelines.This program will also provide funding for designing and building Sidewalk Study.This"project"will have a target budget of $30,000,,the remaining
features on an"as needed"basis in response to individual requests to improve access for individuals with -$20,000 will be set aside to respond to requests to address barriers to movement from
specialized needs. individuals with special needs.
JUSTIFICATION: CHANGES:
A programatic approach is now recognized as being required to-ensure compliance with Federal Law. This is a new program for 2008
I Funded :1 240,5001 Unfunded :1 59,500
Project Totals Programmed Pre-2008 Six Year Program
ITEM Programmed Spent Pre-2007 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES: -
ProjectiDevelopment
Precon Eng/Admin
R-O-W(includes Admin)
Construction Contract 270,000 270,000 45,000 45,000 45,000 45,000 45,000 45,000
Construction Eng/Admin 30,000 5,000 5,000 - 5,000 5,000 5,000 5,000
Other
TOTAL EXPENSES 300,000 300,000 50,000 50,000 50,000 50,000 - 50,000 50,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
- Business License Fee 190,500 190,500 - 20,000 20,000 20,500 30,000 50,000 50,000
Proposed Fund Balance 30,000 - 30,000 30,000
Grants In-Hand -
Mitigation In-Hand
Vehicle Fuel Tax 20,000 20,000 20,000
Other In-Hand
Grants Proposed
Mitigation Proposed -
L.I.D.'s Proposed
Other Proposed
Undetermined 59,500 59,500 30,000 29,500
TOTAL SOURCES 300,000 - 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Ba"fer Free '
013212007 1245 PM
5-28 . FINAL
I 1 I 1
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX YEAR TIP
South Renton Burnett Park Neighborhood Street Improvements Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 12194
TIP No. 29 CONTACT: Ryan Plut 425.430.7372
DESCRIPTION: STATUS: -
Provide improvements and asphalt overlay in the South Renton Burnett Park Neighborhood to include Traffic improvements in the South Renton Burnett Park Neighborhood,sidewalk in Burnett
the S Burnett Av/S 4th intersection. Asphalt overlay Shattuck Av S from SW 7th St to Houser Wy S, Linear Park and 4th&Burnett are complete. King County Metro mitigation funds of
South 6th St from Burnett Av S to Shattuck Av S,SW 7th St from Shattuck Av S to Rainier Av S, $175,000 were assigned as follows:$40,000 for design of improvements for Burnett/S 4th
South 5th St from Burnett Av S to Smithers Av S. intersection;$60,000 reserved for Burnett/S 4th intersection construction with Council
• concur;$75,000 for South Renton street overlay projects.
JUSTIFICATION: CHANGES:
Need Council approval of$60,000 remaining Metro mitigation funds and transfer of
reserve funds from South Renton Reserves for completed work. New projects pending
reserve fund availability.
'Funded : 1408,250 'Unfunded:
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent Pre-2007 2007 Total . 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development 973 973
Precon Eng/Admin 53,112 51,112 2,000 2,000
R-O-W(includes Admin)
Construction Contract 224,138 224,138
Construction Eng/Admin 55,027 55,027 •
Other-Burnett Park&Overlay, 75,000 75,000
TOTAL EXPENSES 408,250 331,250 75,000 2,000 2,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 2,000 2,000 2,000
Prop. Fund Bal. 166,250 166,250
Grants In-Hand
Mitigation In-Hand 125,000 125,000
Vehicle Fuel Tax
Other In-Hand-Metro Mitig. 115,000 40,000 75,000 •
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES 408,250 331,250 75,000 2,000 2,000
S Renton Project
00212007 13.45 PM
5-29 FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Project Development& Pre-Design Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 12150
TIP No. 30 CONTACT: Jim Seitz 425.430.7232
DESCRIPTION: - STATUS:
Perform critical activities needed for the development of future CIP projects and for grant applications, Ongoing yearly program. In 2006,this program began including more small studies funding
including scoping, cost estimates,pre-design, interlocal agreements and deficiency analysis. Also and funds required to match new grants.
provides for the monitoring of active grant projects for compliance with State and Federal laws, regulations
and specifications.
•
JUSTIFICATION: - CHANGES:
Analysis of existing and projected transportation operation problems,infrastructure maintenance needs,
local and regional mobility goals and revenues/costs is vital to the development of transportation projects
that will best serve the needs of Renton and compete well for grants. Also to maintain eligibility for grant
funding,the City must assure that project specifications and management comply with current State and
Federal standards.
(Funded : 11,330,727 (Unfunded : 1100,000
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent in 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development 1,017,729 57,729 130,000 830,000 100,000 140,000 - 140,000 150,000 150,000 150,000
Precon Eng/Admin 413,000 95,000 318,000 48,000 60,000 60,000 50,000 50,000 50,000
R-O-W(includes Admin)
Construction Contract
Construction Enq/Admin
Other
TOTAL EXPENSES 1,430,729 57,729 225,000 1,148,000 148,000 200,000 200,000 200,000 200,000 200,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 1,154,727 57,727 175,000 922,000 130,000 142,000 100,000 150,000 200,000 200,000
Proposed Fund Balance 68,000 50,000 18,000 18,000
Grants In-Hand
Mitigation In-Hand 58,000 58,000 58,000
Vehicle Fuel Tax 50,000 50,000 50,000
Other In-Hand(WSDOT Agreem)
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined 100,000 100,000 100,000
TOTAL SOURCES 1,430,727 57,727 225,000 1,148,000 148,000 200,000 200,000 200,000 200,000 200,000
Pre_D
08121/2007 12:45 PM
5-30 FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Arterial Circulation Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 29
TIP No. 31 CONTACT: Keith Woolley 425.430.7318
DESCRIPTION: STATUS:
This program provides for the long-range and short range planning and traffic analysis required to This project will fund the ongoing planning work which will lead to refinement and/or
evaluate and update the Transportation Element in relation to the Comprehensive Land Use Plan,toadjustment of the of improvement projects on the arterial network identified in the
assess the impacts of new development proposals and to recommend local and regional transportation Transportation Plan.
system improvements for all modes of travel. Funding for hardware,software and employee hours _
required to operate the computer model is also included under this program.
•
JUSTIFICATION: - CHANGES: •
Combined State and Federal Clean Air legislation,the Growth Management Act, passage of the RTA plan Transportation circulation in the South Lake Washington neighborhood continues to adapt
and the increasing importance of making sure that local and regional transportation plans are coordinated to new variables, including the 1-405 Renton to Bellevue project. Upgrades_to traffic
to the benefit of Renton,make on-going, multi-modal planning a high priority need. analysis software is included.
(Funded: 11,487,806 (Unfunded : 1250,000
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent In 2006 2007 Total 2008 2009 . 2010 2011 2012 2013
EXPENSES:
Project Development 1,737,806 87,806 200,000 1,450,000 200,000 • 250,000 250,000 250,000 250,000 250,000
Precon Eng/Admin
R-O-W(includes Admin)
Construction Contract
Construction Eng/Admin
Other
TOTAL EXPENSES 1,737,806 87,806 200,000 1,450,000 200,000 250,000 250,000 250,000 250,000 250,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 1,487,806 87,806 200,000 1,200,000 200,000 200,000 200,000 200,000 200,000 200,000
Proposed Fund Balance
Grants In-Hand
Mitigation In-Hand .
Vehicle Fuel Tax
Other In-Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed • _
Other Proposed '
Undetermined 250,000 250,000 50,000 50,000 50,000 50,000 50,000
TOTAL SOURCES 1,737,806 87,806 200,000 1,450,000 200,000 250,000 250,000 250,000 250,000 250,000
Arlo,,L Cire
' O8R7l1007 72:45 PM
5-31 FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-.2013 SIX-YEAR TIP
•
Transportation Concurrency/ LOS Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 12107
TIP No. 32 CONTACT: Keith Woolley 425.430.7318
DESCRIPTION: STATUS:
The City has created a citywide Transportation Benefit Zone as part of the GMA Comprehensive Ongoing yearly program.
Plan's Transportation Concurrency requirements to provide a source of funds for transportation
improvements necessary to support new development. This project supports the necessary
planning effort to determine appropriate fees to charge as part of the mitigation process,to adjust '
the fee due to transportation plan changes and other factors affecting the fees as a funding source
and to monitor the funds collected.
JUSTIFICATION: CHANGES:
Management of the transportation concurrency and mitigation programs are an integral part of planning Transportation concurrency travel times are anticipated to be updated in 2007.
transportation improvements,ensuring that new development pays a fair share of the cost,and in .
maintaining a level of service required under GMA to allow new development to be approved and to take
place.
(Funded: 1180,000 (Unfunded : 120,000
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent in 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES: -
Project Development 200,000 60,000 140,000 40,000 10,000 10,000 40,000 10,000 30,000
Precon Eng/Admin •
R-O-W(includes Admin) .
Construction Contract - -
Construction Eng/Admin
• Other
TOTAL EXPENSES 200,000 60,000 140,000 40,000 10,000 10,000 . 40,000 10,000 30,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 140,000 50,000 90,000 40,000 10,000 101000 10,000 10,000 10,000
Proposed Fund Balance
Grants In-Hand
Mitigation In-Hand 10,000 10,000
Vehicle Fuel Tax 30,000 30,000 30,000
Other In-Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined 20,000 20,000 20,000
TOTAL SOURCES 200,000 60,000 140,000 40,000 10,000 10,000 40,000 10,000 30,000
Concurrency
08fI1r1007 12:45 PM
5-32 FINAL
- ' - 1 i
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Environmental Monitoring Program Functional Classification: N/A Fund: 317
•
Proj.Length: N/A Proj: 12187
TIP No. 33 CONTACT: Ryan Plut 425.430.7372
DESCRIPTION: STATUS:
Monitoring of wetland mitigation installed as a project environmental requirement and to perform biological The Year 3 report for the Oakesdale, Phase 1,site has been sent to the regulatory
assessments as required by the Endangered Species Act. agencies for review. The Year 1 report for the Phase 2 site is being prepared. Phase 1
and 2 site maintenance continues.
JUSTIFICATION: CHANGES:
Monitoring ensures that the wetland vegetation installed is properly established. Creates an account to Attempts to get early acceptance for the Phase 1 site have been successful. The Corps of
pay for unscheduled project environmental assessments. Engineers has allowed the City to reduce the monitoring requirements to match the sites
success.
'Funded: 1349,969 !Unfunded :
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent in 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development
Precon Eng/Admin 105,000 15,000 90,000 15,000 15,000 15,000 15,000 15,000 •15,000
R-O-W(includes Admin)
Construction Contract 40,000 • 10,000 30,000 5,000 5,000 . 5,000 5,000 5,000 5,000
Construction Enq/Admin 204,969 51,969 73,000 80,000 30,000 10,000 10,000 10,000 10,000 10,000
Other
TOTAL EXPENSES 349,969 51,969 98,000 200,000 50,000 30,000 30,000 30,000 30,000 30,000
SOURCE OF FUNDS: .
Vehicle Fuel Tax 5,000 5,000 5,000 -
Business License Fee 233,969 30,969 43,000 160,000 f 25,000 25,000 25,000 25,000 30,000 30,000
Proposed Fund Balance
Grants In-Hand ..
Mitigation In-Hand 111,000 21,000 55,000 35,000 25,000 5,000 5,000
Vehicle Fuel Tax
Other In-Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES 349,969 51,969 98,000 200,000 50,000 30,000 30,000 30,000 30,000 30,000
0921/2007 12:45 PM
5-33 FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
WSDOT Coordination Program . Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 12146
• TIP No. 34 CONTACT: Keith Woolley 425.430.7318
DESCRIPTION: STATUS:
Provide pre-design,design and construction coordination for WSDOT projects within or adjacent to • Ongoing yearly program. Staff coordination on grant-funded projects. Staff coordination on
Renton to assure that those projects provide the maximum benefits and minimum problems for Renton's the 1-405 Corridor Improvements is included in"1-405 Improvements in Renton."WSDOT
transportation system. agrement($43,300)will contribute with a portion of City's staff time.
JUSTIFICATION: CHANGES:
WSDOT projects can have signficant impacts within the City. The"1-405 Improvements in Renton"program has been combined with this.The 1-405 to
• SR-169 Widening Project is now broken into two stages.The RTID proposal for the fall
2007 vote now includes funding for the Renton to Bellevue project and a HOV flyover ramp
at the I-405/SR167 interchange.Therefore,coordination with the 1-405 project will continue
indepth for some time.
(Funded : 1283,010 IUnfunded : 166,700
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent in 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development 349,710 4,710 15,000 330,000 65,000 65,000 60,000 60,000 40,000 40,000
Precon Eng/Admin
R-O-W(includes Admin)
Construction Contract
Construction Eng/Admin
Other
TOTAL EXPENSES 349,710 4,710 15,000 330,000 65,000 65,000 60,000 60,000 40,000 40,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 219,710 4,710 15,000 200,000 25,000 25,000 25,000 45,000 40,000 40,000
Proposed Fund Balance
Grants In-Hand
Mitigation In-Hand 20,000 20,000 10,000 10,000
Vehicle Fuel Tax
Other In-Hand(WSDOT agreemen 43,300 43,300 40,000 3,300
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined 66,700 66,700 26,700 25,000 15,000
TOTAL SOURCES 349,710 4,710 15,000 330,000 65,000 65,000 60,000 60,000 40,000 40,000
VI/S007
081212007 1745 PM
5-34 FINAL
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX YEAR TIP
Geographic Information System - Needs Assessment& Data Development • Functional Classification: N/A Fund: 317 '
Proj.Length: N/A Proj: 12206
TIP No. 35 CONTACT: Nate Jones 425.430.7217
DESCRIPTION:- STATUS:
Develop a Needs Assessment and Data Development Plan for transportation geographic information City Transportation staff are coordinating with Technical Services and Information
systems(GIS)data and software development to meet the requirements of City's departmental needs. Services staff to develop GIS data.
This project will also fund data collection and database development,staff training and software .
purchases. -
JUSTIFICATION: CHANGES: •
The Transportation Systems Division is interested in expanding the development and use of GIS Intern staff may be required for this effort;the budget is adjusted to reflect this need.
technology,data,and applications to support the Division's business needs. Effective use of GIS
related resources is dependent of careful planning and execution.
GIS-related resources is dependent on careful planning and execution. !Funded: 1472,431 IUnfunded: 178,500
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent in 2006 2007 Total 2008 . 2009 2010. 2011 2012 2013
EXPENSES:
Project Development 550,931 5,931 35,000 510,000 20,000 20,000 20,000 150,000 150,000 150,000
Precon Eng/Admin _ -
R-O-W(includes Admin)
Construction Contract
Construction Eng/Admin
Other
TOTAL EXPENSES 550,931i 5,931 35,000 510,000 20,000 20,000 20,000 150,000 150,000 150,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 447,431_ _ 5,931 35,0001 406,500 20,000 20,000 20,000 46,500 150,000 150,000
Proposed Fund Balance
Grants In-Hand _
Mitigation In-Hand - •
Vehicle Fuel Tax 25,000 25,000 25,000
Other In-Hand .
Grants Proposed - _
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined 78,500 78,500 78,500
TOTAL SOURCES 550,931 5,931 35,0008 510,000 20,000 20,000 20,000 150,000 150,000 150,000
GIS
•
0821/2007 12.45 PM
5-35 FINAL
•
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
1% for the Arts Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 12112
TIP No. 36 CONTACT: Jim Seitz 425.430.7245'
DESCRIPTION: STATUS:
Beautify entrance locations to the City. Projects to include signing and landscaping. Funding is tied to the Program is now based on actual design and construction costs. 2001 was estimated and
calculated share of eligible types of transportation projects and transportation funding subject to the City's the remainder from the actual cost was used for 2002 and part of 2003. $3,278 was
1%for the Arts Program. All gateway project proposals under this program are subject to approval of the transferred in 2004 to cover the remaining 2003 expenditures. $15,669 was transferred in
Arts Commission. 2005 for 1%of 2004 expenditures.
JUSTIFICATION: • CHANGES:
Displays a sense of civic pride. • Discussion underway concerning consideration of artwork within particular projects in lieu of
cash transfer.Coordinate with Community Services Committee.
Funded : 1277;505 (Unfunded: I
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent in 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development 7,000 1,000 6,000 1,000 1,000 1,000 1,000 1,000 1,000
Precon Eng/Admin
R-O-W(includes Admin)
Construction Contract
Construction Eng/Admin
Other 270,505 17,505 59,000 194,000 29,000 29,000 49,000 29,000 29,000 29,000 •
TOTAL EXPENSES 277,505 17,505 60,000 200,000 30,000 30,000 50,000 30,000 30,000 30,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 277,505 17,505 60,000 200,000 30,000 30,000 50,000 30,000 30,000 30,000
Proposed Fund Balance
Grants In-Hand
Mitigation In-Hand
Vehicle Fuel Tax
Other In-Hand •
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined
TOTAL SOURCES 277,505 17,505 60,000 200,000 30,000 30,000 50,000 30,000 30,000 30,000
1%Arts
0821/2007 12.45 PM
5-36 FINAL
,
' I
•
•
•
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Houser Way S -Main Av S to Burnett Av S Functional Classification: Non-arterial Fund: 317
Proj.Length: 0.2 miles Proj:, 12213
TIP No. 37 CONTACT: Jim Seitz 425.430.7245
DESCRIPTION: STATUS:
Upgrade railroad tracks to concrete on Houser Way S between Main Avenue S and Burnett Avenue Discussions with Burlington Northern Santa Fe(BNSF)railroad to share funding on this
South. project were initiated in 2003. BNSF indicated by letter of 5/20/03 that it was not interested
in the City's proposal.
•
JUSTIFICATION: CHANGES: •
This segment of roadway has a pavement management OCI rating(Year 2003)as low as between 0 and A meeting with BNSF was held.on Aug 9,2007.It is very unlikely that BNSF will fund any
12 points(out of a possible 100 points). The quality of the roadway is very poor due to the flexing of the more than 10%of the cost. BNSF agreed the project could be done in three phases,
tracks. An overlay will only be effective if the tracks are placed in concrete. starting in 2010.The project does remain largely unfunded.
Funded :I I Unfunded:1 1,050,000
• Project Totals Programmed Pre-2008 Six-Year Program _
ITEM Programmed Spent Pre-2007 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development •
Precon Enq/Admin ..
R-O-W(includes Admin)
Construction Contract 1,050,000 1,050,000 350,000 . 350,000 350,000
Construction Eng/Admin
Other
TOTAL EXPENSES 1,050,000 1,050,000 350,000 350,000 350,000
SOURCE OF FUNDS:
Vehicle Fuel Tax • •
Business License Fee ••
Proposed Fund Balance -
Grants In-Hand
Mitigation In-Hand
Vehicle Fuel Tax
Other In-Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed(BNSF) 105,000 105,000 35,000 35,000 -35,000
Undetermined 945,000 945,000 315,000 315,000 315,000
TOTAL SOURCES 1,050,000 1,050,000 350,000 350,000 350,000
Mouser eke
08212007 1245 PM
5-37 FINAL -
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION .•
2008-2013 SIX-YEAR TIP
NE 3rd/NE 4th Corridor Improvements Functional Classification: Principal Fund: 317 _
Proj.Length: N/A Proj: 12176
TIP No. 38 CONTACT: Keith Woolley 425.430.7318
DESCRIPTION: STATUS:
This project involves a series of key improvements in this corridor to improve traffic operations such as The NE 3rd/4th Corridor Study was adopted in May 2005. The study refined the corridor
rechannelization and traffic signal modifications,possible construction of an eastbound hill-climbing lane transportation needs and costs,including pedestrian,transit users, bicyclists,as well as
from Monterey Ave NE to east of Edmonds Ave NE, possible transit priority signal treatments and possibly streetscape enhancement.
queue jumps. This project will seek to meet pedestrian,transit and bicycle needs.
JUSTIFICATION: CHANGES:
This corridor has a strong potential for transit usage and is experiencing rapid residential and retail growth. Efforts to obtain grants are ongoing.2009 through 2013 are unfunded.
[Funded: 1357,127 jUnfunded: 19,288,000
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent Pre-2007 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development 222,420 218,420 2,000 2,000 2,000
Precon Enq/Admin 822,707 2,707 820,000 400,000 420,000
R-O-W(includes Admin) 900,000 900,000 200,000 250,000 250,000 100,000 100,000
Construction Contract 7,000,000 • 7,000,000 • 100,000 3,100,000 1,000,000 1,400,000 1,400,000
Construction Eng/Admin 700,000 700,000 20,000 300,000 100,000 140,000 •140,000
Other
TOTAL EXPENSES 9,645,127 221,127 2,000 9,422,000 2,000 320,000 4,050,000 1,770,000 1,640,000 1,640,000
SOURCE OF FUNDS: -
Vehicle Fuel Tax 22,000 2,000 20,000 20,000
Business License Fee 99,162 27,162 72,000 46,500 25,500
Proposed Fund Balance 2,265 265 2,000 2,000
Grants In-Hand
Mitigation In-Hand 233,700 193,700 40,000 40,000
Vehicle Fuel Tax
Other In-Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed -
Undetermined 9,288,000 9,288,000 280,000 4,050,000 1,770,000 1,593,500 1,594,500
TOTAL SOURCES 9,645,127 221,127 2,000 9,422,000 2,000 320,000 4,050,000 1,770,000 1,640,000 1,640,000
NE3r1_NE4rh
08212007 12;45 PM
5-38 FINAL
•
•
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Lake Washington Blvd. - Park Ave N to Gene Coulon Memorial Park Functional Classification: Collector Fund: 317
Proj.Length: N/A Proj: 12121
TIP No. 39 CONTACT: James Wilhoit 425.430.7318
DESCRIPTION: STATUS:
This project includes road widening,traffic signals,railroad crossings,drainage,curb,gutter and Developer to design and construct,and get credit toward mitigation contribution. The
sidewalks. developer is completing the project in 3 phases. Project received$185,000 Railroad
Crossing Safety grant. Estimated contract costs and developer reimbursement is included.
Railroad crossing construction complete except for signal start-up requirements. Waiting
for developer to continue their construction.
JUSTIFICATION: CHANGES:
This project will serve the development and access needs to Coulon Park and to the Southport Remainder of project shown as unfunded until developer has definite schedule to build
Development. office building.
(Funded : 1403,838 (Unfunded : 1142,313
Project Totals _ Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent Pre-2007 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development 16,299 14,899 1,400 1,400
Precon Eng/Admin -
R-O-W(includes Admin)
Construction Contract 500,905 292,492 208,413 - 76,413 132,000
Construction Eng/Admin 11,225 4,800 6,425 2,100 4,325
Other 17,722 13,222 4,500 2,500 2,000
TOTAL EXPENSES 546,151 325,413 220,738 82,413 138,325
SOURCE OF FUNDS:
Vehicle Fuel Tax 14,490 14,490
Business License Fee 275 275
Proposed Fund Balance 5,720 5,720
Grants In-Hand 185,000 106,575 78,425 40,000 38,425
Mitigation In-Hand 198,353 198,353
Vehicle Fuel Tax
Other In-Hand
Grants Proposed
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed
Undetermined 142,313 142,313 42,413 99,900
TOTAL SOW= 546,151 325,413 220,738 82,413 138,325
LRWA
0821!2007 12:45 PM
5-39 FINAL
•
•
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Lind Avenue SW-SW 16th St to SW 43rd St Functional Classification: Minor Arterial Fund: 317
- Proj.Length: 1.69 miles Proj: 24
• TIP No. 40 CONTACT: Keith Woolley 425.430.7318
DESCRIPTION: STATUS:
Widen existing roadway to five lanes where required. Includes new roadway,curbs,sidewalks,drainage, The needs,priorities and schedules for improvements on Lind Avenue will be determined
signals;lighting,signing and channelization. through Arterial Circulation studies. Construction of a signal at the intersection of Lind Av
and SW 27th St occurred in 1998 as an initial phase.
JUSTIFICATION: . CHANGES:
Increasing traffic demands in the Valley including the proposed development at the Boeing Longacres Increases in traffic in the Renton Valley,due in part to development,will increase the need
site,will create the need for increasing the capacity of this major north/south arterial. for improvements. A potential project is a signal installation at the intersection at Lind Ave.
SW and SW 34th St(currently unsignalized). Additionally, improvements may result from
future WSDOT I-405 plans which include an interchange at Lind Ave SW.(currently
• unfunded).
'Funded: 115,000 (Unfunded: 12,540,000
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent Pre-2007 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development 10,000 •5,000 5,000 : 5,000
Precon Eng/Admin 83,000 83,000 5,000 78,000
R-O-W(includes Admin)
Construction Contract 2,280,000 2,280,000 1,700,000 580,000
Construction Eng/Admin 182,000 182,000 136,000 46,000
Other
TOTAL EXPENSES 2,555,000 5,000 2,550,000 5,000 5,000 1,914,000 626,000
SOURCE OF FUNDS: -
Vehicle Fuel Tax
Business License Fee
Proposed Fund Balance
Grants In-Hand
Mitigation In-Hand 15,000 5,000 10,000 5,000 5,000
Vehicle Fuel Tax
Other In-Hand
•
Grants Proposed 830,000 830,000 i 630,000 200,000
Mitigation Proposed
L.LD.'s Proposed
Other Proposed
Undetermined 1,710,000 1,710,000 1,284,000 426,000
TOTAL SOURCES 2,555,000 5,000 2,550,000 5,000 5,000 1,914,000 626,000
O8/21/2C07 120.5 PM
5-40 FINAL
•
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Logan Av N Concrete Panel Repair Functional Classification: Principal Arterial Fund: 317
Proj.Length: N/A Proj: 12303
• TIP No. 41 CONTACT: James Wilhoit 425.430.7319
DESCRIPTION: STATUS:
Location: From the Logan Avenue Bridge north to N 6th St. Repair concrete panels under the asphalt to •
stop the panels from moving.
JUSTIFICATION: CHANGES:
The panels are moving,causing the asphalt overlay to severely spall at the joints. Low priority.
•
• (Funded: 150,000 (Unfunded : 1410,000
Project Totals Programmed Pre-2008 Six-Year Program
ITEM Programmed Spent in 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development 25,000 25,000 • 25,000
Precon Eng/Admin 25,000 . . 25,000 25,000
R-O-W(includes Admin)
Construction Contract 400,000 400,000 400,000
Construction Eng/Admin 10,000 10,000 10,000
Other
TOTAL EXPENSES 460,000 460,000 460,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
Business License Fee 50,0.00 50,000 50,000
Proposed Fund Balance .
Grants In-Hand
Mitigation In-Hand
Vehicle Fuel Tax
Other In-Hand
•
Grants Proposed
Mitigation Proposed .
L.I.D.'s Proposed
Other Proposed .
Undetermined 410,000 410,000 410,000
TOTAL SOURCES 460,000 460,000 460,000
Logan Panel
08/21(2007 12.45 PM
5-41 FINAL
•
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2008-2013 SIX-YEAR TIP
Sam Chastain Lake Washington Trail Connection Functional Classification: N/A Fund: 316
Proj.Length: N/A Proj:
TIP No. 42 CONTACT: Jim Seitz 425.430.7245
DESCRIPTION: STATUS:
The Sam Chastain Waterfront Trail will follow the southerly shoreline of Lake Washington and will connect The Transportation Division has partnered with the Parks Department to submit grants for
Gene Coulon Memorial Beach Park to the Cedar River.Trail via the Southport development and State the Lake Washington("Sam Chastain")Trail Connection. To-date,a$500,000 Federal
Department of Natural Resources(DNR)land. Enhancement grant(to design the Lake Washington Trail connection)and a$900,000
Enhancement grant construction)have been awarded. The Parks Department is the lead
and the funds are noted in their capital fund(Fund 316).
JUSTIFICATION: CHANGES:
The City envisions this trail completion as a"Legacy Project",by completing a missing link and providing Separated from the Bicycle Route Development Route Development Program.
connections to 52+miles of trail, including a 40-mile loop trail system around Lake Washington for
pedestrians,bicyclists and multi-use.
•
(Funded: 13,400,000 !Unfunded : 11,600,000
Project Totals Programmed Pre-2008 Six-Year Program
Programmed Spent In 2006 2007 Total 2008 2009 2010 2011 2012 2013
EXPENSES:
Project Development 250,000 250,000 50,000 100,000 100,000
Precon Eng/Admin 40,000 40,000 20,000 20,000
R-O-W(includes Admin)
Construction Contract 4,280,000 4,280,000 480,000 3,800,000
Construction Eng/Admin 430,000 430,000 50,000 380,000
Other
TOTAL EXPENSES 5,000,000 5,000,000 50,000 650,000 4,300,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
Proposed Fund Balance
Grants In-Hand 1,400,000 1,400,000 500,000 900,000
Mitigation In-Hand
Vehicle Fuel Tax
Other In-Hand(Parks Dept) 2,000,000 2,000,000 50,000 150,000 1,800,000
Grants Proposed -
Mitigation Proposed
L.I.D.'s Proposed
Other Proposed(Parks Dept) 1,600,000 1,600,000 • 1,600,000 •
Undetermined
TOTAL SOURCES 5,000,000 • 5,000,000 50,000 650,000 4,300,000
Bike_Roote 0821(2007 720.5 PM
5-42 FINAL
SECTION SIX
APPENDIX
• Abbreviations & Acronyms 6-1
• TIP Adopting Resolution 6-2
•
ABBREVIATIONS AND ACRONYMS
The following list defines the abbreviated words or acronyms used in the City of Renton's Six-Year
Transportation Improvement Plan.
ACP Asphalt Concrete Pavement
ADA American Disability Act
AIP Arterial Improvement Program (administered by TIB)
BAT Business Access Transit
BNSF Burlington Northern Sante Fe
BRAC Bridge Replacement Advisory Committee
CBD Central Business District
CIP Capital Improvement Program
CMAQ Congestion Mitigation and Air Quality
CTED Community, Trade and Economic Development
CTR Commute Trip Reduction(State Act)
DOE Department of Ecology
EB Eastbound
ECL East City Limits
EDA. Economic Development Administration
EIS Environmental Impact Study
ER Emergency Relief
FAS Federal Aid Secondary Program
FAUS Federal Aid Urban System
FHWA Federal Highway Administration
FMSIB Freight Mobility Strategic Investment Board
FTA Federal Transit Administration
GIS Geographic Information System
GMA Growth Management Act
HCT High Capacity Transit
HES Federal Aid Hazard Elimination and Safety Program
HOV High Occupancy Vehicles
I/C Interchange
ISTEA Intermodal Surface Transportation Efficiency Act(Federal Highway Bill)
ITS Intelligent Transportation System
IVHS Intelligent Vehicle Highway Systems
LF Linear Feet
. LID Local Improvement District
LOS Level of-Service
METRO Municipality of Metropolitan Seattle
MOU Memorandum of Understanding
MUTCD Manual on Uniform Traffic Control Devices
NCL North City Limits
NB Northbound
PMS Pavement Management System
• 6 - 1
Precon Preconstruction Engineering/Administration(design phase of project)
PS&E Plans, Specifications, and Estimates
ROW Right-of-way
RTA Regional Transit Authority
RTID Regional Transportation Investment District
RUSH Renton Urban Shuttle
SB Southbound
SC&DI Surveillance Control and Driver Information
SCATBd South County Area Transportation Board
SCL South City Limits
SMA Structural Matrix Asphalt
SOV Single Occupant Vehicle
ST Sound Transit
ST 2 Sound Transit 2
STP Surface Transportation Program
TDM Transportation Demand Management Program
TEA-21 Transportation Efficiency Act
TIA Transportation Improvement Account(previous TIB program)
TIB Transportation Improvement Board
TIP Transportation Improvement Plan
TOD Transit Oriented Development
TPA Transportation Partnership Act
TPP Transportation Partnership Program (administered by TIB)
UATA Urban Arterial Trust Account(previous TIB program)
UPRR Union Pacific Railroad
UPS Uninterruptible Power Supple
VHS Vehicle Highway System
VMS Vehicle Master System
WB Westbound
WCL West City Limits
WSBIS Washington State Bridge Inventory System
WSDOT Washington State Department of Transportation
•
H:\Division.s\TRANSPOR.TAT\PLANNINGUuliana\TIP12008\ACRONYMS.DOC
CITY OF RENTON,WASHINGTON
RESOLUTION NO. 39 0 2
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON,
UPDATING THE CITY'S SIX-YEAR TRANSPORTATION
IMPROVEMENT PROGRAM 2008-2013.
WHEREAS, the City of Renton has heretofore adopted a "Six-Year Transportation
Improvement Program" pursuant to RCW.35.77.010, and the plan and program having been
amended and modified from time to time as authorized by law; and
WHEREAS, the City Council, after recommendation of the Planning/Building/Public °
Works Department, held a public hearing on August 20, 2007, after notice to the public as
provided by law for the purpose of considering adoption, modification, and amendments of the
plan and program; and
WHEREAS, at the public hearing held on August 20, 2007, due consideration was given
to the proposed changes and amendments for the purpose of updating the plan and program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON,DOES RESOLVE AS FOLLOWS:
SECTION I. The City's "Six-Year Transportation Improvement Program" and
the City's "Arterial Street Plan" are hereby further amended and modified, all as more particularly
shown on the attached Exhibits"A," "B" and"C"incorporated herein as if fully set forth.
--- SECTION H. The plan and program, as evidenced by said Exhibits, shall be and
constitute the City's "Six-Year Transportation Improvement Program" and the City's "Arterial
Street"Plan," and shall remain in full force and effect until further revised, amended, and.modified
as provided by law.
1
RESOLUTION NO. 3902
SECTION IIL The Administrator of the Department of Planning/Building/Public
Works and the City Clerk are hereby authorized and directed to file this Resolution,together with
the Exhibits, with the Director of Highways for, the State of Washington and as otherwise
provided by law. -
PASSED BY THE CITY COUNCIL this 20th day of August , 2007.
29'i'1hLl.G,!� LUG2t )
Bonnie I. Walton, City Clerk -
APPROVED BY THE MAYOR this 20thday of August , 2007.
-
Kathy Keo i'er,Mayor
oved as to form:
IOW
Lawrence J. Warren, City Attorney
RES.1289:07/24/07:ch
2 --
�Ii a.a... a w[c4[Aii
MSC yy / \' 4TMA � 4� �' 1.---,
\V ,
` I 1-u1)
41 ,
HL]aW 91
*:
a 4 !/_.Yr' a
-
I (/�.� i. ,_,,,,,,V... \,,,_:______. ..
JP; SE MAK 1,�511Jj _
Y4 �D W , .. . . , r L_ a. `
DN 1 0). . .. , ) -%.,„ s-t-''''t.',1
..,
.. .si.,)..-----------.-------.---1 , ;11
. .,.__________ ,..,_,. ® !
'��'il +I►���t 4%W ��i
•
o i5oo 3000 �i 7Iiir
Npi
+L F-- sea sl �� -lss�'e.i .=
a 4) - / --- W A Yp, `
e _ -- \it muff ,i.,a st(' ��/ 4 9sm b 4 r,N n All_' - E
iill
S� LAKE WASHINGTON ` r4 ` ~ , WIIonI �;. 111".1111111111111"111----•
-L, „ ,
',l'Gl� • r lair ]riR 3 42sMIWMgW.. -i. t.M1 a 1[.,F
illM aa+1Rr21I K��o ��• vy_ E� E - 1\` / O6y9 R 'f - � IIC 9u \\\\*1
*eft... I---1164ki ,,pt_ \„
1.1 � . IflENI-1 3 , l: , W 1W p• 410 NW]
.\)
Look . . 4
1410St Th.',.. lir" :N 11,.....41
----.11:"1/4 .::,,,\
k
mef imr © L J la' •
Ilial!� ®IR I ICI4
inn my aps
was arm '
9PMk4 rfea11eWN ©��©�3 �� � 1b® ��I awn" III J �� _
M� � ®3�_I ��L t/., 111^ ; G-,7 � ,, �on ff 1 411aW M
rj MI �� -�I ��`1 I� •u1�1 ® 91kIT
aWll11>5al,0Ire
l 0I� Mtn To
r � -�'
�� � 1�,' LL yl ©gym 9R4Nk ff•.,,..��Y
�il � iNR Emi 7. - i®
kHmst , � lic,
ate' hir'ITI''t*„.,,, , ,;- %, �.� ciLD
- -� �o��� ;� `�,�� J� � o, °� o ®� � �HEHd; iil - �T"ar� U�t• 4.WL W� �61.1.
A1mWHI
M
' a
lib%
K ad
1_4--
ry� �11©n �a° ofi Wo., _ 4�� 4-1
A
1,, ,,,6 .,_,.,L___,
. ) ,
,e t N. e
1\._______ „ .,„/4, I J` 1'9•a ��: 'VeCi!IHiII�a� \�� # - - C \J ut,
4a
EL
�r �o �� ��a111G11�1, m o03
---, . 0 -s.--4_-„/-, .., i
411M F. ff IAu
�--/ 1 ,3 ff 13M P
4 ual
SI
M
✓`
ua
-I .--23. .: ']
.i \ .emsO.t.*...L.1----1-1-1-017)-. °1
4/ -., I '
I li e\ ,
k .--, ,--- 111.-. ....K
m I 4Bn
1 1.� rilpNy�¢� ��1 `
d =�Wa
._�\\1 I.
I © 1 LJ �Izleav r 7 ,, A
J I e ©` 30 gyp,�l{ 7(� P. Airport
Arterials
IIIt\ < r® M'1/ 1 Lftrz Way from Ranh Ave yd 5 to L Non Ave.5
\\ ro 31a1 4 ..a J
's 41Ma WW `�OM 1. & can Woy S/Brwaon Way N Irom am Aw.S la Sunwl BIM.N
77 11 HI 3. Logan Aw.S/Logon Ave.N hem Aryart Way to Codon Aro N
/� I ; G O s. �11�■ 11!_tir
w- 5. BMan W Ave.SYfrommS Grady Way t Rainier Ave.S tBronson Wayo west City lls itsI �' �, • 6. Maps Va afi Hghray Irom Sunael BM Nto eoel Cfy limits
ri ., & 1 51 I i J. N}d St am ogon Aw.N to Sunset Blvd N- AB 'I `B> � _ INW4 g IA 8. N1dPIM4M 51frwnHouserWaYN[oLoganAro.N�� ! .-_ __ _89M9 , ill /`",.\J69u St `■® 9. NE ork d St.ho4.Stt.from
Sunset
tNl Palloeast City 1.10
�Y' `� '�I` ` �/// Sii,..: :„P Park Or./NE Park Or horn Pvk w.N toantlaAw.NE:� I ��+ 'CIEWlll ///����r�/// E Sunnt Blvtlhorn Edmwtla AwNE towty Imile�• F ff . obkr Ava N/Ra vier Aro Sham north e.S Iknas to S Gotly Woy
_ 1 2,WSt horn Man Aw.S to Roiniw Aw 6
I5. S]rtlSt.Iran Rana Aro Ste Main Aro.S/6 N fithst hom Logan Aro N to Park An.N
I N 11 II I - •1T. SW Sunset Bin.from w.City bn11s to Rainier Ave.5
I O ] l ) 18. Sunset B vd N horn Branson Way N to FAI.5
i W ,� 19. Mouser WaY S/Mwaer WaY N fiam MaN Aro.S to Bronson WOY N
� �■IYA20. S Gady Wu ham Rainier Aro S to Main An.S
���� �ae� 21. SW 43rtl SI/S frond St kern wto Pu et Dr to east Cty mite
k1i. 31. Tabat Rood S horn S TiF SI to s Pu9el Dr.
I77b4 ] W 3J. Boson Dr S from S Pu9el P to south CItY Imits
© t ' 24. Oakeadae Aro BW hen SW 4Jrtl SL(south Lity mH)toMonster Rd SW,and Monster Rd SW ham Oakes..AYE SW
..i
il st $_ 10.salC tyLim toy� 21 O 7AAswmueITfrom NE 4th to north City Iimlla.
I rF(=_lam` �`1 \\ _I '91 ���� -_ aJ O { aa ( 1 . M M01U/W11
Ok�-! ® , Ili He N " 06 BIN. S:, t B'.va.4
49 g 22 Ben i S m dy W y t th Cly s
j. $ II)
� - \\ ° 39 Ro28. d A SWE SW 1' Slders..rint R h SAwS to Peat CtY mile
1111111
I x M , I ( J Edm 9d ASEt Or.SE Oom trent t OrT4!o aouM CtyEtl�it da Aw.SE
l .... 09.._ O 21 " s..,sl/ / _ " §' '41eNk sl ° \, 32. s 4th Pl/s the n Ranier Are S to Main Ave S
`\ r)'N,n„ I ��I 4 IL R l :y3. 5 St/SW Sl. Sums.Ave.5 t Ookmdola Are.SW
} I II 1W L�$LJ�� M 34. MAI Ave.S Noy S Bruno"Way S
\\ �r I W 18201 1 1�J�J IN , 36. S 2n Ave. MAI S t M Ave.S
�wrdr l\\` 1 iS1 I�uLL��JJ 36. Wit bres e 5/ A N h 8 m dy Way to N 4M St
-}r I I A �� !9. ',dh Ave N homl.N 4."4°tu N PnM1roOrlw to 5 Grady Way
j St 1MW 4 . 40. N 8th St.fr.tngan an N to Houser Way N
as�i 0 ( \ 4 1b.,. 41. Sunset Blvd NE from M w E Pork Or.
WO 51irI
11,
_� 4 1MW 61 43 Edmonds
Ave.NE from,2 4 h S Blvrthd.
O N n Its
'n f�(/ 13. Edmenda Ave.NE O NE Sunset B M.to NE 17V St.
11 - IaeW 4, 44. NE 30N St/7(emnea+ F NE/NE 27th St from FM 405 to Edmonds Me.NE
IBM 4 frA N 30L.St P A N on AI W
S IMk4 r. 1 5
// gy •� % 1G Lok :: BIM NE fr F 405 a t C'1 Opits
(S 19ou 9 e I g< W V ii
33 L - , i J 8NO 4 _A W et9M9 tl I •NUWgMN
-7l I 51.. SW 16th St..from Lind Ave.keettale Ave.
t W to Languor's
Ave.SW
1 52. Aberdeen Ave.
orn Sunset Blvd.NE to NE
63. NE 16th St.from
nes
NE to
Ave.NE
s rvpW 9 e ( 19M SI JLA.��� �, t'...\ 51 NE 11N Sl hwnE 51. SW 18th St.horn PornSu dAntABIMMIo MUononraeonaap^rol 51.
4 1Nu 5, '.'�. 55. 4+onroe Aro.NE hen NE 2nd St.le NE Nh St.
50 E 2nd S E I CI ll SM1
4
.. An.NE
B. Edmonds tAw NE.from N1 from NE Sunsetnset Blvd.tB M.to NE Ytl St
< � 80 Bronson WaY NE/NE 4th St.from NE 3rd S!to JaNeraon An NE
s II
I P el TeE w Aw fNW/Toyw w NWhen RentonAn Es=la rnl CItY INnila
\WImkMR3tillt - F°2
�........1 ihi 83 N 344 St ham Bumolt NE N to Park Avs.N s CITY bn 1s
83. N KM S/LrnNn A NE ham FAI 105 to eo
ff 0uM mu RCM 61 SW Langston Rood from SW Sunset BIM to west City limits
85. S 3rd P horn Rainier Ave.S to Shattuck Ave.S
MI-a ,, Ij.
66 Shalt.Ave.S from 5 2nd St.to S Grady
105w ic� f r r \\ -\�41gW S 4 4'r104a R T66.0. Monmsler,RoodS66. Morrie Ave.S Sfrorn W horn Oakeedot.ASlt St
SW St.
18th St.
71. SW lath St.from East Valley R.d to LMd An.SW
72. East Valley Road from SW lath St.to SW 43rd St.
CITY O F RENTON 73. Talbot Rood S,9 from
W from SPvd.t to soath Ave.CtlIk Ra
)4. SW 11at St.from Ist Volley ROatl to to sou An.SW
75. SW 3.St.from Eeet Valley Rood to Doke..Ave.SW
J4. Hardie Ave.Sr Own t Sunset BIN.t Rodin ro.S
JJ. Loke Wash BIM.N Mom N Park Or.to FAI 405
78. Pork Ave.N/N.11 St.from N 30.St.to Lake Wash.BIM.N
79. Burnett Am N from N 30th St.to Lake Was.BIM.N
80. Ouvo11 Avenue NE from NE 4th to south City limits
81. Hogulam Ave NE from NE 4th St to NE Sunset BIM
82. JeriC0 Ave NE from NE 4th St to south City limits
ARTERIAL STREETS 83. Unbn Ave NE from NE 4th St to south Cily Omits
84. NE 31at St from rest City limits to east City limits
80 N 10.St from Logan An N to Gorden Ave N
8[26.6.02/Mciu9LArlak1
86. Sly 2209 St./Stmnder 817d.from East Volley Rd near SR167 to
West Vciley Rd(S12181)
o'S*, Technical Services
• + Planning/Building/Public Works
'` D.Visneski
LA 0' July 17,2007