Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout2012 Correspondence • CITY OF RENTON & --kO
NOTICE OF
STATE OF WASHINGTON COUNTY OF KING } PUBLIC HEARING
RENTON CITY COUNCIL
AFFIDAVIT OF PUBLICATION NOTICE IS HEREBY GIVEN
that the Renton City Council has
fixed the 13th day of August,
2012,at 7:00 p.m.as the date and
PUBLIC NOTICE time for a public hearing to be
Linda M Mills, beingfirst dulysworn on oath that she is the Legal held in the seventh floor Council
Chambers of Renton City Hall,
. Advertising Representative of the 1055 S. Grady Way, Renton,
WA 98057, to consider the
following:
Annual updates to the Six-Year
Renton Reporter Transportation Improvement
Reporter Program(TIP 2013-2018)
Information regarding the Six-
Year Transportation Plan is
available via the City web site at
a weekly newspaper, which newspaper is a legal newspaper of www.rentonwa.gov, or by calling
-leral circulation and is now and has been for more than six months 425-430-7232. The 2013-2018
dor to the date of publication hereinafter referred to, published in Clerkraft can be viewednat the City
office in Renton City Hall
the English language continuously as a weekly newspaper in King and on the City web page at
httpv/government/Count , Washington. The Renton Reporter has been approved as default.aspx?1d=1012.
a Legal Newspaper by order of the Superior Court of the State of All interested parties are invited
Washington for King County. to attend the hearing and present
written or oral comments regard-
The notice in the exact form annexed was published in regular issues ing the proposal. Letters may
of the Renton Reporter (and not in supplement form) which was also be submitted to City Council
regularly distributed to its subscribers duringthe below stated period. doe City Clerk by 5 pm on the
re
g y P hearing date for inclusion in the
The annexed notice, a: hearing record.
Public Notice Renton City Hall is in compli-
ance with the American
Disabilities Act, and interpretive
-- _services for the hearing impaired
will be provided upon prior no-
was published on July 20, 2012 and August 10, 2012. tice. For information, call 425-
430-6510.
Bonnie I.Walton
The full amount of the fee charged for said foregoing publication is City Clerk
sum o '.175.00. Published in the Renton Reporter
on July 20,2012 and August 10,
ov�,,,,,Nw iiiiiiiii 2012.#652670.
-7� �, C iiip�d
da M. Mills . ;,,,,,Am,,,,,� S 44.,
Legal Advertising Representative, Renton Reporter
---7,0"-.`' �o�o°'t�r''/,c`�'''''f,
Subscribed and sworn to me this 10th day of August, 2012. P .4 ,
-I% -o � ' '=2'
agf,..„.,_,_,,_ °✓✓✓�<R'f✓sliii d, -16
4,,,,,..,,_
en C. Sherman, Notary Public for the State of Washington, h,ii. ,,l, 3N.y.„„ ,z-
vi -...z-
Residing
, -
Residing in Buckley,Washington iiiitit11►\1t\!„‘Nss,``
•
CITY OE RENTON
NOTICE OF
.STATE OF WASHINGTON, COUNTY OF KING '} PUBLIC HEARING
AFFIDAVIT OF PUBLICATION NOTICERENTON •IS HEREBY GIVEN .
that the Renton City Council has
fixed the 13th' day of'August,
• 2012,at 7;00'p.m as the•date and
PUBLIC NOTICE time:for a public hearing to be
Linda M Mills,being first duly sworn on oath that she is the Legal held in the seventh floor Council
Chambers•of Renton City .Hall,
Advertising Representative of the• 1055: S. Grady Way, Renton,
WA. 98057, to consider the
following:
Annual updates to the Six-Year
Renton Reporter Transportation'Improvement
Program(TIP 2013-2018)
Information regarding the Six-
Year Transportation :Plan is
available via the City-web site lit
a weekly newspaper, which'newspaper is 'a legal newspaper of 'www.rentonwa,acv, or by'calling
I.
Ieneral circulation and is,now and has been for more than six months 425-430-7232. The 2013-2018
dClerk
Rent
prior'to the.date of publication hereinafter referred to, published.in Coan be viewedat the City
Clerk office in Renton City Hall •
the English language continuously as a weekly newspaper in King and on the City web page at
County, Washington. The.Renton Reporter has been approved as ht r , . a•:.• / ova nmcnU
default aspx 7i d=1012.
a Legal Newspaper by order of the Superior Court of the State of All interested parties are invited
'Washington for King County. to attend.the hearing.and present
written or oral comments regard-
The-notice in the exact form annexed was published in regular issues ing the proposal.. Letters may
-of the .Renton Reporter (and not in supplement form) which was also-be submitted to City Council.
regularly distributed to its subscribers during the below stated period. e/o_City Clerk by 5 pm on the
hearing date for inclusion in the
The.annexed notice, a: hearing record,
•
Public Notice Renton City Hall is in compli-
ance 'With the American •
Disabilities'Act,-and 'interpretive
— -- --- — - ----- - - - - — services for the hearing Unpaired
will be provided'upon prior no-
was published on July 20,2012 and August 10, 2012, tice. For information,.call 425-
430-6510. •
The full amount of the fee charged for said'foregoing publication is Connie r Walton
g g g City Clerk
the sum o 175:00. Published in the Kenton Reporter
R�•••\titi\,g'tt(
� •
�01- ��tt iti, 2012.on 1y#652670.122 and August 10,
da M. Mills - n =cad �aao` t,ft,V15!',A11.4
F.:
Legal Advertising Representative,Renton ReporterX. -� lam ' g,.':-.1..
.
Subscribed and sworn to me this .10th day of August, 2012. "' ✓ " ., ° =-' s
d CI) PhM-y /
yJ eL.tC+
�
fitlttt IVA, ItA%���4
7iatfleen C. Sherman, Notary Public for the State of Washington, . Iii 6�\i-t`�����,,
Residing in Buckley,Washington
•
STATE OF WASHINGTON, COUNTY OF KING } •
AFFIDAVIT OF PUBLICATION
CITY OF RENTON
NTICE OF
PUBLIC NOTICE PUBLIC HEARING
Linda M Mills, being first duly sworn on oath that she is the Legal RENTON CITY COUNCIL
NOTICE IHEREBY GIVEN
AdvertisinRepresentative of the that the Renton
City Council has
fixed the 1st day of August,
2011,at 7:00 p.m.as the date and
time for a public hearing to be
Renton Reporter held in the seventh floor Council
Chambers of Renton City Hall:
1055 S. Grady Way, Renton,
WA 98057, to consider the
olwin
a weekly newspaper, which newspaper is a legal newspaper of • f Annualupdates to the Six-Year
general circulation and is now and has been for more than six months Transportation Improvement
prior to the date of publication hereinafter referred to, published in Program(TIP 2012-2017)
All interested parties are invited
the English language continuously as a weekly newspaper in King to attend the hearing and present
County, Washington. The Renton Reporter has been approved as written or oral comments regard-
a Legal Newspaper by order of the Superior Court of the State of ing the proposal. Letters may
also be submitted to City Council
Washington for King County. _ —__ — _ c/o City Clerk_by_5_pm on_the _
The notice in the exact form annexed was published in regular issues hearing date for inclusion in the
hearing record.
of the Renton Reporter (and not in supplement form) which was Renton City Hall is in compli-
regularly distributed to its subscribers during the below stated period. ance with the American
The annexed notice, a: Disabilities Act, and interpretive
services for the hearing impaired
Public Notice will be provided upon prior
notice. For information, call 425-
430-6510. Information regarding
the Six-Year Transportation Plan
waspublished on 15, 2011 and 22, 2011. is available via the City web site
JulyJuly at www.rentonwa.gov, or by
calling 425-430-7232.
Bonnie I.Walton
City Clerk
Published in Renton Reporter
The full amount of the fee charged for said foregoing publication is on July 15, 2011 and July 22,
the sum of $161.00. `\\\\\\\t\\elltOil.#508360.
��LSE 18,
L, ' F
EX/Zit"11 If
1‘/Iee 'o,7/7Zace
mda M. Mills •
a l
Legal AdvertisingRepresentative, Renton Reporter
" ``
Suscri,)ed and sp
oMto me this 25th day of July, 2011. ; ,�,� 0
Kathy Da/g, otary Pubf for the State of Washington, Residing i 1 ti;��'```
in Coving on,Washington
P. O. Number:
CITY OF RENTON, WASHINGTON
RESOLUTION NO. 4108
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, UPDATING THE CITY'S
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2012-2017.
WHEREAS, the City of Renton has heretofore adopted a "Six-Year Transportation
Improvement Program" pursuant to RCW 35.77.010, and the plan and program having been
amended and modified from time to time as authorized by law; and
WHEREAS, the City Council, after recommendation of the Public Works Department,
held a public hearing on August 1, 2011, after notice to the public as provided by law for the
purpose of considering adoption, modification, and amendments of the plan and program; and
WHEREAS, at the public hearing held on August 1, 2011, due consideration was given to
the proposed changes and amendments.for the purpose of updating the plan and program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES
RESOLVE AS FOLLOWS:
SECTION I. The above findings are true and correct in all respects.
SECTION II. The City's "Six-Year Transportation Improvement Program" and the City's
"Arterial Street Plan" are hereby further,amended and modified, all as more particularly shown
on the attached Exhibits "A", "B" and "C" incorporated herein as if fully set forth.
SECTION III. The plan and program, as evidenced by said Exhibits, shall be and
constitute the City's "Six-Year Transportation Improvement Program" and the City's "Arterial
Street Plan", and shall remain in full force and effect until further revised, amended, and
modified as provided by law.
1
1
RESOLUTION NO. 4108
SECTION IV. The Administrator of the Public Works Department and the City Clerk are
hereby authorized and directed to file this Resolution, together with the Exhibits, with the
Director of Highways for the State of Washington and as otherwise provided by law.
PASSED BY THE CITY COUNCIL this 1st day of August , 2011.
eD-itnw L&a.�'z
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this 1st day of August , 2011. '
&Aux%
Denis Law, Mayor
Approved as to form:
r ¢ j`.
•
Lawrence J. Warren, City Attorney
4 .
'
•
RES.1510:6/23/11:scr
2
CITY OF RENTON, WASHINGTON
RESOLUTION NO. 4108
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, UPDATING THE CITY'S
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2012-2017.
WHEREAS, the City of Renton has heretofore adopted a "Six-Year Transportation
Improvement Program" pursuant to RCW 35.77.010, and the plan and program having been
amended and modified from time to time as authorized by law; and
WHEREAS, the City Council, after recommendation of the Public Works Department,
held a public hearing on August 1, 2011, after notice to the public as provided by law for the
purpose of considering adoption, modification, and amendments of the plan and program; and
WHEREAS, at the public hearing held on August 1, 2011, due consideration was given to
the proposed changes and amendments for the purpose of updating the plan and program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES
RESOLVE AS FOLLOWS:
SECTION I. The above findings are true and correct in all respects.
SECTION II. The City's "Six-Year Transportation Improvement Program" and the City's
"Arterial Street Plan" are hereby further amended and modified, all as more particularly shown
on the attached Exhibits "A", "B" and "C" incorporated herein as if fully set forth.
SECTION III. The plan and program, as evidenced by said Exhibits, shall be and
constitute the City's "Six-Year Transportation Improvement Program" and the City's "Arterial
Street Plan", and shall remain in full force and effect until further revised, amended, and
modified as provided by law.
1
RESOLUTION NO. 4108
SECTION IV. The Administrator of the Public Works Department and the City Clerk are
hereby authorized and directed to file this Resolution, together with the Exhibits, with the
Director of Highways for the State of Washington and as otherwise provided by law.
PASSED BY THE CITY COUNCIL this 1st day of August , 2011.
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this 1st day of August , 2011.
D19,441L.<2
Denis Law, Mayor
Approved as to form:
714v 61 - cr ,, t°
Lawrence J. Warren, City Attorney t
•RES.1510:6/23/11:scr
2
August 1,2011 Renton City Council Minutes Page 246
The Committee further recommended that the resolution regarding this matter
be presented for reading and adoption. MOVED BY CORMAN,SECONDED BY
PALMER,COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. (See later
this page for resolution.)
Finance Committee Finance Committee Chair Persson presented a report recommending
Community Services: May concurrence in the staff recommendation to approve finalizing the purchase of
Creek Property Acquisition a three-acre property located along the north side of May Creek, east of Lake
Washington Blvd. N., and west of 1-405,from the Rob-Clarissa Partnership, LLP,
for the amount of$250,000. The property will be used for future soft surface
trail and habitat restoration improvements as part of the larger May Creek
Greenway system. Funding will be derived from the Washington State
Department of Commerce, Public Works Board, 2009-2001 Grant Programs,
and Direct-Appropriation Project Funding. MOVED BY PERSSON,SECONDED BY
TAYLOR, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED.
Finance:Vouchers Finance Committee Chair Persson presented a report recommending approval
of Claim Vouchers 304601-305410 totaling$3,589,045.63, and approval of 839
direct deposits, 128 payroll vouchers, and one wire transfer totaling
$2,846,363.53. MOVED BY PERSSON,SECONDED BY TAYLOR, COUNCIL
CONCUR IN THE COMMITTEE REPORT. CARRIED.
RESOLUTIONS AND The following resolutions were presented for reading and adoption:
ORDINANCES
RESOLUTION#4107 A resolution was read stating the City Council's support for King County
Executive:Supporting the Proposition No. 1,the Veterans and Human Services Levy. MOVED BY
Veterans& Human Services PERRSON,SECONDED BY ZWICKER,COUNCIL ADOPT THE RESOLUTION AS
Levy READ. CARRIED.
RESOLUTION#4108 A resolution was read updating the City's Six-Year Transportation Improvement
Transportation:Six-Year TIP Program 2012-2017. MOVED BY CORMAN,SECONDED BY PALMER, COUNCIL
2012 -2017 fTe ,` kik ADOPT THE RESOLUTION AS READ. CARRIED.
The following ordinances were presented for first reading and referred to the
8/8/2011 Council meeting for second and final reading and adoption:
Utility: Franchise Collection An ordinance was read granting unto Rabanco, LTD.dba Allied Waste Services
Contract,SeaTac Disposal of Kent, Rabanco Companies and SeaTac Disposal,the right and non-exclusive
franchise for comprehensive garbage, recyclables, and cornpostables collection
within certain specified areas in the City of Renton,Washington. MOVED BY
ZWICKER,SECONDED BY PARKER, COUNCIL REFER THE ORDINANCE FOR
SECOND AND FINAL READING ON 8/8/2011. CARRIED.
Utility: Franchise Collection An ordinance was read granting unto Fiorito Enterprises, Inc. and Rabanco
Contract, Kent-Meridian Companies dba Kent-Meridian Disposal Company,the right and non-exclusive
Disposal franchise for comprehensive garbage, recyclables, and compostables collection
within certain specified areas in the City of Renton,Washington. MOVED BY
ZWICKER,SECONDED BY PARKER, COUNCIL REFER THE ORDINANCE FOR
SECOND AND FINAL READING ON 8/8/2011. CARRIED.
The following ordinances were presented for second and final reading:
August 1, 2011 Renton City Council Minutes Page 245
Finance: Hire at Step D, Finance and Information Technology Department requested authorization to
Administrative Assistant hire an Administrative Assistant at Step D of the salary range, effective
7/29/2011. Council concur.
Finance: I-Net Service & Finance and Information Technology Department recommended approval of a
Support, King County contract with King County for Institutional Network(I-Net) service and support
in the amount of$1,071 per month (plus taxes)through 12/31/2013. Refer to
Finance Committee.
MOVED BY BRIERE,SECONDED BY PARKER, COUNCIL APPROVE THE CONSENT
AGENDA MINUS ITEM 8.d. CARRIED.
Separate Consideration Item Court Case filed by the United States v.the City of Renton and the City of
8_d. Vancouver, represented by Jonathan D. Carroll,Trial Attorney,seeking relief
Court Case:Alleged and refund of allegedly wrongfully paid stormwater charges. Refer to City
Wrongfully Paid Stormwater Attorney and Insurance Services.
Charges, United States Councilmember Corman requested more information regarding the lawsuit.
City Attorney Warren stated that the federal government is suing the City
because they believe they are exempt from paying stormwater charges. He
explained that the government stopped paying the charges and is requesting
reimbursement for charges already paid. He further explained that the
stormwater charges were recently determined by the federal government to be
fees and not taxes and that the litigation is to determine whether or not it is
retroactive.
MOVED BY CORMAN,SECONDED BY BRIERE,COUNCIL APPROVE CONSENT
AGENDA ITEM 8.d.AS PRESENTED. CARRIED.
UNFINISHED BUSINESS Utilities Committee Chair Zwicker presented a report recommending
Utilities Committee concurrence in the staff recommendation to approve a franchise collection
Utility: Franchise Collection contract with SeaTac Disposal (an Allied/Republic company)starting 10/1/2011
Contract,SeaTac Disposal and expiring 6/30/2019 to provide service in their designated annexation area.
The Committee further recommended that the ordinance regarding this matter
be presented for first reading. MOVED BY ZWICKER,SECONDED BY PARKER,
COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. (See page 246 for
ordinance.)
Utility: Franchise Collection Utilities Committee Chair Zwicker presented a report recommending
Contract, Kent-Meridian concurrence in the staff recommendation to approve a franchise collection
Disposal contract with Kent-Meridian Disposal Company(a partnership with
Allied/Republic as the managing partner) starting 10/1/2011 and expiring
6/30/2019 to provide service in their designated annexation area. The
Committee further recommended that the ordinance regarding this matter be
presented for first reading. MOVED BY ZWICKER,SECONDED BY PARKER,
COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. (See page 246 for
ordinance.)
Transportation (Aviation) Transportation (Aviation) Committee Chair Corman reviewed the 2012-2017
Committee Six-Year Transportation Improvement Program (TIP) and recommended
Transportation: Six-Year TIP concurrence in the staff recommendation to approve the annual updates to the
2012-2017 Six-Year Transportation Improvement Program (TIP 2012-2017), and approve
( the 2011 Arterial Street Plan.
ITV2
Qi1(
August 1, 2011 Renton City Council Minutes Page 246
The Committee further recommended that the resolution regarding this matter
be presented for reading and adoption. MOVED BY CORMAN,SECONDED BY
PALMER, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. (See later
this page for resolution.)
Finance Committee Finance Committee Chair Persson presented a report recommending
Community Services: May concurrence in the staff recommendation to approve finalizing the purchase of
Creek Property Acquisition a three-acre property located along the north side of May Creek, east of Lake
Washington Blvd. N., and west of 1-405,from the Rob-Clarissa Partnership, LLP,
for the amount of$250,000. The property will be used for future soft surface
trail and habitat restoration improvements as part of the larger May Creek
Greenway system. Funding will be derived from the Washington State
Department of Commerce, Public Works Board, 2009-2001 Grant Programs,
and Direct-Appropriation Project Funding. MOVED BY PERSSON,SECONDED BY
TAYLOR, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED.
Finance:Vouchers Finance Committee Chair Persson presented a report recommending approval
of Claim Vouchers 304601-305410 totaling$3,589,045.63, and approval of 839
direct deposits, 128 payroll vouchers, and one wire transfer totaling
$2,846,363.53. MOVED BY PERSSON,SECONDED BY TAYLOR, COUNCIL
CONCUR IN THE COMMITTEE REPORT. CARRIED.
RESOLUTIONS AND The following resolutions were presented for reading and adoption:
ORDINANCES
RESOLUTION#4107 A resolution was read stating the City Council's support for King County
Executive:Supporting the Proposition No. 1,the Veterans and Human Services Levy. MOVED BY
Veterans& Human Services PERRSON,SECONDED BY ZWICKER, COUNCIL ADOPT THE RESOLUTION AS
Levy READ. CARRIED.
RESOLUTION#4108 A resolution was read updating the City's Six-Year Transportation Improvement
Transportation:Six-Year TIP Program 2012-2017. MOVED BY CORMAN,SECONDED BY PALMER, COUNCIL
2012-2017 ADOPT THE RESOLUTION AS READ. CARRIED.
The following ordinances were presented for first reading and referred to the
8/8/2011 Council meeting for second and final reading and adoption:
Utility: Franchise Collection An ordinance was read granting unto Rabanco, LTD.dba Allied Waste Services
Contract,SeaTac Disposal of Kent, Rabanco Companies and SeaTac Disposal,the right and non-exclusive
franchise for comprehensive garbage, recyclables, and compostables collection
within certain specified areas in the City of Renton,Washington. MOVED BY
ZWICKER,SECONDED BY PARKER, COUNCIL REFER THE ORDINANCE FOR
SECOND AND FINAL READING ON 8/8/2011. CARRIED.
Utility: Franchise Collection An ordinance was read granting unto Fiorito Enterprises, Inc. and Rabanco
Contract, Kent-Meridian Companies dba Kent-Meridian Disposal Company,the right and non-exclusive
Disposal franchise for comprehensive garbage, recyclables, and compostables collection
within certain specified areas in the City of Renton,Washington. MOVED BY
ZWICKER,SECONDED BY PARKER, COUNCIL REFER THE ORDINANCE FOR
SECOND AND FINAL READING ON 8/8/2011. CARRIED.
The following ordinances were presented for second and final reading:
•
TRANSPORTATION/AVIATION COMMITTEE APPROVEDBY
COMMITTEE REPORT CITY
COUNCIL
Date S i-aai/
August 1, 2011
2012-2017 Six-Year Transportation Improvement Program (TIP) and
• Arterial Street Plan Update
(Referred July 11,2011)
The Transportation/Aviation Committee reviewed the 2012-2017 Six-Year TIP and recommends
concurrence in the staffrecommendation to approve the annual updates to the Six-Year
Transportation Improvement Program (TIP) 2012-2017, and approve the 2011 Arterial Street'
' Plana
The Committee further recommends that the resolution regarding this matter be presented for.
reading and adoption.
•
"andy Corman, Chair_ .
Marcie Palmer, Vice-Chair
Don Persson, Member
cc: Juliana Fries,Transportation Program Development Coordinator
Connie Brundage,Transportation Administrative Secretary - -
1'
August 1,2011 Renton City Council Minutes Page 242
Tracy Brown (Renton) shared her experience volunteering at the new Compass
Center in Renton and urged Council to support the levy.
There being no further public comment, it was MOVED BY ZWICKER, SECONDED
BY CORMAN, COUNCIL CLOSE THE PUBLIC MEETING. CARRIED. (See page 246
for resolution.)
PUBLIC HEARING This being the date set and proper notices having been posted and published in
Transportation:Six-Year TIP accordance with local and State laws, Mayor Law opened the public hearing to
2012-2017 consider the annual update of the Six-Year Transportation Improvement
in Program (TIP), 2012-2017.
Al! Public Works Administrator Gregg Zimmerman reported that Washington
.1(1/40V/ i f municipalities are required by State law to prepare a Six-Year Transportation
(0` Improvement Program (TIP), and to update it every year. He remarked that the
purpose of this public hearing is to inform the public of the City's plan for 2012
-2017. He introduced Transportation Planning and Program Supervisor Jim
Seitz.
Mr.Seitz explained that transportation programs and projects are required to
be incorporated into the TIP in order to receive State or Federal funding. He
stated that the purpose of the TIP is to develop a multi-year plan for the
development of transportation facilities and to develop funding plans for each
project or program. He also stated that the TIP is coordinated with public and
private utilities in an effort to improve their facilities as the City improves its
transportation facilities.
Mr.Seitz reported that the TIP supports the City's business plan by promoting
planned growth for the community, providing infrastructure for economic
development, and supports overall objectives, policies, capital facilities plan,
and transportation elements of the Comprehensive Plan. He stated that the TIP
also supports growth management in terms of financing consistency and
coordination efforts.
Mr.Seitz further reported that the TIP contains 39 programs and projects
including 14 corridor projects, seven system preservation programs,five non-
motorized programs,two safety programs,two area transit programs,and the
addition of the City Center Community Plan.
Mr.Seitz highlighted projects completed in 2011 including the completed Lake
Washington Trail (Sam Chastain Trail),SW Sunset Blvd. at Hardie Ave.
pedestrian and safety improvements,sidewalk rehabilitation projects,the 1%
for Arts program, and street overlay projects. He also highlighted on-going
transportation programs, including the conversion of traffic signals from
incandescent to LED, installing uninterruptible back-up power supplies at four
intersections,and upgrading school zone signs. He noted that one-half mile of
arterial streets and a small section of minor arterial streets were added to the
Arterial Street Plan due to the Kendall Annexation.
Concluding, Mr.Seitz reported that of the total expenditures for the 2012-2017
TIP, approximately$52 million is funded and $70 million is unfunded. He
reviewed the various funding sources, options for unfunded needs, and the
impact that the economy has had on the TIP.
August 1, 2011 Renton City Council Minutes Page 243
There being no public comment, it was MOVED BY ZWICKER,SECONDED BY
PARKER, COUNCIL CLOSE THE PUBLIC HEARING. CARRIED. (See page 246 for
further information regarding this topic.)
ADMINISTRATIVE REPORT ' Chief Administrative Officer Jay Covington reviewed a written administrative
report summarizing the City's recent progress towards goals and work
programs adopted as part of its business plan for 2011 and beyond. Items
noted included:
* Traffic along a portion of the Cedar River Trail will be detoured August 8 to
31 due to shoreline flood repairs that will necessitate closure of a 100-yard
portion of the trail just south of the non-motorized boat launch near the
Boathouse. The U.S.Army Corps of Engineers will be re-grading a portion
of the shoreline that began to erode during the January 2009 flood. The
work is necessary to protect the existing levee traversed by the trail. Heavy
equipment will be present, as well as numerous large trucks making
deliveries. Signs will be posted warning the public of the work and trail
detour.
AUDIENCE COMMENT Phyllis Forister(Renton) read published statistics regarding police activity at the
Citizen Comment: Forister- downtown Transit Center. She stated that the statistics do not make her feel
Safety at the Transit Center safe, and that having a large police presence there means that other areas of
the City are being neglected. She remarked that the City cannot keep the extra
police protection at the Transit Center after the new library is constructed
because of budget reasons and because it will be detrimental to other parts of
the City. She stated that a mandate of government is to protect its citizens.
Mayor Law stated that the police presence in the downtown core will be
maintained, and the emphasis that she is witnessing is due to the zero
tolerance policy in effect at the Transit Center. He explained that if the police
enforced a zero tolerance policy in the Highlands,or at the current library, she
would see the same level of statistics.
Chief Administrative Officer Covington added that the Police Department has
reassigned and realigned existing resources and that the added emphasis is not
due to short-term funding. He stated that the Council has so far approved of
the added emphasis, and the policy will remain in force as long as the
Administration directs it to happen. Mr.Covington stated that he does not
anticipate a shift in this policy at any time.
Ms. Forister replied that she can only judge by history noting that security was
lost in the past.
Citizen Comment:Wright- Sarah Wright (Renton) expressed appreciation for the Renton River Days
Festivities in Downtown festivities. She stated that she enjoyed the parade and visiting the booths at
Renton Liberty Park. She remarked that there was a lot of traffic at the library and
hoped the event would not mark a memorial service for the library. She
encouraged the City to promote downtown businesses, and suggested closing
streets more often for holiday bazaars and special events.
CONSENT AGENDA Items listed on the consent agenda are adopted by one motion which follows
the listing. At the request of Councilmember Corman, Item 8.d.was removed
for separate consideration. (See page 245 for discussion and motion.)
dt'
I
i
8/1/2011
aux.... ..e..iii.r..,..s,:'..,
Purpose
2012 - 2017 TIP • Mandated by State law
(Transportation Improvement Program) • Required for State and Federal funding programs
• Reflects involvement with citizens and elected
officials
Public Works Department • Details multi-year work plan and funding plan for
Transportation Systems Division the development of transportation facilities
Date
• Used to coordinate transportation projects and
Staff Presentation for Public Hearing programs with other jurisdictions and agencies
August 1,2011
+,'�Wl et it '` 2012-2017 TIP - •.1(11tuo:1 1 ;`.`.„
w
, .
TIP Supports .
Six-Year TIP
Development of S x
• City's Business Plan Re h
v ustr,essPIsn 1• .
v.a,., .-,,::- .,
1+„gym- - • Planning
RM
•
• Comprehensive Plan roiE,ye2� h Financing
tgl
- -cu • Scheduling
• Growth Management Act
A==71 1 ,r • Past Commitment
-�,o•aR�,r.t � yor,� `�a`.`'
2012-2017 TIP ��i �J 1;('(1 'i' 2012-2017 TIP ---�-`t K�llr: n,s.
i
'What is in the TIP 2011 Highlights
39 Projects/Programs ,d fr y
ar- i t l �. r.• ,.' ' - I Fie
• 14 Corridor Projects •. ? � Y q i, 2 13
lifikt• 7 System Preservation Programs , -e t.+ n � ���
• 5 Non-Motorized Projects/Programs rr �C� `471-'4-3'11- - c„ e ,A
• 2 Safety Programs ' 111` '-,-',..,A t �
• 2 Transit Programs • ; � II -`
• 9 Others
Lake Washington Trail(AKA Sam Chastain)-N 6th St to Cedar River Trail
2012-2017 TIP 1titifaa ? 2012-2017 TIP ---- ��,� C:`Ol.
1
, N
8/1/2011
,,,,,y,-.:-.:; .i-...-2.,.,------,--.----,--,.:.,,,a,,.:5i,.:,!,-.,-,.,,.--.5::R.z:,;,4.,;::_.-.4f.,-.:,-•,_,,,,..4,--.--,-r.:-,:_-. '.-,.
.....,...,_
--------
2011 Highlights 2011 Highlights
. ••-.-....,:"•$,{..,z•-•,„--_--- -of • - - r!,-.!Y- , _,,c1,,e'
,- ..,..e..
.
et—
• `... '.-• -!s".`t-,..F,
',•=-••••••.. - .1•,-,,
•••:.• '•:,' ',: •A-77-77.- ' '=‘,,y--=.:,----;,...--• 0 .'1: '04\-,c-','-6- -", . ' .,..
4-4,,:.: 1-- ,-i'''.:". -`„"'. .7, :- t' : '''.:7;- , :'• .• ''''' "'='.:.---',,e?...;'T., '1• , 4 0
:..?;:i.,
'' " ,.-"V•, - - r. ,-,.; " `c-.--.-4%1 ' .
..,,,_4Ar ',-'''' '' - ''. .77.k ' -.'..-'17,4-- .•v. .,7 -> ,-...
',1* .,' ..,.. :,: „ ':• '' '', ke,,,....",,'` -.-;,‘,',' ',.
t'r..i'r-,'--'• - _,'Acwrk,... '' .. ......' .. ii- ":7 .w.,-,,Tes-."-':
:,t7:4,';•::.'- ..
Lake Washington Trail(AKA Sam Chastain)-N 6th St to Cedar River Trail
1%for Arts Program-Lake Washington Trail Project
CI of --.
R-. .,illitoe,all rtn
2012-2017 TIP 2012-2017 TIP
,
,,,,,,,.,,,,,.,..„,,4„,,„„,„,,,,,,,,....„.,..,-,',.:41:',.;,.,",.., ,,';,--;,,,,,;-:-i,,,,-.....44,,,,,42,..,q-::: ,-rr,,,-, ,,4 4-11',"--v_i4e..•,--C,-'.:F,-•,;,',,,,4;---.:.'c'I'..-:r„':.;1:... .e.t,1-.tr,',z-:!--:::-7-'.9,-:,.:.,,, .,
:-..-,.,, -;',-.....f,,"..,- '-'1'`,.''''''.''.-T"---`:, """79:''''''" ' ...,..5,..,-,-,--•"-',.. '.:-'4,.'
- -,,,,--s--,---
2011 Highlights Highlights
' -1.11, -*.14.--, --.-iss-A4 rr,,,,,,`;;;- ;: ''''''""-,-'"I-4,'''.4;,--.'.1 4,y4.- '-i ',.,. •,-.:-..-:------, ir,-,;
•444mio4;„:;`:',-..:.-_-,7--.'" -/'-,. 7 'Z,':,„",,:, '',: '. -,---T,.:'`',:r;,
,,..e.v.i,
4.•-••..... . .., . .....,., tl,r,"+47.41N., 4 4'?'15 444 '
_-•• ......,..,--... .1••=: "- ....-.4 ,.. -L,- . - - --,"' ....---‘4----
:-:f,,c74,,-!,:,.4: ,,,,,,-,--t---.04...-'<,'..,.--•-•-1VR 7,::,:t.r.--,
--"trc LAI: -.}-, .....-=. - -..4-7t- •-;•, ........,....: ,c,;,-,„f = , ..:-'44:71,,--.2rx-r-,:--- -.1-‘,.^,W , _, i --,_ --'1
.?....4::1-' :t :ri`,;,.... .' • Z--. '-'-4''.44 . ''''.1.4i'4
r
4 4.4
s ...„
SW Sunset Blvd at Hardie Ave Pedestrian Improvements Overlay and Arterial Rehabilitation Program
l'-' -'47°I-• ----•""r4K?r,,
2012-2017 TIP g,s, b, r ae 2012-2017 TIP e
.... _ _
Highlights 2011 Highlights- On-Going Programs
•••••,-,,,..• • All signal indicators where retrofitted from incan descent to LED
' -
......,14.;! :,:zic
• Install uninterruptible power supplies(approx.4 intersections)
:--,..11,.., ' .-,- ";:•:--iif,;--.`"g.''-;;.." f-L-fg.,_ ‘,,,.:::",;.:4....,-,-, -7.,,,,,,-,-...-,r,
•.,....•, ,,7 ,:a•74.1.--- --, f, ..---:---: ',K.Z•r ..-•,--•,--•••._-:-, -. • Install 2 Pan/lilt/Zoom(PTZ)cameras to the traffic control sys
4,t'.-'... 177'''''F' - _ t ,,, • Partnering with WSDOT to bring''Traffic Busters Program to Renton
.',.., ile,A'W,.. -'•.-',.'"'..... v '''' ' %-'. '''. -‘ ''''---'''''''*- • School zone sign upgrades/additional equipment:..r.:"'N',.,'"41.,:i:. ,:- , .'. New Horizon School
•,7..;:je,:1::;:0',.-•'. - .... -,,,,, „..,..., Talbot Hill Elementary
X,'I.:,41:,-,",e4,:'''A-; 4f"."' Cascade Elementary
• -- . -----------
Renton Park Elementary
-rt.."' !=-..'A•tr'.1----' •- Sierra Heights Elementary
Kennydale Elementary ••••-"=--- t.--- ----...-:::-
,
Sidewalk Rehabilitation and Replacement Program McKnight Middle School -: ,_
2012-2017 TIP __________......,Lr, c.i.
- 1,-1)inirg m 2012.2017 TIP
2
8/1/2011
•
3.,,,,,,,..-7-,..-.2,..--,,..„-•,-„.. --:'.",,i.:,:':7.;'c,.7,,:,i:':.r r",:;',:...Z,Z+,:".,:,'....,;:;,..',,,-,.".,.: ' ':-.':4'-e',",'-•: -,-iii,--,4-,'f-,o',,,,-:4-i,,,r, :,r-r.,'__-.,-----;.a: :,___- __:,!,L.:,,,,,-;_,-:3;;-,-z__L':,,:,iZ'
--,;t7g7f:'"--''''
2011 Highlights ' - 2040/2011 Grants Awarded
• Transportation Improvement Board(TIB) $1,977,000
• Complete design of NE 4th Street Improvements, (NE 4th Street Improvements Project)
from Union Ave NE to Whitman Ave NE • WSDOT Mobility $1,500,000
• Start construction of SW 27th Street/Strander (Rainier Ave S Project)
•
Blvd Connection,Phase 1 Segment 2A—BNSF STP(through FMSIB) $2,500,000
(SW 27' Street/Strander Blvd Connection Project)
underpass and access to the Sounder Station
• Freight Mobility Strategic Investment Board $5,000,000
• Complete design and right-of-way acquisition on (sw27th Street/Strander Blvd Connection Project—next phase)
Rainier Ave 5 • School Zone Flashing Beacon $27,400
(Various School Zone sites throughout the City)
• Complete design of the Highlands to Landing
TOTAL $11,004,400
Pedestrian Connection
. iiratzaf, 0'-
2012-2017 TIP _ fk ital.b r fl 1 a 2012-2017 TIP
,,,,:_,:„.„, ,....,._,_,,_,..?„,,,—:,,,,,.„0----_—,:,....„..,..}..,,, ,,,,.,,,,,-„,,,.,,,,,,, ,,,.., --„„.:4-,,,,,:-•=4,s,--„,--..,::4, ,...,----=,,,,r_,,,,,...,-,,t,„.:-. ,,:,..,._.-,-,,-,z-,.,,
Project Funding
2012-2017 TIP Funding Summary
Six-Year Period
$90
2
30,000,000 .2 $80
25,000,000 2 $70
20,060,000 Grants/Other ii
1,
-__ _ •Unfunded
—
i it
oi City Funds $50
540
$30 .1111 . ' a City Funds
i
$20 , '''...2---
$10 , -----E Grants
_ .
So
2012 2013 2014 2015 2016 2017
Funded Unfunded
-- -
2012-2017 TIP ..............tr,F1-°ffk -,/.5,k., ,,
It\A;T:giOnt-t4-1,); 2012-2017 TIP
Funding Sources Sources_ City Funding Sources
SIX-Year Total Revenues:$52,704,691 — —Total Revenues
HAW.° —
Projected Revenues
53 500.000
sliminess License Fee
72,
'r OCNSF
es
-- 0Grt/Other
- 3S5SM2E.2I.coG5SonCCw0Oul.,=.0oC.0SPw.o02
..-.•,-- ..
--MBBVuLeFhtsiiPigncreloe7tiFsoeuln
—Mcieet
cilleoTTnnas
a) $00xe
Projection
Nor, ion M. MX 2CO3 2010 mu 2034 Ms
2012-2017 TIP _ ..______. ........01-r,
luDifi -7:4' 2012-2017 TIP
3
•
8/1/2011
Arterial Street Plan Update Recommended Action:
Changes from 2010:Kendall Annexation: • Approve the Six-Year Transportation Improvement
Program(TIP 2012-2017).
• Extended a Principal Arterial:(NE 4'h St)to east
City limits • Approve the 2011 Arterial Street Plan.
• Extended a Minor Arterial:(156th Ave SE)to City
limits • Present the resolution regarding this matter for
reading and adoption.
2012-2017 TIP - Lemma( 2012-2017 TIP - i ( toma
4
\.genda Item No.: ri . Q 1
Ln 12 117 RENTON CITY COUNCIL MEETING
PUBLIC HEARING/MEETING
SPEAKER SIGN-UP SHEET
(Page 1)
CITIZENS MUST PROVIDE NAME AND ADDRESS IN ORDER TO BE
CONTACTED OR TO BE A PARTY OF RECORD WHEN APPROPRIATE
DATE: ( ZO t t PLEASE PRINT 5 Minute Time Limit
1 5
Name: Name:
Address: • Address:
City Zip Code City Zip Code
Topic: Topic:
2 6
Name: Name:
Address: Address:
City Zip Code City Zip Code
Topic: Topic:
3 7
Name: Name:
Address: Address:
City Zip Code City Zip Code
Topic: Topic:
4 8
Name: Name:
Address: Address:
City Zip Code City • Zip Code
Topic: Topic:
(CONTINUED ON REVERSE SIDE) •
•
(Continued from Reverse Side - Page , R
RENTON CITY COUNCIL MEETING
PUBLIC HEARING/MEETING
SPEAKER SIGN-UP SHEET
CITIZENS MUST PROVIDE NAME AND ADDRESS IN ORDER TO BE
CONTACTED OR TO BE A PARTY OF RECORD WHEN APPROPRIATE
PLEASE PRINT 5 Minute Time Liniit
9 13
Name: Name:
Address: Address:
City Zip Code City Zip Code
Topic: Topic:
10 14
Name: Name:
Address: Address:
City Zip Code City Zip Code
Topic: Topic:
11 15
Name: Name:
Address: Address:
City Zip Code City Zip Code
Topic: Topic:
12 16
Name: Name:
Address: Address:
City Zip Code City Zip Code
Topic: Topic:
CITY OF RENTON
NOTICE OF PUBLIC HEARING
RENTON CITY COUNCIL
NOTICE IS HEREBY GIVEN that the Renton City Council has fixed the 1st day of August,
2011, at 7:00 p.m. as the date and time for a public hearing to be held in the seventh
floor Council Chambers of Renton City Hall, 1055 S. Grady Way, Renton, WA 98057, to
consider the following:
Annual updates to the Six-Year Transportation Improvement Program (TIP 2012-
2017)
All interested parties are invited to attend the hearing and present written or oral
comments regarding the proposal. Letters may also be submitted to City Council c/o
City Clerk by 5 pm on the hearing date for inclusion in the hearing record.
Renton City Hall is in compliance with the American Disabilities Act, and interpretive
services for the hearing impaired will be provided upon prior notice. For information,
call 425-430-6510. Information regarding the Six-Year Transportation Plan is available
via the City web site at www.rentonwa.gov, or by calling 425-430-7232.
•
Bonnie I. Walton
City Clerk
Published Renton Reporter
July 15 and 22, 2011
Account No. 50640
July 11, 2011 Renton City Council Minutes , Page 221
CED:Cairnes Short Plat, ROW Community and Economic Development Department recommended
Dedication,Jericho Ave NE acceptance of a deed of dedication for additional right-of-way for Jericho Ave.
NE,to fulfill a requirement of the Cairnes Short Plat(LUA-10-026). Council
concur.
Executive:Veterans& Human Executive Department recommended setting a public meeting on 8/1/2011 to
Services Levy consider the Veterans and Human Services Levy, solicit public comment, and
consider supporting or opposing the measure. Council concur.
Budget: 2011 Second Quarter Finance and Information Technology Department recommended approval of
Amendment the second quarter 2011 Budget amendment increasing appropriations by$3.1
million. Refer to Finance Committee.
Finance: Bond Refinancing, Finance and Information Services Department requested approval of an
City Hall Remodel &City ordinance authorizing the issuance of revenue bonds in the amount of
Center Parking Garage approximately$10.15 million to refinance existing City Hall Remodel and City
Center Parking Garage debt at an average rate of 2.5%, replacing existing bonds
of$9.95 million carrying an average interest rate of 5.25%, saving
approximately$900,000 to$1 million over the remaining six-year life of the
bonds. Refer to Finance Committee.
Police:Traffic Safety Emphasis Police Department requested approval to accept$22,285.50 in grant funds
Patrols, WA Traffic Safety from the Washington State Traffic Safety Commission and to sign a
Commission Grant memorandum of understanding and related amendment in order to conduct
Target Zero Teams high visibility enforcement traffic safety emphasis patrols.
Council concur.
Transportation: 2012-2017 TIP Transportation Systems Division submitted the annual update of the Six-Year
/viJQ ( Transportation Improvement Program (TIP) and Arterial Street Plan. Refer to
Q 1' (� Transportation (Aviation)Committee; set public hearing on 8/1/2011 to
consider the TIP.
Lease: Kaynan,Airport, Transportation Systems Division recommended approval of an addendum to
LAG-85-011& LAG-84-003 two airport leases, LAG-85-011 and LAG-84-003,with Kaynan, Inc.to increase
the total ground lease rate per appraisal by$5,314.20 annually through
5/31/2014, and to readjust the rate thereafter using the CPI index. Council
concur.
Utility: Interlocal Agreement Utility Systems Division recommended approval of Amendment#1 to the 1998
Amendment, City of Seattle/ interlocal agreement (Franchise) with the City of Seattle/Seattle Public Utilities
Seattle Public Utilities regarding water transmission lines to extend the term to 1/1/2062. Refer to
Utilities Committee.
Utility: Lease Agreement Utility Systems Division recommended approval of Amendment#1 to the 1998
Amendment, City of Seattle/ lease agreement#327-815 (Franchise)with the City of Seattle/Seattle Public
Seattle Public Utilities Utilities regarding water transmission lines to revise Renton's use of Seattle
right-of-way for park purposes and for parking and construction staging for the
new King County Library System (KCLS), and extend the term to 1/1/2062.
Refer to Utilities Committee.
MOVED BY BRIERE, SECONDED BY CORMAN, COUNCIL APPROVE THE CONSENT
AGENDA MINUS ITEM 7.b. CARRIED.
-7. t .
CITY OF RENTON COUNCIL AGENDA BILL •
Subject/Title: Meeting:
2012-2017 Six-Year Transportation Improvement Regular Council - 11 Jul 2011
Program (TIP) and Arterial Street Plan update
Exhibits: Submitting Data: Dept/Div/Board:
Draft 2012-2017 TIP including Project Map (Exhibit A) and Public Works
Map Index (Exhibit B)within the document
Arterial Street Plan (Exhibit C) Staff Contact:
Resolution Juliana Fries, Program Development
Coordinator, ext. 7232
Recommended Action:
Refer to Transportation Committee and set Public Hearing •
•
date on August 1, 2011
Fiscal Impact:
Expenditure Required: $ N/A Transfer Amendment: $
Amount Budgeted: $ Revenue Generated: $
Total Project Budget: $ I City Share Total Project: $
SUMMARY OF ACTION:
The City is required by law to annually review the Six-Year Transportation Improvement Program (TIP)
and adopt the update by resolution. In conjunction with this, the Arterial Street Plan is also updated.
STAFF RECOMMENDATION:
1) Approve the annual updates to the Six-Year Transportation Improvement Program (TIP 2012-2017);
2) Approve the 2011 Arterial Street Plan; 3) Set August 1, 2011, as the public hearing on the 2012-2017
TIP;4) Present the resolution regarding this matter for reading and adoption.
r
•
•
•F
. .
•
•.
. - • '
•
, .
. .
. .
•...
. .
..
•
•
•
• .
•
:Ci-t.
.,
y o..
.•
f R• enton ... ... . •. .....• .., •. •.
Washington .,... .. .. • , .. .... . . .•.:..,..... ...
L.. •. ...
.•
..
.. ..•..........•............,...•......_
..
•
•
•
2 •
012:- 2017
•
Six=Yea r
•
• f T •
• ransportation Improvemen•
Program • ••
•
... '••• '-..4"••' --....‘i•- ••+,.. .‹-•-tte--.4'''--‘-',-W.--...7!"a.,,V.r.r...‘`..,;4`1.57,...TAS::,:1,I'. ."-.',.',i-t,e-:i.:.-
.. ii'W*--4:'."' Y _i --." n.�,{..e 'r'a -.,,1-/-Y� t "� `$-e- - - o•
•
s "!
.. }Ss :��'x!•3 a € ��2a}�r-tt -. ' �e� '" s 5 3a' t{•ri ys 4^+y>;y�:<.{' :
.a+• 2 -sa=, .. G � . �.�. y �5 a ", •
..
•
..•
�a J�k` tw Zw''i, w`-K5y a_? 4 t ��rt��,r�s.._ s g . .
•
�`6� �,- A +t 4 �^105 ayE t;"' :: -L e 5 •�
• :r s y ! � 1 4't'w�„�".r^+y.'S`CAP-Az
4:� ,1 .' 7 "c•
•
•;6!•:-.47•;-„;--t-,2-0A Zi.�.• ps-t" 'C- ' al, 74c;.!,-•''.�'`
s• s •t ,7 a.s Y t t rc y' n� yr
�t�1
I 7131.
j ` i-t�. ^Y.‘-.....i.,14,...._„2,,` l '`T�si _ + y�`3 •
. nw•��r• •
.V:
-: t r" " -r. Xv4, _"+ �,,r"` „, '� t., ,-c ,i- :.r s. tx ..
.. *�, +sv` ','" '-c. -Vic.°^, n .. Wcr- .5 x,,E41;, " �4ti.', -,;7-'.
a t
•
r - L4 i W: ,,-�o ..Ya4'� -•fity-� •� -
k 41..,'S-4...e..-- -1"1•9r-ie-F-
rSyt ,�. "IJ
4 ' �- • e:C,1'#� sl:-,I.. mss. t. ^saw'. q r X'._� •.',',
•
LL,i"... -c-1X-V,
1 ~,+ e�csr,C .... uv 5 jun k - _
+'2 w4 x �•'Cyy`44S-'rE� 'L .= 5�.• ;*'2:. '.;"-',-r---,.., `
2 .$r3-, c '���" r
•
G3 a- �. .d'....Y h: +L.:+5-n"arW r - _w:S .W_ .++` i�K"_.t`R�4.tU��":-'Ycn. a�-'±.-
•
•
Lake Washington Trail(AKA Sam Chastain) •
•
• . •Mayor Denis Law ••
•
•
•
Hearing: August 1, 2011 (ten•
tative) -
Gregg Zimmerman Adopted: August- ...., 2011 •
Publ •
ic W •
orks Administrator. Resolution: •
•
t 174'
;:ate�'r , 'et .4.. •,,,,...7---„,....,&,...11.1-4-,•:—. �,'` x qtr
.t-ex's-- - .r • ' 're , ' �G
r=-ti _ �•�--^,- -fix•� � -•••,,,.,•21.:. � r �A. •r�` ��� � �� • �,. �` a ..- �.?
-.•••• B i •- •a.'•=.--_--.--:.---,-::71---4 .:•‘'.1.1.,.41.,
s N .
v� 4„� to t z • ...s `. ',. - %3— -.: E'en -,, ,,•'C�} Y.. r. 'FS -.s3
•
`�' � �"���~�'���. � 's.��.�~�r�":. �' = .'''�.�'r'4 ;k" . '`..�n`'��9��5^3�4������r_-�irF�a:,'"��.i�.��.'�Y �Ya�������`#�.� •-T:s�'t.:zz
•
•
SECTION ONE
PURPOSE OF SIX-YEAR TIP PROGRAM
Purpose of Six-Year TIP 1-1
• Vision Statement. 1-2 ..
• Mission Statement 1-2
• City Business Plan 1-2
CITY OF RENTON
SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM
2012-2017
PURPOSE
• Reflects involvement by citizens and elected officials.
• Implements the City of Renton Mission Statement.:
• Used to coordinate transportation projects and programs
with other jurisdictions and agencies.
• Multi-year planning tool for the development of the
transportation facilities within the City.
• Required for State and Federal funding programs.
• Vital part of planning under the Growth Management
Act
• Mandated by State Law.
1-1
CITY::OF RENTON • .
Vision :Statement
Renton: The.center of opportunity in the Puget Sound Region where
families_:and business thrive.
Mission .Statement
The City of Renton, in partnership and communication with residents;
businesses,`and'schools,is dedicated to:
• Providing a healthy, welcoming atmosphere where.citizens choose to
live, raise families, and take pride in their community.
• Promoting planned growth and economic vitality.
• Valuing our diversity of language, housing,culture,backgrounds and •
choices.
• Capitalizeon the diversity of the community to build stronger
neighborhoods and ensure the availability of city services to all.
• Creating a positive work environment.
• Meeting service demands through innovation and commitment to
excellence.
1-2
City of Renton Business Plan Goals
Meet the service demandsthat contribute to the livability:of the community.,
• Prioritize services at levels that can be sustained by revenue.
• Plan,develop and maintain quality services; infrastructure, and
amenities.
• Respond to growing.service demands:.while:Meeting the unique
requirements of a diverse population through partnerships;
innovation,.and outcome management.
▪ Retain a skilled workforce by making Renton the municipal
employer of choice.
• Balance development with environmental protection..
g
Manage growth owththrough soiindurban planning, -
•° Foster development of vibrant,sustainable, attractive;Mixed use -
neighborhoods in established urban centers.
• .Uphold a high standard of design and property maintenance
throughout the city.
•_ Provide a balance.betweenhousing-and high-quality jobs.
• Maintain services to current residents while welcoming annexation.
areas that desire to become part of Renton.
Influence decisions that impact the city.
• Demonstrate leadership by developing and maintaining
partnerships and investment strategies with other jurisdictions that
improve services...
• Aggressively pursue transportation and other regional.
improvements and services that improve quality of life.
• Advocate Renton's interests through state and federal lobbying
efforts.
Promote strong neighborhoods.
• Support the vitality and positive appearance of neighborhoods
through community involvement.
• Encourage and partner in the development Of quality housing
choices for people of all ages and income levels.
• Ensure the safety, health and security of citizens through effective
service delivery.
1-3
• Promote pedestrian and bicycle linkages between neighborhoods
and community focal pOints.
Promote citywide economic development.
• Promote Renton as the progressive, opportunity-rich city in the
Puget Sound regibn.
• Capitalize on growth opportunities through bold and creative
economic development strategies.
e ..Rectuit and retain businesses to ensure a dynamic, diversified •
employee base. •
• Continue redevelopment efforts downtown, in the Highlands, and
South Lake Washington.
•
•
1-4
SECTION TWO
SIX-YEAR TIP MAP
• o TIP Map, Exhibit A 2-1
• Map Index, Exhibit B 2-2.
•
•
•
•
•
I ;•
�.�' s i
' � - .,�it �;;." ifI
r
,5'
I
•
i
ti ',,'...:-.-.'=.
_ -
I 'Iµ '9� -
( _i. 31-$...-i..:74-,:-...).:-';',...!:', .1,..3:$.3-':$;,[:!3$:
t
1 'f
'f•
�r
mf•
- Ali•:•.
1
1. '4 -
f
I
r
In
t,
2
r,..
_, yy ',' ^` 1Yest siall i}, � ..h-l{ 5 .f� 1 _ r. �^=�;'`;
1 {�
b
V..
s'i' 1'-—
;;;_..:$..:.,$$,.,.;;;,__,;.•••‘,4,$#$k3.13-3.,,..l
i:
'r
f 5
Li
1,
O -
Q7
/' - J
I 1.
i ,•
- 1'
• 1
i
r.
J
Vii'-�.;j
l 1 `%
I.
r w
r•
�j- ' a`
ki`r- .:a` 'r
- -- I -J fir. a
-'i kes -i'
dal
Axe
a 1 I r I. ;;;•rl � •N
Lopirl1,�h
,-,:f.......)...7--L..',"�--• .fit
r� t�
'
•
ik,.)‘411:::: 1' .I.
2..,,,--4.7,7,,,.--;-7-7(....i:',„;;,,-,:•-:...,....:', N
_ � d N - ..�m• •it _ f r, Z. ;•1•1o;,....:-:':. '�I ''i�, . 1•.', ° �• '�
I rit'-
11;."'..\.\6'.
-°t. >'+ - .I.;;:-.1,..L7::.I -..L.'-�(_i.. t,i,, , 1 ''I • ':I,. r;') /r'
t
''o • r �1
iP:
-
• i' • �i'i
,al-• of
>r_ .k
u
Ir .. 1 a
l
�•a
•
S e..:
ji 5•�• - �' 'r 1
7 I'
� fI
, ,
O 1::.:::
_
•
r, _.1',',, o '.
I • ■
r`
�' o� t
-iv
N
0
I I
r".
Loa'ph•Ave N f Z
L Y . } �I`.r
r:
-� -I I I
- 0 Vel =r '
I h-A :- 'Jr, I
• .e
F'
I I' fit':..
1 • 1 I ' !••
S -ti i'i
- I ..,_ .......:-. 4:•':.... y -- - ...5-----7---J'
--_ - .:.1. Ill fl H o-'•' 7 1'. ' '
�.r
r
'tr."..--i".-___.1,06th Ave-SE. I .-.._.. .. .:...•..• � � - ��!.
• ,
.N,
f
I' , :i
i ,,.,. [. 1,-......-;,. , ba' ;.. ';'�ii9 rr - ._f,, ta "fK•..�� -
ryry,
'' r;'1:r''P'd i ..,;'1_, '..Q. .. .; (r 1. ..ii1 k \� �:!".,rte _ _ ..•t.. a4'' - _r.:. :.t_ 't-s+
.
.•r
�
•
I -,1116th Ave 5E I r I r .._ 1 :, l� .r y',I4L-�. r;Tit ^'r,?`'1• f...-.......•---.--.!.,••i, '. !' r�,a_ =' wI
....:.*-.4"?..".
.,!'P I I L... • - i *°`, ,l' i��I:1'k • '.i '1 2 't'' •r j 11•i .` _ , .r •1';' ,� ( -1'
w drrot d •
1.
'v _i 7`::1. .,:....._,,.:_.___•-� ,.. ti.::!:
„., ,F..-�i'' LQ I-� o'< _:y_.,,L,tl' 'L.:`. x... .,:,'` i'�' ,.
••'.i I w • ._ I a •v” i �.• r' TIT--;
I :1-illi-T.;:.')"
illi:...., ./f/ ----- -.---.
I,f 7'7 r� .-_.. i i I Y � �..,�l'.:
!:.'!":::,--$:',:, :',-.$;;:r.11;',',:',2,'
:.,- . .C. '.,' r'A _ /•.;:,•,•„_•.,,;:;,.'-2.:....2.1.47.',.,.',-,,.:
>+ ,_;�" a 1 '-,, - '•-•1• Y.J .. .. �+y:- .r}<.�
to -$1.':.$::',1 :...,'... s'.-::/%'.';s'` (1'1.:.5.:���', :. ="i.� • - -......_.Mi .,1;�.
1._ I .. _. i I,., ,,s-J.... -, l-0, --'rr 1l !'i;-1'.;':-:''''.',J t :..1�_- V11., f ,: ..,:.!1!--•
I,' _ - !•,.-? •,„_
I....1. _ - r t,- I o _ ,I_.i I 1'i- 'f° F"S ••-aa - _ '} - ,,"S' ,,,,,,,.•••-1.-,-......, f:,-;;F.,,_.,--i•::::_.'�'-1
1110e-1'
' 'x ---''' :--,14i
� _ 6 ' .-} , lr;:_ • ''''' 1.1..-'2. `.L::' ,i f _._.._ _. _LL1_..< I_
i
..r.l C [r}' .'�, _-_-_;.-,r,
_+_I�,. •,�,t•t�- l- • /f 1 ©F --• 16 1.;_.1.,1 y f'.:, _ r:'‘.,...:;;.•-•----:,.;,7. - ''::_ t i'--,•� 4
fi. (' . I .i_'. ::k` i( f' ., tl i,'l*r! ,., :I- 1-,i i i• a, .I-, ,j _.'T.l. .r_
J '
( /'t: .. . 111 -i,: -"••:::,T.!
r..i ",al 1 .f 2
J.1 ,,e,---
,CF _:,ny`(. ,i"r.l •' .. I: I I:::� ' ` �.. !1 .., •: -; '-� if. --'�:f..:,..'r-",, ,I�,,f.^ 1{,rJ!,,,� 1__..i
• �� �.,.f `` .�.- !Y • (i •c �,S :•51� • Il-1: "I�'Wi' •. �� {` J.,__..,r -•-
I - f"- -"r s' i'- -I (,• - 'I'::i` .I„7 :/rr T... :A; i,--:.;:"1/...
.,r �-,
•
11 ,-'--,...,.i � I I /•- l s j�.r '{?t,�o �+.:IFI-, ^t h_!• �I°f i.Li • � -....!:-.J.••:1 E ,I'•} ".�-`'a. ;�'t �T.r ^,
II i
..,..__.. ;:_ ..�;�rt40th Avera I: J.. Oyv I I —
.- r
2;;;17.,:".!:::6 ..i..{.,1_l, I,"I z -__ ..''_.:r. -.,l-�r-.., -;:1$'1.).�.: :'sr:
•
r' •
' ;.1+•'' 1� ', S'} 4 t: �I,Sri ^?•
:.( ����' -N.?
� J J �. I .
tt •
.S— f
_..�....._.:w,...-._�.. I (qT--1-..--.17:
„ -_-IIS r
i•'-'-'2T-3/7 f i ,,.-l� .1.-,..:', 'L�r _-1'qY'':I�•i-. -i J�'��1:r�+"-�, ,•i,^�-i:•i � ';':_—IL. r�.._ j9• ....
•
1 ',;.. I .,iIl 4:-''_.. it.
r t y _ _ , fi I .. • •yn:,”
i' 1 I 1 ' I: i J, {Ltt
• ..r,'i:;i; '! • f;;7 •
•11 .--,..,•;•,',:"i'.1.`.•'1 .� ... •p • .
err,.•'' �q
'I•i i'I ! 9°�,,'- ti "1 I',,••p It ' 1' I„J,�..� ' -/t• .,r'.,
,,;..I' }�: ','' _;'L:.- I -t ,i.e_t`.:1 �, ter, '"1..1...._1, --'..2) Lr- Ip-h! ..I. i �` w
• ,1,
r % 3'
$1/4.t., i -1-7 .-1..... ..f._. • •
.. --. •
., ,,/ ., .. • .....-.,.........- • .• . •••••• .. • • .
.•• „:„.
I.
EXHIBIT 'B'
City of Renton
2012 —2017 Transportation Improvement Program
Map Index
TIP No. Project Title
1 Street Overlay Program
2 Arterial Rehabilitation Program
3 Rainier Avenue—Grady Way to S 2"d
4 SW 27th St/Strander Blvd Connection
5 NE 316/NE 4th Corridor
6 Duval Ave NE—NE 7th to Sunset Blvd NE
7 Lake Washington Roadway Improvements (Garden Ave)
8 Park Ave North Extension
9 116th Ave SE/Edmonds Ave SE Improvements
10 Can Road Improvements
11 Sunset Blvd Corridor Improvements
12 Oakesdale Ave SW—Monster Road to SR 900
13 South 7th Street—Rainier Ave S to Talbot Road S
14 NE 31st St Culvert Repair
15 Highlands to Landing Pedestrian Connection Project
16 Lake to Sound(L2S)Trail
17 Walkway Program
18 Sidewalk Rehabilitation and Replacement
19 Bridge Inspection and Repair
20 Roadway Safety and Guardrail Program
21 Intersection Safety and Mobility
22 Traffic Safety Program
23 Preservation of Traffic Operation Devices Program
24 Intelligent Transportation Systems (ITS)Program
25 Transit Program
26 TDM Program
27 Bicycle Route Development Program
28 Barrier Free Transition Plan Implementation
29 City Center Community Plan
30 Project Development&Predesign Program
31 Arterial Circulation Program
32 Transportation Concurrency
33 Environmental Monitoring
34 WSDOT Coordination Program
35 GIS Needs Assessment
36 1%for the Arts Program
37 Lake Washington Boulevard—Park Avenue N to Coulon Park
38 Lind Avenue—SW 16th to SW 43r
39 Logan Avenue Concrete'Panel Repair
2-2
SECTION THREE
DEVELOPMENT'& PRIORITIZATION
OF THE SIX- YEAR TIP
• General Programming Criteria 3-1
• Specific TIP Development.Activities 3-3
• Summary Table of Projects and Programs: 3-5
DEVELOPMENT AND PRIORITIZATION OF THE SIX-YEAR TIP
I. General Programming Criteria
The yearly update of the Six-Year Transportation Improvement Program(TIP) is part of
an ongoing process intrinsically linked with the development of the City's Capital
Improvement Program. The Six-Year TIP is also linked with various state and federal
funding programs,regional/inter-jurisdictional planning and coordination processes and
the City's Growth Management Act Comprehensive Land Use Plan.
Projects are developed and prioritized based on both specific goals to be achieved by the
program and on general programming considerations. Those general programming
considerations are:
Planning. How,at a local and regional level,a project fits with,or addresses identified
future transportation goals;demands and planning processes must be evaluated. This is
strongly influenced by ongoing land use decisions and by regional highway and transit
system plans.
Financing. Many projects are dependent on outside grants, formation of LID's or the
receipt of mitigation funds. Prioritization has to take into account the peculiarities of
each of the various fund sources and the probabilities of when, and how much,money
will be available.
Scheduling. If a project is interconnected with,or interdependent on,other projects
taking place,this is reflected in their relative priorities.
Past Commitment. The level of previous commitment made by the City in terms of
resources, legislative actions or inter-local agreements also must be taken into
consideration in prioritizing TIP projects.
In addition to the general considerations discussed above,there are five specific project
categories through which the TIP is evaluated and analyzed. They are:
• Preservation of Existing Infrastructure
• Multi-Modal and Transportation Demand Management
• Community Livability and Enhancement
• Economic Development
• Operations and Safety
These categories provide a useful analysis tool and represent goals developed through an
evaluation of the City's transportation program in response to input from citizens and
local officials and to State and Federal legislation.
•
3-1
Taken as a whole,the five categories provide a framework for evaluating projects both
individually and as part of a strategy that seeks to meet and balance the transportation
needs of Renton during a time of increasing transportation demand,decreasing revenues,
and growing environmental concerns.
Although each project can be identified with an important concern that allows it to be
classified into one of the five categories,most projects are intended to address,and are
developed to be compatible with,multiple goals.
Preservation of the Existing Infrastructure is a basic need that must be met by the
program. The Mayor and City Council have addressed the importance of sustaining
strong programs in this project category. The State Growth Management Act also
requires jurisdictions to assess and address the funding required to maintain their existing
transportation systems. The City of Renton owns and maintains 243 centerline miles of
streets.
Multi-modal and Transportation Demand Management(TDM)projects and
programs are oriented toward"moving people"through a balanced transportation system
that involves multiple modes of transportation and provides alternatives to the existing
heavy reliance on the single occupant vehicle(SOV). Included are facilities that facilitate
the movement of transit and carpools, and programs that promote the use of high
occupancy vehicles (HOV's) and reduce the number of SOV's. The Federal
Transportation Act(SAFETEA-LU),the State and Federal Clean Air legislation, and the
State Commute Trip Reduction Act(CTR)have added momentum to regional efforts and
placed requirements on local jurisdictions such as Renton to promote these transportation
elements.
Community Livability and Enhancement consists of projects that have been developed
with major emphasis on addressing community quality of life issues by improving and/or
protecting residential livability while providing necessary transportation system
improvements. Bicycle and pedestrian projects are included in this category.
Economic Development projects and programs involve transportation improvements
necessitated by new development that is taking place. Thus,a significant source of local
funding for these projects is projected to come from mitigation payments and from
specific access needs financed by new development.
Operations and Safety projects and programs are developed through ongoing analyses
of the transportation system and are directed mainly toward traffic engineering concerns
such as safety and congestion. Projects are identified not only by analysis of traffic
counts,accident records and geometric data,but also through review and investigation of
citizen complaints and requests.
Following this text are tables that display and summarize the six-year funding,plan
broken out in accordance with the five program categories.
Below is a more specific discussion of the activities involved in TIP development.
3-2
II. Specific TIP Development Activities
TIP project and financial development activities are intricately intertwined and involve
interactions with many groups and agencies at the local,regional, state and federal levels.
Within the Transportation Systems Division of the City of Renton,project development
involves year-around coordination among the Maintenance and Operations Section,the
Planning and Program Section and the Design Section.
The Transportation Maintenance and Operations Section compiles accident and traffic
count data,performs level-of-service calculations needed to identify
operational/congestion problems and tracks all transportation-related complaints,
suggestions and requests that come into the City.
The Transportation Design Section,through the TIP's Overlay Program and Bridge
Inspection and Repair Program,works closely with the Maintenance Services Division
and with its Pavement Management Systems to establish structural ratings for the City's
roads and bridges.
These and other data are being used by the Planning and Programming Section to develop
transportation improvement projects,prepare grant applications, interface with ongoing
state and federal transportation programs,and develop a TIP that supports the goals of the
City's long-range Comprehensive Plan and short-range business plan.
The Transportation Planning Section works with Metro Transit,the Puget Sound
Regional Council, Sound Transit,and other groups and agencies to assure consistency
between Renton's transportation policies and programs and those of the region. Such
consistency is required by the Growth Management Act and related legislation and by
federal and state grant programs.
•
Ongoing transportation planning activities, such as updating the Transportation Element
and traffic model,coordinating with the City's Comprehensive Plan and the development
of sub-area plans, such as the City Center, Benson,Cedar River,East Plateau,Fairwood,
Highlands,Kennydale,Talbot,Valley and West Hill Community Areas play an important
part in identifying and prioritizing transportation improvement projects. State and
regional transportation projects also play an important role such as those involving Sound
Transit,the Metropolitan Transportation Plan and the State Systems Plan.
Within the City of Renton,there are actions and interactions involving other departments
and divisions,the private sector,the City Council and Administration,which strongly
influence the direction of the transportation program.
For example,the transportation system is significantly impacted by land use decisions,
private development proposals and by public water and sewer extensions which increase
transportation demand by making possible higher density and/or intensity of land uses.
3-3
Such proposals need to be monitored and analyzed in regard to how they individually and
collectively create the need for transportation improvements.
All departments and divisions in the City, the City Council, and the Administration are
solicited each year to provide input,discuss,and comment on the Six-Year TIP.
Additional input is also gathered through interactions with other public and private
organizations and through public meetings held in the community concerning specific
transportation projects and programs.
At the City, State and Federal level there are new laws and regulations that create the
need for new or different kinds of transportation projects and programs. Examples
include the Federal Transportation Act(SAFETEA-LU), the Growth Management Act,
the Clean Air Act,the Commute Trip Reduction law, the Endangered Species Act and the
Surface Water Management Ordinance. All of these laws have tremendous impacts on
the development and costs of transportation projects.
Interconnection and/or interdependence among TIP projects and with projects by other
City departments and by other jurisdictions is another element that affects the
development,the prioritization and the timing of transportation projects. Equally
important is the likelihood,the time frame and the amount of outside funding that will be
obtainable to finance transportation projects.
In summary,with its heavy dependence on many different and unpredictable sources of
outside funding and with the significant impacts created by ongoing local and regional
land use decisions,transportation project development is a continuous activity comprised
of a multitude of diverse elements.
3.4
•
CITY OF RENTON - PUBLIC WORKS - TRANSPORTATION SYSTEMS DIVISION - 2012-2017 TIP
Six-Year Total Project
Type TIP Project Title 2012 2013 2014 2015 2016 2017 Period Total Funded Unfunded
1 Street Overlay 756,000 794,000 833,000 876,000 920,000 997,000 5,176,000 4,501,000 675,000_
ea c2 Arterial Rehabilitation Program 348,000 366,000 385,000 404,000 425,000 455,000 2,383,000 2,383,000
g a 14 NE 31st Street Culvert Repair _
i 18 Sidewalk Rehabilitation and Replace 50,000 250,000 250,000 250,000 250,000 250,000 1,300,000 250,000 1,050,000
o E 19 Bridge Inspection&Repair Program 55,000 75,000 20,000 - 20,000 20,000 25,000 215,000 165,000 50,000
M 20 Roadway Safety and Guardrail Prog 10,000 40,000 15,000 15,000 15,000 25,000 120,000 95,000 25,000
23 Preservation of Traffic Operation De 62,000 62,000 62,000 62,000 62,000 62,000 372,000 372,000
3 Rainier Ave Improvements-Grady V 12,156,852 5,210,079 17,366,931 17,366,931
4 SW 27th Street/Strander Boulevard t 5,630,000 6,095,760 1,535,000 7,665,000 6,765,000 4,561,000 32,251,760 16,725,760 15,526,000
4-A SW 27th Street-Loan Repayment 150,000 150,000 150,000 150,000 150,000 750,000 750,000
5 NE 3rd/NE 4th Corridor Improvemen 1,560,000 470,000 400,000 2,220,000 4,440,000 555,000 9,645,000 2,912,000 6,733,000
Z 6 Duvall Ave NE-NE 7th St to Sunset 100,000 660,000 2,800,000 2,120,000 445,000 6,125,000 6,125,000
d 7 S.Lake Washington Roadway Imprc 2,200,000 2,200,000 440,000 1,760,000
If
r 8 Park Avenue North Extension 2,400,000 2,600,000 5,000,000 5,000,000
`0 9 116th Ave SE Improvements 820,000 2,754,000 3,760,000 1,600,000 5,351,000 14,285,000 14,285,000
.o 10 Carr Road Improvements 200,000 200,000 30,000 170,000
c 11 NE Sunset Boulevard Corridor Impri 10,000 1,000,000 2,700,000 1,100,000 2,220,000 7,030,000 10,000 7,020,000
V 12 Oakesdale Ave SW-Monster Road t 50,000 5,300,000 5,350,000 5,350,000
13 South 7th Street-Rainier Ave S to T 80,000 520,000 200,000 800,000 600,000 2,300,000 4,500,000 600,000 3,900,000
37 Lake Washington Blvd N-Park Ave 60,000 230,000 330,000 620,000 60,000 560,000
38 Lind Ave SW-SW 16th St to SW 43r 250,000 1,350,000 1,900,000 3,500,000 3,500,000
39 Logan Ave N Concrete Panel Repair 50,000 725,000 725,000 1,500,000 50,000 1,450,000
�, 21 Intersection Safety&Mobility Progr, 10,000 250,000 250,000 250,000 250,000 250,000 1,260,000 1,260,000
rn 22 Traffic Safety Program 20,000 50,000 40,000 40,000 40,000 40,000 230,000 206,000 24,000
,2 15 Highlands to The Landing Pedestria 1,140,000 560,000 1,700,000 1,700,000
.2 16 Lake to Sound(L2S)Trail 500,000 750,000 1,250,000 1,250,000
c0 17 Walkway Program 120,000 250,000 250,000 250,000 250,000 280,000 1,400,000 1,120,000 280,000
27 Bicycle Route Development Prograr 70,000 70,000 70,000 70,000 • 80,000 360,000 200,000 160,000
zo 28 Barrier-Free Transition Plan implem 15,000 50,000 50,000 50,000 50,000 50,000 265,000 202,000 63,000
c 25 Transit Program 6,000 25,000 25,000 25,000 25,000 40,000 146,000 146,000
FE- y 26 Transportation Demand Managemer 55,000 65,000 65,000 65,000 65,000 65,000 380,000 380,000
24 intelligent Transportation Systems( 50,000 30,000 30,000 30,000 30,000 30,000 200,000 200,000 _
29 City Center Community Plan 50,000 50,000 50,000
30 Protect Development&Pre-Design I • 60,000 135,000 135,000 135,000 135,000 150,000 750,000 650,000 100,000
iv 31 Arterial Circulation Program 90,000 235,000 235,000 235,000 235,000 250,000 1,280,000 1,030,000 250,000
32 Transportation Concurrency/LOS Pr 30,000 20,000 30,000 30,000 30,000 30,000 170,000 160,000 10,000
33. Environmental Monitoring Program 20,000 20,000 40,000 40,000
34 WSDOT Coordination Program 20,000 30,000 30,000 30,000 • 30,000 40,000 180,000 180,000
35 Geographic Information System-Tr 5,000 15,000 15,000 15,000 15,000 15,000 80,000 80,000
38 1%for the Arts Program 15,000 15,000 15,000 15,000 15,000 15,000 90,000 90,000
Total Sources 23,743,852 21.177.839_ 14,619,000 24,642,000 21,657,000 23,881,000 129,720,691 52,704,691 77,016,000
By Typo 3-5 2nd Draft 01 PM
SIX-YEAR PROJECT COST SUMMARY*
CITY OF RENTON-2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Period
TIP Project Title 2012 2013 2014 2015 2016 2017 Total
1 Street Overlay 756,000 794,000 833,000 876,000 920,000 997,000 5,176,000
2 Arterial Rehabilitation Program 348,000 366,000 385,000 404,000 425,000 455,000 2,383,000
3 Rainier Ave Improvements-Grady Way 12,156,852 5,210,079 17,366,931
4 SW 27th StreetlStrander Boulevard Co 5,630,000 6,095,760 1,535,000 7,665,000 6,765,000 4,561,000 32,251,760
4-A SW 27th Street-Loan Repayment 150,000 150,000 150,000 150,000 150,000 750,000
5 NE 3rd/NE 4th Corridor Improvements 1,560,000 470,000 400,000 2,220,000 4,440,000 555,000 9,645,000
6 Duvall Ave NE-NE 7th St to Sunset all 100,000 660,000_ 2,800,000 2,120,000 .445,000 6,125,000
7 S.Lake Washington Roadway Improve 2,200,000 2,200,000
8 Park Avenue North Extension 2,400,000 2,600,000 5,000,000
9 116th Ave SE Improvements 820,000 2,754,000 3,760,000 1,600,000 5,351,000 14,285,000
10 Carr Road Improvements 200,000 200,000
11 NE Sunset Boulevard Corridor Improve 10,000 1,000,000 2,700,000 1,100,000 2,220,000 7,030,000
12 Oakesdale Ave SW-Monster Road to 5 50,000 5,300,000 5,350,000
13 South 7th Street-Rainier Ave S to Talk 80,000 520,000 200,000 800,000 600,000 2,300,000 4,500,000
14 NE 31st Street Culvert Repair
15 Highlands to The Landing Pedestrian( ' 1,140,000 560,000 1,700,000
16 Lake to Sound(US)Trail 500,000 750,000 1,250,000
17 Walkway Program 120,000 250,000 250,000 250,000 250,000 280,000 1,400,000
18 Sidewalk Rehabilitation and Replacem 50,000 250,000 250,000 250,000 250,000 250,000 1,300,000
19 Bridge Inspection&Repair Program 55,000 75,000 20,000 20,000 20,000 25,000 215,000
20 Roadway Safety and Guardrail Progran 10,000 40,000 15,000 15,000 15,000 25,000 120,000
21 Intersection Safety&Mobility Program 10,000 250,000 250,000 250,000 250,000 250,000 1,260,000
22 Traffic Safety Program 20,000 50,000 40,000 40,000 40,000 40,000 230,000
23 Preservation of Traffic Operation Devic 62,000 62,000 62,000 62,000 62,000 62,000 372,000
24 Intelligent Transportation Systems(ITE 50,000 30,000 30,000 30,000 30,000 30,000 200,000
25 Transit Program 6,000 25,000' 25,000 25,000 25,000 40,000 146,000
26 Transportation Demand Management( 55,000 65,000 . 65,000 65.000 65,000 65,000 380,000
27 Bicycle Route Development Program 70,000 70,000 70,000 .70,000 80,000 360,000
28 Barrier-Free Transition Plan Implement 15,000 50,000 50,000 50,000 50,000 50,000 265,000
29 City Center Community Plan 50,000 50,000
30 Project Development&Pre-Design Pro 60,000 135,000 135,000 135,000 135,000 150,000 750,000
31 Arterial Circulation Program 90,000 235,000 235,000 235,000 , 235,000 250,000 1,280,000
32 Transportation Concurrency/LOS Prog 30,000 20,000 30,000, 30,000 ' 30,000 30,000 170,000
33 Environmental Monitoring Program 20,000 20,000 _ 40,000
34 WSDOT Coordination Program 20,000 30,000 30,000 30,000 30,000 40,000 180,000
35 Geographic Information System-Tran, 5,000 15,000 15,000 15,000 15,000 15,000 80,000
36 1%for the Arts Program 15,000 15,000 15,000 15,000 15,000 . 15,000 90,000
37 Lake Washington Blvd N-Park Ave N t 60,000 230,000 330,000 620,000
38 Lind Ave SW-SW 16th St to SW 43rd 5 250,000 1,350,000 1,900,000 3,500,000
39 Logan Ave N Concrete Panel Repair 50,000 725,000 725,000 1,500,000
Total Expenditures 23,743,852 21,177,839 14,619,000 24,642,000 21,657,000 23,881,000 129,720,691
s,x�_P,cisum 'Including unfunded amounts. 060112011 131B
4-1 2nd Draft
•
a
CITY FUNDS (VEHICLE FUEL TAX+BUSINESS LICENSE FEE+ FUND BALANCE+ MITIGATION)
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Period
TIP Project Title 2012 2013 2014 2015 2016 2017 Total
1 Street Overlay 756,000 744,000 725,000 716,000 755,000 805,000 4,501,000
2 Arterial Rehabilitation Program 348,000 366,000 385,000 404,000 425,000 455,000 2,383,000
3 Rainier Ave Improvements-Grady W 47,672 47,672
4 SW 27th Street/Strander Boulevard C
4-A SW 27th Street-Loan Repayment 150,000 150,000 150,000 150,000 150,000 750,000
5 NE 3rd/NE 4th Corridor Improvement 624,000 171,000_ 255,000 296,000 285,000 345,000 1,976,000
6 Duvall Ave NE-NE 7th St to Sunset t
7 S.Lake Washington Roadway Impro 140,000 140,000
8 Park Avenue North Extension
9 116th Ave SE Improvements
10 Can Road Improvements 30,000 30,000
11 NE Sunset Boulevard Corridor Impro 10,000 10,000
12 Oakesdale Ave SW-Monster Road tc
13 South 7th Street-Rainier Ave S to T2
14 NE 31st Street Culvert Repair
15 Highlands to The Landing Pedestriar
16 Lake to Sound(L2S)Trail
17 Walkway Program 120,000_ 190,000 190,000 190,000 200,000 230,000 1,120,000
18 Sidewalk Rehabilitation and Replace 50,000 40,000 40,000 40,000 40,000 40,000 250,000
19 Bridge Inspection&Repair Program 55,000 25,000 20,000 20,000 20,000 25,000 165,000
20 Roadway Safety and Guardrail Progr 10,000 15,000 15,000 15,000 15,000 25,000 95,000
21 Intersection Safety&Mobility Progra 10,000 250,000 250,000 250,000 250,000 250,000 1,260,000
22 Traffic Safety Program 20,000 30,000 36,000 40,000 40,000 40,000 206,000
23 Preservation of Traffic Operation DeN 62,000 62,000 62,000 62,000_ 62,000 62,000 372,000
24 Intelligent Transportation Systems(E 50,000 30,000 30,000 30,000 30,000 30,000 200,000
25 Transit Program 6,000 25,000 25,000 25,000 25,000 40,000 146,000
26 Transportation Demand Managemen 12,000 22,000 22,000 22,000 22,000 22,000 122,000
27 Bicycle Route Development Program 30,000 40,000 40,000 40,000 50,000 200,000
28 Barrier-Free Transition Plan Implemet 15,000 30,000 25,000 50,000 41,000 41,000 202,000
29 City Center Community Plan 50,000 50,000
30 Project Development&Pre-Design P 60,000 115,000 115,000 115,000 115,000 130,000 650,000
31 Arterial Circulation Program 90,000 185,000 185,000 185,000 185,000 200,000 1,030,000
32 Transportation ConcurrencylLOS Prc 30,000 10,000 30,000 30,000 30,000 30,000 160,000
33 Environmental Monitoring Program_ 20,000 20,000 40,000
34 WSDOT Coordination Program 20,000 30,000 30,000 30,000 30,000 40,000 180,000
35 Geographic Information System-Tra 5,000_ 15,000 15,000 15,000 15,000 15,000 B0,000
36 1%for the Arts Program 15,000 15,000 15,000 15,000 15,000 15,000 90,000
37 Lake Washington Blvd N-Park Ave P 60,000 60,000
38 Lind Ave SW-SW 16th St to SW 43rc
39_Logan Ave N Concrete Panel Repair 50,00050,000
Total Sources 2,885,672 2,600,000 2,660,000 2,740,000 2,790,000 2,890,000 16,565,672
OY12O11 @39
4-2 2nd Draft
SUMMARY OF FUNDING SOURCES
2012 -2017 TRANSPORTATION IMPROVEMENT PROGRAM
Period
ITEM 2012 2013 2014 2015 2016 2017 Period Total
SIX-YEAR PROJECT COSTS:
Planning 546,000 ,, 868,000 688,000 668,000 718,000 573,000 4,061,000
Design 332,352 2,074,808 4,383,500 2,379500 749,500 3,449,500 13,369,160
R-O-W (includes Admin) 927,000 500,000 2,400,000 1,600,000 2,300,000 7,727,000
Construction Contract 19,926,982 15,390,381 8,303,500 17,389,500 16,754,500 15,938,500 93,703,363
Construction Management 2,918,518 1,882,650 734,000 1,795,000 1,825,000 1,605,000 10,760,168 '
Other/Post Const. Services 20,000 35,000 10,000 10,000 10,000 15,000 100,000
Sub -TOTAL SIX-YEAR COST 23,743,852 21,177,839 14,619,000 24,642,000 21,657,000 23,881,000 129,720,691
SOURCE OF FUNDS: "
Vehicle Fuel Tax 630,000 640,000 650,000 660,000 670,000 680,000 3,930,000
Business License Fee 1,670,000 1,700,000 1,740,000 1,780,000" 1,820,000 1,860,000 10,570,000
Proposed Fund Balance 60,672 60,672
Grants In-Hand 13,255,887 7,585,079 1,870,000 1,870,000 1,260,000 25,840,965
•
Mitigation In-Hand 525,000 260,000 270,000 300,000 300,000_ 350,000 2,005,000
Other In-Hand 5,842,294 4,283,760 43,000 43,000 43,000_ 43,000 10,298,054
Sub -TOTAL SIX-YEAR FUNDED 21,983,852 14,468,839 2,703,000 4,653,000 4,703,000 4,193,000 52,704,691
Grants Proposed 1,760,000 1,760,000
Undetermined 6,709,000 11,916,000 19,989,000 16,954,000 19,688,000 75,256,000
Sub-TOTAL SIX-YEAR UNFUNDED 1,760,000 6,709,000 11,916,000 19,989,000 16,954,000 19,688,000 77,016,000
TOTAL SOURCES-FUNDED& UNFUNDED 23,743,852 21,177,839 14,619,000 24,642,000 21,657,000 23,881,000 129,720,691
I Not included in the programmed above712011 13:113 `
4 -3 2nd Draft
VEHICLE FUEL TAX
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Period
TIP Project Title 2012 2013 2014 2015 2016 2017 Total
1 Street Overlay 630,000 640,00D 650,000 660,000 670,000 680,000 3,930,000
2 Arterial Rehabilitation Program
3 Rainier Ave Improvements-Grady V
4 SW 27th Street/Strander Boulevard I
4-A SW 27th Street-Loan Repayment
5 NE 3rd/NE 4th Corridor Improvemen
6 Duvall Ave NE-NE 7th St to Sunset
7 S.Lake Washington Roadway Imps
8 Park Avenue North Extension
9 116th Ave SE Improvements
10 Carr Road Improvements
11 NE Sunset Boulevard Corridor Impn
12 Oakesdale Ave SW-Monster Road I
13 South 7th Street-Rainier Ave S to T
14 NE 31st Street Culvert Repair
15 Highlands to The Landing Pedestria
16 Lake to Sound(US)Trail
17 Walkway Program
18 Sidewalk Rehabilitation and Replace
19 Bridge Inspection&Repair Program
2D Roadway Safety and Guardrail Prod
21 Intersection Safety&Mobility Progn
_ 22 Traffic Safety Program
23 Preservation of Traffic Operation De
24 Intelligent Transportation Systems(
25 Transit Program
26 Transportation Demand Managemer
27 Bicycle Route Development Prograr
28 Barrier-Free Transition Plan Implem
29. City Center Community Plan
30 Project Development&Pre-Design I
31 Arterial Circulation Program
32 Transportation Concurrency/LOS Pr
33 Environmental Monitoring Program
34 WSDOT Coordination Program
35 Geographic Information System-Tr
36_1%for the Arts Program
37 Lake Washington Blvd N-Park Ave • ,
38 Lind Ave SW-SW 16th St to SW 43r
•
39 Logan Ave N Concrete Panel Repair
Total Sources 630,000 640,000 __ 650,000 660,000 670,000 680,000 3,930,000
Co T® 0621r.011 1339
4-4 2nd Draft
•
BUSINESS LICENSE FEE
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
•
Period
TIP Project Title 2012 2013 2014 2015 2016 2017 Total
1 Street Overlay 126,000 104,000 75,000 56,000 85,000 125,000 571,000
2 Arterial Rehabilitation Program 348,000 366,000 385,000 404,000 425,000 455,000 2,383,000
3 Rainier Ave Improvements-Grady'
4 SW 27th Street/Strander Boulevard
4-A SW 27th Street-Loan Repayment 150,000 150,000 150,000 150,000 150,000 750,000
5 NE 3rd/NE 4th Corridor Improvemei 376,000 61,000 35,000 46,000 35,000 45,000 598,000
6 Duvall Ave NE-NE 7th St to Sunset
7 S.Lake Washington Roadway Impr
8 Park Avenue North Extension
9 116th Ave SE Improvements _
10 Carr Road Improvements 30,000 30,000
11 NE Sunset Boulevard Corridor Imps
12 Oakesdale Ave SW-Monster Road
13 South 7th Street-Rainier Ave S to'
14 NE 31st Street Culvert Repair
15 Highlands to The Landing Pedestrir
16 Lake to Sound(US)Trail .
17 Walkway Program 70,000 140,000 140,000 140,000 150,000 180,000 820,000
18 Sidewalk Rehabilitation and Replac 50,000 40,000 40,000 40,000 40,000 ' 40,000 250,000
19 Bridge Inspection&Repair Prograr 55,000 25,000 20,000 20,000 20,000 25,000 165,000
20 Roadway Safety and Guardrail Prof, 10,000 15,000 15,000 15,000 15,000 25,000 95,000
21 Intersection Safety&Mobility Progr 10,000 150,000 250,000 250,000 250,000 250,000 1,160,000
22 Traffic Safety Program 20,000 30,000 36,000 40,000 . 40,000 40,000 206,000
23 Preservation of Traffic Operation D 62,000 62,000 62,000 62,000 62,000 62,000 372,000
24 Intelligent Transportation Systems 50,000 30,000 30,000 30,000 30,000 30,000 200,000
25 Transit Program 6,000 25,000 25,000 25,000 25,000 40,000 146,000
26 Transportation Demand Manageme 12,000 22,000 22,000 22,000 22,000 22,000 122,000
27 Bicycle Route Development Progra 30,000 40,000 40,000 40,000 50,000 200,000
28 Barrier-Free Transition Plan Implen 15,000 30,000 25,000 50,000 41,000 41,000 202,000
29 City Center Community Plan 50,000 50,000
30 Project Development&Pre-Design 60,000 115,000 115,000 115,000_ 115,000 130,000 650,000
31 Arterial Circulation Program 90,000 185,000 185,000 185,000 185,000 200,000 1,030,000
32 Transportation Concurrency/LOS P 30,000 10,000 30,000 30,000 30,000 30,000 160,000
33 Environmental Monitoring Program 20,000 20,000 40,000
34 WSDOT Coordination Program 20,000 30,000 30,000 30,000 30,000 40,000 180,000
35 Geographic Information System-T 5,000 15,000 15,000 .15,000 15,000 15,000 80,000
36 1%for the Arts Program 15,000 15,000 15,000 15,000 15,000 15,000 90,000
37 Lake Washington Blvd N-Park Ave
38 Lind Ave SW-SW 16th St toSW43
39 Logan Ave N Concrete Panel Repai 20,000 20,000
Total Sources 1,670,000 1,700,000 1,740,000 1,780,000 1,820,000 1,860,000 10,570,000
am�_ux
4-5 2nd Draft
USE OF FUND BALANCE
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Period
TIP Project Title 2012 2013 2014 2015 2016 2017 Total
1 Street Overlay
2 Arterial Rehabilitation Program
3 Rainier Ave Improvements-Grady 22,672 22,672
4 SW 27th Street/Strander Boulevard
4-A SW 27th Street-Loan Repayment
5 NE 3rd/NE 4th Corridor Improveme 8,000 8,000
6 Duvall Ave NE-NE 7th St to Sunse
7 S.Lake Washington Roadway lmpr
8 Park Avenue North Extension
9 116th Ave SE Improvements
10 Carr Road Improvements
11 NE Sunset Boulevard Corridor Imps
12 Oakesdale Ave SW-Monster Road
13 South 7th Street-Rainier Ave S to'
14 NE 31st Street Culvert Repair
15 Highlands to The Landing Pedestrt
16 Lake to Sound(L2S)Trail
17 Walkway Program
18 Sidewalk Rehabilitation and Replac
19 Bridge Inspection&Repair Prograr
20 Roadway Safety and Guardrail Pro(
21 Intersection Safety&Mobility Progi
22 Traffic Safety Program
23 Preservation of Traffic Operation D
24 Intelligent Transportation Systems
25 Transit Program
26 Transportation Demand Manageme
27 Bicycle Route Development Progra
28 Barrier-Free Transition Plan Implen
29 City Center Community Plan
30 Project Development&Pre-Design
31 Arterial Circulation Program
32 Transportation Concurrency/LOS P
33 Environmental Monitoring Program
34 WSDOT Coordination Program
35 Geographic Information System-T
36 1%for the Arts Program
37 Lake Washington Blvd N-Park Ave
38 Lind Ave SW-SW 16th St to SW 43
39 Logan Ave N Concrete Panel Repai 30,000 30,000
Total Sources 60,672 60,672
Prepsal F,n,Bebm OOR12111 13:30
4-6 2nd Draft
•
GRANTS IN-HAND
•
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Period
TIP Project Title 2012 2013 2014 2015 2016 2017 Total
1 Street Overlay
2 Arterial Rehabilitation Program
3 Rainier Ave Improvements-Gradyl 7,889,887 3,785,079 11,674,965
4 SW 27th Street/Strander Boulevard 4,430,000 5,090,000 1,870,000 1,870,000 1,260,000 14,520,000
4-A SW 27th Street-Loan Repayment
5 NE 3rd/NE 4th Corridor Improvemer 936,000 936,000
6 Duvall Ave NE-NE 7th St to Sunset
7 S.Lake Washington Roadway Impri
8 Park Avenue North Extension
9 116th Ave SE Improvements
10 Carr Road Improvements
11 NE Sunset Boulevard Corridor Impr
12 Oakesdale Ave SW-Monster Road
13 South 7th Street-Rainier Ave S to-
14 NE 31st Street Culvert Repair
15 Highlands to The Landing Pedestrl
16 Lake to Sound(L2S)Trail
17 Walkway Program
18 Sidewalk Rehabilitation and Replan
19 Bridge Inspection&Repair Progran
20 Roadway Safety and Guardrail Pro,a
21 Intersection Safety&Mobility Progr
22 Traffic Safety Program
23 Preservation of Traffic Operation DI
24 Intelligent Transportation Systems
25 Transit Program
26 Transportation Demand Manageme
27 Bicycle Route Development Prograi
28 Barrier-Free Transition Plan Implerr
29 City Center Community Plan
30 Project Development&Pre-Design
31 Arterial Circulation Program
32 Transportation Concurrency/LOS P
33 Environmental Monitoring Program
34 WSDOT Coordination Program
35 Geographic Information System-Ti
36 1%for the Arts Program
37 Lake Washington Blvd N-Park Ave
38 Lind Ave SW-SW 16th St to SW 43
39 Logan Ave N Concrete Panel Repall
Total Sources 13,255,887 8,875,079 1,870,000 1,870,000 1,260,000 27,130,965
wn.ww a
4-7 2nd Draft
•
MITIGATION IN-HAND
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Period
TIP Project Title 2012 2013 2014 2015 2016 2017 Total
1 Street Overlay
2 Arterial Rehabilitation Program
3 Rainier Ave Improvements-Grady V 25,000 25,000
4 SW 27th Street/Strander Boulevard
4-A SW 27th Street-Loan Repayment •
5 NE 3rd/NE 4th Corridor Improvemen 240,000 110,000 220,000 250,000 250,000 300,000 1,370,000
6 Duvall Ave NE-NE 7th St to Sunset
7 S.Lake Washington Roadway Imprc 140,000 140,000
8 Park Avenue North Extension
9 116th Ave SE Improvements
10 Carr Road Improvements
11 NE Sunset Boulevard Corridor Impn 10,000 10,000
12 Oakesdale Ave SW-Monster Road 1
13 South 7th Street-Rainier Ave S to T
14 NE 31st Street Culvert Repair
15 Highlands to The Landing Pedestria
16 Lake to Sound(L2S)Trail
17 Walkway Program 50,000 50,000 50,000 50,000 50,000 50,000 300,000
18 Sidewalk Rehabilitation and Replace
19 Bridge Inspection&Repair Program
20 Roadway Safety and Guardrail Prog
21 Intersection Safety&Mobility Progr, 100,000 100,000
22 Traffic Safety Program
23 Preservation of Traffic Operation De
24 Intelligent Transportation Systems(
25 Transit Program
26 Transportation Demand Managemer
27 Bicycle Route Development Progran
28 Barrier-Free Transition Plan Implem
29 .City Center Community Plan
30 Project Development&Pre-Design F
31 Arterial Circulation Program
32 Transportation Concurrency/LOS Pr
33 Environmental Monitoring Program
34 WSDOT Coordination Program
35 Geographic Information System-Tr
36 1%for the Arts Program
37 Lake Washington Blvd N-Park Ave 60,000 60,000
38 Lind Ave SW-SW 16th St to SW 43r
39 Logan Ave N Concrete Panel Repair
Total Sources 525,000 260,000 270,000 _ 300,000 300,000 350,000 2,005,000
u��JIcE O6(t1/011 13:48
4-8 2nd Draft
OTHER IN-HAND(INCLUDES: CITY UTILITIES, SOUND TRANSIT&WSDOT AGREEMENTS)
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Period
TIP Project Title 2012 2013 2014 2015 2016 2017 Total
1 Street Overlay
2 Arterial Rehabilitation Program
3 Rainier Ave Improvements-Grady 4,219,294 1,425,000 5,644,294
4 SW 27th Street/Strander Boulevard 1,200,000 1,005,760 2,205,760
4-A SW 27th Street-Loan Repayment
5 NE 3rd/NE 4th Corridor Improveme
6 Duvall Ave NE-NE 7th St to Sunse
7 S.Lake Washington Roadway Impr 300,000 300,000
8 Park Avenue North Extension
9 116th Ave SE Improvements
10 Carr Road Improvements
11 NE Sunset Boulevard Corridor Imp!
12 Oakesdale Ave SW-Monster Road
13 South 7th Street-Rainier Ave S to' 80,000 520,000 600,000
14 NE 31st Street Culvert Repair
15 Highlands to The Landing Pedestri!
16 Lake to Sound(L2S)Trail
17 Walkway Program
18 Sidewalk Rehabilitation and Replac
19 Bridge Inspection&Repair Prograr
20 Roadway Safety and Guardrail Pro,
21 Intersection Safety&Mobility Progi
22 Traffic Safety Program
23 Preservation of Traffic Operation D
24 Intelligent Transportation Systems
25 Transit Program
26 Transportation Demand Manageme 43,000 43,000 43,000 43,000 43,000 43,000 258,000
27 Bicycle Route Development Progra
28 Barrier-Free Transition Plan Implen
29 City Center Community Plan
30 Project Development&Pm-Design
31 Arterial Circulation Program
32 Transportation Concurrency/LOS P
33 Environmental Monitoring Program
34 WSDOT Coordination Program
35 Geographic Information System-T
36 1%for the Arts Program
37 Lake Washington Blvd N-Park Avc
38 Lind Ave SW-SW 16th St to SW 43
39 Logan Ave N Concrete Panel Repai
Total Sources 5,842,294 2,993,760 43,000 43,000 43,000 43,000 9,008,054
O°'�'01i0 ownrzo„ 13,11
4-9 2nd Draft
•
GRANTS PROPOSED
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Period
TIP Project Title 2012 2013 2014 2015 2016 2017 Total
1 Street Overlay
2 Arterial Rehabilitation Program
3 Rainier Ave Improvements-Grady
4 SW 27th Street/Strander Boulevard
4-A SW 27th Street-Loan Repayment
5 NE 3rd/NE 4th Corridor Improveme
6 Duvall Ave NE-NE 7th St to Sunse
7 S.Lake Washington Roadway lmpr 1,760,000 1,760,000
8 Park Avenue North Extension
9 116th Ave SE Improvements
10 Carr Road Improvements
11 NE Sunset Boulevard Corridor Imp
12 Oakesdale Ave SW-Monster Road
13 South 7th Street-Rainier Ave S to:
14 NE 31st Street Culvert Repair
15 Highlands to The Landing Pedestrii
16 Lake to Sound(L2S)Trail
17 Walkway Program
18 Sidewalk Rehabilitation and Replac
19 Bridge Inspection&Repair Prograr
20 Roadway Safety and Guardrail Prod
21 Intersection Safety&Mobility Progi
22 Traffic Safety Program
23 Preservation of Traffic Operation D
24 Intelligent Transportation Systems
25 Transit Program
26 Transportation Demand Manageme,
27 Bicycle Route Development Progra
28 Barrier-Free Transition Plan Implen
29 City Center Community Plan
30 Project Development&Pre-Design
31. Arterial Circulation Program •
32 Transportation Concurrency/LOS P
33 Environmental Monitoring Program
34 WSDOT Coordination Program
35 Geographic Information System-T
36 1%for the Arts Program
37 Lake Washington Blvd N-Park Avc
38 Lind Ave SW-SW 16th St to SW 43
39 Logan Ave N Concrete Panel Repai
Total Sources 1,760,000 Grenes_Propee0 eemmn, ,r.e
4-10 -2nd Draft
UNDETERMINED
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Period•
TIP Project Title 2012 2013 2014 2015 2016 2017 Total
1 Street Overlay 50,000 108,000 160,000 165,000 192,000 675,000
2 Arterial Rehabilitation Program
3 Rainier Ave Improvements-Grady
4 SW 27th Street/Strander Boulevard 1,535,000 5,795,000 4,895,000 3,301,000 15,526,000
4-A SW 27th Street-Loan Repayment
5 NE 3rd/NE 4th Corridor Improvemel 299,000 145,000 1,924,000 4,155,000 210,000 6,733,000
6 Duvall Ave NE-NE 7th St to Sunse 100,000 660,000 2,800,000 2,120,000 445,000 6,125,000
7 S.Lake Washington Roadway lmpr
B Park Avenue North Extension 2,400,000 2,600,000• 5,000,000
9 116th Ave SE Improvements 820,000 2,754,000 3,760,000 1,600,000 5,351,000 14,285,000
10 Carr Road Improvements 170,000 170,000
11 NE Sunset Boulevard Corridor Imp , 1,000,000 2,700,000 1,100,000 2,220,000 7,020,000
12 Oakesdale Ave SW-Monster Road 50,000 5,300,000 5,350,000
13 South 7th Street-Rainier Ave S to' 200,000 800,000 600,000 2,300,000 3,900,000
14 NE 31st Street Culvert Repair
15 Highlands to The Landing Pedestrt 1,140,000 560,000 1,700,000
16 Lake to Sound(L2S)Trail 500,000 750,000 1,250,000
17 Walkway Program 60,000 60,000 60,000 50,000 50,000 280,000
18 Sidewalk Rehabilitation and Replac 210,000 210,000 210,000 210,000 210,000 1,050,000
19 Bridge Inspection&Repair Prograr 50,000 50,000
20 Roadway Safety and Guardrail Pros 25,000 25,000
21 Intersection Safety&Mobility Progi
22 Traffic Safety Program 20,000 4,000 24,000
23 Preservation of Traffic Operation D
24 Intelligent Transportation Systems
25 Transit Program
26 Transportation Demand Manageme
27 Bicycle Route Development Progra 40,000 30,000 30,00D 30,000 30,000 160,000
28 Barrier-Free Transition Plan Implen 20,000 25,000 9,000 9,000 63,000
29 City Center Community Plan
30 Project Development&Pre-Design 20,000 20,000 20,000 20,000 20,000 100,000
31 Arterial Circulation Program 50,000 50,000 50,000 50,000 50,000 250,000
32 Transportation Concurrency/LOS P 10,000 10,000
33 Environmental Monitoring Program
34 WSDOT Coordination Program
35 Geographic Information System-T
36 1%for the Arts Program
37 Lake Washington Blvd N-Park AVE 230,000 330,00D 560,000
38 Lind Ave SW-SW 16th St to SW 43 250,000 1,350,000 1,900,000 3,500,000
39 Logan Ave N Concrete Panel Repai 725,000 725,000 1,450,000
Total Undetermined 6,709,000 11,916,000 19,989,000 16,954,000 19,688,000 75,256,000
mrtrats.e.,
UBTRITI1 1148
4-1.1 2nd Draft
•
SECTION FIVE
PROJECT DESCRIPTIONS
• Summary of TIP Projects & Costs 5-la
• • Detailed Project Descriptions 5-1 to 5-41
CITY OF RENTON -PUBLIC WORKS TRANSPORTATION SYSTEMS DIVISION 2012-2017 SIX-YEAR TIP
Total Project Costs
Six-Year Total Total •
TIP Protect Title 2012 2013 2014 2015 2016 2017 Period Total Funded Unfunded
1 Street Overlay 756,000 794,000 833,000 876,000 920,000 997,000 5,176,000 4,501,000 675,000
2 Arterial Rehabilitation Program 348,000 366,000 385,000 404,000 425,000 455,000 2,383,000 2,383,000
3 Rainier Ave Improvements-Grady W 12,156,852 5,210,079 17,366,931 17,366,931
4 SW 27th Street/Strander Boulevard C 5,630,000 6,095,760 1,535,000 7,665,000 6,765,000 4,561,000 32,251,760 16,725,760 15,526,000
4-A SW 27th Street-Loan Repayment 150,000 150,000 150,000 150,000 150,000 750,000 750,000
5 NE-3rd/NE 4th Corridor Improvement 1,560,000 470,000 400,000 2,220,000 4,440,000 555,000 9,645,000 2,912,000 6,733,000_
6 Duvall Ave NE-NE 7th St to Sunset E 100,000 660,000 2,800,000 2,120,000 445,000 6,125,000 6,125,000
7 S.Lake Washington Roadway Improv 2,200,000 2,200,000 440,000 1,760,00o,
a Park Avenue North Extension 2,400,000 2,600,000 5,000,000 5,000,00.
9 116th Ave SE improvements 820,000 2,754,000 3,760,000 1,600,000 5,351,000 14,285,000 14,285,006''
10 Carr Road Improvements 200,000 200,000 30,000 170,000
11 NE Sunset Boulevard Corridor Impro 10,000 1,000,000 2,700,000 1,100,000 2,220,000 7,030,000 10,000 7,020,000
12 Oakesdale Ave SW-Monster Road tc 50,000 • 5,300,000 5,350,000 5,350,000
13 South 7th Street-Rainier Ave S to Ta 80,000 520,000 200,000 . 800,000 600,000 2,300,000 4,500,000 ' 600,000 3,900,000
14 NE 31st Street Culvert Repair
15 Highlands to The Landing Pedestriar 1,140,000 560,000 1,700,000 1,700,000
16 Lake to Sound(L2S)Trail .500,000 750,000 1,250,000 1,250,000 •
17 Walkway Program 120,000 250,000 250,000 - 250,000 250,000 280,000 1,400,000 1,120,000 280,000
18 Sidewalk Rehabilitation and Replace 50,000 250,000 250,000 250,000 250,000 250,000 1,300,000 250,000 1,050,000
19 Bridge Inspection&Repair Program 55,000 75,000 20,000 20,000 20,000 25,000 215,000 165,000 50,000_
20 Roadway Safety and Guardrail Progn 10,000 40,000 15,000 15,000 15,000 25,000 120,000 95,000 25,000_
21 intersection Safety&Mobility Progra 10,000 250,000 250,000 250,000, 250,000 250,000 1,260,000 1,260,000
22 Traffic Safety Program 20,000 50,000 40,000 40,000 40,000 40,000 230,000 206,000 24,000
23 Preservation of Traffic Operation Deu 62,000 62,000 62,000 62,000 62,000 62,000 372,000 372,000
24 Intelligent Transportation Systems(I- 50,000 30,000 30,000 30,000 30,000 30,000 200,000 200,000
25 Transit Program 6,000 25,000, 25,000 25,000 25,000 40,000 146,000 146,000
26 Transportation Demand Management 55,000 65,000 • 65,000 65,000 65,000 65,000 380,000 380,000
27 Bicycle Route Development Program 70,000 70,000 70,000 70,000 80,000 360,000 200,000 160,0(_
28 Barrier-Free Transition Plan impieme 15,000 50,000 50,000 50,000 50,000 50,000 265,000 202,000 63,000
29 City Center Community Plan 50,000 50,000 50,000
30 Protect Development&Pre-Design P 60,000 135,000 135,000 135,000 135,000 150,000 750,000 650,000 100,006-
31 Arterial Circulation Program 90,000 235,000 235,000 235,000 235,000, 250,000 1,280,000 1,030,000 250,000
32 Transportation Concurrency/LOS Prc 30,000 20,000 30,000 30,000 30,000 30,000 170,000 160,000 10,000
33 Environmental Monitoring Program 20,000 20,000 40,000 40,000
34 WSDOT Coordination Program 20,000 30,000 30,000 30,000 30,000 40,000 180,000 180,000
35 Geographic information System-Tra 5,000 15,000 15,000 15,000 15,000 15,000 80,000 80,000
36 1%for the Arts Program 15,000 15,000 15,000 15,000 15,000 15,000 90,000 90,000
37 Lake Washington Blvd N-Park Ave N 60,000 230,000 330,000 620,000 60,000 560,000
38 Lind Ave SW-SW 16th St to SW 43rd 250,000 1,350,000 1,900,000 3,500,000 3,500,000
39 Logan Ave N Concrete Panel Repair 50,000 725,000 725,000 1,500,000 50,000 1,450,000
Total Sources I 23,743,852 21,177,839 14,619,000 24,642,0001 21,657,000 23,881,000 • 129,720,691 52,704,691 77,016,000
Toll Prolix'Co.!.
2:05 PM
5-1a Draft
CITY OF RENTON
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 1 Street Overlay
Annual program for repairing and resurfacing existing roadways, operating the City's
Pavement Management System and providing data for deficiency ratings.The arterial
streets are rated every year,while the residential streets are rated every other year.
•
DESCRIPTION: ACP overlay and slurry seal of streets provide improved driving surface and are highly
cost-effective ways of avoiding expensive repairs and reconstruction. Installation of ADA
compliant curb ramps has been incorporated into this program according to new federal
requirements.
Community Planning Area: N/A
PROGRAM COST: Design $ 87,300
(2012-2017) Right-of-Way $ -
Construction Contract $ 4,845,700
Construction Management $ 243,000
TOTAL $ 5,176,000
•
PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
• _ Spent in 10 $ 959,961 $ - $ 959,961
2011 $ 819,110 $ - $ 819,110
2012 $ - $ 756,000 $ - $ 756,000
2013 $ 50,000 $ 744,000 $ - $ 744,000
2014 $ 108,000 $ 725,000 $ - $ 725,000
2015 $ 160,000 $ 716,000 $ - $ 716,000
2016 $ 165,000 $ 755,000 $ - $ 755,000
2017 $ 192,000 $ 805,000 $ - $ 805,000
Total $ 675,000 $4,501,000 $ - $ 4,501,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 4,501,000
Unfunded Need $ 675,000
TOTAL $ 5,176,000
PROGRAM STATUS: $100,000 have been allocated in 2010 for maintenance of alleyways.The budget is
reflected in the Overlay Program($50,000)and in the Arterial Rehabilitation Program
($50,000).
PAGE 5 - 1A
•
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Street Overlay Functional Classification: N/A
Proj.Length: N/A Proj: 122108
Community Planning Area: N/A TIP No. 1 CONTACT: NI Wressell 425.430.7400
DESCRIPTION: STATUS:
Annual program for repairing and resurfacing existing roadways,operating the City's Pavement This program funds overlays on neighborhood streets and collector streets. The Arterial
Management System and providing data for deficiency ratings. Rehabilitation Program funds major and minor arterials.Installation of ADA compliant curb
ramps has been incorporated into the annual Street Overlay Program in accordance with
federal requirements. A 5%annual cost increase has been incorporated into this program. -
JUSTIFICATION: CHANGES:
Asphalt concrete pavement(ACP)overlay and slurry seal of streets provide for improved driving surface The Transportation/Aviation Committee recommended$100,000 be allocated in 2011 for
and are highly cost-effective ways of avoiding expensive repairs and reconstruction. The computerized maintenance of existing alleyways.The budget Is reflected in the Overlay Program
Paverfient Management System and yearly survey of roadway conditions greatly improve the efficiency of ($50,000)and in the Arterial Rehabilitation Program($50,000).
the Overlay Program. The arterial streets are rated every year,while the residential streets are rated
every other year.
•
• 'Funded: 16,280,071 lUnfunded: I 675,000
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent In 2010 2011 Total 2012' 2013 2014 2015 2016 2017 ,
EXPENSES:
Planning
Preliminary Engineering 102,402 2,102 13,000 87,300 13,000 14,300 15,000 15,000 15,000 15,000
R-O-W(includes Admin)
Construction 6,528,075 - 916,265 766,110 4,845,700 703,000 739,700 778,000 820,000 864,000 941,000
Construction Services 324,594 41,594 40,000 - 243,000 40,000 40,000 40-,000 41,000 41,000 41,000
Post Construction Services
TOTAL EXPENSES 6,955,071 959,961 819,110 5,176,000 756,000 794,000 833,000 876,000 920,000 997,000
SOURCE OF FUNDS:
Vehicle Fuel Tax 4,920,000 370,000 620,000 3,930,000 630,000 640,000 650,000 660,000 670,000 680,000'
Business License Fee 952,000 250,000 131,000 571,000 , 126,000 104,000 75,000 56,000 85,000 125,000
Proposed Fund Balance 408,071 339,961 68,110
Grants In-Hand(1)
Grants In-Hand(2)
Mitigation In-Hand ,
Other In-Hand(1)
Other In-Hand(2)
Undetermined 675,000 675,000 50,000 108,000 160,000 165,000 192,000
TOTAL PROG SOURCES 6,955,071 959,961 819,110 5,176,000 756,000 794,000 833,000 876,000 920,000 997,000
Corby 00/182011 MIS ASI
5-1 2nd Draft
a
CITY OF RENTON
2012 - 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 2 Arterial Rehabilitation Program
This program provides for the rehabilitation of arterial streets,which have higher traffic
volume and truck and bus traffic. Installation of ADA compliant curb ramps has been
incorporated into the annual Arterial Rehabilitation and Overlay programs according to
new federal requirements.
DESCRIPTION: Proposed paving schedule:2011 -E Valley(SW 34th to SW 16th);2012-Benson Rd
(SR 515 to Puget Dr);2013-Benson Rd (Puget Dr to 1-405);2014-Airport Rd (Rainier
Ave to Logan): 2015-NE 3rd/4th(Logan to Sunset Blvd).This order may change
depending on future ratings.
Community Planning Area: N/A
PROGRAM COST: Design $ • -
(2012-2017) Right-of-Way $ -
Construction Contract $ 2,383,000
Construction Management . $ -
TOTAL $ 2,383,000
PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Spent in 10
2011 $ 342,000 •$ - $ 342,000
2012 $ - $ 348,000 $ - $ 348,000
2013 $ - $ 366,000 $ - $ 366,000
2014 $ - $ 385,000 $ - $ 385,000
2015 $ - $ 404,000 $ - $• 404000
2016 $ - $ 425,000 $ - $ 425,000
2017 $ - $ 455,000 $ - $ 455,000
Total $ - $ 2,383,000 $ - $ 2,383,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 2,383,000
Unfunded Need $ -
TOTAL $ 2,383,000
PROGRAM STATUS: A 5%annual cost increase has been incorporated into this program.$100,000 have
been allocated in 2011 for maintenance of existing alleyways.The budget is reflected
in the Overlay Program ($50,000)and in the Arterial Rehabilitation Program ($50,000).
PAGE 5 -2A
•
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
•
Arterial Rehabilitation Program Functional Classification:Various
Proj.Length: NIA • Proj: 122186
Community Planning Area: N/A TIP No. 2 CONTACT: Bill Wressel 425.430.7400
DESCRIPTION: STATUS:
This program provides for the rehabilitation of arterial streets where the restoration requirements are Proposed paving schedule:2011:E Valley(SW 27th to SW 19th);2012:Benson Rd(SR
beyond that which can be accomplished through the annual Overlay Program. Installation of ADA- 515 to S 26th St);2013:Benson Rd(S 26th St to 1-405);2014:N 3rd(Logan to Factory PI
compliant curb ramps has been incorporated.into the annual Arterial Rehabilitation and Overlay N);2015:N 4th PI(Burnett Av N to FactoryAv N);2016:Airport Way(Rainier Ave to
programs according to new federal requirements. Logan). This order may change depending on future ratings. A 5%annual cost Increase
has been incorporated into this program.
JUSTIFICATION: CHANGES:
The Overlay Program concentrates to a great degree on maintaining residential streets,where relatively The Transportation/Aviation Committee recommended$100,000 be allocated in 2011 for
small traffic volumes and less truck and bus traffic make standard asphalt overlays a long term means of maintenance of existing alleyways.The budget is reflected in the Overlay Program
maintenance. Arterial streets can often deteriorate rather quickly and often require more costly ($50,000)and in the Arterial Rehabilitation Program($50,000).
rehabilitation measures and/or costly temporary repairs to avoid more extensive deterioration. A number
of arterials identified as needing major rehabilitation are being addressed in this program and the
Overlay Program.
(Funded: 13,075,500 lUnfunded: I
Project Totals Programmed Pre-2012 Slx-Year Program
ITEM Programmed Spent In 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning
Preliminary Engineering
R-O-W(includes Admin)
Construction 3,075,500 350,500 342,000 2,383,000 348,000 366,000 385,000 404,000 425,000' 455,000
Construction Services
Post Construction Services
TOTAL EXPENSES 3,075,500 350,500 " 342,000 2,383,000 348,000 366,000 385,000 404,000 425,000 455,000
SOURCE OF FUNDS: .
Vehicle Fuel Tax 250,000 250,000
Business License Fee 2,825,500 100,500 342,000 2,383,000- 348,000 366,000 - 385,000 404,000, 425,000 455,000
Proposed Fund Balance
Grants In-Hand(1)
Grants In-Hand(2)
Mitigation In-Hand
Other In-Hand(1)
Other In-Hand(2)
Undetermined
TOTAL PROG SOURCES 3,075,500 350,500 342,000 2,383,000 348,000 366,000 385,000 404,000 425,000 455,000
Art atel_R 06/16/2011 8:45 AIA
5-2 2nd Draft
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 3 Rainier Ave Improvements-Grady Way to S 2nd Street
Rainier Ave is a critical corridor in Renton with existing operational problems and in
need of infrastructure enhancements to provide greater ease of non-motorized and
, transit-based travel,and reduce accidents. Business Access and Transit lanes will be
provided from S 2nd St to Grady Way southbound and from Grady Way to S 3rd St
northbound.
DESCRIPTION: Improvements will consolidate access points to existing major businesses and
enhance pedestrian/ADA environment. Project elements include removing the BNSF
railroad bridge pier,add left-turn lanes at intersections,widening sidewalks with
streetscaping, adding pedestrian-scale illumination,transit facility improvements,
planted buffer strips and landscaped medians.
Community Planning Area: City Center
TOTAL PROJECT COST:
Design $ 6,847,550
Right-of-Way $ 6,225,000
Construction Contract $ 16,132,885
Construction Management $ 3,150,375
BNSF bridge replacement $ 10,449,031
TOTAL $ 42,804,841
PROJECT EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Pre-2011 $ 4,468,030 14,147,848 $ 18,615,878
2011 $ - $ 1,992,837 $ 4,829,195 $ 6,822,032
2012 $ - $ 47,672 $ 12,109,181 $ 12,156,852
2013 $ - $ - $ 5,210,079 $ 5,210,079
2014
2015
2016
2017
Total $ - $ 6,508,539 $ 36,296,302 $42,804,841
PROGRAMMED FUNDING:
City of Renton: $ 6,508,539
Unfunded Need $ -
Other(Grants/Agreements): $ 36,296,302
TOTAL $ 42,804,841
PROJECT STATUS: Construction of the Phase 1 -Shattuck Ave Stormwater bypass is complete. City utility
improvements will be funded by the respective utilities.
PAGE 5 -3A
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Rainier Ave Improvements-Grady Way to S 2nd Street Functional Classification: Principal&Minor
Proj.Length: 0.89 ml Proj: 122703
Community Planning Area: City Center TIP No. 3 CONTACT: Derek Akesson 425.430.7337
DESCRIPTION: STATUS:
Improvements remove barriers,eliminate substandard conditions,consolidate access points to existing The ST agreement authorizes$14.9 million. Two State Ped and Bike Safety Grants have
major businesses,and provide an enhanced pedestrian environment. Project elements include adding been awarded:$200,000(2006)and$230,000(2007). TIB awarded grant funds of
business access and transit(BAT)lanes north and southbound,removing the BNSF railroad bridge $2,202,000(2003);$1,906,200(2006);and$2,831,500(2008). A$2.0 million(2009)
support pier,adding left-turn lanes at intersections,widening sidewalks with streetscaping, adding ARRA grant was awarded for Phase 1 (Shattuck Ave). A$4.8 million STP/CMAQ grant
pedestrian-scale illumination,bollards(at crossings),transit facility Improvements(shelters,benches, awarded for construction(2009). Dept of Commerce awarded a$500,000 grant(2009).A ,
information kiosks),planted buffer strips and landscaped medians. $1'.5 million Mobility grant award for construction(2011).
JUSTIFICATION: CHANGES:
Rainier Ave is a critical corridor in central Renton with existing operational problems and in need of Construction of the Phase 1-Shattuck Ave Stormwater bypass system is complete.
infrastructure enhancements to provide greater ease of non-motorized and transit-based travel. Existing Mitigation funds in the amount of$2,100,000 must be dedicated to fulfill grant
high levels of traffic congestion and accidents. Improvements will enhance traffic flow and reduce requirements to this project. City utility improvements will be funded by the respective
accidents. BAT lanes will be provided from S 2nd St to Grady Way southbound and from Grady Way to utilities and are not included in the TIP.
S 3rd St northbound.
I Funded:1 42,094,0671 Unfunded:I
Project Totals Programmed Pre-2012 Six Year Program
ITEM Programmed Spent Pre-2011 2011 Total 2012 2013 2014 2015 2016 _ 2017
EXPENSES:
Planning
Preliminary Engineering 6,847,550 5,694,788 889,402 263,360 184,352 79,008
R-O-W(Includes Admin) 6,225,000 292,370 5,932,630
Construction 16,132,885 1,631,482 14,501,403 10,150,982 4,350,421
Construction Services 3,150,375 548,207 2,602,168 1,821,518 780,650
BNSF Bridge-work by others 10,449,031 10,449,031
TOTAL EXPENSES 42,804,841 18,615,878 6,822,032 17,366,931 12,156,852 5,210,079
SOURCES OF FUNDS:
Vehicle Fuel Tax ,
Business License Fee 207,487 187,487 20,000
Proposed Fund Balance 1,653,123 157,614 1,472,837 22,672 22,672
Grants In-Hand(TIB) 6,939,700 962,804 . 1,517,931 4,458,965 3,223,687- 1,235,279
Grants(WSDOT+ARRA+STP+Mobilit; 9,170,828 1,991,828 13,000 7,166,000 4,666,200 2,499,800
Mitigation In-Hand 4,647,929 4,122,929 500,000 25,000 25,000
Grants In-Hand(Commerce) 500,000 151,749 298,251 50,000 50,000
Other In-Hand(Sound Tran.) 14,225,000 5,580,693 3,000,013 5,644,294 4,219,294 1,425,000
Other In-Hand(WSDOT bridge sal 4,750,000 4,750,000
Other(City Utilities) 710,774 710,774
Undetermined
TOTAL SOURCES 42,804,841 18,615,878 6,822,032 17,366,931 _ 12,156,852 5,210,079
Rth SI OB11820t1 8:15 AM
5-3 2nd Draft
H:1Division.s\TRANSPOR.TAl1PLANNING\Juliana\TIP120121Draft 2012-2017 TIP.xls Page 1
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 4 SW 27th Street/Strander Boulevard Connection
This project provides a new critical four/five-lane arterial that will serve as a connector
to West Valley Highway(SR 181)and East Valley Road.The project will provide a
grade-separated crossing at the Union Pacific Railroad(UPRR)and Burlington
Northern Santa Fe(BNSF)railroad tracks.
DESCRIPTION: The new road will provide access to the new Tukwila Station, a multi-modal center
being developed immediately north of the roadway alignment,and to the Boeing
. Longacres site. By undercrossing the UPRR and BNSF railroads,the new arterial will
provide significant benefits to both freight mobility and general motorists.
•
Community Planning Area: Valley
PROJECT COST(Up to 2017): •
Planning
Design $ 6,322,542
Right-of-Way $ 4,635,500
Construction Contract $ 29,495,510
Construction Management . $ 3,541,000
Phase 1, Seg 1 Design and Constr. $ 3,009,442
TOTAL $47,003,994
PROJECT EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Pre-2011 $ 5,441,591 $ 4,089,643 $ 9,531,234
2011 $ - $ 4,521,000 $ 4,521,000
2012 $ - $ - $ 5,630,000 $ 5,630,000
2013 $ - $ - $ 6,095,760 $ 6,095,760
2014 $ 1,535,000 $ - $ - $ -
2015 $ 5,795,000 $ - $ 1,870,000 $ 1,870,000
2016 $ 4,895,000 $ -. $ 1,870,000 $ 1,870,000
2017 $ 3,301,000 $ - $ 1,260,000 $ 1,260,000
Total $15,526,000 $ - $ 16,725,760 $ 16,725,760
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ -
Other(Grants/Agreements): $ 16,725,760
Unfunded Need $ 15,526,000
TOTAL $ 32,251,760
PROJECT STATUS: The total project cost is estimated as$62M,with completion in 2020.An interfund loan
in the amount of$700K was approved.The loan repayment is reflected in a separate
TIP (SW 27th St/Strander Blvd-Loan Repayment-TIP No.4-A).
PAGE 5 -4A
•
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
SW 27th Street/Strander Boulevard Connection Functional Classification: Minor Arterial
Proj.Length: 1.27 miles Proj: 122239,122240
Community Planning Area: Valley TIP No. 4 CONTACT: Rob Lochmiller 425.430.7303
DESCRIPTION: STATUS:
This project provides a critical four/five-lane arterial that will serve as a connector to West Valley $1,000,000 was received from the General Fund in 2003. Ph.1 Seg.1 is complete and
Highway(SR 181)and East Valley Road,as well as an arterial connector to SR 167 from the south. The has been paid with approximately$3M in bonds. Grants include:TEA-21 funds of -
project will provide a grade-separated crossing at the Union Pacific Railroad(UPRR)and Burlington $745,563(2003)and$2,398(2005);federal discretionary(STP)of$737,946, STP-N of
Northern Santa Fe(BNSF)railroad tracks. Right-of-way includes:City of Renton-$3.17 million,City of $94,420,federal discretionary(HPP)of$719,921,Section 129 of$122,500. The City was -
•
Tukwila-$0.95 million. awarded$4.6 M of STP Regional funds.FMSIB awarded a$5M for construction of the
next phase,pending Legislature authorization.
JUSTIFICATION: CHANGES:
A new east-west arterial roadway will connect the cities of Renton and Tukwila and provide significant FMSIB is contributing$7.75M and Sound Transit is contributing$4 M to Phase 1 -Seg 2a.
congestion relief to existing arterials. The new road will provide access to the new Tukwila Station,a The total project cost is estimated as$62M and completion anticipated for 2020. Costs
multi-modal center being developed immediately north of the new alignment,and to the Boeing • beyond 2017 not shown. An interfund loan in the amount of$700K was approved for the
Longacres site. By undercrossing the UPRR and BNSF railroads,the new arterial will provide significant current phase of this project.The loan repayment is reflected in a separate TIP(SW 27th
benefits to both freight mobility and general motorists. St/Strander Blvd-Loan Repayment-TIP No.4-A).
Pro ect Totals I Funded:I 31,477,9941 Unfunded:1 15,526,000
Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent Pre-2011 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning
Preliminary Engineering 6,322,542 3,337,542 1,450,000 1,535,000 1,535,000
R-O-W(includes Admin) 4,635,500 3,172,500 336,000 1,127,000 227,000 — 900,000
Construction 29,495,510 11,750 3,035,000 26,448,760 5,080,000 5,318,760 6,000,000 6,000,000 4,050,000
Construction Services 3,541,000 400,000 3,141,000 550,000 550,000 765,000 765,000 511,000
Phase 1,Seg 1 design and col 3,009,442 3,009,442
TOTAL EXPENSES 47,003,994 9,531,234 5,221,000 32,251,760 5,630,000 6,095,760 1,535,000 7,665,000 6,765,000 4,561,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
Loan for construction 700,000 700,000
Gen Fund&Prop.Fund Balance 2,084,591 2,084,591
Grants in-Hand(State&Fed) 2,422,748 2,077,988 344,760 -
Grants In-Hand(FMSIB) 12,750,000 448,000 1,322000 10,980,000 2,180,000 3,800,000 1,870,000 1,870,000 1,260,000
Mitigation In-Hand 557,500 557,500
Bonds _ 2,799,500 2,799,500
Other:Sound Transit+FRB 4,563,655 563,655 1,794,240 2,205,760 1,200,000 1,005,760
Grants In-Hand(STP Grant) 4,800,000 1,060,000 3,540,000 2,250,000 1,290,000
City of Tukwila Reimb. 1,000,000 1,000,000
Undetermined 15,526,000 15,526,000 1,535,000 5,795,000 4,895,000 3,301,000
TOTAL SOURCES 47,003,994 9,531,234 5,221,000 32,251,760 5,630,000 6,095,760 1,535,000 7,665,000 6,765,000 4,561,000
•
09/212011 2.10 PM
5-4 2nd Draft
;.i . !j,�..ey. .
a
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 4-A SW 27th Street/Strander Boulevard Connection-Loan Repayment
This project will account for the SW 27th St/Strander Blvd Connection loan repayment.
The loan was approved by Council in May 2011 and will be amortized over a 5-year
period, at a 2.25%interest rate.The interest amount to be paid over the life of the loan
is$50,000.
DESCRIPTION:
Community Planning Area: Valley
PROJECT COST:
Loan repayment . $ 750,000
Design $ -
Right-of-Way $ -
Construction Contract $ -
Construction Management . $ -
Phase 1,Seg 1 Design and Constr. $ -
TOTAL $750,000
PROJECT EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Pre-2011 $ - $ - $ -
2011 $ - $ - $ -
2012 $ - $ 150,000 $ - $ 150,000
2013 $ - $ 150,000 $ - $ 150,000
2014 $ - $ 150,000 $ - $ 150,000
2015 $ - $ 150,000 $ - $ 150,000
2016 $ - $ 150,000 $ - $ 150,000 •
2017 $ - $ - $ - $ -
Total $ - $ 750,000 $ - $ 750,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 750,000
Unfunded Need $ -
TOTAL $ 750,000
PROJECT STATUS: This TIP is for the SW 27th St/Strander Blvd-Loan repayment only.
PAGE 5 -4A.2
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
SW 27th Street/Strander Boulevard Connection -Loan Repayment Functional Classification:
Proj.Length: Proj: .
Community Planning Area: Valley TIP No. 4-A CONTACT: Rob Lochmiller 425.430.7303
DESCRIPTION: STATUS:
This project will account for the SW 27th St/Strander Blvd Connection loan repayment.The loan was
approved by Council in May 2011 and will be amortized over a 5-year period,at a 2.25%interest rate.
The interest amount to be paid over the life of the loan is$50,000.
• CHANGES:
•
1 Funded:I 750,0001 Unfunded:I
Project Totals Programmed Pre-2012 Six Year Program
ITEM Programmed Spent Pre-2011 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Loan repayment 750,000 750,000 150,000 150,000 150,000 150,000 150,000
Preliminary Engineering
R-O-W(includes Admin)
Construction
Construction Services
Phase 1,Seg 1 design and cons
TOTAL EXPENSES 750,000 750,000 150,0007 150,000 150,000 150,000 150,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
Business License Fee 750,000 750,000 150,000 150,000 150,000 150,000 150,000
Gen Fund&Prop.Fund Balance
Grants In-Hand(State&Fed)
Grants In-Hand(FMSIB)
Mitigation In-Hand
Bonds
Other:Sound Transit+FRB
Grants In-Hand(SW Grant)
City of Tukwila Reimb.
Undetermined
TOTAL SOURCES 750,000 _ 750,000 150,000 150,000 150,000 150,000 150,000
0611013011 4.29 PM
5-4A 2nd Draft
•
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
•
TIP No.: 5 NE 3rd/NE 4th Corridor Improvements
This project involves a series of improvements in this corridor(from Sunset Blvd to the
east City limits). The project will seek to meet pedestrian,transit and bicycle needs.
The NE 3rd/4th Corridor Study was adopted in May 2005.
DESCRIPTION: The estimated cost for design and construction of the improvements along the corridor
is$40M.This project has been phased. Phase 1 is the design and construction of
improvements along NE 4th St and a traffic signal at NE 4th St&Whitman Ave. Phase
1 improvements are estimated at$3.3M.
• Community Planning Area: Highlands&East Plateau
PROJECT COST(Up to 2017):
Planning $ 218,420
Design . $ 1,005,572
Right-of-Way $ 1,020,000
Construction Contract $ 8,430,000
Construction Management . $ 985,000
TOTAL $ 11,658,992
PROJECT EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 - Other 2 Total Funded
Pre-2011 $ 223,992 $ - $ 223,992
2011 $ 1,041,000
2012 $ - $ 624,000 $ 936,000 $ 1,560,000
2013 $ 299,000 $ 171,000 $ - $ 171,000
_ 2014 $ 145,000 $ 255,000 $ - $ 255,000
2015 $ 1,924,000 $ 296,000 $ - $ 296,000
2016 $4,155,000 $ 285,000 $ - $ 285,000
2017 $ 210,000 $ 345,000 $ - $ 345,000
Total $ 6,733,000 $ 1,976,000 $ 936,000 $ 2,912,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 1,976,000
Unfunded Need: $ 6,733,000
Other(grants/agreements) $ 936,000
TOTAL $ 9,645,000
PROJECT STATUS: Funds shown in 2011 and 2012 are for the Phase 1 improvements. Costs beyond 2017
not shown in the TIP.
PAGE 5 -5A
•
•
CITY OF RENTON
PUBLIC WORKS •
•
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
NE 3rd/NE 4th Corridor Improvements Functional Classification: Principal
Proj.Length: NIA Proj: 122176
Community Planning Area: Highlands&East Plateau TIP No. 5 CONTACT: Rob Lochmiller 425.430.7303
DESCRIPTION: STATUS:
This project Involves a series of improvements in this corridor to improve traffic operations such as The estimated cost for design and construction for the corridor(from Sunset Blvd N to the
rechannelization and traffic signal modifications,possible transit priority signal treatments and queue east City limits)is$40M.The project corridor has been phased.The project received a
jumps. This project will seek to meet pedestrian,transit and bicycle needs. $1,977,000 grant from TIB for Phase 1 improvements. Phase 1 is the design and
• construction and improvements along NE 4th St and a traffic signal at NE 4th St&
Whitman Ave.
JUSTIFICATION: CHANGES:
This corridor has a strong potential for transit usage and is experiencing rapid residential and retail Funds shown in 2011 and 2012 are for the Phase 1 improvements.The Phase 1
growth.The NE 3rd/4th Corridor Study was adopted In May 2005. The study refined the corridor improvements are estimated at$3.3M.
transportation needs and costs,including pedestrian,transit,bicycle Improvements,as well as
streetscape enhancement.
[Funded: 14,925,992 1Unfunded: 16,733,000
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent Pre-2011 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning 218,420 218,420 _
Preliminary Engineering 1,005,572 . 5,572 430,000 570,000 370,000 200,000
R-O-W(includes Admin) 1,020,000 720,000 300,000 100,000 200,000
Construction 8,430,000 530,000 7,900,000 1,400,000 2,000,000 4,000,000 500,000
Construction Services 985,000 110,000 875,000 160,000 220,000 . 440,000 55,000
Post Construction Services
TOTAL EXPENSES 11,658,992 223,992 1,790,000 9,645,000 1,560,000 - 470,000 400,000 2,220,000 4,440,000 555,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 735,162 27,162 110,000 598,000 376,000 61,000 35,000 46,000 35,000 45,000
Proposed Fund Balance 287,130 3,130 276,000 8,000 8,000
Grants In-Hand(TIB) 1,977,000 1,041,000 936,000 936,000
Grants In-Hand(2)
Mitigation In-Hand 1,926,700 193,700 363,000 1,370,000 240,000 110,000 220,000 250,000 250,000 300,000
Other In-Hand(1)
Other In-Hand(1)
Grants Proposed _
Other Proposed
Undetermined 6,733,000 6,733,000 299,000 145,000 1,924,000 4,155,000 210,000
•
TOTAL SOURCES 11,658,992 223,992 1,790,000 9,645,000 1,560,000 470,000 400,000 2,220,000 4,440,000 555,000
NE3,d NE4O, %I1G/2011 645 AM
5-5 2nd Draft
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 6 Duvall Ave NE-NE 7th St to Sunset Blvd NE
Widening roadway to five lanes, including new pavement,curb,gutter,sidewalk,street
lights,storm drainage,channelization and bike lanes from NE 7th St to the intersection
with NE Sunset Blvd.
DESCRIPTION: Complete a missing link of 5-lane roadway, bicycle lanes and sidewalks on Duvall Ave
NE,from NE 4th St to Sunset Blvd NE.Condition of the existing roadway pavement
requires total replacement.
Community Planning Area: Highlands&East Plateau
TOTAL PROJECT COST:
(2012-2017) Planning $ 10,000
Design $ 650,000
Right-of-Way $ -
Construction Contract $ 4,900,000
Construction Management $ 565,000
TOTAL $ 6,125,000
PROJECT EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Pre-2011 $ - $ - $ -
2011 $ - $ $ -
2012 $ - $ - $ - $ -
2013 $ 100,000 $ - $ - $ -
2014 $ 660,000 $ - $ - $ -
2015 $2,800,000 $ - $ - $ -
2016 $2,120,000 $ - $ - $ -
2017 $ 445,000 $ - $ - $ -
Total $6,125,000 $ - $ - $ -
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ -
Unfunded Need: $ 6,125,000
TOTAL $ 6,125,000
PROJECT STATUS: Construction pending outside funding. Project to enhance safe vehicle, bicycle and
pedestrian access along a minor arterial street.
PAGE 5 -6A
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Duvall Ave NE -NE 7th St to Sunset Blvd NE Functional Classification: Minor Arterial Fund: 317
Proj.Length: 0.67 mi Proj: 122702
Community Planning Area: Highlands&East Plateau TIP No. 6 CONTACT: James Wilholt 425.430.7319
•
DESCRIPTION: STATUS:
Widening roadway to five lanes,including new pavement,curb,gutter,sidewalk,street lights,storm Construction to be completed in 2017,pending outside funding. New project to enhance
drainage,channellzation and bike lanes from NE 7th St to the intersection with Sunset Blvd NE._ safe vehicle,bicycle and pedestrian access along a minor arterial street.
JUSTIFICATION: CHANGES:
Complete a missing link of 5-lane roadway,bicycle lanes and sidewalks on Duvall Ave NE,from NE 4th Funds shown in 2013 for minor overlay repair.Project is unfunded.
St to Sunset Blvd NE.Condition of the existing roadway pavement requires total replacement.
1 Funded:1 I Unfunded:1 6,125,000
Protect Totals Programmed Pre-2012 Six Year Program
ITEM Programmed Spent Pre-2011 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning 10,000 10,000 10,000
Preliminary Engineering 650,000 650,000 650,000
R-O-W(Includes Admin)
Construction 4,900,000 4,900,000 100,000 2,500,000 1,900,000 400,000
Construction Services 565,000 565,000 300,000 220,000 45,000
Post Construction Services
TOTAL EXPENSES 6,125,000 6,125,000 100,000 660,000 2,800,000 2,120,000 445,000
SOURCES OF FUNDS: -
-
Vehicle Fuel Tax
Business License Fee •
Proposed Fund Balance
Grants In-Hand(1)
Grants In-Hand(2)
Mitigation In-Hand
Other In-Hand(1)
Other In-Hand(2)
Undetermined 6,125,000 6,125,000 100,000 660,000 2,800,000 2,120,000 445,000
TOTAL SOURCES 6,125,000 6,125,000 100,000 . 660,000 2,800,000 2,120,000 445,000
OureB T,h to 9uuN • 06/112011 061168011 6:46
5-6 2nd Draft
CITY OF RENTON
2012 - 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 7 S.Lake Washington Roadway Improv.(Garden Ave N Widening)
With the growth in the North Renton area,which includes The Landing, Lowe's, and
the Southport residential/office development,this project will identify and construct
improvements to improve traffic flows in the vicinity.
DESCRIPTION: The project will provide roadway, intersection and traffic route improvements on
Garden Ave N,Lake Washington Blvd and Houser Way to mediate the growing traffic
demands in the area. It includes widening a segment of Garden Avenue N to
accomodate traffic from existing and future development plans in the area.
•
Community Planning Area: City Center
TOTAL PROJECT COST:
Planning $ 6,781
Design $ 375,692
Right-of-Way $ -
Construction Contract $ 2,001,018
Construction Management : $ 300,000
TOTAL $ 2,683,492
PROJECT EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Pre-2011 $ 423,492 $ - $ 423,492
2011 $ 60,000 $ - $ 60,000
2012 $ 1,760,000 $ 140,000 $. 300,000 $ 440,000
2013 $ - $ - $ - $ -
2014 $ - $ - $ - $ -
2015 $ - $ - $ - $ -
2016 $ - $ - $ - $ -
2017 $ - $ - $ - $ -
Total $ 1,760,000 $ 140,000 $ 300,000 $ 440,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 140,000
Unfunded Need: $ 1,760,000
TOTAL $ 2,200,000
PROJECT STATUS: Design of Garden Ave N are complete.Construction estimated at$2.5M. Efforts to
obtain grants are ongoing.
PAGE 5 -7A
•
•
•
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM •
S. Lake Washington Roadway Improvements (Garden Ave N Widening) Functional Classification: Minor Arterial Fund: 317
Proj.Length: 0.38 miles Prof: 122603
Community Planning Area: City Center TIP No. 7 CONTACT: Rob Lochmiller 425.430.7303
DESCRIPTION: STATUS:
The project will determine necessary roadway,intersection and traffic route improvements on Garden The North Renton Area Traffic Analysis has been completed. Design of Garden Ave N
Ave N,Lake Washington Blvd N and Houser Way N to mediate the growing traffic demands in the area. has been completed.Refund to Fairfield Residential,LLC for improvements done beyond
It includes widening a portion of Garden Ave N to accommodate additional traffic from existing and future City code in the amount of$90,224 were paid out of Fund 305.
development plans In the area.
JUSTIFICATION: CHANGES:
With the additional development growth in the North Renton area,which includes The Landing,Lowe's, Construction estimated at$2.5M and will start once funds become availalbe.
and the Southport residential/office development,this project identified and will construct Improvements
to improve traffic flows In the vicinity.
r Funded:1 923,4921 Unfunded:1 1,760,000
Project Totals Programmed Pre-2012. Six-Year Program
ITEM Programmed spent Pre-2011 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning 6,781 6,781
Preliminary Engineering 375,692 315,692 60,000
R-O-W(includes Admin)
' Construction 1,910,794 10,794 1,900,000 1,900,000
Construction Services 300,000 • 300,000 300,000
Developer Reimbursement 90,224 90,224
TOTAL EXPENSES 2,683,492 423,492 60,000 2,200,000 2,200,000
' SOURCES OF FUNDS:
Vehicle Fuel Tax
Business License Fee 53,268 53,268
Proposed Fund Balance
Grants In-Hand(1) .
Grants In-Hand(2)
Mitigation In-Hand 570,224 370,224 60,000 140,000 140,000
Other(Proposed general fund) 300,000 300,000 300,000 •
Other In-Hand(2)
Grants Proposed(TIB) 1,760,000 1,760,000 1,760,000
TOTAL SOURCES 2,683,492 423,492 60,000 2,200,000 2,200,000
Orden Are N.
DO/18f1017 OAS AM
5-7 2nd Draft
i
•
CITY OF RENTON
2012 -2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 8 Park Avenue North Extension
The project will extend Park Ave N to provide access to Southport, PSE property and
The Boeing Company. Includes improvements needed to convert Houser Way N to two-
way operations(between N 8th St and Lake Washington Blvd).
DESCRIPTION: This project will construct improvements(4/5 traffic lanes,curb,gutter and sidewalks)
to extend Park Ave N to support the additional development growth in the North
Renton area,which includes The Landing and the Southport residential/office
development.
Community Planning Area: City Center
TOTAL PROJECT COST:
(2012-2017) Planning $ -
Design $ 630,000
Right-of-Way $ 500,000
Construction Contract $ 3,500,000
Construction Management . $ 370,000
TOTAL $ 5,000,000
PROJECT EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Pre-2011 $ - $ - $ -
2011 $ - $ - $ -
2012 $ - $ - $ - $ -
2013 $2,400,000 $ - $ - $ -
2014 $2,600,000 $ - $ - $ -
2015 $ - $ - $ - $ -
2016 $ - $ - $ - $ -
2017 $ - $ - $ - $ -
Total $ 5,000,000 $ - $ • - $ -
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ -
Unfunded Need: $ 5,000,000
TOTAL $ 5,000,000
PROJECT STATUS: Funds are needed for the improvements on the extension of Park Ave N and Houser •
Way N.
•
PAGE 5 -8A
CITY OF RENTON •
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
•
Park Avenue North Extension Functional Classification: Fund: 317
Proj.Length: Proj:
Community Planning Area: City Center TIP No. B CONTACT: Rob Lochmiller 425.430.7303
DESCRIPTION: STATUS:
U Design and construction of Park Ave N extension and improvements on Houser Way N
are anticipated In 2013 and 2014 and are unfunded.
JUSTIFICATION: CHANGES:
With the additional development growth in the North Renton area,which Includes The Landing and the Funds are needed for the improvements on Houser Way N and for the extension of Park
Southport residential/office development,this project will construct improvements to extend Park Ave N. Ave N.
1 Funded:1 I Unfunded:1 5,000,000
Project Totals Programmed Pre-2012 Slx-Year Program
ITEM Programmed Spent Pre-2011 2011 Total 2012 2013 2014 • 2015 2016 2017
EXPENSES: _
Planning
Preliminary Engineering 630,000 630,000 580,000 50,000
R-O-W(Includes Admin) 500,000 500,000 500,000
Construction 3,500,000 3,500,000 1,200,000 2,300,000
Construction Services 370,000 370,000 120,000 250,000
Post Construction Services
TOTAL EXPENSES 5,000,000 5,000,000 2,400,000 2,600,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
Business License Fee {'
Proposed Fund Balance
Grants In-Hand(1)
Grants In-Hand(2)
Mitigation In-Hand . -
Other In-Hand(1)
Other In-Hand(2)
Undetermined 5,000,000 5,000,000 2,400,000 2,600,000
TOTAL SOURCES 5,000,000_ 5,000,000- 2,400,000 2,600,000
Perk EN c611&2011 SA5 AM
5-8 2nd Draft •
CITY OF RENTON
2012 - 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 9 116th Ave SE Improvements
116th Ave SE is classified as a minor arterial. It has generally two lanes of traffic with
left-turn lanes at signalized intersections and intermittent two-way-left-turn-lane south of
SE 168th. Short segments of sidewalk exist on both sides of the roadway.
DESCRIPTION: Widen roadway to provide a 3-lane roadway with bike lanes along 116th Ave SE,curb,
gutter,sidewalk,street lights,traffic signals, storm drainage, channelization and
landscaping from Puget Drive SE to south City limits.
Community Planning Area: Benson
TOTAL PROJECT COST:
Planning $ 10,000
Design $ 1,904,000
Right-of-Way $ 300,000
Construction Contract $ 11,177,000
Construction Management .. $ 894,000
TOTAL $ 14,285,000
PROJECT EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Pre-2011 $ - $ - $ -
2011 $ - $ - $ -
2012 $ - $ - $ - $ -
2013 $ 820,000 $ - $ - $ -
2014 $ 2,754,000 $ - $ - $ -
2015 $ 3,760,000 $ - $ - $ -
2016 $ 1,600,000 $ - $ - $ -
2017 $ 5,351,000 $ - $ - $ -
Total $14,285,000 $ - $ - $ -
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ -
Unfunded Need: $ 14,285,000
TOTAL $ 14,285,000
PROJECT STATUS: The project's cost and schedule for improvements will be determined through Arterial
Circulation studies. Construction of improvements between Puget Drive SE and SE
176th Street is anticipated as a first phase.
PAGE 5 -9A
CITY OF RENTON
PUBLIC WORKS •
TRANSPORTATION SYSTEMS DIVISION
• 2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
• 116th Ave SE Improvements Functional Classification: Minor arterial Fund: 317
Proj.Length:2.5 mi Proj:
Community Planning Area: Benson TIP No. 9 CONTACT: Jim Seitz 425.430.7245
DESCRIPTION: STATUS:
Widen roadway to provide a 3-lane roadway with bike lanes along 116th Ave SE and Edmonds Ave SE, New project in the Benson Hill annexation area.The priority,cost and schedule for
including new pavement,curb,gutter,sidewalk,street lights,traffic signals,storm drainage, improvements will be determined through Arterial Circulation studies.Construction of
channelization and landscaping from Puget Drive SE to south City limits. improvements between Puget Drive SE and SE 176th Street is anticipated as a first
phase.
JUSTIFICATION: CHANGES:
116th Ave SE was annexed to the City of Renton in 2008 and is classified as a minor arterial. It has
generally two lanes of traffic with left-turn lanes at signalized intersections and intermittent two-way-left-
turn-lane south of SE 168th. Short segments of sidewalk exist on both sides of the roadway.
Improvements will enhance vehicular,bicycle and pedestrian safety along this important north-south •
transportation corridor.
(Funded: I !Unfunded: 114,285,000
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent id 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning 10,000 10,000 10,000
Preliminary Engineering 1,904,000 1,904,000 810,000 294,000 500,000 300,000
R-O-W(Includes Admin) 300,000 300,000 300,000
Construction 11,177,000 11,177,000 2,000,000 3,500,000 1,000,000 4,677,000
Construction Services 894,000 894,000 160,000 260,000 100,000 374,000
Post Construction Services
TOTAL EXPENSES 14,285,000 14,285,000 820,000 2,754,000 3,760,000 1,600,000 5,351,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
Proposed Fund Balance
Grants In-Hand(1)
Grants In-Hand(2)
Mitigation In-Hand
Other In-Hand(1)
Other In-Hand(2)
Undetermined 14,285,000 14,285,000 820,000 2,754,000 3,760,000 1,600,000 5,351,000
TOTAL SOURCES 14,265,000_ 14,285,000 820,000 2,754,000 3,760,000 1,600,000 5,351,000
1180
oeneno++ e:unrn
5-9 2nd Draft
•
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 10 Carr Road Improvements
Carr Road is classified as a major arterial. It has four lanes of traffic with left turn lanes
at intersections.The project limits are Benson Rd South to Talbot Rd South.
•
DESCRIPTION: Potential improvements vary from roadway realignment/widening at several locations
to address geometric deficiencies,widening to 5-lane roadway(2 lanes westbound,3
lanes eastbound),or a new 4-5 lane roadway on new alignment.This project includes
intersection improvements at Carr Road and 108th Ave SE.
Community Planning Area: Talbot& Benson
PROJECT COST(Up to 2017):
Planning $ 200,000
Design $ -
Right-of-Way $ -
Construction Contract $ -
Construction Management $ -
TOTAL $ 200,000
PROJECT EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Pre-2011 $ - $ - $ -
2011 $ - $ - $ -
2012 $ - $ - $ - $ -
2013 $ 170,000 $ 30,000 $ - $ 30,000
2014 $ - $ - $ - $ -
2015 $ - $ - $ - $ -
2016 $ - $ - $ - $ -
2017 $ - $ - '$ - $ -
Total $ 170,000 $ 30,000 $ - $ 30,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 30,000
Unfunded Need: $ 170,000
TOTAL $ 200,000
PROJECT STATUS: The total project cost is estimated as$72M. Funding proposed in the TIP is for
investigation of improvements and finalization of a scope, cost and schedule of
improvements. Corridor improvements will be developed in phases.
PAGE 5 - 10'A
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Carr Road Improvements Functional Classification: Major Arterial Fund: 317
Proj.Length: Proj:
Community Planning Area: Talbot&Benson TIP No. 10 CONTACT: Jim Seitz 425.430.7245
DESCRIPTION: STATUS:
Includes new pavement,curb,gutter,sidewalk,street lights,traffic signals from Benson Rd South(108th Roadway improvement options including spot safety improvements,roadway widening and
Ave SE)to Talbot Rd So.Potential improvements vary from roadway realignment/widening at several new roadway on new alignment have previously been investigated by King County.
locations to address geometric deficiencies,widening to 5-lane roadway(2 lanes westbound,3 lanes Funding proposed in the TIP Is for Investigation of Improvements and finalization of a
eastbound),to a new 4-5 lane roadway on new alignment. This project includes intersection scope,cost and schedule of improvements.Corridor improvements will be developed in
improvements at Carr Road and Benson Rd S(108th Ave SE). phases.
JUSTIFICATION: CHANGES:
Carr Road was recently annexed to the City of Renton and has been classified as a major arterial. It has The total project cost is estimated as$72M.This project remains unfunded.
four lanes of traffic with left-turn lanes at intersections. King County has identified the need for
improvements to improve vehicle traffic capacity and enhance vehicular,bicycle,and pedestrian safety
on this major east-west transportation corridor.
'Funded: 130,000 (Unfunded: 1170,000
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent In 2010 2011 Total 2012 2013. 2014 2015 2016 2017
EXPENSES:
Planning 200,000 200,000 200,000
Preliminary Engineering
R-O-W(includes Admin)
Construction
Construction Services
Post Construction Services —
TOTAL EXPENSES 200,000 200,000 200,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 30,000 30,000 30,900
Proposed Fund Balance
Grants In-Hand(1) •
Grants In-Hand(2)
Mitigation In-Hand
•
Other In-Hand(1)
Other In-Hand(2)
•
Undetermined 170,000 170,000 170,000
TOTAL SOURCES 200,000 200,000 200,000
Car Rd 0011012011 0155 081
5-10 2nd Draft
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 11 NE Sunset Boulevard Corridor Improvements
This project involves a series of key improvements in this corridor to improve traffic
mobility and to meet pedestrian,transit and bicycle needs.The project limits are from 1-
405 on the west to the east City limits. Phase 1 will construct multi-modal improvements
identified in the Sunset Area Community Planned Action Study.Roadways will be
widened,extended and/or realigned to provide for future traffic flows.
DESCRIPTION: This corridor has strong potential for transit usage and is experiencing residential and
retail growth. Phase 1 is key to support the redevelopment of the Sunset Area
Community in the Highlands area, bounded by NE 21st St on the north, Edmonds Ave
NE on the west, NE 7th St on the south, and Monroe Ave NE on the east.
Community Planning Area: City Center, Highlands&East Plateau
PROJECT COST(Up to 2017):
Planning . $ 10,000
Design $ 2,700,000
Right-of-Way $ 2,100,000
Construction Contract $ 2,000,000
Construction Management . $ 220,000
TOTAL $ 7,030,000
PROJECT EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Pre-2011 $ - $ - $ -
• 2011 $ - $ - $ -
• 2012 $ - $ 10,000 $ - $ . 10,000
2013 $ - $ - $ - $ -
2014 $ 1,000,000 $ - $ - $ -
2015 $ 2,700,000 $ - $ - $ -
2016 $ 1,100,000 $ - $ - $ -
2017. $ 2,220,000 $ - $ - $ -
Total $ 7,020,000 $ 10,000 $ - $ 10,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 10,000
Other(Grants/Agreements): $ -
Unfunded Need: $ 7,020,000
TOTAL $ 7,030,000
PROJECT STATUS: The Sunset Area Planned Action EIS delineated transportation needs along Sunset Blvd
from Edmonds Ave NE to Monroe Ave NE(Phase 1).The cost for phase 1 is estimated
at$44.3M,of which NE Sunset Blvd improvements estimate is$26M.
PAGE 5 - 11A
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION -
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
NE Sunset Boulevard Corridor Improvements Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj:
Community Planning Area: City Center,Highlands&East Plateau TIP No. 11 CONTACT: Jim Seitz,425.430.7245
DESCRIPTION: STATUS:
This project Involves a series of key improvements in this corridor to improve traffic operations.This The Sunset Area Planned Action EIS delineated transportation needs along Sunset Blvd
project will seek to meet pedestrian,transit and bicycle needs.The project limits are from 1-405 on the from Edmonds Ave NE to Monroe Ave NE(Phase 1).The cost for this first phase Is
west to the east City limits.Phase 1 will construct multi-modal improvements identified in the Sunset estimated at$44.3M,of which NE Sunset Blvd improvements estimate is$26M.NE
Area Community Planned Action Study.Roadways will be widened,extended and/or realigned to provide Sunset Blvd(SR 900)is a state route,therefore eligible for State and Federal grants.
for future traffic flows.Residential streets will be developed as"green connections"improving pedestrian Costs estimate,schedule and selection of future phases to be determined. ,
mobility and enhance the neighborhood. ,
JUSTIFICATION: CHANGES: •
This corridor has strong potential for transit usage and is experiencing residential and retail growth. Costs shown for design and ROW for Sunset Blvd only.Costs beyond 2017 are not
Phase 1 is key to support the redevelopment of the Sunset Area Community in the Highlands area, shown in the TIP.
bounded by NE 21st St on the north, Edmonds Ave NE on the west,NE 7th St on the south,and Monroe
Ave NE on the east. The City in partnership with the Renton Housing Authority aspires to redevelop the
Sunset Terrace public housing community -
Funded:1 10,0001 Unfunded :1 7,020,000
Project Totals Programmed Pre-2012 Six Year Program
ITEM Programmed Spent Pre-2011 2011 Total 2012 2013 2014 2015 2016 2017 •
EXPENSES: _
Planning . 10,000 10,000 10,000
Preliminary Engineering 2,700,000 2,700,000 1,000,000 1,700,000 •
R-O-W(Includes Admin) 2,100,000 2,100,000 1,000,000 1,100,000
Construction 2,000,000 2,000,000 2,000,000
Construction Services 220,000 220,000 - 220,000
Post Construction Services
TOTAL EXPENSES 7,030,000 7,030,000 10,000 1,000,000 2,700,000 1,100,000 2,220,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
Business License Fee
Proposed Fund Balance
Grants In-Hand(1) .
Grants In-Hand(2) _
Mitigation In-Hand 10,000 10,000 10,000
Other In-Hand(CED)
Other In-Hand
Undetermined 7,020,000 7,020,0001,000,000 2,700,000 1,100,000 2,220,000
TOTAL SOURCES 7,030,000 _ 7,030,000 - 10,000 • 1,000,000 2,700,000 1,100,000 2,220,000
& w RA 06/18/2011 Ew un
5-11 2nd Draft
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 12 Oakesdale Ave SW-Monster Road to SR 900
The first stage of improvements will address roadway deficiencies and drainage
problems between the Monster Rd bridge and Beacon Coal Mine Road.
DESCRIPTION: Widen existing roadway to four lanes plus two-way-left-turn-lane where needed, and
bike lanes. Realign Beacon Coal Mine Road approach to intersection with the new
Oakesdale Ave roadway. Includes new roadway, curbs,sidewalk, drainage,street
lighting,traffic signals,channelization, retaining walls and bridge widening.
Community Planning Area:.. West Hill
PROJECT COST(Up to 2017):
Planning $ 50,000
Design $ 3,000,000
Right-of-Way $ 2,300,000
Construction Contract $ -
Construction Management . $ -
TOTAL $ 5,350,000
PROJECT EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local Other 2 Total Funded
Pre-2011 $ - $ - $ -
2011 $ - $ - $ -
2012 $ - $ - $ - $ -
2013 $ - $ - $ - $ -
2014 $ = $ - $ - $
2015 $ - $ - $ - $ -
2016 $ 50,000 $ - $ - $ -
2017 $5,300,000 $ - $ - $ -
Total $5,350,000 $ - $ - $ -
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ -
Unfunded Need: $ 5,350,000
TOTAL $ 5,350,000
PROJECT STATUS: The project cost is estimated to be$25 million(a portion of the cost is within
unincorporated KC). Costs beyond 2017 not shown in the TIP.
PAGE 5 - 12A
•
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Oakesdale Ave SW-Monster Road to SR 900 Functional Classification: Fund: 317
Proj.Length: N/A Proj:
Community Planning Area: West Hill TIP No. 12 CONTACT: Bob Mahn 425.430.7322
DESCRIPTION: STATUS:
Widen existing roadway to four lanes plus two-way-left-turn-lane where needed and bike lanes. Realign A preliminary design study was completed in 1999. Phase 1 of Improvements will address
Beacon Coal Mine Road approach to intersection with the new Oakesdale Ave SW roadway. Includes roadway deficiencies and drainage problems between the Monster Rd Bridge and Beacon
new roadway,curbs,sidewalk,drainage,street lighting,traffic signals,channelization,retaining walls and Coal Mine Rd. Scope,cost and implementation schedule to be determined. The project
widening the existing bridge. cost is estimated to be$25 million(a portion of the cost is within unincorporated KC),and
is shown to be programmed for future years.
JUSTIFICATION: CHANGES:
Will serve growing north-south traffic demand.
(Funded: I (Unfunded: 15,350,000
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent Pre-2011 2011 Total 2012 • 2013 2014 2015 2016 2017
EXPENSES:
Planning 50,000 50,000 50,000
Preliminary Engineering 3,000,000 3,000,000 3,000,000
R-O-W(includes Admin) 2,300,000 2,300,000 2,300,000
Construction _
Construction Services
Post Construction Services
TOTAL EXPENSES 5,350,000 5,350,000 50,000 5,300,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
Proposed Fund Balance
Grants In-Hand(1)
Grants In-Hand(1)
Mitigation In-Hand
Other In-Hand(1) -
Other In-Hand(1)
Undetermined 5,350,000 5,350,000 50,000 5,300,000
TOTAL SOURCES 5,350,000 5,350,000 50,000 5,300,000
Mwir Rd 06/18/1011 8:53 AM
5-12 2nd Draft
I
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 13 South 7th Street-Rainier Ave S to Talbot Road South
This segment of the S/SW 7th St corridor connects Talbot Rd S(SR 515)with Rainier
Ave S(SR 167). Increasing traffic demands resulting from the WSDOT I-405/Talbot
Rd S interchange ramps will create the need for increased capacity of S 7th St. This
segment of S 7th St is part of a designated east-west ped/bike route through the City's
commercial core and an important link between regional trails. The South Renton
DESCRIPTION: Widening the existing roadway to 3 lanes(2 lanes EB and 1 lane WB)and a separated
multi-use trail. Included will be new curb,gutter,wider sidewalks,streetlighting,
channelization and landscaping, including street trees.Also included is a new traffic
signal at Shattuck Ave S and other signal modifications.
Community Planning Area: City Center
PROJECT COST(Up to 2017):
Planning $ 32,270
'Design $ 700,000
Right-of-Way $ 1,100,000
Construction Contract $ 2,350,000
Construction Management $ 350,000
TOTAL $ 4,532,270
PROJECT EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Pre-2011 $ 32,270 $ - $ 32,270
2011 $ - $ - $ -
2012 $ - $ - $ 80,000 $ . 80,000
2013 $ - $ - $ 520,000 $ 520,000
2014 $ 200,000 $ - $ - $ -
2015 $ 800,000 $ - $ - $ -
2016 $ 600,000 $ - $ - $ -
2017 $2,300,000 $ - $ - $ -
Total $ 3,900,000 $ - $ 600,000 $ 600,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ -
Other(King County): $ 600,000
Unfunded Need: $ 3,900,000
TOTAL $ 4,500,000
PROJECT STATUS: The planning level cost estimate for the improvements is$7M. Phase 1 of the project is
the installation of a traffic signal at the intersection with Shattuck Ave S. Funding for the
signal will be provided by KC Metro as part of the Rapid Ride Line F.
PAGE 5 - 13A
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
South 7th Street- Rainier Ave S to Talbot Road South Functional Classification: Fund: 317
Prof.Length:-NIA Proj: 122151
Community Planning Area: City Center TIP No. 13 CONTACT: Jim Seitz 425.430.7245
DESCRIPTION: STATUS:
Widening the existing roadway to 3 lanes(2 lanes EB and 1 lane WB)and a separated multi-use trail. The S 7th St Improvements Project-Traffic Analysis Report provided alternatives for
Included will be new curb,gutter,wider sidewalks,streetlighting,channelizatlon and landscaping, improvement options.The planning level cost estimate for the improvements are$7M.
Including street trees.Also included is a new traffic signal at Shattuck Ave S and other signal Phase 1 of the project is the installation of a traffic signal at the intersection of S 7th St and
modifications. Shattuck Ave S.Funding for the signal will be provided by KC Metro as part of the Rapid
Ride Line F.
JUSTIFICATION: CHANGES:
This segment of the S/SW 7th St corridor connects Talbot Rd S(SR 515)with Rainier Ave S(SR 167). Costs beyond 2017 not shown. This project is mostly unfunded.
Increasing traffic demands resulting from the WSDOT I-405/Talbot Rd S interchange ramps will create
the need for increased capacity of S 7th St. This segment of S 7th St is part of a designated east-west
ped/bike route through the City's commercial core and an important link between regional trails. The
South Renton Neighborhood Study has identified S 7th St as needing streetscape improvements.
IFunded: 1632,270 !Unfunded: 13,900,000
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent Pre-2011 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning 32,270 32,270
Preliminary Engineering 700,000 700,000 80,000 20,000 200,000 300,000 100,000
R-O-W(includes Admin) 1,100,000 1,100,000 100,000 500,000 500,000
Construction 2,350,000 2,350,000 350,000 2,000,000
Construction Services 350,000 350,000 _ 50,000 • 300,000
Post Construction.Services
TOTAL EXPENSES 4,532,270 32,270 . 4,500,000 80,000 520,000 200,000 800,000 600,000 2,300,000
SOURCE OF FUNDS:
Vehicle Fuel Tax -
Business License Fee
Proposed Fund Balance 32,270 32,270
Grants In-Hand(1)
Grants In-Hand(1) e
Mitigation in-Hand
Other(proposed KC Metro) 600,000_ 600,000_, 80,000 520,000
Other In-Hand(1)
Undetermined 3,900,000 3,900,000 200,000 800,000 600,000 2,300,000
TOTAL SOURCES 4,532,270 32,270 4,500,000 80,000 520,000 200,000 800,000 600,000 2,300,000
9 70i 91 00.16/2011 5.55 AM
5-13 2nd Draft '
•
4
CITY OF RENTON
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 14 NE 31st Street Culvert Repair
Then 2009 flooding on May Creek caused damage to NE 31st St above an existing
culvert due to high creek flows. Evidence of piping has occurred above the culvert
during the high flows that came close to the top of the culvert pipe.The gabion
headwall is starting to collapse,which may cause the culvert to completely fail.
DESCRIPTION: The existing gabion headwall and culvert pipe needs to be replaced. NE 31st st is the
only public access to six homes. Failure of the culvert will result in elimination of
general and emergency access.
•
Community Planning Area: N/A
PROJECT COST(Up to 2017):
•
Planning $
Design $ 7,354
Right-of-Way $ -
Construction Contract $ 110,000
Construction Management . $ 20,000
TOTAL $ 137,354
PROJECT EXPENSES:
2012-2017 Program Funding Categories
;, Unfunded Secured 2012-2017 Funding
YEAR Need
Local 1 Other 2 Total Funded
Pre-2011 $ 7,354 $ - $ 7,354
2011 $ 11,046 $ 118,954 $ 130,000
2012 $ - $ - $ - $ -
2013 $ - $ - $ - $ -
2014 $ - $ - $ - $
2015 $ - $ - $ - $ -
2016 $ - $ - $ - $ -
2017 $ - $ - $ - $ -
Total $ - $ .- $ - $ -
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ -
Unfunded Need: $ -
TOTAL $ -
PROJECT STATUS: This project was awarded a FEMA grant in the amount of$$101,961 with a State
share of$16,993 and City share of 16,994 for repair of the existing culvert.
• PAGE 5 - 14A
•
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
NE 31st Street Culvert Repair Functional Classification: NIA Fund: 317
Proj.Length: N/A Proj: 120026
Community Planning Area: N/A •
TIP No. 14 CONTACT: Derek Akesson 425.430.7337
DESCRIPTION: STATUS:
The 2009 flooding on May Creek caused damage to NE 31st St. Settlement of the asphalt roadway This project was awarded a FEMA grant in the amount of$$101,961,State share of
above an existing culvert occured after the high creek flows. Evidence of piping has occurred above the $16,993,and City share of$16,994 for repair to the existing culvert.
culvert during the high flows that came close to the top of the culvert pipe. The gabion headwall Is
starting to collapse,which may cause the culvert to completely fall. The existing gabion headwall and
culvert pipe need to be replaced.
JUSTIFICATION: CHANGES:
NE 31st St is the only public access to six homes. Failure of the culvert will result in elimination of
general and emergency access,thus the importance of the repair.
•
(Funded : 1137,354 (Unfunded: 1
Project Totals Programmed Pre-2012 Six-Year Program
Programmed Spent Pre-2011 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning
Preliminary Engineering 7,354 7,354
R-O-W(Includes Admin)
Construction 110,000 110,000
Construction Services 20,000 • 20,000
Post Construction Services
TOTAL EXPENSES 137,354 7,354 130,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
Proposed Fund Balance 18,400 7,354 11,046
Grants In-Hand(FEMA) 101,961 101,961
Grants In-Hand(State share) 16,993 16,993 _
Mitigation In-Hand
Other In-Hand(1)
Other In-Hand(2)
Undetermined
TOTAL SOURCES 137,354_ 7,354 130,000
alncwm oeneaoil BM AM
5-14 2nd Draft
•
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 15 Highlands to Landing Pedestrian Connection Project
This project will provide a barrier-free pedestrian connection between the Highlands
and the Landing/Coulon Park.The project was conceived by the Highlands Task Force
Committee that included residents, businesses and elected officials from the Renton
Highlands.
DESCRIPTION: Since the construction of 1-405 there has been a physical barrier preventing the
pedestrian connection along Park Avenue North between the Highlands and Gene
Coulon Park.This project will complete the pedestrian connection between the
Highlands Urban Center and the Downtown North Urban Center.
Community Planning Area: Highlands
PROJECT COST:
Planning $ 418
Design $ 299,000
Right-of-Way $ -
Construction Contract $ 1,500,000
Construction Management . $ 200,000
TOTAL $ 1,999,418
PROJECT EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Pre-2011 $ 418 $ - $ 418
2011 $ 59,000 $ 240,000 $ 299,000
2012 $ - $ - $ - $ -
2013 $ 1,140,000 $ - $ - $ -
2014 $ 560,000 $ - $ - $ -
2015 $ - $ - $ . - $ -
2016 $ - $ - $ - $ -
2017 $ - $ - $ • - $ -
Total $ 1,700,000 $ - $ - $ -
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ -
Unfunded Need: $ 1,700,000
TOTAL $ 1,700,000
PROJECT STATUS: Preliminary planning and conceptual drawings have been completed. Design of the
improvements will be completed in 2011.
PAGE 5 - 15A
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Highlands to The Landing Pedestrian Connection Project Functional Classification: N/A • Fund: 317
Proj.Length: N/A Proj: 122901
Community Planning Area: Highlands TIP No. 15 CONTACT: Keith Woolley 425.430.7303
DESCRIPTION: - STATUS:
This project will provide a continuous barrier-free pedestrian connection between the Highlands and The The City was awarded a federal grant in the amount of$240,000 for design of the
Landing/Gene Coulon Park. The project was conceived by the Highlands Task Force Committee that pedestrian connection. Project design will be completed in 2011.
included residents,businesses and elected officials from the Renton Highlands. Preliminary planning
and conceptual drawings have been completed.
•
JUSTIFICATION: CHANGES:
Ever since the construction of 1-405 there has been a physical barrier preventing the pedestrian
connection along Park Ave North between the Highlands and Gene Coulon Park. This project will
complete the pedestrian connection between the Highlands Urban Center and the Downtown North
Urban Center.
•
(Funded: 1299,418 'Unfunded: 11,700,000
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent In 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning 418 418 _
Preliminary Engineering 299,000 299,000
R-O-W(Includes Admin)
Construction 1,500,000 1,500,000 1,000,000 500,000
Construction Services 200,000 200,000 140,000 60,000
Post Construction Services
TOTAL EXPENSES 1,999,418 418 299,000 1,700,000 • 1,140,000 560,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 59,000 • 59,000
Proposed Fund Balance 418 418
Grants In-Hand(CMAQ) 240,000 240,000
Grants In-Hand(2)
Mitigation In-Hand -
•
• Other In-Hand
Other In-Hand(2)
Undetermined 1,700,000 1,700,000 1,140,000 560,000
TOTAL SOURCES 1,999,418 418 299,000 1,700,000 _ 1,140,000 560,000
Moru.tds b l_ flQ 0d16/2O11 t93 AM
5-15 2nd Draft
•
CITY OF RENTON
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
•
TIP No.: 16 Lake to Sound(L25)Trail
The Lake to Sound(L2S)Trail is a joint partnership between the cities of SeaTac,
Renton,Tukwila, Burien and Des Moines, in coordination with King County. The 17-
mile L2S Trail will provide and east-west connection between the shoreline of Lake
Washington(Renton)to the.shoreline of Puget Sound (Des Moines).
DESCRIPTION: Segment A will connect Fort Dent(Tukwila)to the larger system of regional trails in
South King County,including the Green River Trail,the Interurban Trail and the Cedar
River Trail. Segment A goes from Naches Avenue in Renton,to Fort Dent in Tukwila.
Community Planning Area: City Center&Valley
PROJECT COST(Up to 2017):
Planning $ -
Design $ -
Right-of-Way $ -
Construction Contract $ 1,125,000
Construction Management $ 125,000
TOTAL $ 1,250,000
PROJECT EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Pre-2011 $ - $ - $ -
2011 $ - $ - $ -
2012 $ - $ - $ - $ - --
2013 $ 500,000 $ - $ - $ -
2014 $ 750,000 $ - $ - $ -
2015 $ - $ - $ - $ -
2016 $ - $ - $ - $ --
2017 $ - $ - $ - $ -
Total $ 1,250,000 $ - $ - $ -
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ -
Unfunded Need: $ 1,250,000
TOTAL $ 1,250,000
PROJECT STATUS: Design of the Fort Dent Park Connection is 30%complete. Design to be completed in
2012.Construction of Segment A(through Renton)estimated at$1.25M,and
anticipated to start in 2013, pending new grant funding.
PAGE 5 - 16A
•
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Lake to Sound (L2S)Trail Functional Classification: N/A Fund: 317
Pro'.Length: N/A ProJ: 122903
Community Planning Area: City Center&Valley TIP No. 16 CONTACT: Jim Seitz 425.430.7245
DESCRIPTION: STATUS:
The Lake to Sound(L2S)Trail is a joint partnership between the cities of SeaTac,Renton,Tukwila, This project was awarded a federal grant in the amount of$800,125 for design and
Burien and Des Moines,in coordination with King County. The 17-mile L2S Trail will provide an east- environmental documentation of Segments: A-Naches Ave SW(Renton)to Fort Dent
west connection between the shoreline of Lake Washington(Renton)and the shoreline of Puget Sound Park(Tukwila),and B-Des Moines Memorial Drive S(SeaTac and Burien). Segment A
(Des Moines). (Renton)portion of the grant amount is estimated to be$300,000.King County is leading
the design.
JUSTIFICATION: CHANGES:
Segment A will connect Fort Dent(Tukwila)to the larger system of regional trails in South King County, Design of the Fort Dent Park Connection is 30%complete.Design to be completed In
including the Green River Trail, the Interurban Trail and the Cedar River Trail.Segment A goes from 2012.Construction of Segment A(through Renton)estimated at$1.25M, and anticipated
Naches Ave SW in Renton to Fort Dent in Tukwila. to start in 2013,pending new grant funding.
[Funded : I (Unfunded: 11,250,000
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent In 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning •
Preliminary Engineering
R-O-W(includes Admin)
Construction 1,125,000 1,125,000 450,000 675,000
Construction Services 125,000 125,000 50,000 75,000
Post Construction Services
TOTAL EXPENSES 1,250,000 1,250,000 500,000 750,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
Proposed Fund Balance
Grants In-Hand(1)
Grants In-Hand(2)
Mitigation In-Hand
Other
Other In-Hand
Undetermined _ 1,250,000 1,250,000 500,000 750,000
TOTAL SOURCES 1,250,000 1,250,000 500,000 750,000
US 09.16/7011 6:66 AM
5-16 2nd Draft
•
CITY OF RENTON
2012 - 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 17 Walkway Program
Providing safe and convenient non-motorized facilities is an integral part of a complete
transportation network. Specific improvements will respond to the needs of school
children,the aged and persons with disabilities, and will support increased use of
transit.
DESCRIPTION: This program provides for the design and construction of high priority non-motorized
facilities for pedestrians. Projects are identified and prioritized using criteria from the
Comprehensive Citywide Walkway Study,Council direction, and through coordination
with the City's Neighborhood Program.
Community Planning Area: Citywide
PROGRAM COST:
(2012-2017) Planning $ 25,000
Design $ 150,000
Right-of-Way $ -
Construction Contract $ 1,110,000
Construction Management $ 115,000
TOTAL $ 1,400,000
PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Spent in 10 $ 9,952 $ - $ 9,952
• 2011 $ 470,000 $ - $ 470,000
2012 $ - $ 120,000 $ - $ 120,000
2013 $ 60,000 $ 190,000 $ - $ 190,000
2014 $ 60,000 $ 190,000 $ - $ 190,000
2015 $ 60,000 $ 190,000 $ - $ 190,000
2016 $ 50,000 $ 200,000 $ - $ 200,000
2017 $ 50,000 $ 230,000 $ - $ 230,000
Total $ 280,000 $ 1,120,000 $ • - $ 1,120,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 1,120,000
Unfunded Need: $ 280,000
TOTAL $ 1,400,000
PROGRAM STATUS: 2011 -Burnett Ave N, near Senior Center;2012-Taylor Ave NW/Taylor PI NW at NW
4th St; NE 24th St(nearby Jones Ave), Lake Ave S(S 2nd St to S Tobin St).
PAGE 5 - 17A
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Walkway Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 120009
Community Planning Area: Citywide TIP No. 17 CONTACT: James Wilhoit 425.430.7319
DESCRIPTION: STATUS:
This program provides for the design and construction of high priority non-motorized transportation The Comprehensive Citywide Walkway Study was completed in 2009 and is being used to
facilities for pedestrians and missing links. Projects are identified and prioritized using criteria from the select projects that move Into the design and construction phases.
Comprehensive Citywide Walkway Study,Council direction,and through coordination with the City's
Neighborhood Program.
JUSTIFICATION: CHANGES:
Providing safe and convenient non-motorized facilities is an integral part of a complete transportation Walkway schedule is:2011-Burnett Ave N,near the Senior Center; Taylor Ave
network. Specific improvements will respond to the needs of school children,the aged and persons with NW/Taylor PI NW at NW 4th St;2013-NE 24th St(near Jones Ave NE)and Lake Ave S
disabilities,and support increased use of transit. (from S 2nd St to S Tobin St).
• 'Funded : 11,599,952 !Unfunded: 1280,000
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent In 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning 30,000 5,000 25,000 5,000 5,000 5,000 5,000 5,000
Preliminary Engineering 209,393 9,393 50,000 150,000 25,000 25,000 25,000 25,000 25,000 25,000
R-O-W(includes Admin)
Construction 1,490,000 380,000 1,110,000 80,000 200,000 200,000 200,000 200,000 230,000
Construction Services 150,559 559 35,000 115,000 15,000 20,000 20,000 20,000 20,000 20,000
Post Construction Services
TOTAL EXPENSES 1,879,952 9,952 470,000 1,400,000 120,000 250,000 250,000 250,000 250,000 280,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 930,000 110,000 820,000 70,000 140,000 140,000 140,000 150,000 180,000
Proposed Fund Balance 310,000 310,000
Grants In-Hand(1)
Grants In-Hand(2)
Mitigation In-Hand(sidewalk mit) 359,952 9,952 50,000 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Other In-Hand(1) .
Other In-Hand(2)
Undetermined 280,000 280,000 60,000 60,000 60,000 50,000 50,000
TOTAL SOURCES 1,879,952 9,952 470,000 . 1,400,000 120,000 250,000 250,000 250,000 250,000 280,000
%%Awayoaiaa2o17 B68 AM
5-17 2nd Draft
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 18 Sidewalk Rehabilitation and Replacement Program
This program will address deficiencies and provide safe and convenient non-motorized
facilities for pedestrians on neighborhoods with damaged or deteriorated curb and
gutter,sidewalks, and curb ramps. There are some places where curb ramps do not
exist or are not to current ADA Standards.
DESCRIPTION: This program provides for the removal and replacement of existing curb and gutter,
sidewalks, and curb ramp,where such facilities have deteriorated or have been
damaged.
Community Planning Area: Citywide
PROGRAM COST:
(2012-2017) Planning $ -
Design
Right-of-Way $ -
Construction Contract $ 1,300,000
Construction Management . $ -
TOTAL $ 1,300,000
PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Spent in 10 $ 362,784 $ - $ 362,784
• 2011 $ 377,000 $ - $ 377,000
2012 $ - $ 50,000 $ - $ 50,000
2013 $ 210,000 $ 40,000 $ - $ 40,000_
2014 $ 210,000 $ 40,000 $ - $ 40,000
2015 $ 210,000 $ 40,000 $ - $ 40,000
2016 $ 210,000 $ 40,000 $ - $ 40,000
2017 $ 210,000 $ 40,000 $ - $ 40,000
Total $ 1,050,000 $ 250,000 $ - $ 250,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 250,000
Unfunded Need: . $ 1,050,000
TOTAL $ 1,300,000
PROGRAM STATUS: In 2010 this program replaced sidewalks, including ADA ramps, in the Highlands and
Maplewood Glenn area.
PAGE 5 - 18A
•
CITY OF RENTON
PUBLIC WORKS .
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Sidewalk Rehabilitation and Replacement Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 122801
Community Planning Area: Citywide TIP No. 18 CONTACT: Bill Wressell 425.430.7400
DESCRIPTION: STATUS:
This program provides for the removal and replacement of existing curb and gutter,sidewalks,and curb In 2010,this program replaced sidewalks in the Highlands and Maplewood Glenn areas,
ramps where such facilities have deteriorated or have been damaged. including ADA ramps.The 2011 program will include sidewalk rehabilitation at S 4th PI
• (between Rainier Ave S and Shattuck Ave S)and continue work in the Maplewood Glen
Neighborhood.
JUSTIFICATION: , CHANGES:
This program will address deficiencies and provide safe and convenient non-motorized facilities for This ongoing program replaces deteriorated and damaged sidewalks as funds become
pedestrians in neighborhoods with damaged or deteriorated curb and gutter,sidewalks,and curb ramps. available.
There are some places where curb ramps do not exist or are not to.current ADA Standards.
• I Funded:1 989,7841 Unfunded:1 1,050,000
Project Totals Programmed Pre-2012 Six-Year Program
-
ITEM Programmed Spent In 2010 2011 Total 2012 . 2013 2014 2015 2016 2017
EXPENSES: -
Planning
Preliminary Engineering 59,998 12,998 47,000
• R-O-W(includes Admin) '
Construction 1,968,509 348,509 320,000 1,300,000 50,000 250,000, 250,000 250,000 250,000 250,000
Y
Construction Services 11,277 1,277 10,000
Post Construction Services
TOTAL EXPENSES 2,039,784 362,784 377,000 1,300,000 50,000 250,000 250,000 250,000 250,000 250,000
SOURCE OF FUNDS: -
Vehicle Fuel Tax '
Business License Fee 450,000 200,000 250,000_ 50,000 40,000 40,000 40,000 40,000 40,000
Proposed Fund Balance 419,784 42,784 377,000
Grants In-Hand(1)
Grants In-Hand(2)
Mitigation In-Hand
Other In-Hand(transfer from CED) 120,000 120,000
Other In-Hand(2) -
Undetermined 1,050,000 1,050,000 210,000 210,000 210,000 210,000 210,000
TOTAL SOURCES 2,039,784 362,784 377,000 1,300,000 50,000 250,000_ 250,000 250,000 250,000 250,000
9MeneR Rehab mew 1 5:613 AM
5.18 2nd Draft
CITY OF RENTON
2012 - 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 19 Bridge Inspection&Repair Program
Inspection program as part of WSBIS Program to determine structural deficiencies,
physical deterioration,or functional obsolescence and to qualify for bridge replacement
funding. Repairs are provided as identified through the inspection program to increase
the safety and extend the longevity of the structures.
DESCRIPTION: Inspect all roadway bridges owned by the City every two years to determine bridge
sufficiency and load ratings,seismic retrofit needs, undertake minor repairs,and
preventative maintenance as needed.
Community Planning Area: Citywide
PROGRAM COST:
(2012-2017) Planning $ -
Design $ 60,000
Right-of-Way $ -
Construction Contract $ 150,000
Construction Management . $ 5,000
TOTAL $ 215,000
-PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
' Local 1 Other 2 Total Funded
Spent in 10 $ 7,417 $ 13,089 $ 20,506
2011 $ 220,000 $ - $ 220,000
2012 $ - $ 55,000 $ - $ 55,000
2013 $ 50,000 $ 25,000 $ - $ 25,000
2014 $ - $ 20,000 $ - $ 20,000
2015 $ - $ 20,000 $ - $ 20,000
2016 $ - $ 20,000 $ - $ 20,000
2017 $ - $ 25,000 $ - $ 25,000
Total $ 50,000 $ 165,000 $ 13,089. $ 165,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 165,000
Unfunded Need: $ 50,000'
TOTAL $ 215,000
PROGRAM STATUS: Biennial bridge inspections in 2011 and 2013.The Monster Road Bridge repairs
require an annual inspection frequency for the next three inspection cycles.
PAGE 5 - 19A
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Bridge Inspection & Repair Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 120106
Community Planning Area: Citywide TIP No. 19 CONTACT: Derek Akesson 425.430.7337
DESCRIPTION: STATUS:
Inspect all roadway bridges owned by the.City every two years to determine bridge sufficiency and load Biennial bridge inspections occur in 2011 and 2013.The Monster Road Bridge repairs
ratings,seismic retrofit needs. Undertake minor repairs and preventative maintenance as needed. require an annual inspection frequency for the next three inspection cycles.
JUSTIFICATION: CHANGES:
Inspection program must be done for safety and funding purposes and as part of WSBIS Program to
determine structural deficiencies,physical deterioration,or functional obsolescence and to qualify for
federal bridge replacement grant funding. Repair funding is provided to accomplish Improvements,
identified through the inspection program,that will increase the safety and extend the longevity of the
structures.
(Funded: 1405,506 (Unfunded: 150,000
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent In 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning •
Preliminary Engineering 158,936 18,936_ 80,000 60,000 10,000 10,000 10,000 10,000 10,000 10,000
R-O-W(includes Admin) _ _
Construction 151,570 1,570 100,000 50,000 20,000 30,000 •
Construction Services 10,000 5,000 5,000 5,000
Post Construction Services/Other 135,000 35,000 100,000 20,000 35,000 10,000 10,000 10,000 15,000
TOTAL EXPENSES 455,506 20,506 220,000 215,000 55,000 75,000 20,000 20,000 20,000 25,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 275,000 110,000 165,000 55,000 25,000 20,000 20,000 20,000 25,000
Proposed Fund Balance 117,417 7,417 110,000
Grants In-Hand(FEMA) _ 11,219 11,219
Grants In-Hand(State Share) 1,870 1,870 _
Mitigation In-Hand
Other In-Hand
• Other In-Hand
Undetermined 50,000 50,000 50000
TOTAL SOURCES 455,506 20,506_ 220,000 215,000 55,000 75,000 20,000 20,000 20,000 25,000
Brldp.Inpcl 06/162011 0.56 AM
5-19 2nd Draft
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 20 Roadway Safety and Guardrail Program
This program will implement roadside safety improvements including barrier systems
and hazardous object removal.
DESCRIPTION: This program will make miscellaneous guardrail improvements each year and improve
the safety of the roadside environment.
Community Planning Area: Citywide
PROGRAM COST:
(2012-2017) Planning . $ -
Design . $ 22,000
Right-of-Way $ -
Construction Contract $ 85,000
Construction Management $ 13,000
TOTAL $ 120,000
PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded •
Spent in 10 $ - $ - $ -
2011 $ 50,000 $ - $ 50,000
2012 $ - $ 10,000 $ - $ 10,000
2013 $ 25,000 $ 15,000 $ - $ 15,000
2014 $ - $ 15,000 $ - $ 15,000
2015 $ - $ 15,000 $ - $ 15,000
2016 $ - $ 15,000 $ - $ 15,000
2017 $ - $ 25,000 $ - $ 25,000
Total $ 25,000 $ 95,000 $ - $ 95,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 95,000
Unfunded Need: $ 25,000
TOTAL $ 120,000
PROGRAM STATUS:
PAGE 5 -20A
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION •
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Roadway Safety and Guardrail Program Functional Classification: N/A Fund: 317
Proj.Length: NIA Proj:
Community Planning Area: Citywide . TIP No. 20 CONTACT: Derek Akesson 425.430.7337
DESCRIPTION: STATUS:
This program will make miscellaneous guardrail Improvements each year and Improve the safety of the. New program
roadside environment.
JUSTIFICATION: CHANGES:
This program will implement roadside safety Improvements including barrier systems and hazardous
object removal.
'Funded: 1145,000 (Unfunded: 125,000
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent In 2010 2011 Total 2012 2013 " 2014 2015 2016 2017
EXPENSES:
Planning
• Preliminary Engineering 28,000 6,000 22,000 5,000 5,000 3,000 3,000 3,000 3,000
R-O-W(includes Admin)
Construction 125,000 40,000 85,000- 5,000 30,000 10,000 . 10,000 10,000 20,000
Construction Services 17,000 4,000 13,000 5,000 2,000 2,000 2,000 2,000
Post Construction Services/Other •
TOTAL EXPENSES 170,000 50,000 120,000 10,000 40,000 15,000 15,000 15,000 25,000
SOURCE OF FUNDS: • -
Vehicle Fuel Tax
Business License Fee 95,000 . 95,000, 10,000 15,000 15,000 15,000 15,000 25,000
Proposed Fund Balance 50,000 50,000
Grants In-Hand(1)
Grants In-Hand(2)
Mitigation In-Hand
Other In-Hand
Other In-Hand
Grants Proposed -
Other Proposed
Undetermined 25,000 25,000 25,000 •
TOTAL SOURCES 170,000 50,000 120,000 10,000 40,000 . 15,000 15,000 15,000 25,000
CluerdmIl OW16/2011 OA AM
5-20 2nd Draft
,
•
CITY OF RENTON
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 21 Intersection Safety&Mobility Program
This program budgets for projects needed to meet increasing demand, and the need
for signalized traffic control. Elements used to prioritize project intersections may
include vehicular approach volumes,accident analysis,signal-warrant analysis,and
pedestrian volume.
DESCRIPTION: This program will design and construct traffic signals identified by the transportation
system traffic signal priority needs list, including intersection improvements.
Intersections without signalized traffic control will be evaluated.
Community Planning Area: N/A
PROGRAM COST:
(2012-2017) Planning . $ -
Design $ 140,000
Right-of-Way $ -
Construction Contract $ 1,010,000
Construction Management $ 110,000
TOTAL $ 1,260,000
PROGRAM EXPENSES: •
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Spent in 10 $ 11,847 $ - $ 11,847
2011 $ 10,000 $ - $ 10,000
2012 $ - $ 10,000 $ - $ 10,000
2013 $ - $ 250,000 $ - $ 250,000
2014 $ - $ 250,000 $ = $ 250,000
2015 $ - $ 250,000 $ - $ 250,000
2016 $ - $ 250,000 $ - $ 250,000
2017 $ - $ 250,000 $ - $ 250,000
Total $ - $ 1,260,000 $ - $ 1,260,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 1,260,000
Unfunded Need: $ -
TOTAL $ 1,260,000
PROGRAM STATUS: Traffic signal high on the warrant priority list include NE 4th St&Whitman(installation
in 2011).
PAGE 5 -21A
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Intersection Safety& Mobility Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 122601
Community Planning Area: N/A TIP No. 21 CONTACT: Chris Barnes 425.430.7220
DESCRIPTION: STATUS:
This program will design and construct traffic signals identified by the Transportation Systems'Traffic The priorities and schedules for new traffic signals will be set by the Transportation
Signal Priority List,including intersection improvements. Intersections without signalized traffic control Systems'Traffic Signal Priority List. The list is determined by citizen concerns,
will be evaluated. intersection safety,mobility needs,and intersections that meet MUTCD traffic signal
warrants.
JUSTIFICATION: CHANGES:
Historically,on the average,one traffic signal is designed and constructed every two years to meet safety Traffic signals high on the warrant priority list include NE 4th St&Whitman(installation in
and mobility needs. This program budgets for projects needed to meet increasing demand,and the need 2011),SW 41st St&Oakesdale_Ave SW,S Carr Road&Mill Ave S,and SW 34th St&
for signalized traffic control. Elements used to prioritize project intersections may Include vehicular Lind Ave SW.
approach volumes,accident analysis,signal-warrant analysis,and pedestrian volume.
(Funded: 11,281,847 'Unfunded: 1
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed _ Spent In 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning
Preliminary Engineering 150,613 613 10,000 140,000 10,000 26,000 26,000 26,000 26,000 26,000
R-O-W(includes Admin)
Construction 1,017,945 7,945 1,010,000 202,000 202,000 202,000 202,000 202,000
Construction Services 113,269 3,289 110,000 22,000 22,000 22,000 22,000 22,000
Post Construction Services
TOTAL EXPENSES 1,281,847 11,847 10,000 1,260,000 10,000 250,000 250,000 250,000 250,000 250,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 1,170,000 10,000 1,160,000 - 10,000 150,000 250,000 250,000 250,000 250,000'
Proposed Fund Balance __ 11,847 11,847
Grants In-Hand(1)
Grants In-Hand(2) _
Mitigation In-Hand 100,000 100,000 100,000
Other In-Hand
Other In-Hand
Grants Proposed
Other Proposed
Undetermined
TOTAL SOURCES 1,281,847_ 11,847 10,000- 1,260,000 10,000 250,000 250,000 250,000_ 250,000 250,000
Inters safety 06/16/2011 9.56 AM
5.21 2nd Draft
4
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 22 Traffic Safety Program
This program budgets for safety projects to address traffic safety needs. Projects are
typically identified through citizen concerns,analysis of accident records or observation
by City Traffic Operations and Maintenance personnel. Traffic Operations Section
identify and prioritize locations.
•
DESCRIPTION: This program provides for small-scale traffic safety improvements that are identified
and require materials, labor or equipment beyond the normal scope of City operations
and maintenance crews.This program includes converting school zone signs to
electronic operation.
Community Planning Area: N/A
PROGRAM COST:
(2012-2017) Planning $ -
Design $ 34,500
Right-of-Way $ - •
Construction Contract $ 177,500
Construction Management $ 18,000
TOTAL $ '230,000
PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local Other 2 Total Funded
Spent in 10 $ - $ - $ -
2011 $ 120,000 $ 177,400 $ 297,400
2012 $ - $ 20,000 $ - $ 20,000
2013 $ 20,000 $ 30,000_ $ - $ 30,000
2014 $ 4,000 $ 36,000 $ - $ 36,000 .
2015 $ - $ 40,000 $ - $ 40,000
2016 $ - $ 40,000 $ - $ 40,000
2017 $ - $ 40,000 $ - $ 40,000
Total $ 24,000 $ 206,000 $ - $ 206,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 206,000
Unfunded Need: $ 24,000
TOTAL $ 230,000
PROGRAM STATUS: Uninterruptable Power Supply/Battery Backup Systems (UPS/BBS)project is
approximatelly 20%completed. Program goal is to install UPS at three critical
intersections per year(all years).
PAGE 5 22A
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Traffic Safety Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 122115
Community Planning Area: N/A TIP No. 22 CONTACT: Dave Whitmarsh 425.430.7423
DESCRIPTION: STATUS:
This ongoing yearly program provides for special small-scale traffic safety improvements that are Uninterruptable power supply/battery backup systems(UPS/BBS)project is approximatelly
identified and require materials,labor or equipment beyond the normal scope of City operations and 20%completed. Program goal Is to install UPS at three critical intersections per year(all
maintenance crews.This program includes providing materials for railroad crossing upgrades and years),pending sufficient funding. LED Replacement Program is part of the Intelligent
converting school zone signs to electronic operation. Transportation System(ITS)Program.
JUSTIFICATION: CHANGES:
Historically,this level of traffic safety improvements are required on an annual basis. This program
budgets for safety projects to address these needs. Projects are typically identified through citizen
concerns,analysis of accident records or observation by City Traffic Operations and Maintenance
personnel. The Traffic Operations Section identifies and prioritizes locations.
(Funded: 1503,400 lUnfunded: 124,000
Project Totals Programmed Pre-2012 Six-Year Program ,
-
ITEM Programmed Spent in 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning
Preliminary Engineering 59,000 24,500 34,500 _ 2,000 14,500 4,500 4,500 4,500 4,500
R-O-W(includes Admin)
Construction 427,400 249,900 177,500 15,000 32,500 32,500 32,500 32,500 32,500
Construction Services 41,000 23,000 18,000 3,000 3,000 3,000 3,000 3,000 3,000
Post Construction Services
TOTAL EXPENSES 527,400 297,400 230,000 20,000 50,000 40,000 40,000 40,000 40,000
SOURCE OF FUNDS: _
Vehicle Fuel Tax
Business License Fee 246,000 40,000 206,000 20,000 30,000 36,000 40,000 40,000 40,000
Proposed Fund Balance 80,000 80,000
Grants In-Hand(WSDOT) 150,000 150,000
Grants In-Hand(WTSC) 27,400 27,400
Mitigation In-Hand
Other In-Hand(1)
Other In-Hand(2)
Undetermined 24,000 24,000 20,000 4,000
TOTAL SOURCES 527,400 297,400 230,000 20,000 50,000 40,000 40,000 40,000 40,000,
s-r.ry OW?612011 . 8.66N4
5-22 2nd Draft
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 23 Preservation of Traffic Operation Devices Program
Most of Renton's signals require extensive vehicle detection systems to provide traffic
count data needed for the intersection controllers and ACTRA signal coordination
system to operate effectively. The detection loops in the pavement must be properly
maintained;their failure results in highly inefficient operation.
DESCRIPTION: Replace failed or failing traffic signal vehicle detection loops and repair pavement as
required to assure reliability. This program also provides for the replacement and/or
relocation of sign, pavement markings and replacement of damaged luminaire and
signal poles due to unknown incidents where reimbursement is impossible.
•
Community Planning Area: N/A
PROGRAM COST:
(2012-2017) Planning $ -
Design $ -
Right-of-Way $ -
Construction Contract $ 372,000
Construction Management , $ -
TOTAL $ 372,000
PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
• Spent in 10 $ 62,445 $ - $ 62,445
2011 $ 82,000 $ - $ 82,000
2012 $ - $ 62,000 $ - $ 62,000
2013 $ - $ 62,000 $ - $ 62,000
. 2014 $ - $ 62,000 $ - $ 62,000
2015 $ - $ 62,000 $ - $ 62,000
2016 $ - $ 62,000 $ - $ 62,000
2017 $ - $ 62,000 $ - $ 62,000
Total $ - $ 372,000 $ - $ 372,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 372,000
Unfunded Need: $ -
TOTAL $ 372,000
PROGRAM STATUS: Replacement of traffic signal detection loops,traffic signs and traffic signal/street
•
lighting poles are dependent upon yearly inspections.
PAGE 5 -23A
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012 -2017 TRANSPORTATION IMPROVEMENT PROGRAM
Preservation of Traffic Operation Devices Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 122904
Community Planning Area: Citywide. TIP No. 23 CONTACT: Dave Whitmarsh 425.430.7423
DESCRIPTION: STATUS:
Replace failed or failing traffic signal vehicle detection loops and repair pavement as required to achieve Ongoing yearly program.Replacement of traffic signal detection loops,traffic signs,traffic
proper installation and assure reliability. This program also provides for the replacement and/or signal,street lighting poles and pavement markings Is dependent upon yearly inspections.
relocation of signs that are obsolete,faded,poorly located or no longer appropriate,and replacement of
damaged luminaire and signal poles.These poles have been damaged In unknown Incidents where
reimbursement through normal channels is impossible.
JUSTIFICATION: CHANGES:
Most of Renton's signals require extensive vehicle detection systems to provide traffic count data needed _
for the intersection controllers and ACTRA signal coordination system to operate effectively. The
detection loops in the pavement must be properly maintained;their failure results in highly inefficient
operation. Pavement deterioriation due to heavy traffic volumes,trucks,and adverse weather has
increased the need for replacement. •
]Funded: 1516,445 1Unfunded: I
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent In 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning
Preliminary Engineering J
R-O-W(includes Admin)
Construction 481,233 27,233 82,000 372,000 62,000 62,000 62,000 62,000 62,000 62,000
Construction Services 35,212 35,212
Post Construction Services
TOTAL EXPENSES 516,445 62,445 82,000 372,000 62,000 62,000 62,000 62,000 62,000 62,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 484,000 50,000 62,000 372,000 62,000 62,000 62,000 62,000 62,000 62,000
Proposed Fund Balance 32,445 12,445 20,000
Grants In-Hand(1)
Grants In-Hand(2) _
Mitigation In-Hand
Other In-Hand(1)
Other In-Hand(2)
Undetermined
TOTAL SOURCES 516,445 62,445 82,000_ 372,000 82,000 62,000 62,000 62,000_ 62,000_ 62,000
Over 0916I2OI1 B:SB AM
5-23 2nd Draft
•
CITY OF RENTON
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 24 Intelligent Transportation Systems(ITS)Program
Provides improvements to the operational efficiency of the roadway system,signal
coordination programs,signing and channelization,surveillance control and driver
information(SC&DI),transit signal priority, ITS Master Plan,signal upgrades such as
protective/permissive phasing and LED signal indications upgrade.
DESCRIPTION: Increasing the capacity and efficiency of the existing roadway system through
operational improvements is a very cost effective element of the transportation '
program.
Community Planning Area: N/A
PROGRAM COST:
(2012-2017) Planning $ -
Design $ 28,000
Right-of-Way $ -
Construction Contract $ 143,000
Construction Management $ 29,000
TOTAL $ 200,000
PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Spent in 10 $ - $ - $ -
2011 $ 120,000 $ - $ 120,000_
2012 $ - $ 50,000 $ - $ 50,000
2013 $ - $ 30,000 $ - $ 30,000
2014 $ - $ 30,000 $ - $ 30,000
2015 $ - $ 30,000 $ - $ 30,000
2016 $ - $ 30,000 $ - $ 30,000
2017 $ - $ 30,000 $ - $ 30,000
Total $ - $ 200,000 $ - $ 200,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 200,000
Unfunded Need: $ -
TOTAL $ 200,000
PROGRAM STATUS: Upgrading of all signal controllers (to be compatible with the new central system)has
been completed.
PAGE 5 -24A
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
intelligent Transportation Systems (ITS) Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 122162
Community Planning Area: 'N/A TIP No. 24 CONTACT: Chris Barnes 425.430.7220
DESCRIPTION: . STATUS:
Provides for Improvements to the operational efficiency of the roadway system,including development Upgrading of all signal controllers to be compatible with the new central system has been
and Implementation of signal coordination programs,signing and channelization improvements, completed.
surveillance control and driver information system(SC&DI),transit signal priority,Intelligent Traffic
Systems(ITS)Master Plan,signal improvements such as protective/permissive phasing and LED signal
indications upgrade;and matching funds for possible grants to upgrade the central traffic control system.
JUSTIFICATION: CHANGES:
Improving the capacity and efficiency of the existing roadway system is a very cost effective element of
the transportation program.
(Funded: 1320,000 (Unfunded: I _
Project Totals Programmed Pre-2012 Six-Year Program
• ITEM Programmed Spent In 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES: ,
Planning
Preliminary Engineering 31,000 3,000 28,000 3,000 5,000 5,000 5,000 5,000 5,000
R-O-W(Includes Admin)
Construction 256,000 113,000 143,000 43,000 20,000 20,000 20,000 20,000 20,000
Construction Services 33,000 4,000 29,000 4,000 5,000, 5,000 5,000 5,000 5,000
Post Construction Services/Other
TOTAL EXPENSES 320,000 120,000 200,000 50,000 30,000 30,000 30,000 30,000 30,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 250,000 50000 200,000 50,000 30,000 30,000 30,000 30,000 30,000 i
Proposed Fund Balance 70,000 70,000
Grants In-Hand(1)
Grants In-Hand(2)
Mitigation In-Hand
Other In-Hand(1)
Other In-Hand(2) .
•
Undetermined
TOTAL SOURCES 320,000 120,000 200,000 50,000 30,000 30,000 30,000_ 30,000 30,000
ITS oe1617o11 8.56 AM
5-24 2nd Draft
,
a
CITY OF RENTON
2012 - 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 25 Transit Program
Transit improvements are a vital component of the transportation system's ability to
absorb future traffic demand and meet level-of-service standards. Coordination with
Metro and Sound Transit projects and programs will help leverage funds and increase
benefits to Renton.
DESCRIPTION: This program funds planning activities for short and long-range transit services and
facilities, including park-and-ride lots, bus shelters, and HOV lanes required to facilitate
transit speed and reliability.This program also supports staffing to coordinate with
transit agencies and serve as a liaison to the community.
Community Planning Area: N/A
PROGRAM COST:
(2012-2017) Planning $ 146,000
Design $ -
Right-of-Way $ -
Construction Contract $ -
Construction Management . $ -
TOTAL $ 146,000
PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Spent in 10 $ 52,403 $ - $ 52,403
2011 $ 40,000 $ - $ 40,000
2012 $ - $ 6,000 $ - $ 6,000
2013 $ - $ 25,000 $ - $ 25,000
2014 $ - $ 25,000 $ - $ 25,000
2015 $ - $ 25,000 $ - $ 25,000
2016 $ - $ 25,000 $ - $ 25,000
2017 $ - $ 40,000 $ - $ 40,000
Total $ - $ 146,000 $ - $ 146,000
PROGRAMMED FUNDING:
• (2012-2017) City of Renton: $ 146,000
Unfunded Need: $ -
TOTAL $ 146,000
PROGRAM STATUS: •
•
PAGE 5 -25A
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Transit Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 122706
Community Planning Area: N/A TIP No. 25 CONTACT: Dan Hasty 425.430.7217
DESCRIPTION: STATUS:
This program funds planning activities for short and long-range transit services and facilities,including Staff continues to attend regional coordination meetings with transit agencies,monitor
park-and-ride lots,bus shelters,and arterial high occupancy vehicle(HOV)lanes required to facilitate service and capital facility improvements within Renton,pursue and advocate for better-
transit speed and reliability. This program also supports staffing to coordinate with transit agencies, timed arrivals and departures at major Renton transit facilities.Coordinates with King
serve as a liaison to the transit-using community,and advocate for service implementation to serve County Metro the implementation of the Rapid Transit Ride.
business needs.
JUSTIFICATION: CHANGES:
Transit improvements are a vital component of the transportation system's ability to absorb future traffic
demand and meet level-of-service standards. The City and private developers have invested millions of
dollars in capital improvements in support of transit-oriented development and services. Transit will be
one key in meeting the goals of the downtown area as well as development in other parts of the City.
Coordination with Metro and Sound Transit projects and programs will help leverage these funds and
increase benefits to Renton.
(Funded: 1238,403 'Unfunded: I
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent In 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning 238,403 52,403 40,000 146,000 6,000 25,000 25,000 25,000 25,000 40,000
Preliminary Engineering
R-O-W(includes Admin)
Construction
Construction Services
Post Construction Services •
TOTAL EXPENSES 238,403 52,403 40,000 146,000 6,000 25,000 25,000 25,000 25,000 40,000
SOURCE OF FUNDS:
Vehicle Fuel Tax •
Business License Fee 236,000 50,000 40,000 146,000 6,000, 25,000 25,000 25,000 25,000 40,000 _
Proposed Fund Balance 2,403- 2,403
Grants In-Hand(1)
Grants In-Hand(1)
Mitigation In-Hand
Other In-Hand(General Fund)
Other In-Hand(2)
Undetermined
TOTAL SOURCES ' 238,403 52,403 40,000 146,000 6,000 25,000 25,000 25,000 25,000 40,000
hnN 06'16QOt1 e:56 AM
5-25 2nd Draft
CITY OF RENTON
2012 - 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 26 Transportation Demand Management(TDM)Program
The City is required by 1991. State Legislation to develop and implement a CTR
program. This law applies to areas of the State with continuing air quality problems.
Renton City Hall is an affected CTR site and must implement its own CTR program for
City employees; it is funded outside the TIP program.
DESCRIPTION: The program implements the State's Commute Trip Reduction (CTR)Act by
encouraging a reduction in the SOV. Incentives are offered to employees(businesses
with 100 or more employees)arriving to work between 6-9 a.m.The program offers
citywide technical assistance to businesses affected by the Act.
Community Planning Area: N/A
PROGRAM COST:
(2012-2017) Planning . $ 380,000
Design $ -
Right-of-Way $ -
Construction Contract • $ -
Construction Management . $ -
TOTAL $ 380,000
PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Spent in 10 $ 28,836 $ 37,767 $ 66,603
2011 $ 22,000 $ 43,000 $ 65,000
2012 $ - $ 12,000 $ 43,000 $ 55,000
2013 $ - $ 22,000 $ 43,000 $ 65,000
2014 $ $ 22,000 $ 43,000 $ 65,000
2015 $ - $ 22,000 $ 43,000 $ 65,000
2016 $ - $ 22,000 $ 43,000 $ 65,000
2017 • $ - $ 22,000 $ 43,000 $ 65,000
Total $ - $ 122,000 $ 258,000 $ 380,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 122,000
• Other(Grants/Agreements): $ 258,000
TOTAL $ 380,000
PROGRAM STATUS:
PAGE 5 -26A
•
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Transportation Demand Management(TDM) Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 122135
Community Planning Area: N/A TIP No. 26 CONTACT: Dan Hasty 425.430.7217
DESCRIPTION: STATUS:
Renton's TDM program implements the State's Commute Trip Reduction(CTR)Act(the Act)by It is expected that technical assistance to employers for the Citywide program will continue
encouraging a reduction In the use of single occupancy vehicles(SOV). Incentives are offered to at current levels in future years(provided State funds in support of this program continue).
employees at businesses with 100 or more employees arriving to Work between 6 and 9 a.m. The City Renton receives a State allotment every two years to help fund the Citywide CTR program.
has two CTR programs:1)The Citywide program,and 2)the City Hall CTR program(see note below). The actual amount is determined by the number of CTR-affected worksites. The City is
The TIP funds the Citywide CTR Program and offers technical assistance to Renton businesses affected also pursuing opportunities for additional funding via a Growth and Transportation
by the Act. Efficiency Center(GTEC)program.
JUSTIFICATION: CHANGES:
The City Is required by 1991 State Legislation to develop and implement a CTR program. This law
applies to areas of the State with continuing air quality problems. TDM is an important element iri
achieving desired transportation,environmental,and land use goals. Note: Renton City Hall is an
affected CTR site and must implement Its own CTR program for City employees. It is funded outside of •
the TIP program.
{Funded: 1511,603 'Unfunded: I
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent In 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning 486,603 66,603 40,000 380,000 55,000 65,000 65,000 65,000 65,000 65,000
Preliminary Engineering 25,000 25,000
R-O-W(includes Admin)
Construction
Construction Services
Post Construction Services
TOTAL EXPENSES 511,603 . 66,603 65,000 380,000 55,000 65,000 65,000 65,000 65,000 65,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 169,000 25,000 22,000 122,000 . 12,000 22,000 22,000 22,000 22,000 . 22,000,
Proposed Fund Balance 3,836 3,836
Grants In-Hand(1)
Grants In-Hand(2)
Mitigation In-Hand
Other In-Hand(CTR allot.) _ 338,767 37,767 43,000 258,000 43,000 43,000 43,000 43,000 43,000, 43,000
Other In-Hand(2) .
Undetermined
TOTAL SOURCES 511,603 66,603 65,000 380,000 55,000 .65,000 65,000 • 65,000 65,000 65,000
TDM 06'142011 k56 AM
5-26 2nd Draft
•
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 27 Bicycle Route Development Program
Partner with other City departments to further develop the City's non-motorized
facilities. Sign bicycle routes,construct missing links in the bicycle route system,
upgrade routes as needed to safely accommodate bicycle traffic. Publicize Renton
bicycle network and educate citizens about safe bicycling.
DESCRIPTION: This program will complete an integrated system of bicycle routes and trails and
upgrade streets to better accommodate bicycles. There is a strong demand for better-
developed non-motorized facilities in Renton.
Community Planning Area: N/A
PROGRAM COST:
(2012-2017) Planning $ -
Design $ 55,000
Right-of-Way $ -
Construction Contract $ 280,000
Construction Management $25,000
TOTAL • $360,000
PROGRAM EXPENSES:•
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Pre-2011 $ 19,603 $ - $ 19,603
2011 $ 70,000 $ - $ 70,000
2012 $ - $ - $ - $ -
2013 $ 40,000 $ 30,000 $ - $ 30,000
2014 $ 30,000 $ 40,000 $ - $ 40,000
2015 $ 30,000 $ 40,000 $ - $. 40,000 .
2016 $ 30,000 $ 40,000 $ - $ 40,000
2017 $ 30,000 $ 50,000 $ - $ 50,000
Total $ 160,000 $ 200,000 $ - $ 200,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 200,000
Unfunded Need: $ 160,000
TOTAL $ 360,000
PROGRAM STATUS: This program is coordinating with the Overlay Program to identify opportunities for
developing,repairing,or enhancing bicycle facilities as the overlay repairs are made.
Assessment of signage needs and upgraded pavement markings is ongoing.
PAGE 5 -27A
CITY OF RENTON .
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Bicycle Route Development Program - Functional Classification: N/A Fund: 317
• Proj.Length: N/A Proj: 122173
Community Planning Area: Citywide • TIP No. 27 CONTACT: Dan Hasty 425.430.7217
DESCRIPTION: STATUS:
Partner with other City departments to further develop the City's non-motorized facilities. Sign bicycle The City was awarded a$100,000 Federal Enhancement Grant to develop and produce a
routes along preferred corridors. Construct missing links in the bicycle route system. Construct site- map that identified a bicycle network with connections leading into and out of the City of
specific Improvements. Upgrade routes as needed to safely accommodate bicycle traffic. Publicize the Renton. The product of this project,the Trails and Bicycle Master Plan was adopted in
Renton bicycle network and educate citizens about safe bicycling. Provides funding to match grant May 2009,and distribution of the Bicycle Guide Map started in the summer of 2009.
requests for bicycle planning and construction Improvements.
JUSTIFICATION: CHANGES:
This program will complete an integrated system of bicycle routes and trails and upgrade streets to better The Bicycle Route Program is coordinating with the Street Overlay Program manager to
accommodate bicycles. There is a strong demand for better developed non-motorized facilities in identify opportunities for developing,repairing,or enhancing bicycle facilities within the
Renton. City as the overlay repairs are made. Additionally,an assessment of signage needs and
upgraded pavement markings is ongoing. Planning cost estimates and a prioritization list
are underway.
(Funded: 1289,603 !Unfunded: 1160,000
Project Totals Programmed Pre-2012 • Six-Year Program
ITEM Programmed Spent Pre-2011 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning 1,328 1,328
Preliminary Engineering 65,000- 10,000 55,00011,000, 11,000 11,000 11,000 11,000
R-O-W(includes Admin) - -
Construction 348,275 18,275 50,000 280,000 54,000 54,000 54,000 54,000 64,000
Construction Services 35,000 10,000 25,000 5,000 5,000 5,000 5,000 5,000
Post Construction Services
TOTAL EXPENSES 449,603 19,603 70,000 360,000 70,000 70,000 70,000 70,000 80,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 285,000 . 15,000 70,000 200,000 30,000 40,000 40,000 40,000 50,000''
Proposed Fund Balance 4,603 4,603
Grants In-Hand(1)
Grants In-Hand(2)
Mitigation In-Hand
Other In-Hand(1)
Other In-Hand(2)
Undetermined 160,000 160,000 40,000 30,000 30,000 30,000 30,000
TOTAL SOURCES 449,603 19,603 70, 000 360,000 V 70,000 70,000 70,000 70,000 80,000
Wk,Reut•
1313/1132011 0:513 AM
5-27 2nd Draft
a
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 28 Barrier-Free Transition Plan Implementation
This program implements projects that support the City's effort to transition pedestrian
facilities within the right-of-way into conformity with the Americans with Disabilities Act
(ADA)Guidelines, and features on an"as needed"basis in response to requests to
improve access for individuals with special needs.
DESCRIPTION: An annual project list will be developed based upon sites identified in the Transition
Plan section of the City of Renton Comprehensive Citywide Sidewalk Study.
Community Planning Area: N/A
PROGRAM COST:
(2012-2017) Planning $ 70,000
Design $ -
Right-of-Way $ -
Construction Contract $ 185,000
Construction Management . $ 10,000
TOTAL $ 265,000
PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Spent in 10 $ 51,623 $ - $ 51,623
2011 $ 75,000 $ - $ 75,000
2012 $ - $ 15,000 $ - $ 15,000
2013 $ 20,000 $ 30,000 $ - $ 30,000
2014 $ 25,000 $ 25,000 $ - $ 25,000
2015 $ - $ 50,000 $. - $ 50,000
2016 $ 9,000 $ 41,000 $ - $ 41,000
2017 $ 9,000 $ 41,000 $ - $ 41,000
Total $ 63,000 $ 202,000 $ - $ 202,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 202,000
Unfunded Need: $ 63,000
TOTAL $ 265,000
PROGRAM STATUS: In 2011 this program retrofitted pedestrian islands and sidewalks along S 2nd Street.
PAGE 5 -28A
•
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Barrier-Free Transition Plan Implementation Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 122705
Community Planning Area: Citywide TIP No. 28 CONTACT: James Wi[hoit 425.430.7319
DESCRIPTION: STATUS:
This program implements projects that support the City's effort to transition pedestrian facilities within the An annual project list will be developed based upon sites identified In the Transition Plan
right-of-way into conformity with provisions contained in the Americans with Disabilities Act(ADA) section of the City of Renton Comprehensive Citywide Sidewalk Study. This"project"will
Guidelines. This program provides funding for designing and building features on an"as needed"basis have a target budget of$25,000. The remaining$20,000 will be set aside to respond to
in response to individual requests to improve access for individuals with special needs. requests to address barriers to movement for individuals with special needs.
JUSTIFICATION: CHANGES:
A programatic approach is now recognized as being required to ensure compliance with federal law. In 2011 this program retrofitted pedestrian Islands and sidewalks along S 2nd Street.
•
I Funded:1 328,6231 Unfunded:1 63,000
Project Totals Programmed Pre-2012 Six Year Program
ITEM Programmed Spent In 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning 83,849 849 13,000 70,000 5,000 13,000 13,000 13,000 13,000 13,000
Preliminary Engineering
R-O-W(includes Admin)
Construction 295,774 50,774 • 60,000 185,000 10,000 35,000 35,000 35,000 35,000 35,000
Construction Services 12,000 2,000 10,000 2,000 2,000 2,000 2,000 2,000
Post Construction Services
TOTAL EXPENSES 391,623 51,623 75,000 265,000 15,000 50,000 50,000 50,000 50,000 50,000
SOURCES OF FUNDS:
Vehicle Fuel Tax •
Business License Fee 292,000 40,000 50,000 202,000 15,900 30,000_ 25,000 50,000 41,000 41,000j' -
Proposed Fund Balance 36,623 11,623 25,000
Grants In-Hand(1)
Grants In-Hand(1)
Mitigation In-Hand
Other In-Hand(1)
Other In-Hand(2)
•
Undetermined 63,000 63,000 20,000 25,000 9,000 9,000
TOTAL SOURCES 391,623 51,623 75,000 265,000 15,000 50,000 50,000 50,000 50,000 50,000
BrtIR FIN
00/1812011 13:50 AM
5-28 2nd Draft
}
•
CITY OF RENTON
2012 -2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 29 City Center Community Plan
The City Center Plan intends to provide better transportation connections for the full
range of transportation modes to improve access,and overall safety within,to and from
the City Center.The City Center Community Plan was adopted by the council on June
6,2011.
DESCRIPTION: The City Center Community Plan will provide traffic operation and circulation
improvements and strategies such as pedestrianenhancement on major streets,
connections improvements to provide multiple circulation routes,evaluation of benefits
of one-way streets,"road-diet"and traffic awareness to reduce right-of-way to vehicular
traffic and provide enhanced space for other modes of transportation.
Community Planning Area: City Center
PROJECT COST(Up to 2017):
Planning . $ 50,000
Design $ -
Right-of-Way $ -
Construction Contract $ - .
Construction Management $ -
TOTAL $ 50,000
PROJECT EXPENSES:
• 2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Spent in 10 $ - $ - $ -
2011 $ - $ - $ -
2012 $ - $ 50,000 $ - $ 50,000
2013 $ - $ - $ - $ -
2014 $ - $ - $ , - $ -
2015 $ - $ - $ - $ -
2016 . $ - $ - $ - $ -
2017 $ - $ - $ - $ -
Total $ - $ 50,000 $ - $ 50,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 50,000 includes Metro mitigation fee
Unfunded Need: $ -
TOTAL $ 50,000
PROJECT STATUS: New project.The scope and cost of the City Center Plan improvements and strategies
to be determined. Funding shown in 2012 is for City staff to conduct a feasibility study
on the conversion of the one way couplets to two-way streets.
PAGE 5 -29A
CITY OF RENTON
• PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION •
2012-2017 SIX YEAR TIP
City Center Community Plan Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 122194
Community Planning Area: City Center TIP No. 29 CONTACT: Jim Seitz 425.430.7245
DESCRIPTION: •
STATUS:
The City Center Community Plan will provide traffic operation and circulation improvements and New project.The scope and cost of the City Center Plan improvements and strategies has
strategies such as pedestrian enhancement(sidewalks,landscaping,wayfinding,public art)on major yet to be determined.Improvements on S 7th St and Park Ave N extension identified in the
streets,connection improvements to provide multiple circulation routes,evaluation of benefits of one- City Center Plan are included in the TIP as separate projects. Funding shown in 2012 is
way streets,"road-diet"and traffic awareness to reduce right-of-way to vehicular traffic and provide for City staff to conduct a feasibility study on the conversion of the one way couplets to two- -
enhanced space for other modes of transportation. way streets.
JUSTIFICATION: CHANGES:
The City Center Plan intends to provide better transportation connections for the full range of
transportation modes to improve access to and from the City and overall safety within.The City
Center Community Plan was adopted by the council on June 6,2011.
'Funded: 150,000 'Unfunded: I
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent Pre-2011 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning 50,000 50,000 50,000
Preliminary Engineering
R-O-W(includes Admin)
Construction
Construction Services
Post Construction Services
TOTAL EXPENSES 50,000 50,000 50,000
SOURCE OF FUNDS:
Vehicle Fuel Tax %
Business License Fee 50,000 50,000 50,000
Prop. Fund Bal.
Grants In-Hand(1)
Grants In-Hand(2)
Mitigation In-Hand
Other In-Hand-Metro Mitig.
Other In-Hand(2)
Undetermined
TOTAL SOURCES 50,000 50,000 50,000
s Rota,P,, 06/184011 6.69 AM
5-29 2nd Draft
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 30 Project Development&Pre-Design Program
Analysis of existing and projected transportation operation problems, infrastructure
maintenance needs, local and regional mobility goals and revenues/costs is vital to the
development of transportation projects that will best serve the needs of Renton and
compete well for grants.
DESCRIPTION: Perform activities needed for the development of future CIP projects and for grant
applications,including scoping, cost estimates, pre-design, interlocal agreements and
deficiency analysis. Also provides for the monitoring of grant projects for compliance
with State and Federal laws, regulations and specifications.
Community Planning Area: N/A
PROGRAM COST:
(2012-2017) Planning $ 500,000
Design $ 250,000
Right-of-Way $ -
Construction Contract _ $ -
Construction Management . $ -
TOTAL $ 750,000
PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Spent in 10 $ 75,384 $ - $ 75,384
2011 $ 220,000 $ - $ 220,000 •
2012 $ - $ 60,000 $ - $ 60,000
2013 $ 20,000 $ 115,000 $ - $ 115,000
2014 $ 20,000 $ 115,000 $ - $ 115,000
2015 $ 20,000 $ 115,000 $ - $ 115,000
2016 $ 20,000 $ 115,000 $ - $ 115,000
2017 $ 20,000 $ 130,000 $ - $ 130,000
Total $ 100,000 $ 650,000 $ - $ 650,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 650,000
Unfunded Need: $ 100,000
TOTAL $ 750,000
PROGRAM STATUS: This program includes small studies funding and funds required to match new grants.
PAGE 5 -30A
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Project Development& Pre-Design Program Functional Classification: N/A Fund: 317
• Proj.Length: N/A Proj: 122150
Community Planning Area: N/A TIP No. 30 CONTACT: Jim Seitz 425.430.7245
DESCRIPTION: STATUS: •
Perform critical activities needed for the development of future CIP projects and for grant applications, Ongoing yearly program.This program Includes small studies funding and funds required
including scoping,cost estimates,pre-design,interlocal agreements and deficiency analysis. Also to match new grants.
provides for the monitoring of active grant projects for compliance with State and Federal laws,
regulations and specifications. , "
•
JUSTIFICATION: CHANGES:
Analyses of existing and projected transportation operation problems,Infrastructure maintenance needs, Funding to this program has been reduced due to funding constraints.
local and regional mobility goals and revenues/costs are vital to the development of transportation,
projects that will best serve the needs of Renton and compete well for grants. Also,to maintain eligibility
for grant funding,tha City must assure that project specifications and management comply with current
State and Federal standards.
'Funded: 1945,384 (Unfunded : 1100,000
Project Totals Programmed Pre-2012 Slx-Year Program
ITEM Programmed Spent In 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning 656,584 56,584 100,000 500,000 60,000 85,000 85,000 85,000 85,000 100,000
Preliminary Engineering 388,800 18,800 120,000 250,000 50,000 50,000 50,000 50,000 50,000
R-O-W(includes Admin)
Construction
Construction Services
Post Construction Services
TOTAL EXPENSES 1,045,384 75,384 220,000 750,000 60,000 135,000 135,000 135,000 135,000 150,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 900,000 70,000 180,000 650,000 60,000 115,000 115,000 115,000 115,000 130,000 '
Proposed Fund Balance 45,384 5,384 40,000
Grants In-Hand(1)
Grants In-Hand(2)
Mitigation In-Hand .
Other In-Hand
Other In-Hand(2) '
Undetermined 100,000 100,000 20,000 20,000 20,000 20,000 20,000
TOTAL SOURCES 1,045,384 75,384 220,000_ 750,000 60,000 135,000 135,000 135,000 135,000 150,000
06116@011 6:66 AM
• 5-30 2nd Draft
i
CITY OF RENTON
2012 - 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 31 Arterial Circulation Program
State and Federal Clean Air legislation,the Growth Management Act, and the
increasing importance of making sure that regional transportation plans are
coordinated to the benefit of Renton, make ongoing, multi-modal planning a high
priority need.
DESCRIPTION: This program provides for the long and short-range planning and traffic analysis
needed to evaluate and update the Transportation Element in the Comprehensive
Plan,to assess the impacts of new development proposals and to recommend local
and regional transportation improvements for all modes of travel.
Community Planning Area: N/A
PROGRAM COST:
•
(2012-2017) Planning $ 1,280,000
Design $ -
Right-of-Way $ -
Construction Contract $ -
Construction Management . $ -
TOTAL $ 1,280,000
PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
• Local 1 Other 2 Total Funded
Spent in 10 $ 68,489 $ - $ 68,489
2011 $ 310,000 $ - $ 310,000
2012 $ - $ 90,000 $ - $ 90,000
2013 $ 50,000 $ 185,000 $ - $ 185,000
2014 $ 50,000 $ 185,000 $ - $, 185,000
2015 $ 50,000 $ 185,000 $ - $ t 185,000
2016 $ 50,000 $ 185,000 $ - $ 185,000.
2017 $ 50,000 $ 200,000 $ - $ 200,000
Total $ 250,000 $ 1,030,000 $ - $ 1,030,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 1,030,000
Unfunded Need: $ 250,000
TOTAL $ 1,280,000
PROGRAM STATUS: An update to the City's travel demand model will commence in 2011. Renton's Street
Development Guidelines will be developed.
PAGE 5 -31A
•
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Arterial Circulation Program Functional Classification: NIA Fund: 317
Proj.Length: NIA Proj: 120029
Community Planning Area: N/A TIP No. 31 CONTACT: Keith Woolley 425.430.7318
DESCRIPTION: STATUS:
This program provides for the short and long-range planning and traffic analyses required to evaluate This project will fund the ongoing planning work which will lead to refinement and/or
and update the Transportation Element in relation to the Comprehensive Land Use Plan to assess the adjustment of the of Improvement projects on the arterial network identified in the
Impacts of new development proposals,and to recommend local and regional transportation system Transportation Element.An update to the City's travel demand model will commence in
improvements for all modes of travel. Funding for hardware,software and employee hours required to 2011.Also Renton's Street Development Guidelines will be developed.
operate the computer model Is also Included under this program.
JUSTIFICATION: CHANGES:
Combined State and Federal Clean Air legislation,the Growth Management Act,and the increasing
importance of making sure that local and regional transportation plans are coordinated to the benefit of
Renton make ongoing multi-modal planning a high priority need.
(Funded: 11,408,489 !Unfunded: 1250,000
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent in 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning 1,658,489 68,489 310,000 1,280,000 90,000 235,000 235,000 235,000 235,000 250,000
Preliminary Engineering
R-O-W(includes Admin)
Construction
Construction Services
Post Construction Services
TOTAL EXPENSES 1,658,489 68,489 310,000 1,280,000 90,000 235,000 235,000 235,000 235,000 250,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 1,250,000 60,000 160,000 1,030,000 90,000 185,000 185,000 185,000 185,000 200,000
Proposed Fund Balance 158,489 8,489 150,000
Grants In-Hand(1)
Grants In-Hand(2) _
Mitigation In-Hand
Other In-Hand(1)
Other In-Hand(2)
Undetermined 250,000 250,000 50,000 50,000 50,000 50 000 50,000
TOTAL SOURCES 1,658,489 68,489 310,000 1,280,000_ - 90,000 235,000 235,000 235,000 235,000 _ 250,000
Arty Gc 09'1872011 8:58 AN
5-31 2nd Draft
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 32 Transportation Concurrency/LOS Program
Management of the transportation concurrency and mitigation programs is an integral
part of planning transportation improvements, ensuring that new development pays a
fair share of the cost, and in maintaining a level of service required under GMA to allow
new development to be approved and take place.
DESCRIPTION: This project supports the planning effort to determine appropriate mitigation fees,to
adjust the fee due to transportation plan changes and other factors affecting the fees
as a funding source and to monitor the funds collected.
• Community Planning Area: N/A
PROGRAM COST:
(2012-2017) Planning $ 170,000
Design $ -
Right-of-Way $ -
Construction Contract $ -
Construction Management . $ -
TOTAL $ 170,000
PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Spent in 10 $ 52,667 $ - $ 52,667
2011 $ 25,000 $ - $. 25,000
2012 $ - $ 30,000 $ - $ 30,000
2013 $ 10,000 $ 10,000 $ - $ 10,000
2014 '$ - $ 30,000 $ - $ 30,000
2015 $ - $ 30,000 $ - $ 30,000
2016 $ - $ 30,000 $ - $ 30,000
2017 $ - $ 30,000 $ - $ 30,000
Total $ 10,000 $ 160,000 $ - $ 160,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 160,000
Unfunded Need: $ 10,000
TOTAL $ 170,000
PROGRAM STATUS: The City mitigation fee may be revised from a SEPA base to a GMA base.As a result
the City may also need to review and update the level of Service(LOS)standards.
PAGE 5 -32A
•
•
•
CITY OF RENTON
PUBLIC WORKS •
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Transportation Concurrency/LOS Program Functional Classification: N/A Fund: 317
Pro).Length: N/A Pro): 122107
Community Planning Area: N/A TIP No. 32 CONTACT: Jim Seitz 425.430.7245
DESCRIPTION: STATUS:
The City is creating a Transportation Mitigation Fee as part of the Growth Management Act(GMA) Ongoing yearly program.The City is completing an analysis of the transportation mitigation
Comprehensive Plan's Transportation Concurrency requirements to provide funds for transportation fees for a possible adjustment of the fees compatible with the City's 20-year
improvements necessary to support new development. This project supports the planning effort to Transportation Plan. .
determine appropriate mitigation fees,to adjust the fee due to transportation plan changes,a funding
source and to monitor the funds collected.
JUSTIFICATION: CHANGES:
Management of the transportation concurrency and mitigation programs is an Integral part of planning The City mitigation fee may be revised from a SEPA base to a GMA base.As a result the
transportation improvements,ensuring that new development pays a fair share of the cost,and in City may also need to review and update the level of Service(LOS)standards.
maintaining a level of service required under GMA to allow new development to be approved and take
place.
!Funded: 1237,667 ►Unfunded: 110,000
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent In 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning 247,667 52,667 25,000 170,000 30,000 20,000 30,000 30,000' 30,000 30,000
Preliminary Engineering _
R-O-W(includes Admin)
Construction
Construction Services
Post Construction Services
TOTAL EXPENSES 247,667 52,667 25,000 170,000 30,000 20,000 30,000 30,000 30,000 30,000
SOURCE OF FUNDS: .
Vehicle Fuel Tax
Business License Fee 220,000 50,000 10,000 160,000 30,000 10,000 30,000 30,000 30,000 30,000
Proposed Fund Balance 17,667 2,667 15,000
Grants In-Hand(1)
Grants In-Hand(2)
Mitigation In-Hand .
Other In-Hand(1)
Other In-Hand(2)
Undetermined 10,000 10,000 10,000
TOTAL SOURCES 247,667_ 52,667 25,000 170,000 30,000 20,000 30,000 30,000 30,000 30,000
Calc�oney
C018/2011 Q!!AM
5-32 2nd Draft
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 33 Environmental Monitoring Program
Monitoring ensures that the wetland vegetation installed is properly established.
Creates an account to pay for unscheduled project environmental assessments.
DESCRIPTION: Monitoring of wetland mitigation installed as an environmental requirement and to
perform biological assessments as required by the Endangered Species Act.
Community Planning Area: N/A ,
PROGRAM COST:
(2012-2017) Planning $ -
Design $ -
Right-of-Way $ -
Construction Contract $ -
Construction Management . $ 40,000
TOTAL $ 40,000
PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other z ' Total Funded
Spent in 10 $ 4,982 $ - $ 4,982
2011 $ 60,000 $ - $ 60,000
2012 $ - $ 20,000 $ - $ 20,000.
2013 $ - $ 20,000 $ ,- $ 20,000
2014 $ - $ - $ - $ -
2015 $ - $ - $ - $ -
2016 $ - $ , - $ - $ -
2017 $ - $ - . $ - $ -
Total $ - $ 40,000 $ - $ 40,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 40,000
Unfunded Need: $ -
TOTAL $ 40,000
PROGRAM STATUS: Attempts to get early acceptance for the Oakesdale Ave Phase 1 site have been
successful. The Corps of Engineers has allowed the City to reduce the monitoring
requirements to match the site's success.
PAGE 5 -33A
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Environmental Monitoring Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 122187
Community Planning Area: N/A TIP No. 33 CONTACT: James wiihoit 425.430.7319
DESCRIPTION: STATUS:
Monitoring of wetland mitigation installed as an environmental requirement for a project and to perform A consultant has been contracted to evaluate and maintain wetlands.
biological assessments as required by the Endangered Species Act.
JUSTIFICATION: CHANGES:
Monitoring ensures that the wetland vegetation installed is properly established. Creates an account to Attempts to get early acceptance for the Oakesdale Ave SW Phase 1 site were successful.
pay for unscheduled project environmental assessments. The Army Corps-of Engineers has allowed the City to reduce the monitoring requirements
to match the site's success.
(Funded: 1104,982 1Unfunded: I
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent in 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning
Preliminary Engineering 41,470 1,470 40,000
R-O-W(Includes Admin)
Construction 280 280
Construction Services 63,232 3,232 20,000 40,000 20,000 20,000
Post Construction Services
TOTAL EXPENSES 104,982 4,982 60,000 40,000 20,000 20,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 90,000 50,000 40,000 20,000 20,000
Proposed Fund Balance 14,982" 4,982" 10,000
Grants in-Hand(1)
- Grants In-Hand(2)
Mitigation In-Hand
Other In-Hand(1) _
Other In-Hand(2)
Undetermined
TOTAL SOURCES 104,982 4,982 60,000 40,000 20,000 20,000 _
6ikcn 06116'2011 666 Mf
5-33 2nd Draft
••
•
CITY OF RENTON
2012 - 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.,: 34 WSDOT Coordination Program
Staff coordination on the 1-405 Corridor Improvements in Renton.
DESCRIPTION: Provide pre-design,design and construction coordination for WSDOT projects within or
adjacent to Renton to assure that those projects provide the maximum benefits and
minimum problems for Renton's transportation.system.
Community Planning Area: N/A •
PROGRAM COST:
(2012-2017) Planning $ 180,000
Design $ -
Right-of-Way $ -
Construction Contract $ -
Construction Management $ -
TOTAL $ 180,000
PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Spent in 10 $ 15,681 $ 42,685 $ 58,366
2011 $ 53,000 $ - $ 53,000
2012 $ - $ 20,000 $ - $ 20,000
2013 $ - $ 30,000 $ - $ 30,000
2014 $ - $ 30,000 $ - $ 30,000
2015 $ - $ 30,000 $ - $ 30,000
2016 $ - $ 30,000 $ - $ 30,000
2017 $ - $ 40,000 $ - $ 40,000
Total $ - $ 180,000 $ - $ 180,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 180,000
Unfunded Need: $ -
TOTAL $ 180,000
PROGRAM STATUS: Coordination with the 1-405 project team will have minimal activity until future phases of
1-405 are funded.
PAGE 5 -34A
•
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
WSDOT Coordination Program Functional Classification: N/A Fund: 317
Proj.Length: N/A Proj: 122146
Community Planning Area: N/A TIP No. 34 CONTACT: Keith Woolley 425.430.7318
DESCRIPTION: - STATUS:
Provide pre-design,design and construction coordination for WSDOT projects within or adjacent to Ongoing yearly program. Staff coordination on grant-funded projects. Staff coordination
Renton to assure that those projects provide the maximum benefits and minimum problems for Renton's on the 1-405 Corridor Improvements Is Included In"1-405 Improvements in Renton."
transportation system. WSDOT agreements contributed towards a portion of City's staff time.1-405 Stage II
project has been completed in 2011.
JUSTIFICATION: CHANGES: •
WSDOT projects can have signficant impacts within the City. Thal-405/1-5 to SR 169 Widening Project
is now broken into two stages.Coordination with the 1-405 project team will have minimal activity until
future phases of 1-405 are funded.
(Funded: 1291,366 [Unfunded: I
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent in 2010 2011 Total 2012 2013 • 2014 2015 2016 2017
EXPENSES:
Planning 291,366 58,366 53,000 180,000 20,000 30,000 30,000 30,000 30,000 40,000
Preliminary Engineering
R-O-W(Includes Admin)
Construction
Construction Services
Post Construction Services
TOTAL EXPENSES 291,366 58,366 53,000 180,000 20,000 30,000 30,000 30,000 30,000 40,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 243,000 10,000 53,000 180,000 20,000 30,000 30,000 30,000 30,000 40,000
Proposed Fund Balance 5,681 5,681
Grants In-Hand(1)
Grants In-Hand(2) •
Mitigation In-Hand
Other In-Hand(WSDOT agreemer 42,685 42,685
Other In-Hand(2)
Undetermined
TOTAL SOURCES 291,366 58,366 53,000 180,000 20,000 30,000 30,000 30,000 30,000 40,000
WsoOT 06/172011 468 AM
5-34 2nd Draft .
•
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 35 Geographic Information System-Transportation Data Development
Collect, analyze,and edit transportation geographic data.
DESCRIPTION: The Transportation Systems Division GIS technology,data, and applications supports
the city business needs.
Community Planning Area: N/A
PROGRAM COST:
(2012-2017) Planning $ 80,000
Design $ -
Right-of-Way $ -
Construction Contract $ -
Construction Management $ -
TOTAL $ 80,000
PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Spent in 10 $ 5,187 $ - $ 5,187
2011 $ 15,000 $ - $ 15,000
2012 $ -. $ 5,000 $ - $ 5,000
2013 $ - $ 15,000 $ - $ 15,000
2014 $ - $ 15,000 $ - $ 15,000
2015 $ - $ 15,000 $ - $ 15,000
2016 $ - $ 15,000 $ - $ 15,000
2017 $ - $ 15,000 $ - $ 15,000
Total $ - $ 80,000 $ - $ 80,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 80,000
Unfunded Need: $ -
TOTAL $ 80,000
PROGRAM STATUS: The Transportation Division is coordinating with Technical Services and Information
Services to develop GIS data and participating in training opportunities and user's
group meetings.
PAGE 5 -35A
•
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012 -2017 SIX YEAR TIP
Geographic Information System -Transportation Data Development Functional Classification: N/A Fund: 317
Proj.Length: N/A Pro): 122206
Community Planning Area: NIA TIP No. 35 CONTACT: Dan Hasty 425.430.7217
DESCRIPTION: STATUS:
Collect,analyze,and edit transportation geographic data. The Transportation Systems Division is coordinating with the GIS section of Information
Technology to develop GIS data and participates in training opportunities and user's group
meetings.
JUSTIFICATION: CHANGES:
The Transportation Systems Division GIS technology,data,and applications support the City's
business needs.
'Funded: 1100,187 !Unfunded: I
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent In 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning 100,187 5,187 15,000 80,000 5,000 15,000 15,000 15,000 15,000 15,000
Preliminary Engineering
R-O-W(includes Admin)
Construction
Construction Services
Post Construction Services
TOTAL EXPENSES 100,187 5,187 15,000 80,000 5,000 15,000 15,000 15,000 15,000 15,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee 100,000 5,000 15,000 80,000 5,000 15,000 15,000 15,000 15,000 15,000
Proposed Fund Balance 187 187
Grants In-Hand(1)
Grants In-Hand(2)
Mitigation In-Hand -
Other In-Hand(1)
Other In-Hand(2)
Undetermined
TOTAL SOURCES 100,187 5,187 15,000 80,000 5,000 15,000 15,000 15,000 15,000 15,000
31S 061161201I 616 AM
5-35 2nd Draft
CITY OF RENTON.
•
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 36 1%for the Arts Program
Displays a sense of civic pride. Beautify locations around the City. Projects incorporate
artwork,signing, landscaping.
DESCRIPTION: Funding is tied to the calculated share of eligible types of transportation projects and
• transportation funding subject to the City's 1%for the Arts Program. All gateway
project proposals under this program are subject to approval of the Arts Commission.
Community Planning Area: N/A
PROGRAM COST:
(2012-2017) Planning $ 90,000
Design $ -
Right-of-Way $ -
Construction Contract $ -
Construction Management . $ -
TOTAL $ 90,000
PROGRAM EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Spent in 10 $ 13,261 $ - $ 13,261
2011 $ 30,000 $ - $ 30,000
2012 $ - $ 15,000 $ - $ 15,000
2013 $ - $ 15,000 $ - $ 15,000
2014 $ - $ 15,000 $ - $ 15,000
2015 $ - $ 15,000 $ - $ 15,000
2016 $ - $ 15,000 $ - $ 15,000
2017 $ - $ 15,000 $ - $ 15,000
Total $ - $ 90,000 $ - $ 90,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 90,000
Unfunded Need:
TOTAL $ 90,000
PROGRAM STATUS: This program transfers funds to Fund 125,which is being managed by the Department
of Community and Economic Development.
•
PAGE 5 -36A
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION •
2012 -2017 TRANSPORTATION IMPROVEMENT PROGRAM
1%for the Arts Program Functional Classification: NIA Fund: 317
Proj.Length: N/A Proj: 122112
Community Planning Area: N/A TIP No. 36 CONTACT: Juliana Fries 425.430.7232
DESCRIPTION: STATUS:
Funding Is tied to the calculated share of eligible types of transportation projects and transportation Program is now based on actual design and construction costs.$60,000 was transferred in
funding subject to the City's 1%for the Arts Program. All gateway project proposals under this program 2007 for 1%of 2006 expenditures(amount due:$22,483).Remaining credit($37,517)
are subject to approval of the Arts Commission. used for 1%of 2007(amount due:$26,726). Remaining credit($10,791)used for 1%of
2008(amount due:$32,190). A transfer of$21,399(credit deducted)was made In 2009
for 2008 Capital expenses.$13,261 was transferred in 2010 for 2009 expenditures.
JUSTIFICATION: CHANGES:
This program transfers funds to Fund 125,which is being managed by the Department of
Community and Economic Development.
(Funded: [133,261 lUnfunded:
Project Totals Programmed Pre-2012 Slx-Year Program
ITEM Programmed Spent In 2010 2011 Total 2012 2013 2014 2015 2016 2017 `
EXPENSES:
Planning 133,261 13,261 30,000 90,000 , 15,000 15,000 15,000 15,000 15,000 15,000
Preliminary Engineering
R-O-W(includes Admin)
Construction
Construction Services
Post Construction Services
TOTAL EXPENSES 133,261 13,261 30,000 90,000 15,000 15,000 15,000 15,000 15,000 15,000
SOURCE OF FUNDS:
Vehicle Fuel Tax •
Business License Fee 118,261 13,261 15,000 90,000 15,000 15,000 15,000 15,000 15,000 15,000
Proposed Fund Balance 15,000 15,000 _
Grants In-Hand(1)
Grants In-Hand(2)
Mitigation In-Hand
Other In-Hand(1)
Other In-Hand(2)
Undetermined
TOTAL SOURCES 133,281 13,261 30,000 90,000 15,000 15,000 15,000 15,000 15,000 15,000
1%M. 081187011 e:58 AM
5-36 2nd Draft
e •
.y
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 37 Lake Washington Blvd-Park Ave N to Gene Coulon Memorial Park
This project will serve the development and access needs to Coulon Park and to the
Southport Development. •
•
DESCRIPTION: This project includes road widening,traffic signals,railroad crossings,drainage,curb,
gutter and sidewalks. Developer to design and construct,and get credit toward traffic
mitigation contribution. The developer is completing the project in 3 phases.
Community Planning Area: N/A
TOTAL PROJECT COST:
Planning $ 24,899
Design $ -
Right-of-Way $ -
Construction Contract $ 867,801
Construction Management . $ 54,800
TOTAL $ 947,500
PROJECT EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Pre-2011 $ 220,925 $ 106,575 $ 327,500
• 2011 $ - $ - $ -
2012 $ - $ 60,000 $ = $ 60,000
2013 $ - $ - $ - $ -
2014 $ 230,000 $ - $ - $ -
2015 $ 330,000 $ - $ - $ -
2016 $ - $ - $ - $ -
2017 $ - $ - $ - $ -
Total $ 560,000 $ 60,000 $ - $ 60,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 60,000
Unfunded Need: $ 560,000
TOTAL $ 620,000
PROJECT STATUS: The costs shown above are for the estimated mitigation credit, per agreement with the
developer.
PAGE 5 -37A
CITY OF RENTON
PUBLIC WORKS •
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
•
Lake Washington Blvd N -Park Ave N to Gene Coulon Memorial Park Functional Classification:Collector Fund: 317
Proj.Length: N/A Proj: 122121
Community Planning Area: City Center TIP No. 37 CONTACT: James WIIholt 425.430.7319
DESCRIPTION: STATUS:
This project includes road widening,traffic signals,railroad crossings,drainage,curb,gutter and Developer to design and construct,and get credit toward mitigation contribution.The
sidewalks. Developer to design and construct,and get credit toward mitigation contribution. developer Is completing the project in 3 phases. Project received a Railroad Crossing
Safety grant In 2001 for the signal and gates on Lake Washington Blvd. Railroad grade
crossing construction complete except for signal start-up requirements. Waiting for
developer to continue their construction.
JUSTIFICATION: CHANGES:
This project will serve the development and access needs to Coulon Park and the Southport The costs shown below are for the estimated mitigation credit,per agreement with the
Development.Agreement with developer to credit traffic mitigation towards the costs of certain developer.Project awaiting developer's schedule to continue their construction.
Improvements.
1Funded: 1387,500 (Unfunded: 1560,000 _
Project Totals Programmed Pre-2012 Slx-Year Program
ITEM Programmed Spent Pre-2011 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning 24,899 14,899 10,000 10,000
Preliminary Engineering _
R-O-W(Includes Admin)
Construction 854,579 294,579 560,000 60,000 200,000 300,000
Construction Services 54,800 4,800 50,000 _ 20,000 30,000
Post Construction Services 13,222 13,222 _ _
TOTAL EXPENSES 947,500 327,500 620,000 60,000 230,000 330,000
SOURCE OF FUNDS:
Vehicle Fuel Tax 14,490 14,490 •
Business License Fee 2,362 2,362 _
• Proposed Fund Balance . 5,720 5,720
Grants In-Hand(1) 106,575 106,575
Grants In-Hand(2)
Mitigation In-Hand 258,353 198,353 60,000 60,000
Other In-Hand(1) _
Other In-Hand(2)
Undetermined 560,000 560,000_ 230,000 330,000
TOTAL SOURCES 947,500 327,500 _ 620,000 60,000 230,000 330,000
LII WA 06/162011 9:66 AM
5-37 2nd Draft
CITY OF RENTON
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
• TIP No.: 38 Lind Avenue SW-SW 16th St to SW 43rd St
Increasing traffic demands in the Valley due in part to development,will create the
need for increasing the capacity of this major north/south arterial.Additionally,
improvements may result from future WSDOT 1-405 plans which include an
interchange at Lind Ave SW(currently unfunded).
DESCRIPTION: Widen existing roadway to five lanes where required. Includes new roadway,curbs,
sidewalks,drainage,signals, lighting,signing and channelization.
Community Planning Area: Valley
TOTAL PROJECT COST:
Planning $ -
Design $ 480,000
Right-of-Way . $ -
Construction Contract $ 2,700,000
Construction Management $ 320,000
TOTAL $ 3,500,000
•
PROJECT EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Spent in 10 $ - $ - $ -
2011 $ - $ - $ -
2012 $ - $ - $ - $ -
2013 $ - $ - $ - $ -
2014 $ 250,000 $ - $ - $ -
2015 $ 1,350,000 $ - $ - $ -
2016 $ 1,900,000 $ - $ - $ -
2017 $ - $ - $ - $ -
Total $3,500,000 $ - $ - $ -
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ -
Unfunded Need: $ 3,500,000
TOTAL $ 3,500,000
PROJECT STATUS:
PAGE 5 -38A
•
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Lind Ave SW-SW 16th St to SW 43rd St Functional Classification: Minor Arterial Fund: 317
Proj.Length: 1.69 miles Proj: 120024
Community Planning Area: Valley TIP No. 38 CONTACT: Keith Wooley 425.430.7318
DESCRIPTION: STATUS: •
Widen existing roadway to five lanes where required. Includes new roadway,curbs,sidewalks,drainage, The needs,priorities and schedules for improvements on Lind Ave SW will be determined
signals,lighting,signing and channelization. through Arterial Circulation studies(TIP No.32).
JUSTIFICATION: CHANGES:
Increasing traffic demands In the Valley due In part to development will create the need for increasing the
capacity of this major north/south arterial. A potential project is a signal installation at the intersection at
Lind Ave SW and SW 34th St(currently unsignalized). Additionally,improvements may result from
future WSDOT 1-405 plans which include an interchange at Lind Ave SW(currently unfunded).
'Funded: I lUnfunded: 13,500,000
Project Totals Programmed Pre-2012 Six-Year Program
ITEM Programmed Spent Pre-2011 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning
Preliminary Engineering 480,000 480,000 250,000 230,000!
R-O-W(includes Admin)
Construction 2,700,000 2,700,000 1,000,000 1,700,000
Construction Services 320,000 320,000 120,000 200,000
Post Construction Services
TOTAL EXPENSES 3,500,000 3,500,000 250,000 1,350,000 • 1,900,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
Proposed Fund Balance
Grants In-Hand(1)
Grants In-Hand(2)
Mitigation In-Hand
Other In-Hand(1)
Other In-Hand(2)
Undetermined 3,500,000 3,500,000 250,000 1,350,000 1,900,000
TOTAL SOURCES 3,500,000 3,500,000 250,000 1,350,000 1,900,000
u,a
OW16106 &.%AM
5-38 2nd Draft
CITY OF RENTON
2012- 2017 TRANSPORTATION IMPROVEMENT PROGRAM
TIP No.: 39 Logan Ave N Concrete Panel Repair
The concrete panels under the asphalt are moving due to subgrade settlement,
causing the asphalt overlay to severely spall at the joints.
DESCRIPTION: Repair concrete panels under the asphalt to stop them from moving. Project limits:
from the Logan Avenue Bridge north to N 6th St.
Community Planning Area: City Center
TOTAL PROJECT COST:
Planning $ 50,000
Design $ 110,000
Right-of-Way $ -
Construction Contract $ 1,200,000
Construction Management $ 140,000
TOTAL $ 1,500,000 •
•
PROJECT EXPENSES:
2012-2017 Program Funding Categories
YEAR Unfunded Secured 2012-2017 Funding
Local 1 Other 2 Total Funded
Spent in 10 $ - $ - $ -
2011 $ - $ - $ -
2012 $ - $ 50,000 $ -, $ 50,000
2013 $ 725,000 $ - $ - -$ -
2014 $ 725,000 $ - $ - $ -
2015 $ . - $. - $ - $ -
2016 $ - $ - $ - $ . -
2017 $ - $ - $ - $ -
Total $ 1,450,000 $ 50,000 $ - $ 50,000
PROGRAMMED FUNDING:
(2012-2017) City of Renton: $ 50,000
Unfunded Need: $ 1,450,000
TOTAL $ 1,500,000
PROJECT STATUS: Funding shown in 2012 is for a pavement assessment and evaluation of alternatives. If
the existing pavement can be rehabilitated,costs are estimated to be$1.5M.
PAGE 5 -39A
•
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2012-2017 TRANSPORTATION IMPROVEMENT PROGRAM
Logan Ave N Concrete Panel Repair Functional Classification: Principal Arterial Fund: 317
Proj.Length: N/A Proj: 122303
Community Planning Area: City Center TIP No. 39 CONTACT: James Wilhoit 425.430.7319
DESCRIPTION: STATUS: •
• Repair concrete panels under the asphalt to stop them from moving. Project limits are from the Logan Funding shown in 2012 is for a pavement assessment and evaluation of alternatives.If the
Ave Bridge north to N 6th Street. existing pavement can be rehabilitated(dowel bar retrofit),costs are estimated to be
$1.5M.
JUSTIFICATION: CHANGES:
The concrete panels are moving,causing the asphalt overlay to severely spall at the joints, Funding shown in 2013 and 2014 is for repair of the existing concrete pavement panels.
Project is largely unfunded.
(Funded: 150,000 'Unfunded: 11,450,000
Project Totals Programmed Pre-2012 Slx-Year Program
ITEM Programmed Spent In 2010 2011 Total 2012 2013 2014 2015 2016 2017
EXPENSES:
Planning 50,000 50,000 50,000
Preliminary Engineering 110,000 110,000 55,000 55,000
R-O-W(Includes Admin)
Construction 1,200,000 1,200,000 600,000 600,000
Construction Services 140,000 140,000 70,000 70,000
Post Construction Services
TOTAL EXPENSES 1,500,000 1,500,000 50,000 • 725,000 725,000
SOURCES OF FUNDS:
Vehicle Fuel Tax
Business License Fee 20,000 20,000 20,000
Proposed Fund Balance 30,000 30,000 30,000
Grants in-Hand(1)
Grants In-Hand(1)
Mitigation In-Hand
Other In-Hand(1)
Other In-Hand(2)
-
Undetermined 1,450,000 1,450,000 725,000 725,000 •
TOTAL SOURCES 1,500,000 1,500,000 50,000 725,000 725,000
•
Laps,Pend
00/161261I 6.56 M1
5-39 2nd Draft
SECTION SIX
APPENDIX
• Abbreviations &Acronyms 6-1
• TIP Adopting Resolution 6-2
r
ABBREVIATIONS AND ACRONYMS
The following list defines the abbreviated words or acronyms used in the City of Renton's Six-Year
Transportation Improvement Plan.
ACP Asphalt Concrete Pavement
ADA American Disability Act
AIP Arterial Improvement Program(administered by TIB)
BAT Business Access Transit
BNSF Burlington Northern Sante Fe
BRAC Bridge Replacement Advisory Committee
CBD Central Business District
CIP Capital Improvement Program
CMAQ Congestion Mitigation and Air Quality
CTED Community,Trade and Economic Development
CTR Commute Trip Reduction(State Act)
DOE Department of Ecology
EB Eastbound
ECL East City Limits
EDA Economic Development Administration
EIS Environmental Impact Study
ER Emergency Relief
FAS Federal Aid Secondary Program
FAUS Federal Aid Urban System
FHWA Federal Highway Administration
FMSIB Freight Mobility Strategic Investment Board
FTA Federal Transit Administration
GIS Geographic Information System
GMA Growth Management Act
HCT High Capacity Transit
HES Federal Aid Hazard Elimination and Safety Program
HOV High Occupancy Vehicles
UC Interchange
ISTEA Intermodal Surface Transportation Efficiency Act(Federal Highway Bill)
ITS Intelligent Transportation System
IVHS Intelligent Vehicle Highway Systems
LF Linear Feet
LID Local Improvement District
LOS Level of Service
METRO Municipality of Metropolitan Seattle
MOU Memorandum of Understanding
MUTCD Manual on Uniform Traffic Control Devices
NCL North City Limits
NB Northbound
PMS Pavement Management System
6- 1
►
Precon Preconstruction Engineering/Administration(design phase of project)
PS&E Plans, Specifications,and Estimates
ROW Right-of-way
RTA Regional Transit Authority
RTID Regional Transportation Investment District
RUSH Renton Urban Shuttle
SB Southbound
SC&DI Surveillance Control and Driver Information
SCATBd South County Area Transportation Board
SCL South City Limits
SMA Structural Matrix Asphalt
SOV Single Occupant Vehicle
ST Sound Transit
ST 2 Sound Transit 2
STP Surface Transportation Program
TDM Transportation Demand Management Program
TEA-21 Transportation Efficiency Act
TIA Transportation Improvement Account(previous-TIB program)
TIB Transportation Improvement Board
TIP Transportation Improvement Plan
TOD Transit Oriented Development
TPA Transportation Partnership Act
TPP Transportation Partnership Program(administered by TIB)
UATA Urban Arterial Trust Account(previous TIB program)
UPRR Union Pacific Railroad
UPS Uninterruptible Power Supple
VHS Vehicle Highway System
VMS Vehicle Master System
WB Westbound
• WCL West City Limits
WSBIS Washington State Bridge Inventory System
WSDOT Washington State Department of Transportation
•
H:\Divisions\TRANSPOR.TAT\PLANNINGUuliana\TIP\2012\Publish\ACRONYMSDOC
t
•
..• .. f
•
•
- - .. ..
•
C [Nitof: enton
,. ...,;‘,._i,.,_._";._!_:. .
•
.Anterial Streets
•
. PRINCIPAI ARTERIAL ..i' \',( 4. • _e•fa - i, -!I'} Dsnon - • ,2'
-"'
- i; .
..
COLLECTOR STREET j:_ -S • .
T _^ •
-
' - - ^i'• RENTCN NLIMITS — - _ _ _ _
I.s Y • • • ! ;
•
•
.. • -,5;:
•(..-• ),1`•)p .. • 'i _ .TW'- ='I. •;,q_ 1-4,,,.-ii..,-..-.._ -,Iv.' -_S., . i .'\':... .I • ...
1 - - 1•.;11.1., vj - - , • ._Yy -.:'i p—, :i ..
•
•
NHT
�• } r1-: .-n- '.-L j .1,,,,I.0.-:
wl:
�`
"
'........':77.*
rY
yr...c: � - - r-i_„ ' : ' • • { S
f l r' `1 'i' - 'i - f 1-
•
i --.',,-.:•',1.•1,'ate ___
�.'�!'-� --:1,: • - •• --.'''..,1'-',...,---.-1.1.-t-',7;• - '1.± -_� I._`! _j
[rA. — kid. � t ,_tl- 1 . ,---,z::E-
•
. : .'- i._ !'
_t
•
•
•
1,
_ Z
9 i
i:�'1� `` f!_ • \ ' - :
- yr-7".'-•••I
ij
'
_ .- _ iI _ _ ..,-.7.7!-,-.....,i.-1.4,•
-
r,) • +' i
r /'fir 1._ S_'• _ }t:•----..1-. - i
l _
_jam -....7--2:_---- - .
•
_ •, .."-' moi-'- - ;:
•
•
L"' a. •
•
Proposed 2011 Arterials' m',,c,..'";a:n, ;„";"'�'°"'"`.,,Wa",,,'.
•
Printed on Date:05/16/2011 t°" " "'v"' °°"
•
CITY OF RENTON,WASHINGTON
RESOLUTION NO.
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, UPDATING THE CITY'S
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2012-2017.
WHEREAS, the City of Renton has heretofore adopted a "Six-Year Transportation
Improvement Program" pursuant to RCW 35.77.010, and the plan and program having been
amended and modified from time to time as authorized by law;and
WHEREAS, the City Council, after recommendation of the Public Works Department,
held a public hearing on August 1, 2011, after notice to the public as provided by law for the
purpose of considering adoption, modification, and amendments of the plan and program; and
WHEREAS, at the public hearing held on August 1, 2011, due consideration was given to
the proposed changes and amendments for the purpose of updating the plan and program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES
RESOLVE AS FOLLOWS:
SECTION I. 'The above findings are true and correct in all respects.
SECTION II. The City's "Six-Year Transportation Improvement Program" and the City's
"Arterial Street Plan" are hereby further amended and modified, all as more particularly shown
on the attached Exhibits "A", "B" and "C" incorporated herein as if fully set forth.
SECTION III. The plan and program, as evidenced by said Exhibits, shall be and
constitute the City's "Six-Year Transportation Improvement Program" and the City's "Arterial
Street Plan", and shall remain in full force and effect until further revised, amended, and
modified as provided by law.
1
J
! 0
4
RESOLUTION NO.
SECTION IV. The Administrator of the Public Works Department and the City Clerk are
hereby authorized and directed to file this Resolution, together with the Exhibits, with the
Director of Highways for the State of Washington and as otherwise provided by law.
PASSED BY THE CITY COUNCIL this day of , 2011.
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this day of ,2011.
•
Denis Law, Mayor
Approved as to form:
Lawrence J. Warren, City Attorney
RES.1510:6/23/11:scr
2