Loading...
HomeMy WebLinkAboutCommittee of the Whole - 28 Oct 2019 - Agenda - Pdf CITY OF RENTON AGENDA Committee of the Whole Meeting 6:00 PM - Monday, October 28, 2019 Council Chambers, 7th Floor, City Hall – 1055 S. Grady Way 1. WSDOT/Sound Transit Update a) Presentation 2. Emerging Issues LISA HODGSON, P.E., DBIA, DEPUTY PROGRAM ADMINISTRATOROctober 28, 2019I-405/SR 167 CORRIDOR PROGRAMRenton City CouncilAGENDA ITEM #1. a) I-405 and SR 167: A 40+ mile corridor 2AGENDA ITEM #1. a) Projects Funded in 2019 Legislative Session3Projects in green will be funded through toll revenue per 2019 Legislative sessionAGENDA ITEM #1. a) I-405 Renton to Bellevue Widening and Express Toll Lanes Project (Renton to Bellevue)4Bid awarded on Oct. 1 Flatiron West Inc.-The Lane Construction Corporation Joint Venture was Apparent Best Value• Bid price: $704.9 million• Maintains commitments to meeting partner schedulesAGENDA ITEM #1. a) Renton to Bellevue: Eastrail regional trail –King County partnershipAs part of the I-405 Renton to Bellevue Widening and Express Toll Lanes project, WSDOT is working closely with King County to build portions of the Eastrail regional trail. The project includes the following elements:• Builds a 2.5 mile segment of paved trail south of I-90 • Extends the paved trail between Coal Creek Parkway in south Bellevue and Ripley Lane in Renton • Replaces sections of existing Lake Washington Loop trail• Builds a new crossing over southbound I-4055Trail cross section visualizationI-405 crossing visualizationAGENDA ITEM #1. a) 6Renton to Bellevue: Existing NE 44th StreetInterchangeAGENDA ITEM #1. a) 7Renton to Bellevue: NE 44th Streetdirect access ramp and transit station AGENDA ITEM #1. a) Renton to Bellevue: 112th Avenue SE interchange8AGENDA ITEM #1. a) Next steps• Practical design workshop• Notice to Proceed• Project team collocation in Renton• Preconstruction activities• Spring groundbreaking• Construction beginning early 20209AGENDA ITEM #1. a) CONTACTWSDOT I-405/SR 167 Program Office600 - 108th Avenue NE, Suite 405 Bellevue, WA 98004Lisa Hodgson, P.E., DBIAHodgsoL@wsdot.wa.gov10AGENDA ITEM #1. a) Stride: I -405 BRT Renton City Council October 28, 2019 AGENDA ITEM #1. a) 2 I -405 BRT •11 BRT stations across 8 cities •3 new/expanded parking facilities •1 transit center •Estimated 15,000-18,000 riders daily by 2040 37-mile corridor: Lynnwood to Burien AGENDA ITEM #1. a) 3 I -405 BRT travel times AGENDA ITEM #1. a) 4 South Renton Transit Center Preferred layout schemeProject station area AGENDA ITEM #1. a) 5 South Renton Transit Center AGENDA ITEM #1. a) 6 Future Compatibility –HCT Study S. Renton TC Preferred layout •High Capacity Transit Study to connect Renton to LRT approved in ST3 •Assumes West-East Connection: Light Rail Extending from West Seattle to Burien, connecting to Renton via Tukwila •S. Renton TC likely future station area AGENDA ITEM #1. a) 7 NE 44 th St AGENDA ITEM #1. a) Thank you. soundtransit.org AGENDA ITEM #1. a) 8Project schedule2018-2020Project refinement (2018)• Q1 2019 – Board advances refined projectConceptual Engineering & Environmental Review (2019)Preliminary engineering (2020)PUBLIC INVOLVEMENT2020-2023Final design of roadway improvementsFinal station designs and public artObtain land use and construction permitsPUBLIC INVOLVEMENTBegins 2023GroundbreakingConstruction updates and mitigationConstruction of roadway improvements, parking and stations.PUBLIC INVOLVEMENT*Construction for most of the BRT projects are expected to begin by 2023 and be completed by 2024. Construction of some elements may begin before 2023 and others may occur after service starts in 2024. AGENDA ITEM #1. a) 9AGENDA ITEM #1. a) 10BRT Routing: Talbot vs. Rainier• Option is for SB route intothe SRTC• AM peak shows high delays along Talbot & along Grady• Access via Rainier is recommended for all times of dayAGENDA ITEM #1. a) 11AGENDA ITEM #1. a) 12BRT Routing: Into and Out of SRTCAGENDA ITEM #1. a)